Records from 1985 to 2025. Most recent: inspection, 7 March 2025.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 45
7 March 2025
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8090243
2 March 2017
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6111445
16 October 2014
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5006319
16 December 2011
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4209329
16 November 2010
Internal Structural Exam · Deficiency Check · Hull Examination
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3901079
21 July 2008
Deficiency Check · DAPI Audit
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3275519
16 April 2008
Annual Inspection · DAPI Audit · Plan Review "T" Boat
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3185942
10 September 2007
Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3054128
17 November 2005
COI Inspection · Hull Examination
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2535936
27 June 2005
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2405466
11 May 2005
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2342660
10 June 2004
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2094097
20 May 2004
Annual Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2072749
12 May 2003
Periodic Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1790054
1 July 2002
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1639348
24 May 2002
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1620101
21 June 2001
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1068632
16 May 2001
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1370191
3 April 2001
Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1460526
15 May 2000
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1426392
17 May 1999
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1401009
29 April 1998
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1415000
21 May 1997
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1386078
4 February 1997
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1460054
30 May 1996
Hull Examination · Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1432990
4 May 1995
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1355207
10 September 1994
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1380083
12 May 1994
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1455163
19 January 1994
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1359693
31 August 1993
Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1136857
20 May 1993
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1391851
6 May 1992
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1384960
14 May 1991
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1336599
9 May 1991
Administrative
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 919514
26 April 1991
Hull Examination
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 914290
26 April 1991
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1306254
8 May 1990
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 911836
3 May 1989
COI Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1199179
3 May 1988
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1345354
5 May 1987
Re-Inspection
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1328939
23 June 1986
COI Inspection · Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1294233
13 March 1986
Credit Drydock
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 998422
3 May 1985
COI Inspection
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1297809
4 April 1985
Examination of Repairs
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1297813
21 March 1985
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 979523
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 16 November 2010
Resolved
Replace electrical outlet hanging from beam (at foot of ladder in liquor locker).
Action required: 705 - Other - as specified
Due 9 May 2011
Resolved 6 May 2011
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 November 2010
Resolved
There is a cord plugged into electrical outlet hanging from beam in liquor locker. Wiring runs up to bar area. Remove temporary wiring/plug and install permanent wiring within a junction box.
Action required: 705 - Other - as specified
Due 9 May 2011
Resolved 6 May 2011
Electrical › Electrical Distribution System (service) › Junction Box
Issued 16 November 2010
Resolved
Replace switch box located on the overhead beam at foot of ladder in liquor locker. This box has knockouts removed with no plugs installed, wiring open to the environment.
Action required: 705 - Other - as specified
Due 9 May 2011
Resolved 6 May 2011
Stability › Unintentional Flooding › General
Issued 16 November 2010
Resolved
Some through-hull penetrations in E/R do not have means to prevent water from entering vessel if pipe fractures/fails. Install metallic valves at through-hull penetrations (2 port side, 1 starboard side).
Action required: 705 - Other - as specified
Due 9 May 2011
Resolved 19 May 2011
Engineering › Bilge Water Management System › Piping
Issued 16 November 2010
Resolved
Double clamp fire/bilge pump raw water intake hose between sea valve and pump on port MDE.
Action required: 705 - Other - as specified
Due 9 May 2011
Resolved 6 May 2011
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 16 November 2010
Resolved
Reinforce starboard main engine guard to prevent falling onto flywheel.
Action required: 705 - Other - as specified
Due 9 May 2011
Resolved 6 May 2011
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 16 November 2010
Resolved
Determine cause and secure oil leak from starboard main engine (outboard side).
Action required: 705 - Other - as specified
Due 9 May 2011
Resolved 6 May 2011
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 16 November 2010
Resolved
Permanently post fire and bilge pump instructions in E/R.
Action required: 705 - Other - as specified
Due 9 May 2011
Resolved 6 May 2011
Stability › Watertight Integrity › General
Issued 16 November 2010
Resolved
Seal aft engine room bulkhead opening amidships, in vicinity of fuel strainers.
Action required: 705 - Other - as specified
Due 9 May 2011
Resolved 6 May 2011
Construction/Loadline › Structures › Superstructure
Issued 21 July 2008
Resolved
Prior to the 2009 operating season replace securing structure for all cleats. Temp repairs completed and approved for 2008 op season.
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 5 August 2009
Resolution: Deck area for aft cleats repaired. New requirement issued for forward stbd cleat.
Electrical › Electrical Distribution System (service) › Cable
Issued 16 April 2008
Resolved
Replace port engine battery cables and properly support. Covering broken exposing wire.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 April 2008
Resolved 17 April 2008
Resolution: Cables replaced, re-routed with adequate supported.
Electrical › Electrical Distribution System (emergency) › Cable
Issued 16 April 2008
Resolved
Battery box needs cutouts to allow cover to be secured, in addition positive requires replacement broken covering IWO bilge area.
Action required: 705 - Other - as specified
Due 18 April 2008
Resolved 17 April 2008
Resolution: New cable installed, re-routed and adequately supported.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 April 2008
Resolved
IWO Port engine properly connect wires presently installed with twist and electrical tape.
Action required: 705 - Other - as specified
Due 16 May 2008
Resolved 21 July 2008
Resolution: Wire replaced with proper gauge and connection.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 April 2008
Resolved
Install metal wire supports over both engines. Present installation provide wires resting on muffler and manifold.
Action required: 705 - Other - as specified
Due 16 May 2008
Resolved 21 July 2008
Resolution: Inspected installation finding wire properly secured IAW regs.
Electrical › Electric Supply System (service) › Cable
Issued 16 April 2008
Resolved
Replace cable attached to overhead installed with inadequate radius and stapled breaking jacket.
Action required: 705 - Other - as specified
Due 16 May 2008
Resolved 21 July 2008
Resolution: Cable supported with adequate radius for size. Inspection of sheathing provided cable did not required replacement.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 16 April 2008
Resolved
Install grounding strap for both fuel oil tanks
Action required: 705 - Other - as specified
Due 16 May 2008
Resolved 21 July 2008
Resolution: Inspected installation finding grounding wires attached properly installed.
Engineering › Bilge Water Management System › Valve
Issued 16 April 2008
Resolved
Install positive shutoff valves for each bilge pump discharge.
Action required: 705 - Other - as specified
Due 16 May 2008
Resolved 21 July 2008
Resolution: Valve arrangement installed as required.
Construction/Loadline › Structures › Superstructure
Issued 16 April 2008
Resolved
Remove and replace all cleats, remove all wasted wood. Reinstall with new material sandwich and hardware for acceptable temporary repair (2008 op season). Temp repair required complete by May 16, 2008. Complete permanent repair prior to 2009 op season.
Action required: 705 - Other - as specified
Due 1 May 2009
Resolved 21 July 2008
Resolution: Temp repairs completed, with plan presented to complete permanent repairs prior to the 2009 op season. Issued an additional CG-835 for completion.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 16 April 2008
Resolved
Replace 16 adult life jackets and replace retro tape on 10 additional adult and 7 child. Vessel is limited to 128 pax until corrected.
Action required: 705 - Other - as specified
Due 16 April 2008
Resolved 17 April 2008
Resolution: 16 jackets provided with appropriate marking with tape ordered for extra jackets. Jackets requiring corrective measure removed from vessel.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 16 April 2008
Resolved
Mark forward child life jacket stowage location.
Action required: 705 - Other - as specified
Due 16 May 2008
Resolved 21 July 2008
Resolution: Stowage marking completed as required.
Fire Fighting › Structural Fire Protection - General › Structural Bulkhead Construction
Issued 16 April 2008
Resolved
Seal with approved fire stop material all openings from engine space. Several opening noted from e/r to galley area, for and aft bulkheads.
Action required: 705 - Other - as specified
Due 16 May 2008
Resolved 21 July 2008
Resolution: Holes plugged with spray foam. Material properties does not meet fire code however have similar properties as hull material. Recommended use of approved material which o/o intends to install during winter lay-up.
Electrical › Electrical Distribution System (service) › Wiring
Issued 16 April 2008
Resolved
Remove black wire IWO bar and properly wire components to outlet.
Action required: 705 - Other - as specified
Due 16 May 2008
Resolved 21 July 2008
Resolution: Wire removed, with approved boat cable installed.
Lifesaving › Lifebuoys › Serviceable
Issued 16 April 2008
Resolved
Replace ring or attached grab line with appropriate uv resistant line.
Action required: 705 - Other - as specified
Due 16 May 2008
Resolved 21 July 2008
Resolution: Approved line with adequate length attached to buoys.
Accommodation/Occupational Safety › Potable Water System › General
Issued 16 April 2008
Resolved
Replace fresh water tank fill.
Action required: 705 - Other - as specified
Due 16 May 2008
Resolved 21 July 2008
Resolution: Fill tube replaced.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 9 May 2006
Resolved
Complete required annual DAPI audit.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 June 2006
Resolved 15 May 2006
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 9 May 2006
Resolved
Vessel is limited to carrying 95 adult and 6 child size passengers until required amount is provided as per COI.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Engineering › Bilge Water Management System › Pump
Issued 9 May 2006
Resolved
Properly secure all electric submursible bilge pumps and float switches.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 9 May 2006
Resolved
Port engine needs guards around rotating machinery.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Fire Fighting › Fire Hoses › Material
Issued 9 May 2006
Resolved
Commercial grade hose needed for fire station.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 9 May 2006
Resolved
Replace hose on stbd side fuel tank fill with proper hose and install bonding as needed.
Action required: 705 - Other - as specified
Due 26 July 2006
Resolved 13 September 2006
Documentation › Manuals/Policy Documentation › Cargo/Ballast System Instruction Manual
Issued 9 May 2006
Resolved
Provide diagram for operation of fixed bilge and fire main system.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Engineering › Fuel Oil Service System › Valve
Issued 9 May 2006
Resolved
Remount fuel shut off valve for generator.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 9 May 2006
Resolved
Provide annual service report for fixed CO2 system.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 10 May 2006
Fire Fighting › Ventilation Systems › Operating Controls
Issued 9 May 2006
Resolved
Provide shut down for power ventilation when fixed CO2 system is activated and provide covers for natural air vents.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 May 2006
Resolved
Replace wire nuts on electrical appliances as needed.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Communications › Alarms/Indicators › Bilge Alarm
Issued 9 May 2006
Resolved
Label bilge alarm panel according to space protected.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Documentation › Certificates/Documents › FCC SSL
Issued 9 May 2006
Resolved
Vessel is limited to operate no more than 1000' from shore until FCC license is provided.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Documentation › Markings/Placards › Capacity Marking
Issued 9 May 2006
Resolved
Provide label for upper deck not ot exceed 90 passengers in accordance with stability letter.
Action required: 705 - Other - as specified
Due 8 June 2006
Resolved 16 June 2006
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 11 May 2005
Resolved
Vessel operator does not have an EAP program.
Condition: Unknown
Action required: 705 - Other - as specified
Due 11 June 2005
Resolved 27 June 2005
Resolution: EAP Program in place.
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 20 May 2004
Resolved
inspect and correct various areas in engine room that have chaffing wires and hoses. Secure all loose electrical wiring.
Due 21 June 2004
Resolved 9 June 2004
Accommodation/Occupational Safety › Heating
Issued 20 May 2004
Resolved
remove (2) portable propane heaters from vessel LEGACY COMPONENT DESC: Burners
Action required: 701 - Prior to carriage of passengers/cargo
Due 21 May 2004
Resolved 9 June 2004
Documentation › Markings/Placards
Issued 20 May 2004
Resolved
mark the maximum passenger capacity of the upper deck LEGACY COMPONENT DESC: Capacity Marking
Due 21 June 2004
Resolved 9 June 2004
Lifesaving › Lifebuoys
Issued 20 May 2004
Resolved
mark ring buoys with vessel name LEGACY COMPONENT DESC: Markings (ship name/port)
Due 21 June 2004
Resolved 9 June 2004
Lifesaving › Lifebuoys
Issued 23 May 2002
Resolved
Replace life ring buoy.
Due 24 June 2002
Resolved 25 June 2002
Lifesaving › Lifejacket/PFD (Type I)
Issued 23 May 2002
Resolved
Replace/install 16 type I PFDs.
Due 24 June 2002
Resolved 24 May 2002
Resolution: Cleared prior to end of inspection
Communications › Radio Communications
Issued 23 May 2002
Resolved
Prove proper operation of VHF-FM marine radio.
Due 24 June 2002
Resolved 24 May 2002
Resolution: Corrected prior to end of inspection.
Construction/Loadline › Hull
Issued 23 May 2002
Resolved
Stop minor water leak in seam of starboard plank and first strake in aft compartment forward end.
Due 24 June 2002
Resolved 25 June 2002
Fire Fighting
Issued 16 May 2001
Resolved
Provide additional 50 foot length of fire hose.
Condition: Unknown
Due 21 June 2001
Resolved 23 June 2001
Engineering
Issued 16 May 2001
Resolved
repair or replace leaking fuel lines.
Condition: Unknown
Due 21 June 2001
Resolved 23 June 2001
Construction/Loadline
Issued 16 May 2001
Resolved
Prove proper operation of lazzerette bilge suction.
Condition: Unknown
Due 21 June 2001
Resolved 23 June 2001
Fire Fighting
Issued 16 May 2001
Resolved
Conduct testing of fixed fire extinguishing system in presence of USCG marine inspector.
Condition: Unknown
Due 21 June 2001
Resolved 23 June 2001
Unknown
Issued 21 May 1997
Resolved
REPACK/ADD PACKING TO BOTH RUDDER POSTS.
Condition: Unknown
Due 26 August 1997
Resolved 26 August 1997
Navigation
Issued 4 May 1995
Resolved
Tighten port and starboard rudder packing glands to the satisfaction of theattending Coast Guard Marine Inspector prior to operation of vessel.
Condition: Unknown
Due 4 May 1995
Resolved 6 May 1995
Electrical
Issued 20 May 1993
Resolved
PROVIDE OVERCURRENT PROTECTION FOR THE AUXILIARY GENERATORS AND THEIR OUTOUT CONDUCTORS. AMPACITY OF THE OVERCURRENT PROTECTION SHALL BE BASED ON THE SIZE OF THE OUTPUT CONDUCTORS AFTER DERATING (MACHINERY SPACES ARE CONSIDERED 50 DEGREE C SPACES).
Condition: Unknown
Due 20 May 1993
Resolved 20 May 1993
Lifesaving
Issued 6 May 1992
Resolved
Conduct fire and man overboard drill to the satisfaction of the attending inspector.
Condition: Unknown
Due 27 May 1992
Resolved 27 May 1992
Electrical
Issued 6 May 1992
Resolved
mark breakers in engine room 12VDC and 117VAC power panels.
Condition: Unknown
Due 27 May 1992
Resolved 27 May 1992
Electrical
Issued 6 May 1992
Resolved
Provide proper electrical connections as pointed out by inspector._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 27 May 1992
Resolved 27 May 1992
Electrical
Issued 6 May 1992
Resolved
provide overcurrent protection for both MDE driver DC alternators. _x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 27 May 1992
Resolved 27 May 1992
Accommodation/Occupational Safety
Issued 6 May 1992
Resolved
Renew all ventilation and blower hoses with metallic ducting.
Condition: Unknown
Due 27 May 1992
Resolved 27 May 1992
Navigation
Issued 26 April 1991
Resolved
CONDUCT FIRE AND MAN OVERBOARD DRILLS IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 26 April 1991
Resolved 26 April 1991