Inspection history · 59
18 March 2014
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4818447
15 September 2010
Type not recorded
No type recorded · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3872883
29 April 2010
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3726926
24 March 2009
Periodic Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3436385
7 May 2008
Deficiency Check
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3201369
2 May 2008
Annual Inspection
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3196693
29 January 2007
Annual Inspection · Internal Structural Exam
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2863238
31 January 2006
Deficiency Check · COI Inspection · MTSA Verification
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 2576283
17 February 2005
MTSA Verification · Examination of Repairs · Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2294626
23 August 2004
MTSA Verification
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2174538
17 February 2004
Periodic Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2007498
10 October 2003
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1925684
7 January 2003
Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1726861
20 November 2001
COI Inspection · Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1443295
20 November 2001
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1478872
20 July 2001
Permit to Proceed
Administrative · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1070261
26 October 2000
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1369873
20 December 1999
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1442926
7 January 1999
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1424699
9 April 1998
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 489586
28 January 1998
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1416631
14 January 1997
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1385908
26 September 1996
Damage Survey
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1357738
24 September 1996
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 830082
23 September 1996
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 24778
1 May 1996
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 167617
9 February 1996
Re-Inspection · Hull Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1454293
14 August 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 480571
15 June 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 481148
20 March 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 502766
11 March 1995
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 78652
20 January 1995
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 962823
26 January 1994
Hull Examination · Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1162214
20 January 1993
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 827265
29 December 1992
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 828154
11 February 1992
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 348798
25 January 1992
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 955298
30 October 1991
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 521878
25 January 1991
Hull Examination · COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1244937
21 November 1990
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 903418
5 October 1990
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1215447
24 September 1990
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 899967
7 September 1990
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1237397
13 February 1990
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 525838
14 January 1990
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 498809
1 September 1989
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1348315
8 June 1989
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 470872
10 December 1988
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 445594
2 December 1988
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1207682
14 November 1988
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 477315
10 April 1988
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1036467
16 March 1988
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1303999
17 November 1987
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 487347
22 October 1987
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1016132
8 September 1987
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1006261
23 September 1986
Re-Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1313661
31 January 1986
Credit Drydock
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 998126
16 September 1985
COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 990441
8 August 1985
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 472628
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 2 May 2008
Resolved
Renew draft markings and vessel name in contrasting color to the hull IAW 46CFR 97.40-10.
Due 2 June 2008
Resolved 7 May 2008
Resolution: Renewed the draft markings and vessel name in contrasting color to the hull as per 46 CFR 97.40-10.
Construction/Loadline › Structures › Deck Plating
Issued 30 January 2007
Resolved
Crop and renew to good steel #4 STBD tank top in way of STBD prime mover due to excessive pitting.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 13 July 2007
Construction/Loadline › Structures › Deck Plating
Issued 30 January 2007
Resolved
Crop and renew to good steel #4 port tnk top in way of port prime mover due to excessive pitting
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 13 July 2007
Construction/Loadline › Structures › Deck Plating
Issued 30 January 2007
Resolved
Crop and renew marked areas of stern void to good steel due to excessive pitting.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 13 July 2007
Construction/Loadline › Hull › Double Hull
Issued 30 January 2007
Resolved
#4 STBD Wing Void: crop and renew aft bulkhead from #4 sidelong to overhead.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 13 July 2007
Documentation › Manuals/Policy Documentation › Transfer Procedures
Issued 29 January 2007
Resolved
Provide updated cargo piping diagram in accordance with 33 CFR 155.720.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 13 July 2007
Construction/Loadline › Structures › Deck Plating
Issued 29 January 2007
Resolved
Provide gauging report for #4 port cargo tank top in way of aft prime mover (port side) 9' X 41" area at spill rail.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 30 January 2007
Resolution: Provided gauging reports as required.
Construction/Loadline › Structures › Deck Plating
Issued 29 January 2007
Resolved
Provide gauging report for #4 port cargo tanl top in way of aft prime mover (stbd side) 9' x 18" from base of prime mover.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 30 January 2007
Resolution: Provided gauging reports as required.
Construction/Loadline › Structures › Deck Plating
Issued 29 January 2007
Resolved
Provide gauging report for #4 STBD cargo tank top in way of primer mover on STBD side 13' X 4' area at spill rail.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 30 January 2007
Resolution: Provided gauging reports as required.
Construction/Loadline › Hull › Double Hull
Issued 29 January 2007
Resolved
#1 STBD Wing Void: make repairs as marked in void (10 pickups).
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 30 January 2007
Resolution: Made repairs as required.
Construction/Loadline › Hull › Double Hull
Issued 29 January 2007
Resolved
#2 STBD Wing Void: make repairs to ladder weld (top left side), and #1 sidelong crack in #1 bay.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 30 January 2007
Resolution: Made repairs as required.
Construction/Loadline › Hull › Double Hull
Issued 29 January 2007
Resolved
#3 STBD Wing Void: make repairs to incomplete weld in #6 bay, #4 sidelong.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 30 January 2007
Resolution: Made repairs as required.
Construction/Loadline › Hull › Double Hull
Issued 29 January 2007
Resolved
#4 STBD Wing Void: make repairs to #5 sidelong at #3 frame in #1 bay; #1 sidelong in # 5 bay; aft bulkhead crop & renew from #4 sidelong to overhead.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 30 January 2007
Resolution: Made repairs as required.
Construction/Loadline › Hull › Double Hull
Issued 29 January 2007
Resolved
#1 Port Wing Void: make repairs to ladder supports (top left and right).
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 30 January 2007
Resolution: Made repairs as required.
Construction/Loadline › Hull › Double Hull
Issued 29 January 2007
Resolved
#2 Port Wing Void: make repairs to ladder supports (top right); #4 bay top sidelong; #5 bay corner clip.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 30 January 2007
Resolution: Made repairs as required.
Construction/Loadline › Hull › Double Hull
Issued 29 January 2007
Resolved
#3 Port Wing Void: cap weld aft bulkhead between #3 & #1 sidelong.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 30 January 2007
Resolution: Made repairs as required.
Construction/Loadline › Hull › Double Hull
Issued 29 January 2007
Resolved
Stern Void: STBD vertical lap seam, #3 shelf bracket on STBD side.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 30 January 2007
Resolution: Made repairs as required.
Construction/Loadline › Hull › Double Hull
Issued 29 January 2007
Resolved
Fore Peak Void: weld bottom longs at headlog as marked.
Action required: 705 - Other - as specified
Due 28 February 2007
Resolved 30 January 2007
Resolution: Made repairs as required.
Engineering › Diesel Engine (auxiliary) › Block
Issued 31 January 2006
Resolved
Replace tach seal on port prime mover.
Action required: 705 - Other - as specified
Due 28 February 2006
Resolved 27 February 2006
Pollution Prevention/Response › Prevention Equipment › Drains/Scuppers (means of closure)
Issued 31 January 2006
Resolved
Install check valve in forward #1 containment return line.
Action required: 705 - Other - as specified
Due 28 February 2006
Resolved 27 February 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 31 January 2006
Resolved
Provide and install securing pins to all cam lock fittings as required by 33 CFR 151.500 & ASTM Standard F 1122-87.
Action required: 705 - Other - as specified
Due 28 February 2006
Resolved 27 February 2006
Deck/Cargo › Holds/Tanks › Hatch
Issued 31 January 2006
Resolved
Renew and prove tightness of No. 1 starboard butterworth hatch.
Action required: 705 - Other - as specified
Due 28 February 2006
Resolved 27 February 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 31 January 2006
Resolved
Renew black oil header stop valve as per 46 CFR 38.10-1
Action required: 705 - Other - as specified
Due 28 February 2006
Resolved 27 February 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Flame Screens
Issued 31 January 2006
Resolved
Clean all flame screens on cargo domes.
Action required: 705 - Other - as specified
Due 28 February 2006
Resolved 27 February 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Flame Screens
Issued 31 January 2006
Resolved
Renew flame screen on independent fuel oil tank vent as per 46 CFR 56.50-85
Action required: 705 - Other - as specified
Due 28 February 2006
Resolved 27 February 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 31 January 2006
Resolved
Provide documentation for the testing of all pressure gauges as per 33 CFR 156.170
Action required: 705 - Other - as specified
Due 28 February 2006
Resolved 31 January 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Closure Devices
Issued 31 January 2006
Resolved
Repair or renew outboard port header valve position indicator as per 46 CFR 38.10-1 and 46 CFR 56.20-9.
Action required: 705 - Other - as specified
Due 6 March 2006
Resolved 3 March 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pressure/Vacuum Relief Valve
Issued 31 January 2006
Resolved
Install PV valves or goosenecks with flame screens to all cargo tanks as required by 46 CFR 32.55-25
Action required: 705 - Other - as specified
Due 28 February 2006
Resolved 27 February 2006
Deck/Cargo › Holds/Tanks › Hatch
Issued 17 February 2005
Resolved
Crop and renew No. 1 port void hatch and prove watertight integrity.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 13 April 2005
Resolution: Installed a new hatch.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 17 February 2005
Resolved
Properly insulate exhaust system on port and starboard prime movers.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 13 April 2005
Resolution: Installed new insulation on both cargo pumps exhaust.
Engineering › Diesel Engine (auxiliary) › Governor
Issued 17 February 2005
Resolved
Provide revolution per minute (RPM) gauge on port engine.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 13 April 2005
Resolution: Installed new RPM gauge on port cargo engine.
Engineering › Diesel Engine (auxiliary) › Crankcase
Issued 17 February 2005
Resolved
Prove proper operation of port engine emergency shutdown.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 13 April 2005
Resolution: Witnessed satisfactory operation of emergency shutdowns.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 17 February 2005
Resolved
Replace No. 2 and 3 port hatch cover, and stern hatch cover.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 21 March 2005
Resolution: Replaced the No 2, 3 and stern hatches and covers.
Deck/Cargo › Holds/Tanks › Coaming
Issued 17 February 2005
Resolved
Provide plug for forward starboard containment drain.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 13 April 2005
Resolution: replaced containment drains and drain plugs
Construction/Loadline › Hull › Hull Plating
Issued 17 February 2005
Resolved
Prove tank top thickness via certified gauging reports.
Action required: 705 - Other - as specified
Due 18 February 2005
Resolved 13 April 2005
Resolution: Installed new containment drain plug.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 17 February 2005
Resolved
Properly secure emergency shutdown cable conduit.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 13 April 2005
Resolution: secured the emergency shutdown cable conduit.
Deck/Cargo › Holds/Tanks › Cargo Tank Drainage
Issued 17 February 2005
Resolved
Install approved valve and drain plug on day tank on both fore and aft part of tank.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 13 April 2005
Resolution: Secured emergency shutdown cable conduit.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 17 February 2005
Resolved
Properly install valve handle on 3" line valve connected to discharge header.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 13 April 2005
Resolution: Installed new valve and drain plug for fuel oil day tank.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 17 February 2005
Resolved
Install new nut and bolts on head discharge manifold, specifically the cross connect valve.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 13 April 2005
Resolution: Install new valve handle.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Manifold
Issued 17 February 2005
Resolved
Install handle on port to starboard cross connect valve.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 13 April 2005
Resolution: Removed cross connect from piping system.
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 17 February 2005
Resolved
Properly repair holes in tank top and prove tank top via gauging report prior to operating cargo.
Action required: 705 - Other - as specified
Due 18 March 2005
Resolved 13 April 2005
Resolution: Removed cross connect from vessel.
Construction/Loadline
Issued 20 November 2001
Resolved
Renew 21 p/u welds in the following locations: stern rake, bow rake, #2 stbd void, #3 stbd void, #3 port void and #4 port void.
Condition: Unknown
Due 28 November 2001
Resolved 28 November 2001
Construction/Loadline
Issued 20 November 2001
Resolved
Renew triped bulkead brackets in the following voids: bow rake, stbd voids 2-4, port voids 2 and 4. Renew damaged sidelongs in the following voids: #1stbd and #1 port
Condition: Unknown
Due 28 November 2001
Resolved 28 November 2001
Construction/Loadline
Issued 20 November 2001
Resolved
Renew swash bulkhead in the following voids: stbd voids 1-4, port voids 1-4
Condition: Unknown
Due 28 November 2001
Resolved 28 November 2001
Documentation
Issued 7 January 1999
Resolved
Provide documentation that company is in complete compliance with 46 CFR 16._x001C_ _x001C_ Company provided with copy of USCG check list.
Condition: Unknown
Due 12 February 1999
Resolved 12 February 1999
Deck/Cargo
Issued 7 January 1999
Resolved
Fax copy of Authorized Tankerman to MSO Tampa and post original on vessel or in file on vessel.
Condition: Unknown
Due 8 January 1999
Resolved 22 January 1999
Documentation
Issued 7 January 1999
Resolved
Post original CoFR on board vessel vice photo copy.
Condition: Unknown
Due 7 January 1999
Resolved 22 January 1999
Construction/Loadline
Issued 28 January 1998
Resolved
Repaint aft draft marks to be contrasting in color from the hull.
Condition: Unknown
Due 17 February 1998
Resolved 18 February 1998
Construction/Loadline
Issued 28 January 1998
Resolved
Renew forward bow rake void hatch gasket._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 17 February 1998
Resolved 18 February 1998
Engineering
Issued 28 January 1998
Resolved
Renew plastic fuel hose on both port and stbd cargo pumps with CG approved flexible hose.
Condition: Unknown
Due 17 February 1998
Resolved 18 February 1998
Engineering
Issued 28 January 1998
Resolved
Renew flame screen on #1 port tank pressure vacuum valve.
Condition: Unknown
Due 17 February 1998
Resolved 18 February 1998
Engineering
Issued 28 January 1998
Resolved
Renew flex hose from port cargo pump to hydraulic oil resevoir with pipe. Limit flex hose lenghts to no more than 30 inches.
Condition: Unknown
Due 17 February 1998
Resolved 18 February 1998
Deck/Cargo
Issued 26 September 1996
Resolved
PRIOR TO LOADING/UNLOADING. PROVIDE DIVERS REPORT OF U/W DAMAGE SURVEY OR DRYDOCK VESSEL. ALSO PROVIDE GAS FREE CERTIFICATE FOR ENTRY TO CONDUCT INTERNAL EXAMINATION OF VESSEL VOIDS BY A MARINE INSPECTOR.
Condition: Unknown
Due 26 September 1996
Resolved 26 September 1996
Documentation
Issued 26 September 1996
Resolved
PROVIDE PROOF OF ANNUAL REVIEW OF VESSEL RESPONSE PLAN BY OWNER OR OPERATOR_x001C_ _x001C_ I.A.W. 33/155.1070(a)
Condition: Unknown
Due 2 October 1996
Resolved 26 September 1996
Documentation
Issued 26 September 1996
Resolved
PROVIDE COPY OF COAST GUARD APPROVAL LETTER WITH VESSEL RESPONSE PLAN._x001C_ _x001C_ _x001C_ I.A.W. 33/155.1065(b)
Condition: Unknown
Due 2 October 1996
Resolved 26 September 1996
Documentation
Issued 25 January 1992
Resolved
PROVIDE PROOF OF LOG AND LOG ENTRIES OF REFERRED TEST OF EQUIPMENT AND INPECTIONS.
Condition: Unknown
Due 19 February 1992
Resolved 19 February 1992
Deck/Cargo
Issued 7 September 1990
Resolved
PREFORM ANNUAL HYDROTEST OF CARGO MANIFLOD & STENCIL
Condition: Unknown
Due 7 September 1990
Resolved 7 September 1990
Documentation
Issued 7 September 1990
Resolved
REVISE ALL OF THE TRANSFER PROCEDURES TO COMPLY W/ 33 CFR (2 CARGO PUMP IN LIEU OF 1).
Condition: Unknown
Due 7 September 1990
Resolved 7 September 1990
Documentation
Issued 7 September 1990
Resolved
PROVIDE A COPY OF THE CERTIFICATE OF FINANCIAL RESPONSIBILITY
Condition: Unknown
Due 7 September 1990
Resolved 7 September 1990
Engineering
Issued 7 September 1990
Resolved
A. PROVIDE FLAME SCREEN FOR #3 PORT ULLAGE PRIOR TO CARRYING CARGO B. CLEAN OTHER SCREENS AS NEEDED.
Condition: Unknown
Due 7 September 1990
Resolved 7 September 1990
Engineering
Issued 7 September 1990
Resolved
REPIPE INDEPENDANT FUEL TANK. FILL MUST BE AT TOP OF TANK.
Condition: Unknown
Due 7 September 1990
Resolved 7 September 1990
Engineering
Issued 7 September 1990
Resolved
REMOVE DRAIN VALVES FROM BOTTOM OF DIESEL TANK. TANK MAY BE FITTED WITH A THREADED PLUG OR CAP (AT THE TANK) FOR THE CLEANING PURPOSES.
Condition: Unknown
Due 7 September 1990
Resolved 7 September 1990
Construction/Loadline
Issued 7 September 1990
Resolved
REPAIR/REPLACE DRAIN FOR FWD PORT MANIFOLD CONTAINMENT.
Condition: Unknown
Due 7 September 1990
Resolved 7 September 1990
Documentation
Issued 7 September 1990
Resolved
PROVIDE LISTING OF PERSONS IN CHARGE. KEEP ABOARD THE BARGE.
Condition: Unknown
Due 7 September 1990
Resolved 7 September 1990
Electrical
Issued 7 September 1990
Resolved
REPAIR THE STBD RUNNING H PLATFORM SO THAT LIGHT IS SEEN FROM DEAD AHEAD TO2 PTS ABFT THE BEAM
Condition: Unknown
Due 7 September 1990
Resolved 7 September 1990
Deck/Cargo
Issued 1 September 1989
Resolved
MAKE TEMPORARY REPAIR TO WEEPING WELD IN #2 STBD CARGO TANK LOWER OUTBOARD CORNER LOCATED 3RD FRAME AFT OF FWD BULKHEAD. PERMANENT REPAIR TO BE COMPLETED AT NEXT GAS FREEING. MONITOR TEMPORARY REPAIR. NOTIFY MSO TAMPAOF ANY CHANGES.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Deck/Cargo
Issued 16 March 1988
Resolved
GAS FREE AFT VOID AND AFT CARGO TANKS AS NECESSARY FOR INSPECTION BY A CG MARINE INSPECTOR TO DETERMINE SOURCE OF CARGO IN AFT VOID AND TO MAKE TESTS AND REPAIRS AS NECESSARY TO CORRECT PROBLEM.
Condition: Unknown
Due 16 March 1988
Resolved 16 March 1988
Deck/Cargo
Issued 8 September 1987
Resolved
HYDRO TEST DECK CARGO PIPING AT 1.5X THE MAXIMUM ALLOWABLE WORKING PRESSUREIN ACCORDANCE WITH 33 CFR 156.170.
Condition: Unknown
Due 8 September 1987
Resolved 8 September 1987