Records from 1985 to 1995. Most recent: inspection, 10 September 1995.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 23
10 September 1995
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1189431
2 June 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1170793
7 October 1993
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 830101
9 July 1993
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 847747
21 May 1993
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 841985
21 May 1993
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 846884
4 May 1993
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1138381
19 August 1992
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 218800
6 July 1992
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 943561
19 March 1992
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1256419
20 May 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1225643
25 October 1990
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1232529
13 September 1990
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1215300
19 June 1989
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1040345
6 June 1989
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1035232
22 November 1988
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 895139
9 November 1988
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1202946
8 June 1988
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 891142
12 June 1987
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1030340
1 June 1987
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1335525
5 May 1987
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1021684
2 June 1986
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1301917
3 June 1985
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1305860
Construction/Loadline
Issued 4 May 1993
Resolved
MAKE SATISFACTORY REPAIRS TO TRANSOM IN WAY OF BOARDING PLATFORM.
Condition: Unknown
Due 4 May 1993
Resolved 4 May 1993
Construction/Loadline
Issued 4 May 1993
Resolved
MAKE SATISFACTORY REPAIRS TO CAP RAIL PORT SIDE AFT. REPAIRS TO BE MADE TOTHE SATISFACTION OF ATTENDING MARINE INSPECTOR OF COGNIZANT [name withheld] 04JUN93.
Condition: Unknown
Due 4 May 1993
Resolved 4 May 1993
Navigation
Issued 6 July 1992
Resolved
REPLACE ROTTED MAST.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Construction/Loadline
Issued 6 July 1992
Resolved
REPLACE ROTTED BRIDGE SUPPORT PORTSIDE AFT.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Navigation
Issued 6 July 1992
Resolved
REPLACE MAST HEAD LIGHT BULB WITH PROPER SIZE.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Construction/Loadline
Issued 6 July 1992
Resolved
REFASTEN FORWARD END OF FREEBOARD TRIM PORTSIDE.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Construction/Loadline
Issued 6 July 1992
Resolved
REPLACE ROTTED FOREPEAD HATCH COAMING.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Construction/Loadline
Issued 6 July 1992
Resolved
ATTACH FOREPEAK HATCH WITH CHAIN OR LINE TO THE VESSEL.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Engineering
Issued 6 July 1992
Resolved
EMERGENCY FUEL SHUT OFF VALVES NEED TO BE MARKED ON DECK.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Accommodation/Occupational Safety
Issued 6 July 1992
Resolved
CHAIN AND LOCK CLOSE MSD DISCHARGE VALVE UNTIL TYPE III MSD CONTAINMENT IS PROVIDED IN THE SYSTEM.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Construction/Loadline
Issued 6 July 1992
Resolved
REPAIR ROTTED HOLE PORTSIDE OF BRIDGE.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Electrical
Issued 6 July 1992
Resolved
SECURE ALL LOOSE WIRING BEHIND AND UNDER CONSOLE.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Construction/Loadline
Issued 6 July 1992
Resolved
DECK AND DECK HATCHES NEED TO BE MADE WEATHERTIGHT.
Condition: Unknown
Due 16 September 1992
Resolved 16 September 1992
Fire Fighting
Issued 6 June 1989
Resolved
HAVE 2 B-II FIRE ESTINGUISHERS REMOVED AND HYDRO TESTED. REPLACE ABOARD VESSEL. UPPON COMPLETION OF HYDRO TEST RETURN TO VESSEL, CONTACT OCMI AT MIO FOR SCHEDULING OF CG MARINE INSPECTOR TO VERIFIY. HYDRO TESTING, NO LATER THAN 20 JUNE 1989.
Condition: Unknown
Due 6 June 1989
Resolved 6 June 1989
Construction/Loadline
Issued 9 November 1988
Resolved
REPLACE AS ORIGINAL THE #5 BOTTOM PLANK FORWARD FROM THE TRANSOM ON THE STARBOARD SIDE. THIS REQUIREMENT MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 9 November 1988
Resolved 9 November 1988
Construction/Loadline
Issued 9 November 1988
Resolved
RENEW THE SECOND FRAME AND FASTNERS, PORTSIDE, FORWARD OF THE TRANSOM.
Condition: Unknown
Due 9 November 1988
Resolved 9 November 1988
Construction/Loadline
Issued 9 November 1988
Resolved
REPAIR 6 FRAME AND FASTNERS, STARBOARD SIDE, FORWARD OF THE TRANSOM. THIS REQUIREMENT MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 9 November 1988
Resolved 9 November 1988
Construction/Loadline
Issued 9 November 1988
Resolved
REFASTEN THE STRINGER IN WAY OF THE #6 FRAME FORWARD OF THE TRANSOM, ON THEPORTSIDE. THIS REQUIREMENT MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 9 November 1988
Resolved 9 November 1988
Construction/Loadline
Issued 9 November 1988
Resolved
REPLACE THE WASTED CHINE BOLT IN THE #1 FRAME FORWARD OF THE TRANSOM ON THEPORTSIDE. THIS REQUIREMENT MUST BE COMPLETED PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 9 November 1988
Resolved 9 November 1988
Navigation
Issued 1 June 1987
Resolved
RENEW PORT AND STARBOARD RUNNING LIGHTS TO LIGHTS WITH A RANGE OF 2 MILES.
Condition: Unknown
Due 1 June 1987
Resolved 1 June 1987
Construction/Loadline
Issued 1 June 1987
Resolved
INSTALL SECURING DEVICES ON ALL HATCHES AND ATTACHMENTS FOR HATCHES IN COCKPIT.
Condition: Unknown
Due 1 June 1987
Resolved 1 June 1987
Lifesaving
Issued 1 June 1987
Resolved
POST LEGIBLE EMERGENCY CHECK OFF LIST WHERE ACCESSIBLE TO PASSENGERS.
Condition: Unknown
Due 1 June 1987
Resolved 1 June 1987
Electrical
Issued 1 June 1987
Resolved
RENEW SPLICED WIRES IN A JUNCTION BOX AND INSTALL FUSES IN A FUSE PANEL AS PER 46 CFR 183.05.
Condition: Unknown
Due 1 June 1987
Resolved 1 June 1987
Lifesaving
Issued 1 June 1987
Resolved
REPLACE THREE ADULT LIFE JACKETS FOR A TOTAL OF 22 ADULT LIFE JACKETS. UNTIL THESE LIFEJACKETS ARE REPALCED THE VESSEL IS LIMITED TO A TOTAL OF 19 PERSONS ON BOARD.
Condition: Unknown
Due 1 June 1987
Resolved 1 June 1987
Accommodation/Occupational Safety
Issued 1 June 1987
Resolved
INSTALL MACERATOR PUMP AND VENT ON MSD TO MEET REQUIREMENTS OF APPROVED PLANS DATED 01 APRIL 1987.
Condition: Unknown
Due 1 June 1987
Resolved 1 June 1987
Engineering
Issued 1 June 1987
Resolved
REPAIR OR REMOVE FIXED HAND BILGE PUMP AND ELECTRIC RULE PUMP ON STARBOARD SIDE OF ENGINEROOM.
Condition: Unknown
Due 1 June 1987
Resolved 1 June 1987
Engineering
Issued 1 June 1987
Resolved
INSTALL FLAME SHIELD ON RAYCOR FUEL FILTER.
Condition: Unknown
Due 1 June 1987
Resolved 1 June 1987
Fire Fighting
Issued 1 June 1987
Resolved
PROVIDE MARINE TYPE MOUNTS AT PROPER LOCATIONS FOR FIRE EXTINGUISHERS.
Condition: Unknown
Due 1 June 1987
Resolved 1 June 1987
Construction/Loadline
Issued 5 May 1987
Resolved
INSTALL ONE-WAY NON-RETURN VALVES IN BILGE DISCHARGE LINES.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987
Construction/Loadline
Issued 5 May 1987
Resolved
PROVIDE WATERTIGHT HATCH FOR FOREPEAK SPACE.
Condition: Unknown
Due 5 May 1987
Resolved 5 May 1987