MAURY USCG vessel records Sign in
← All vessels

RICHMOND

RICHMOND is a 1996 freight ship. The Coast Guard has recorded 22 inspections since 1996, most recently in December 2015, along with 13 deficiencies and 2 operational controls.

Records from 1996 to 2015. Most recent: inspection, 15 December 2015.

Built
1996
Last inspected
15 December 2015
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9109483 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
435656
Flag
HONG KONG
—
Maury page id
psix-435656

Inspections, by type

…with no type recorded9
Years with a record 15 calendar years (1996–2015)
The 22 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 11 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it70316 - Dead Weight, Ton
79422 - Displacement, Ton
23279 - Convention (Subpart B), Net Ton
36559 - Convention (Subpart B), Gross Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 22

15 December 2015 Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5782502
26 June 2014 Deficiency Check
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4900561
8 June 2014 Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4882897
29 December 2011 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4211689
8 November 2010 ISPS II Exam · Ballast Water Examination · PII Safety Exam
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3881288
1 December 2009 Deficiency Check · Administrative Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3638909
29 January 2009 PII Safety Exam · Deficiency Check · ISPS II Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 3401852
9 June 2008 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3231744
5 September 2007 ISPS II Exam · MARPOL Annex I Examination · Ballast Water Examination · MARPOL Annex V Examination · PII Safety Exam · Deficiency Check
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3049993
4 September 2007 Type not recorded
No type recorded · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3043965
25 February 2007 Random ISPS/MTSA/PSC · Ballast Water Examination
Physical examination · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2877855
17 February 2007 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 2872182
14 September 2006 PII Safety Exam · Ballast Water Examination · ISPS II Exam · MARPOL Annex I Examination
Physical examination · Marine Safety Unit Victoria · USCG Heartland District (CGD-H) · Activity 2772649
22 September 2004 ISPS II Exam
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 2202065
24 March 2004 Annual Inspection
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 2030272
11 December 2002 Annual Inspection
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1715751
4 September 2001 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 293296
6 December 1999 Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 435474
15 September 1998 Type not recorded
No type recorded · Resident Inspection Office St. Croix · USCG Southeast District (CGD-SE) · Activity 420993
12 June 1997 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 404376
29 December 1996 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 176861
26 March 1996 Type not recorded
No type recorded · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 389456

Deficiency record · 13

Engineering › Bilge Water Management System › Piping
Issued 15 December 2015 Resolved
Ballast water pump with softpatch leaking water.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 15 December 2015
Resolved 15 December 2015
Engineering › Freshwater Generation System › Pump
Issued 15 December 2015 Resolved
Execissive corrosion/damage on sea water intake pump.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 23 December 2015
Resolved 23 December 2015
Resolution: Vessel provided class report attesting to proper repairs.
Fire Fighting › Miscellaneous Items › Waste Receptacles
Issued 15 December 2015 Resolved
Excessive amounts of oily rags found throughout the engine room between the machinery.
Action required: 705 - Other - as specified
Due 15 December 2015
Resolved 15 December 2015
Resolution: Corrected on the spot.
Navigation › Collision/Grounding Avoidance › Relative Motion Plotting Equipment
Issued 26 June 2014 Resolved
1510 - All ships 300 GT and upwards, in addition to meeting the requirements of paragraph 2.2, be fitted with speed and distance measuring device, or other means to indicate speed and distance through water. Vessels speed log is inoperable. 74SOLAS(09 Cons) Ch V/19.1.1 40ac
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 7 November 2014
Resolution: Technician''s report recieved attesting to proper operation of ship''s speed log.
Pollution Prevention/Response › Prevention Equipment › Oily Mixture Discharge Fixed Piping System
Issued 29 December 2011 Resolved
1735- Pumping discharge arrangements- Oil filtering equipment shall be of a design approved by the Admin. PSCO observed a pipe installed (appears to be original installation) leading from the overboard discharge pipe to the 2nd valve after the bilge pump to drain water to the bilge tank, but piping diagram at the OWS does not show this line. Line a MARPOL Annex I/14.6
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 5 January 2012
Resolved 11 September 2012
Resolution: Received, reviewed, and accept class report from NKK stating that the pip was of original design.
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 29 December 2011 Resolved
0899- Other (acid prevention)- Every vessel of 400 gross tons and above shall carry a Non-Tank Vessel Response Plan, and conduct drills and training in accordance with the plan. Vessel could now show proof of training for current crew, and has not conducted an oil spill drill other than the spill on deck since May 21, 2011 - 33 USC 1321
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 5 January 2012
Resolved 11 September 2012
Resolution: During annual port state control examination vessel provided current crew training and records of oil spill drill.
Electrical › Electric Generation Source (emergency) › Generator
Issued 8 November 2010 Resolved
1499 - A second source of energy shall be provided for three additional starts of the emergency generator within thirty minutes unless manual starting can be demonstrated to be effective. The EDG would not start on secondary souce of power. Primary and secondary souce are batteries. Battery maintenance has not been performed since 10SEP10 - SOLAS 74a 2004 cons. II-1/44
Action required: 17 - Rectify deficiencies prior to departure
Due 8 November 2010
Resolved 9 November 2010
Resolution: Received, reviewed and accepted class report from Nippon [name withheld] stating the deficiency was rectified. Batteries were replaced.
Electrical › Electric Generation Source (emergency) › Generator
Issued 8 November 2010 Resolved
1499 - Other (Prop. & Aux. Machinery) - Electrical power from the EDG shall be sufficient to supply all those services that are essential for safety in an emergency. PSCO observed fuel level in EDG tank at 350 liters, required level for 18 hours operation at full load is 396 liters according to vessel's crew and posted documentation. - SOLAS 74a 2004 cons. II-1/43
Action required: 17 - Rectify deficiencies prior to departure
Due 8 November 2010
Resolved 9 November 2010
Resolution: Received, reviewed and accepted class report from Nippon [name withheld] stating the deficiency was rectified. Crew put in missing fuel and 420 litters available in EDG tank now.
Electrical › Electrical Distribution System (service) › Panelboard
Issued 8 November 2010 Resolved
0950 - Electric equipment in general - Alll elelctrical apparatus shall be so constructed and so installed as not to cause injury when handled or touched in the normal manner. The No. 1 & No. 2 F/O purifier controllers and alarm panel have been damaged by a recent engine room fire and present an electrical hazard to personnel. - SOLAS 74a 2004 cons. II-1/45
Action required: 17 - Rectify deficiencies prior to departure
Due 8 November 2010
Resolved 9 November 2010
Resolution: Received, reviewed and accepted class report from Nippon [name withheld] stating the deficiency was rectified. Purifier''s panels were repaired and electrical safety confirmed by attending surveyor.
Deck/Cargo › Mooring/Anchoring › Winch
Issued 8 November 2010 Resolved
1330 - Winches and capstans - After survey of any ship, no change shall be made to machinery or equipment. No. 4 mooring winch has a soft patch installed on the oil return line. - SOLAS 74 I/11
Action required: 705 - Other - as specified
Due 15 November 2010
Resolved 6 October 2011
Resolution: No. 4 mooring winch had a soft patch installed on the oil return line, classification society conducted a survey on 27DEC10 and ship was found to be fit.
Construction/Loadline › Markings › Load Line Mark
Issued 29 January 2009 Resolved
Seasonal designations on loadline must be permanently marked on the sides of the ship. ILLC 66 Annex I/6 and 8. 70.a
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 1 December 2009
Resolution: Received class report from NKK satisfying the requirement.
Fire Fighting › Emergency Fire Pumps › Pressure
Issued 29 January 2009 Resolved
Vessel emergency fire pump failed to provide a discharge when tested; Incapable of fighting a fire. Solas 1997 II-2/21. 17c
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 January 2009
Resolution: Attended vessel once it was loaded. Emergency fire pump operated satisfactorily.
Lifesaving › Lifeboat › Handholds/Handrails
Issued 29 January 2009 Resolved
Starboard side of starboard lifeboat handhold broken in the mid-portion; Not sufficient means to provide persons to cling. Solas 1997 III/41.7.4. 50.c
Due 28 February 2009
Resolved 30 January 2009
Resolution: Attended vessel. Handhold has been repaired.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.