Records from 1996 to 2023. Most recent: operational control imposed, 28 August 2023.
Inspection history · 42
28 August 2023
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7776528
21 August 2023
PSC A
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 7773085
29 October 2022
Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7585927
4 August 2022
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7519758
23 April 2022
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7437690
20 April 2022
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 7435572
3 March 2022
Type not recorded
No type recorded · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7403415
26 December 2021
PSC B
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7371261
27 January 2021
PSC A
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7130576
16 August 2020
Deficiency Check · PSC B · ISM Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7034299
28 June 2017
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6189406
28 June 2017
Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6189469
19 January 2017
PII Safety Exam · Ballast Water Examination · ISPS III Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 6073410
30 December 2016
Administrative Inspection
Administrative · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 6063925
22 December 2016
Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6061345
4 June 2016
Ballast Water Examination · PII Safety Exam · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5897022
30 April 2016
Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5866114
7 October 2015
ISPS II Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5737555
22 August 2008
PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3305509
17 August 2008
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3300631
26 June 2008
Type not recorded
No type recorded · Sector Virginia · USCG East District (CGD-E) · Activity 3248581
9 May 2008
Type not recorded
No type recorded · Marine Safety Unit Savannah · USCG Southeast District (CGD-SE) · Activity 3202593
25 February 2008
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3156077
28 January 2008
PI Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3138079
28 January 2008
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 3138247
24 December 2007
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 3120354
22 December 2007
NPV Safety Exam
Physical examination · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3119777
7 September 2007
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3051574
2 September 2007
Type not recorded
No type recorded · Sector Boston · USCG Northeast District (CGD-NE) · Activity 3045537
4 June 2007
ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 2950922
12 August 2000
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 281040
25 June 2000
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 638361
10 June 2000
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 278763
4 December 1999
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 435404
31 July 1999
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 431277
29 January 1999
Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 46512
20 July 1998
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 418182
24 September 1997
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 408260
23 January 1997
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 399832
3 December 1996
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 192071
3 December 1996
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 754270
2 February 1996
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 387553
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 21 August 2023
Resolved
During the abandon ship drill, the port side lifeboat remote braking cable snapped, rendering the lifeboat unusable in an emergency condition.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 21 August 2023
Resolution: Vessel crew replaced the affected braking cable, USCG examiners verified repairs.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 17 August 2020
Resolved
The Company and the ship shall comply with the requirements of the International Safety Management Code. For the purpose of this regulation, the requirements of the Code shall be treated as mandatory. In meeting these requirements, the Company should ensure that: inspections are held at appropriate intervals; any non-conformity is reported, with its possible cause, if known; appropriate corrective action is taken; and records of these activities are maintained. Objective evidence discovered during an expanded ISM exam revealed the following non-conformities: the crew failed to fully implement the requirements of the ISM code through their SMS procedures. These identified deficiencies are evidence that the ship and/or company are not meeting the SMS requirements. Recommend external audit. During the exam, PSCO requested engineering crew to conduct a test of the engine room bilge alarm system. Vessel’s electrician was tasked by the Chief Engineer to conduct the requested tests. In the presence of the PSCO, the electrician removed the bilge containment gratings in vicinity of the high and low sea chests to access the bilge alarms. The bilge water in each location was found to be so high that it almost reached the bilge deck plate (i.e. at such at a high level that the bilge alarms should have already been activated). PSCO asked the electrician why the audible and visual components of the bilge alarm system weren’t engaging, the electrician stated that he had disconnected the alarms without providing further explanation. The PSCO determined that the consistent ingress of water into this area was attributed to excessive leaking from the general service pump and sea water intake piping. The inoperability of the bilge alarms, deterioration of the general service pump and lack of watertight integrity within the piping system demonstrates neglect of the crew to address these issues in a timely and proper manner. The SMS required weekly and monthly inspections of the E/R to include operation of the bilge alarms. None of the weekly logs indicated any report of the nonconformity of the bilge alarm nor corrective action taken. Additionally, the operational readiness and effectiveness of the CO2 fire suppression system was found to be in non-compliance with the system’s intended design and installation. Two CO2 dispersion nozzles within the overhead of of the main diesel engine was missing (i.e. not installed).Maintenance of the CO2 system was conducted by a third party contractor in May of 2020; therefore the absence of these dispersion nozzles at the time of examination is inexplicable. The engineering department completed weekly and monthly inspection reports (i.e. logs), where the existing non-conformities on the CO2 system were not recorded, reported, or corrected as required by the SMS. This is clear evidence that the ship’s crew was not performing adequate required inspections and/or not submitting notifications to the vessel's classification society.
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 17 August 2020
Resolved 18 August 2020
Resolution: External Audit of the Shipboard Safety Management System (SMS) completed by DNV-GL on August 18, 2020.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 17 August 2020
Resolved
The piping for the distribution of fire-extinguishing medium shall be arranged and discharge nozzles so positioned that a uniform distribution of medium is obtained. PSCOs discovered 02 fixed carbon dioxide dispersion nozzles missing from piping outside of engine control room.
74SOLAS(97)II-2/5.1.3
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 17 August 2020
Resolved 17 August 2020
Resolution: CO2 dispersion nozzles installed and approved by Classification Society Surveyor and MSC Superintendent.
04 - Emergency Systems › N/A - No Subsystem › Emergency source of power - Emergency generator
Issued 17 August 2020
Resolved
Each emergency generating set arranged to be automatically started shall be equipped with starting devises approved by the Administration with a stored energy capability of at least three consecutive starts. A second source of energy shall be provided for an additional three starts within 30 min. PSCOs witnessed crew try to start the emergency generator via hydraulic start for 30 minutes with no start achieved.
74SOLAS(04)II-1/44.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 17 August 2020
Resolved 17 August 2020
Resolution: PSCO witnessed proper operation of the vessel's EDG.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 August 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. PSCOs witnessed 04 soft patches on piping throughout the engine room. 01 on sea water piping along fwd bilge near GS pump, 03 in the overhead outside of the engine control room.
SOLAS 74 (88 Protocol) I/11
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 December 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 August 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. PSCO observed substantial sea water ingress from one of the vessel’s general service pumps of approximately 1 gallon an hour, lack of machinery guard over impeller shaft, and wasted and missing mounting hardware.
74solas(04)II-1/26.1
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 26 December 2021
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 16 August 2020
Resolved
The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or person onboard. Bilge alarm system is inoperable (disconnected) and unable to produce audible or visual alarm for water ingress.
SOLAS 74 (88 Protocol) I/11
Action required: 30 - Ship detained
Due 16 August 2020
Resolved 17 August 2020
Resolution: Tested all engine room bilge alarms and found all 06 engine room bilge alarms to be operational.
Operations/Management › Vessel Safety Management › Emergency Preparedness
Issued 29 January 2008
Resolved
RO to attest to proper implementation of SMS in regards to the emergency anchoring procedures.
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Resolved 1 February 2008
Resolution: Received class report clearing above issued def.
Stability › Watertight Integrity › General
Issued 28 January 2008
Resolved
Due to vessel running aground, vessel must provide dive survey to Baltimore OCMI.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2008
Resolution: Provided dive survey, all sat.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Pump, High Pressure (fuel injection)
Issued 28 January 2008
Resolved
Class to attest to proper operation of vessel's failed #2 generator fuel booster pump.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 29 January 2008
Resolution: Received class report clearing above issued def.
Engineering › Diesel Engine (propulsion/auxiliary-electric) › Pump, High Pressure (fuel injection)
Issued 28 January 2008
Resolved
Class to attest to proper operation of failed relay switch of #2 fuel booster pump.
Due 28 February 2008
Resolved 1 February 2008
Resolution: Received class report clearing above issued def.
Electrical › Electric Generation Source (emergency) › Generator
Issued 28 January 2008
Resolved
Emergency generator was unable to sustain electrical load after service generators failed. Class to attest to proper operation.
Due 28 February 2008
Resolved 1 February 2008
Resolution: Received class report clearing above issued def.
Navigation › Piloting/Steering › Gyro Compass
Issued 24 December 2007
Resolved
Master requested a Letter of Deviation to enter the Port of New York with an inoperable gyrocompass. Letter of Deviation was issued to the vessel. Repairs to the gyrocompass must be completed prior to departure from the Port of New York.
Action required: 17 - Rectify deficiencies prior to departure
Due 26 December 2007
Resolved 26 December 2007
Resolution: Received technicians report #Y/599251 from Mackay Marine stating the problem with the Gyrocompass was identified as a bad sensor PCB. Sensor PCB was replaced and the Gyrocompass was reported to be working in satisfactory condition.