Records from 2012 to 2025. Most recent: inspection, 12 August 2025.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 12 August 2025
Resolved
Provision must be made be means of plugs, covers, etc., to prevent the admission of air into the space protected. Wire run obstructed functionality of closure device. 46CFR 181.20-35 "Old T"
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2025
Resolved 27 August 2025
Resolution: Operator emailed photo of engine room fire damper fitted into place. Photo uploaded to documents.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 12 August 2025
Resolved
The lifeline and pendants must be as furnished by the manufacturer with the approved life float or buoyant apparatus. Replacement lifelines and pendants must meet the requirements in Subpart 160.010 of this chapter: Each pendant must be made up in a hank, and the hank secured by not more than two turns of light twine. Pendants were not made up into hanks. 46 CFR 180.175(f)(1)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2025
Resolved 27 August 2025
Resolution: Operator emailed photos of pendants made up into hanks. Photos uploaded to documents.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 12 August 2025
Resolved
A vessel must be fitted with ground tackle and mooring lines necessary for the vessel to be safely anchored or moored. The ground tackle and mooring lines provided must be satisfactory for the size of the vessel, the waters on which the vessel operates, subject to the approval of the cognizant [name withheld] shackle securing anchor rode to vessel was wasted. 46 CFR 184.300
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 August 2025
Resolved 27 August 2025
Resolution: Operator emailed photo of new shackle installed. Photo uploaded to documents.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 August 2024
Resolved
The fixed power bilge pump shall be self-priming and may be driven off the main engine or other source of power. MI observed a deteriorated belt for the engine driven bilge pump, operator replaced on the spot.
46 CFR 182.25-10
Old T
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 August 2024
Resolution: Vessel operator replaced bilge pump belt, while MIs were still on board.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 6 August 2024
Resolved
Each survival craft must be: secured to the vessel by a painter with a float-free link permanently attached to the vessel. Life floats float-free link was not connected, install to satisfaction of MI.
46 CFR 180.130 (a)(1)
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 August 2024
Resolution: Submitted satisfactory photo of new connection.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 6 August 2024
Resolved
Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve. Life floats had damage exposing the inner portion of the rafts, repair to MI satisfaction.
46 CFR 185.175(a)(4)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 August 2024
Resolved 8 August 2024
Resolution: Submitted documentation of rapairs, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 6 August 2024
Resolved
Filling and sounding pipes shall be arranged that overflow of liquid or vapor cannot escape to the inside of the vessel. Sounding pipes may be omitted where sounding can be accomplished through the fill pipe or where marine type fuel gages are installed. Where sounding pipes are used, their openings shall be at least as high as the opening of the fill pipe and they shall be kept closed at all times except during sounding Vessel's filling and sounding piping was allowing overflow into the space. Replace the hoses to the satisfaction of the MI.
46 CFR 182.20-30(b)
Old T
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 8 August 2024
Resolution: Hose was properly replaced, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 August 2024
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc. Vessels guard on the aft belt of the engine was found broken and not properly covering the exposed belt. Repair the guard to the satisfaction of the MI.
46 CFR 117.35-15
OLD T
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 29 August 2024
Resolution: Received photo evidence of securing the support guard. All Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 August 2024
Resolved
At least one ring life buoy must be fitted with a lifeline... Each lifeline on a ring must: be buoyant. MI observed forward life line was not of buoyant type. Replace line the line to satisfaction of the MI.
46 CFR 180.70 (c)(1)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 8 August 2024
Resolution: Replaced line, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 6 August 2024
Resolved
Each bouyant apparatus must have Type II retroreflective material meeting subpart 164.018 of this chapter on each side and end. The material must be in strips at least 55 mm (2 in.) wide extending from top to bottom over the side or end and continuing over the top and bottom surfaces of the apparatus. For peripheral body apparatus, each strip must extend completely over the top and bottom surface of the body. For box type apparatus, the strip must extend at least 300 mm (12 in.) inboard from the edge over the top and bottom
surface. Each strip must be positioned near the center of the side or end, but so that it is not obscured by any strap. Multiple sections of tape were found not properly installed as required. Replace the tape to the satisfaction of the MI.
46 CFR 160.010-4(p)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 8 August 2024
Resolution: Reapplied tape all sat.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 6 August 2024
Resolved
Each first-aid kit must meet the requirements in ISO 18813:2006(E) paragraph 4.12 (incorporated by reference, see § 199.05).(i) A first-aid kit may be considered acceptable if it meets all of the requirements of ISO 18813:2006(E) paragraph 4.12, except that it does not contain the burn preparations. It must be clearly marked on the first-aid kit that it does not include the burn preparations.(ii) The active ingredients in medicinal products must conform to over-the-counter (OTC) drug regulations set out in 21 CFR part 330. Vessel had several items in their med kit, bring med kits up to ISO 18813:2006 (E) standard.
46 CFR 199.175(b)(10)
46 CFR 184.710
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 29 August 2024
Resolution: Vessel removed all expired meds and are now in compliance.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 6 August 2024
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: Charts of large enough scale to make safe navigation possible; Tide tables. Vessel charts and tide tables were outdated, update to MI satisfaction.
46 CFR 184.420 (a) (1)/(4)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 29 August 2024
Resolution: Vessel submitted photo of new chart and tide table. All sat.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 6 August 2024
Resolved
Each flare carried to meet this section must be stowed in one of the following: A portable watertight container marked as required by § 185.614 of this chapter, carried at the operating station. Flare box paint appeared faded, repaint to MI satisfaction.
46 CFR 180.68 (e)(1)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 August 2024
Resolved 8 August 2024
Resolution: Repainted all sat.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 August 2024
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: (1) Inspection of all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks; A crack was discovered in the port side sanded area within void space 4. Diagnose extent of the damage of the crack and repair to the satisfaction of the Marine Inspector.
46 CFR 176.405(a)(2)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 September 2024
Resolved 9 December 2024
Resolution: MI confirmed no crack found in the port side of space 4. Deficiency rectified.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 August 2024
Resolved
Vapor barriers must be provided where insulation of any type is used in spaces where flammable and combustible liquids or vapors are present, such as machinery spaces and paint lockers. Vessel has a removable section of its bulkhead that has been found removed and allows vapors to escape to other areas of the vessel. Make the removable section permanent to the satisfaction of the Marine Inspector.
46CFR177.405(e)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 September 2024
Resolved 9 December 2024
Resolution: MI confirmed vapor barriers sufficient for vessel design/construction. Deficiency rectified.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 August 2024
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspections of the hull structure and its appurtenances, including the following: (1) Inspection of all accessible parts of the exterior and interior of the hull, the watertight bulkheads, and weather decks. Vessel weather deck surrounding the hatch into the lazarette was found to be delaminating allowing water into the space. Submit temporary repair proposal to the satisfaction of the MI with a permanent repair to be conducted at the vessels next drydock.
46 CFR 176.802(a)(1)
Condition: Invalid
Action required: 705 - Other - as specified
Due 31 December 2024
Resolved 27 January 2025
Resolution: Watertight deck hatch installed to satisfaction of the attending MI.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 23 August 2023
Resolved
A vessel not required to have a power driven fire pump by § 181.300 must have at least three 9.5 liter (21/2 gallon) buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. The words “FIRE BUCKET” must be stenciled in a contrasting color on each bucket. Vessel did not have the fire buckets on board of the vessel during the inspection. Vessel must obtain the required fire buckets of this regulation to the satisfaction of the attending Marine Inspector.
46CFR181.610
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 August 2023
Resolution: Vessel Represenative was able to produce the amount of Fire Buckets required.
05 - Radio Communications › N/A - No Subsystem › Functional requirements
Issued 23 August 2023
Resolved
Vessels operated solely within 20 nautical miles of land must be equipped with a VHF–DSC radiotelephone installation meeting the requirements of § 80.1101(c)(2), except that a VHF radiotelephone installation without DSC capability is permitted until one year after the Coast Guard notifies the Commission that shore-based sea area A1 coverage is established. Vessels in this category must not operate more than 20 nautical miles from land. Vessel's VHF is not properly programmed with DSC which includes the vessel's MMSI and GPS coordinates. Vessel must upload and integrate all three of these systems into their radios to the satisfaction to the attending Marine Inspector.
46CFR184.502
47CFR80.905(a)(1)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 September 2023
Resolved 8 September 2023
05 - Radio Communications › N/A - No Subsystem › Performance standards for radio equipment
Issued 23 August 2023
Resolved
Every vessel subject to Part III of Title III of the Communications Act must have a detailed inspection of the radio installation by an FCC-licensed technician in accordance with § 80.59 once every five years. The FCC-licensed technician must use the latest FCC Information Bulletin, How to Conduct an Inspection of a Small Passenger Vessel. If the ship passes the inspection, the technician will issue a Communications Act Safety Radiotelephony Certificate. Vessel's Radiotelephone certificate showed incorrect information and radios tested did not meet the requirements outline in this part. The vessel radio telephony certificate is deemed invalid, vessel must obtain a new radio telephony certificate.
46CFR184.502
47CFR80.903
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 September 2023
Resolved 21 September 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 August 2023
Resolved
Each floating water light installed after March 11, 1997, on a vessel carrying only one ring buoy, must be attached to the lanyard with a corrosion-resistant clip. The clip must have a strength of at least 22.7 kilograms (50 pounds), and allow the water light to be quickly disconnected from the ring life buoy. Vessel's water light was tied onto the life buoy. Vessel must install the water light to the satisfaction the the attending Marine Inspector.
46CFR180.70(d)(3)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 September 2023
Resolved 8 September 2023
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 23 August 2023
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: (1) Charts of large enough scale to make safe navigation possible; (2) U.S. Coast Pilot or similar publication; (3) Coast Guard Light List; (4) Tide tables; and (5) Current tables, or a river current publication issued by the U.S. Army Corps of Engineers or a river authority. Vessel has multiple publications listed that were out of date. Vessel must obtain up to date publications to the satisfaction of the Marine Inspector.
46CFR1184.420(a)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 September 2023
Resolved 15 September 2023
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 31 March 2023
Resolved
The intent of this part is to insure that the scantlings, material, fastenings, workmanship and arrangement of each vessel are such as to provide for safe operation in accordance with the terms of its certificate of inspection. Vessel reported damage to hull after allision with dock. Make necessary repairs to the hull and submit all repair proposals to the satisfaction of the Coast Guard marine inspector. 46 CFR 177.01-05(a) “OLD T”
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 13 April 2023
Resolution: Vessel made satisfactory repairs and conducted successful sea trial.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 15 February 2023
Resolved
Watertight integrity above the margin line in a vessel less than 100 gross tons.(a) Each hatch exposed to the
weather must be watertight, except that the following hatches may be weather tight: (1) Each hatch on a watertight trunk that extends at least 12 inches
(30.5 cm) above the weather deck. (2) Each hatch in a cabin top. (3) Each hatch on a vessel that operates
only on protected waters. (b) Each hatch cover must-
(1) Have securing devices; and be attached to the hatch frame or coaming by hinges, captive chains, or other devices to prevent its loss.(c) Each hatch that provides access to crew or passenger accommodations
must be operable from either side.
Access cover leading into the space aft of collision bulkhead is not watertight.
46CFR121.124 (OLD T, OLD S)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 27 February 2023
Resolved 24 February 2023
Resolution: Replaced the hatch with approved type. OP TESTED SAT.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 16 August 2022
Resolved
The breaking strength of each (float-free) link must be between: (1)450 N (100 lbs) and 600 N (134 lbs) for links intended for life floats and buoyant apparatus of 10 persons and less capacity.(2) 900 N (200 lbs) and 1200 N (268 lbs) for links intended for life floats and buoyant apparatus of 11 to 20 persons capacity. Vessel's weak link leading to 6 person life float is not compatible with current installation. In addition, 22 person life float's weak link is missing required identifying information.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 August 2022
Resolved 1 September 2022
Resolution: Received satisfactory photo.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 June 2021
Resolved
"All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspections." 46 CFR 183.01-15(a). Bundle electrical installations in bridge.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 June 2021
Resolved 17 June 2021
Resolution: Provided photos of satisfactory bundling.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 June 2020
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as reasonable and practicable. The vessel's main propulsion engine exhaust lagging is torn. Repair the exhaust lagging to the satisfaction of the Marine Inspector.
46 CFR 177.10-5
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2020
Resolved 13 July 2020
Resolution: Replaced
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 8 June 2020
Resolved
The general construction of the vessel shall be such as to minimize fire hazards insofar as reasonable and practicable. There are multiple bulkhead penetrations in the forward bulkhead of the Engine Room that are not vapor tight. Seal the bulkhead penetrations to restore the vapor tight boundaries of the Engine Room compartment.
46 CFR 177.10-5
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2020
Resolved 13 July 2020
Resolution: Sealed
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 8 June 2020
Resolved
At each inspection, the marine inspector shall examine all weather tight closures above the weather deck. The gasket for the watertight hatch on the No. 2 compartment is damaged. Repair the gasket to restore the watertight integrity of the main deck.
46 CFR 176.25-5 (5)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 8 July 2020
Resolved 13 July 2020
Resolution: Repaired
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 4 December 2018
Resolved
Crop and renew rotten port underdeck beam and deck on forward most main deck hatch at next credit dry dock in 2021.
Action required: 705 - Other - as specified
Due 31 January 2021
Resolved 12 January 2021
Resolution: Beam was satisfactorily cropped and renewed.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 4 June 2018
Resolved
Replace the fuel line support (currently zip lines) with metallic/fire resistant material.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 June 2018
Resolution: Metal support has been installed.
Electrical › Electric Supply System (service) › Battery Installation
Issued 4 June 2018
Resolved
Replace the wing nut connections on each battery with standard nut connections.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 June 2018
Resolution: Wing nuts were removed.
Electrical › Electric Supply System (service) › Battery Installation
Issued 4 June 2018
Resolved
Replace fwd battery broken connection (port fwd, for the anchor windlass).
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 June 2018
Resolution: Connection was replaced.
Lifesaving › Lifebuoys › Serviceable
Issued 4 June 2018
Resolved
Replace deteriorated life ring.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 June 2018
Resolution: New Ring was installed.
Engineering › Bilge Water Management System › Not Operational
Issued 4 June 2018
Resolved
Install visual bilge alarms on the bridge.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 3 July 2018
Resolution: Photo documentation provided of visual alarm at the operating station.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 4 June 2018
Resolved
Install machinery guard to cover the alternator belts on the main engine.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 15 June 2018
Resolution: Machinery guard has been installed.
Construction/Loadline › Hull › Bracket
Issued 4 June 2018
Resolved
Identified crack in the vertical corner structure of the laz, port aft side - 3 planks of wood each approx 1/2" comprise the corner post, only the outer post appears to be cracked and also has an approx 1" spot of rot in the same vicinity. Prep the area for inspection prior to the upcoming drydock in December and be prepared for probable replacement of structural member. Ref: NVIC 7-95
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 31 December 2018
Resolved 15 June 2018
Resolution: Crack will be reviewed for potential replacement during the next drydock.
Lifesaving › Hand Flares › Expired
Issued 28 August 2017
Resolved
3 hand flares and 3 smoke signals onboard were expired.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 28 August 2017
Resolved 28 August 2017
Resolution: New flares/ smoke signals were purchased prior to the end of exam.
Engineering › Bilge Water Management System › Valve
Issued 26 October 2016
Resolved
Provide screw down valve for the forpeake bilge suction that is operable from the weather deck IAW 46 CFR 182.510(d)
Due 6 June 2017
Resolved 28 August 2017
Resolution: witnessed remote operation of the bilge suction valve.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 25 May 2016
Resolved
Vessel's anchor light inoperable. Make proper repairs to the anchor light.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 May 2016
Resolved 26 May 2016
Lifesaving › Lifefloat › Serviceable
Issued 25 May 2016
Resolved
Renew primary lifesaving equipment for a minimum of 25 persons, 50%. If changing equipment from lifefloats, provide equipment information and arrangement for approval.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 15 July 2016
Resolved 13 July 2016
Lifesaving › Lifefloat › Float-free Link
Issued 25 May 2016
Resolved
Installed weak link on lifefloats is for 11-20 persons. Replace with proper weak link for 28 person capacity.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 June 2016
Resolved 15 June 2016
Lifesaving › Lifefloat › Floating Electric Waterlight
Issued 25 May 2016
Resolved
All waterlight batteries are expired, renew with proper new batteries.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 25 June 2016
Resolved 26 May 2016
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 25 May 2016
Resolved
Provide proof of obtaining 1 adult PFD to meet COI requirements.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 26 May 2016
Documentation › Logs/Records › Drug Test Records
Issued 25 May 2016
Resolved
Provide current list of crewmembers enrolled in drug and alcohol program
Condition: Invalid
Due 1 June 2016
Resolved 27 May 2016
Lifesaving › Lifebuoys › Serviceable
Issued 25 May 2016
Resolved
Installed lifering damaged from exposure, renew with new.
Condition: Improper/Lack of Maintenance
Due 25 June 2016
Resolved 26 May 2016
Navigation › Piloting/Steering › Marine Charts
Issued 25 May 2016
Resolved
Provide current and corrected charts and publications for area of transit.
Condition: Improper/Lack of Maintenance
Due 6 June 2016
Resolved 15 June 2016
Engineering › Bilge Water Management System › Hose
Issued 25 May 2016
Resolved
Bilge suction in the forepeak and #4 void inoperable. Make proper repairs and prove proper operation.
Condition: Improper/Lack of Maintenance
Due 30 May 2016
Resolved 27 May 2016
Stability › Weathertight Integrity › General
Issued 25 May 2016
Resolved
Renew the attachements for the identified deck hatches.
Condition: Improper/Lack of Maintenance
Due 6 June 2016
Resolved 15 June 2016
Engineering › Diesel Engine (propulsion-direct drive) › Crankshaft
Issued 12 March 2016
Resolved
Vessel had a loss of propulsion with passengers onboard. Identify and correct cause of the engine failure. Prove proper operation of the MDE to the satisfaction of the attending marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 April 2016
Resolution: Successful dock trials completed.