KAREN N is a 1996 passenger vessel (inspected). The Coast Guard has recorded 23 inspections since 2016, most recently in March 2026, along with 13 deficiencies and 1 casualty investigation in 2016.
Records from 2016 to 2026. Most recent: inspection, 11 March 2026.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
Registered dimensions (L × B × D)39.6 ft × 13.7 ft × 4.0 ft
Registered tonnagegross 14 / net 14
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderPATRIOT MARINE FAB · WARETOWN NJ, UNITED STATES · built 1996
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portBISHOPS HEAD, MD
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 4 September 2025 · expires 30 September 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it14 - Simplified, Gross Ton 14 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 2016 to
2026 for this class, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
The Coast Guard recorded this vessel and the following in the same
inspection activity — normally a tug and the barges in its tow. A recreational or
unclassed hull in the same activity is held and not published, so it does not appear
here: these lists are a floor, not a complete manifest.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 7 March 2024Resolved
07109 - A pre-engineered fixed gas fire extinguishing system must be capable of manual actuation from outside the space in addition to automatic actuation by a heat detector. The pre-engineered fixed gas fire fighting system is inoperable.
46 CFR 181.420(a)(2)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 16 March 2024
Resolution: Received a video showing the proper operation of the Fireboy system.
46 CFR 176.300(d) - A vessel must comply with the structural design requirements of one of the standards listed for aluminum hull vessels: Lloyd's Yachts and Small Craft, or ABS Steel Vessel Rules, with the appropriate conversions from the ABS Aluminum Vessel Rules; or ABS High Speed Craft. Provide written proposal to address all damages identified by the Marine Inspector for the below areas identified at the dry-dock inspection on 02FEB2023:
(03) welds in the middle compartment were pointed out to the vessel representative and circled in yellow crayon for identification
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 March 2023
Resolution: (03) welds repaired to the satisfaction of the CG Marine Inspector.
Vessel must undergo an annual inspection within the 3 months before or after each anniversary date. Due to your vessels current operational status, your vessel failed to meet the 3-month window requirement to complete your Annual Inspection. Complete required Annual Inspection prior to the carriage of passengers.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 29 April 2021
Resolution: Vessel O/O completed required Drydock and Annual Inspection as required by CG-835
Vessel is over 12 meters. Nav lights are not in accordance with Nav Rules. Missing Stern Light.
Condition: Improper Installation
Due 11 June 2017
Resolved 13 July 2017
Resolution: Vessel has installed an operational stern light. Vessel NAV lights are IAW NAV Rules.
Construction/Loadline › Hull › Hull Plating
Issued 14 July 2016Resolved
Crop and Renew the identified/affected areas (including framing and plating) in way of the Mid/Section Compartment.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 July 2016
Resolved 15 February 2017
Resolution: Verified renewal to the areas indentified in way of the Mid/Section Compartment. All welds associated with the hull insert were Dye Penetrant Tested and found to be ALL SAT.
Construction/Loadline › Hull › Hull Plating
Issued 14 July 2016Resolved
Crop and Renew the identified/affected areas (including framing and plating) in way of the Engine Room Compartment.
Due 15 July 2016
Resolved 15 February 2017
Resolution: Verified renewal to the areas indentified in way of the Engine Room Compartment. All welds associated with the hull insert were Dye Penetrant Tested and found to be ALL SAT.
Construction/Loadline › Hull › Bottom Plating
Issued 14 July 2016Resolved
Crop and Renew affected bottom plating located underneath the Portside Fuel Tank.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 July 2016
Resolved 15 February 2017
Resolution: Verified renewal to the bottom plating located underneath the Portside Fuel Tank. All welds associated with the hull insert were Dye Penetrant Tested and found to be ALL SAT.
Construction/Loadline › Hull › Keel
Issued 14 July 2016Resolved
Crop and Renew damaged portion of Keel.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 July 2016
Resolved 15 February 2017
Resolution: Verified renewal to the damaged portion of Keel. All welds associated with the hull insert were Dye Penetrant Tested and found to be ALL SAT.
Engineering › Fuel Oil Service System › Hose
Issued 14 July 2016Resolved
Replace the deteriorated hose fittings (including for the fuel delivery and hydraulic steering system).
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 July 2016
Resolved 11 May 2017
Construction/Loadline › Hull › Weld
Issued 14 July 2016Resolved
Conduct sea trials prior to carrying passengers for hire.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 July 2016
Resolved 11 May 2017
Construction/Loadline › Hull › Weld
Issued 14 July 2016Resolved
Submit Repair Plan to U.S. Coast Guard prior to commencement of work; to include list of materials and procedures.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 July 2016
Resolved 15 February 2017
Resolution: This office verified and approved the submitted Repair Plan.
Operations/Management › Casualty Reporting/Post-Casualty Actions › Filing Written Report of Marine Casualty
Issued 6 June 2016Resolved
Provide Repair Plan of work to be conducted, including welder qualifications and materials to be used.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 June 2016
Resolved 14 July 2016
Resolution: Vessel Rep provided and imnitial Repair Plan of work which included removal of engine and other interferences thus allowing clear access for Coast Guard Marine Inspectors to conduct ISE/Damage Survey.
Operations/Management › Casualty Reporting/Post-Casualty Actions › Filing Written Report of Marine Casualty
Issued 2 June 2016Resolved
After vessel is cleared and all spaces are available for inspection; call for USCG Marine Inspector to conduct Internal Structural Exam (ISE).
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 June 2016
Resolved 14 July 2016
Resolution: Vessel Rep notified Coast Guard that the vessel's interferences were cleared and all spaces were available for inspection/Internal Structural Exam (ISE).
1 June 2016Significant Marine Casualty · role: Involved in a Marine Casualty · serious marine incident, as classified · 8 injured · activity 5896255
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.