MAURY USCG vessel records Sign in
← All vessels

NAUTIC STAR

NAUTIC STAR is a 1959 passenger vessel (inspected). The Coast Guard has recorded 74 inspections since 1984, most recently in November 2023, along with 119 deficiencies — 5 with no resolution recorded — and 1 operational control.

Records from 1984 to 2023. Most recent: inspection, 15 November 2023.

Built
1959
Last inspected
15 November 2023
Documentation
Expired · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDH7034
Flag
UNITED STATES
367442220, 367543410, 367644090 (licence lapsed)
Maury page id
psix-43701

Inspections, by type

…with no type recorded7
Years with a record 33 calendar years (1984–2023)
The 74 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 3 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)52.3 ft × 15.5 ft × 2.9 ft
Registered tonnagegross 10 / net 7
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderERNEST F PETTEK · DORCHESTER, NJ, UNITED STATES · built 1959
Hull materialWood
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portBROOKLYN, NY
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it10 - Regulatory (Subpart C or D), Gross Ton
7 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDH7034MMSI 367644090 · expired · compulsorily equipped · granted 16 October 2014, cancelled 21 December 2024
WDG5109MMSI 367543410 · expired · compulsorily equipped · granted 24 August 2012, cancelled 29 October 2022
WDF3633MMSI 367442220 · expired · compulsorily equipped · granted 9 March 2010, cancelled 9 May 2020 · licensed under a name not among this hull’s recorded names (not shown)
WCY2666MMSI not assigned · expired · voluntarily equipped · granted 1 April 1998, cancelled 7 June 2008 · licensed under a name not among this hull’s recorded names (not shown)
WAD5297MMSI not assigned · expired · compulsorily equipped · granted 9 May 1994, cancelled 26 September 2004 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 74

15 November 2023 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7825143
6 September 2022 Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7552266
25 January 2022 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7385311
25 May 2021 COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7203213
7 April 2021 Deficiency Check · DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7154258
23 September 2020 Drydock Exam · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7054937
19 August 2020 In-Service Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7037538
18 May 2020 Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6955540
17 September 2019 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6809284
21 September 2018 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6542205
10 August 2018 Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6434685
5 April 2018 Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6385708
28 September 2017 In-Service Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6277274
13 September 2017 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6259753
7 October 2016 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6015401
8 June 2016 Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5901237
16 June 2014 Hull Examination · Deficiency Check · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 4889998
12 July 2012 Hull Examination · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 4376153
14 December 2009 Simplified Stability Test
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3649719
29 March 2006 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2612165
7 March 2005 Hull Examination · Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2305248
22 July 2004 Administrative Inspection
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2141322
19 April 2004 Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2049710
21 March 2003 Annual Inspection · Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1760591
8 April 2002 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1602089
25 October 2001 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 772101
20 April 2001 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1066523
12 April 2001 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1062272
7 March 2001 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1059925
20 April 2000 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 817002
6 April 2000 Examination of Repairs
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1423319
23 February 2000 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 816272
30 August 1999 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1119453
7 June 1999 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 805940
5 May 1999 COI Inspection · Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1129269
16 February 1999 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1384074
14 May 1998 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 790507
14 May 1998 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1108300
13 May 1997 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1088936
21 April 1997 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1091247
7 May 1996 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1084013
12 April 1996 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1081835
18 May 1995 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1182650
3 May 1995 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 867258
7 April 1995 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 835428
24 May 1994 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 861780
5 May 1994 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1466873
10 May 1993 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1145657
12 April 1993 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1147788
28 April 1992 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 956759
19 March 1992 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1258452
7 August 1991 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1252772
20 May 1991 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1200307
3 May 1991 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 917785
17 April 1991 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 927106
14 March 1991 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 927819
13 June 1990 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 917204
24 May 1990 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1220840
9 May 1990 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 923600
14 July 1989 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1038240
30 June 1989 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1350117
9 June 1989 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1195709
9 May 1989 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1195707
13 February 1989 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1343498
27 October 1987 Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1017943
3 June 1987 Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1311055
28 May 1987 COI Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1309865
28 May 1987 Hull Examination
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1309869
6 March 1987 Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1005656
20 May 1986 Re-Inspection · Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1299651
10 March 1986 Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 989300
14 June 1985 Re-Inspection · Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1296167
12 June 1985 Credit Drydock
Administrative · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1297924
2 May 1984 COI Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1294805

Deficiency record · 119

02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 18 November 2022 No resolution recorded
Provide repair plan for excessive gap between chine and first plank in the proximity of 14 to 17 feet measured aft the bow on the starboard side due to chine log scarf wastage.
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Hull - cracking
Issued 18 November 2022 No resolution recorded
Provide repair plan for incorrect plank sizing in the newly fastened keel to chine plank in the proximity of 14 foot measured aft the bow on the starboard side.
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 18 November 2022 No resolution recorded
Refasten two identified midship chine fasteners on starboard side.
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 18 November 2022 No resolution recorded
Provide repair plan for loose butt joint on the port side, 1st plank above the chine located 42 feet measured aft the bow.
Action required: 705 - Other - as specified
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 18 November 2022 Resolved
Provide repair plan to make forepeak bulkhead watertight.
Action required: 705 - Other - as specified
Resolved 24 January 2023
Resolution: Inspected sealing of all gaps.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 18 November 2022 Resolved
Refasten chine log fastener on port side frame #3 in 2nd Void.
Action required: 705 - Other - as specified
Resolved 24 January 2023
Resolution: Verified refastening
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-corrosion
Issued 18 November 2022 No resolution recorded
Provide repair plan for wasted through-bolt fasteners on the port side chine log scarf in the vicinity of the fuel tank.
Action required: 705 - Other - as specified
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 25 May 2021 Resolved
VSL required to be inspection ready. VSL not ready for inspection. Issued checklist and zone requirments to be completed and/ or reviewed prior to future inspections. As discussed bilges need to be clean and dry, documentation needs to be updated and properly endorsed, and material items to be inspected ready and available.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2021
Resolution: Attended vessel; vessel was inspection ready.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 25 May 2021 Resolved
BA were filled with water and no longer fit for service.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2021
Resolution: Vessel is not required to carry a BA due to its vessel route of less than 1 mile offshore.
01 - Certificates & Documentation › 012 - Crew Certificates › Other (STCW)
Issued 25 May 2021 Resolved
Crew not enrolled in DAPI program.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2021
Resolution: Crew is enrolled in a DAPI program.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 25 May 2021 Resolved
Outdated and inappropriate charts and pubs.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2021
Resolution: Vessel has all current charts/publications for its route.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 25 May 2021 Resolved
Ring life buoy had more than 6 feet of line attached.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2021
Resolution: Vessel's ring life buoy now has 6 feet of line attached.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 May 2021 Resolved
F/O shut off valves seized.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2021
Resolution: F/O shut off valve was repaired/not seized and worked properly.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 25 May 2021 Resolved
Sheathing on aft 3/4 of vsl needs to be raised to ensure designed drainage is not compromised.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2021
Resolution: Sheathing on aft 3/4 of vsl was raised and drained properly.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 25 May 2021 Resolved
Forward compartment must be water tight.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2021
Resolution: Fwd compartment was repaired and appeared to be watertight during the inspection & while u/w.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 25 May 2021 Resolved
Freeing ports required to be secured while u/w per design construction.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2021
Resolution: Freeing ports were secured while u/w.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 25 May 2021 Resolved
Conduct drills in the presents of inspector.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2021
Resolution: Vessel/crew conducted MOB drill in front of Inspection Team.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 25 May 2021 Resolved
Engine room wiring must be mounted and installed in a safe manner and enclosures must be used where apporpriate.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 5 August 2021
Resolution: Wiring in the engine room was mounted/installed/secured in a safer manner with use of plastic wraps and metal supports.
11 - Life Saving Appliances › N/A - No Subsystem › Launching arrangements for survival craft
Issued 14 April 2021 Resolved
Buoyant apparatus installed must be in accordance with manufacturers instructions. Identified the float free line feeding from the top. The float free line must feed from the bottom of the float free guide installed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 April 2021
Resolved 22 April 2021
Resolution: The float free line was reconfigured from the bottom of the furling canister to the top as designed by manufacturer
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 14 April 2021 Resolved
A vessel inspected under 46 CFR sub-chapter T must be standards, not covered under sub chapter T, however be maintained to acceptable standards to the OCMI under good marine practices. Identified the forward sections of the Port and starboard passenger bench type seating as loose and a hazard.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 April 2021
Resolved 22 April 2021
Resolution: The bench type seating identified was refastened and secured to prevent injury aboard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 April 2021 Resolved
An adult life jacket must be provided for each person on board. Identified 6 KAPOK type I adult PFD’s in in serviceable condition and condemned. available serviceable PFDs on board are 44 adult PFDs. Provide PFDs in accordance with COI prior to carrying passengers.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 April 2021
Resolved 22 April 2021
Resolution: Condemned PFDs were removed and replaced. Vessel has the appropriate number of PFDs IAW the issued COI.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 14 April 2021 Resolved
The number and type of life saving equipment stored must be labeled and marked clearly. Identified the PFD labels work and illegible. Re-stencil the adult and child PFD locations on the over head.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 April 2021
Resolved 22 April 2021
Resolution: PFD labeling was renewed for adult and child sized PFDs.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 April 2021 Resolved
Placards containing instructions for the donning and use of the life jackets on board must be posted in a conspicuous place, regularly accessible to the crew and passengers. Vessel has 2 types of PFD’s on board and no placard for the KAPOK type.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 April 2021
Resolved 22 April 2021
Resolution: Donning instructions were posted in a common space to the crew and passengers.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 14 April 2021 Resolved
Vessel must be made available for inspection. Arrived at the vessel with numerous tripping hazards through out the deck and gear adrift throughout the vessel. Make the vessel inspection ready prior to the inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 April 2021
Resolved 22 April 2021
Resolution: Deck and passenger areas were cleaned and all gear adrift was stowed.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 14 April 2021 Resolved
Rails and guards must be installed around the periphery of all decks accessible by the passengers or crew. On the starboard side ladder on the bow the hand railing is loose. Deck railing must be able to withstand 200lb point load. Re- fasten and secure railing.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 April 2021
Resolved 22 April 2021
Resolution: Railing was removed and re-fastened to withstand greater than 200LBS at any point
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 14 April 2021 Resolved
A vessel must comply with the applicable requirements for any radio and EPIRB in accordance with the FCC, 47 CFR 80. Identified the EPIRB hydrostatic release expired. Replace the hydro static release and mark with the appropriate expiration date prior to operations.
Action required: 17 - Rectify deficiencies prior to departure
Due 14 April 2021
Resolved 22 April 2021
Resolution: New EPIRB hydro-static release was purchased and installed. I personally marked the hydrostatic release, providing training and education to the mariner.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 September 2020 Resolved
Submit repair plan for the clamp block on the PORT side aft.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 28 September 2020
Resolution: 7. Clamp block replaced and refastened with galvanized steel carriage bolts.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 September 2020 Resolved
Submit repair plan in way of the rudder and keel where the top board in front of the rudder was removed
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 28 September 2020
Resolution: 6. At the keel where the rudder post protrudes though the keel,a section of wood was cut out and replaced.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 September 2020 Resolved
Make available for inspection the forepeak where the space is over run with living organisms.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 28 September 2020
Resolution: Areas were cleaned out and made available for inspection.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 September 2020 Resolved
Submit a repair plan where day light was observed from the inside the vessel in the number 2 void in way of the chine.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 28 September 2020
Resolution: 4. RCVD repair plan and approved, light was observed where the hull planks met the chine board. Filled with cotton and caulked satisfactorily.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 September 2020 Resolved
Submit a repair plan for areas discussed where newly installed caulk was identified.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 28 September 2020
Resolution: 3. Area where caulk was identified was dried out and repaired appropriately. Gap between the hull planks and the chine board was filled with cotton and caulked over.
02 - Structural Conditions › N/A - No Subsystem › Loading/Ballast condition
Issued 23 September 2020 Resolved
Remove all "apparent" black water from void 3 and make the internal structures available for inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 28 September 2020
Resolution: Areas were cleaned out and made available for inspection.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 September 2020 Resolved
Remove all oily water substance from the machinery space and make the internal structures available for inspection.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 28 September 2020
Resolution: Areas were cleaned out and made available for inspection.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 September 2020 Resolved
Submit a repair plan in way of the starboard side aft where a keel bolt was identified corroded and the wood over the bolt was wasted.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 28 September 2020
Resolution: 8. STBD side keel bolt was replaced and caulked over on the starboard side.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 August 2020 Resolved
Prove proper operation on the vessel's MDE
Condition: Damaged By Earlier Event
Action required: 17 - Rectify deficiencies prior to departure
Due 19 August 2020
Resolved 7 April 2021
Resolution: Witnessed operations of the vessel's MDE underway during drills
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 18 May 2020 Resolved
Failure to correct deficiencies identified by the attending MI on the vessel's annual exam
Condition: Improper Installation
Action required: 17 - Rectify deficiencies prior to departure
Due 18 May 2020
Resolved 7 April 2021
Resolution: Deficiencies issued corrected. O/O left the area during COVID-19 and was not available to make the vessel available for inspection
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 17 September 2019 Resolved
EPIRB Battery found expired 6/2018 on 09/2019. 46 CFR 185.726(d)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 October 2019
Resolved 7 April 2021
Resolution: Inspected. New EPIRB Purchased
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 17 September 2019 Resolved
Vessel's representative does not keep or track EPIRB Maintanance IAW CFR. 46 CFR 185.728
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 October 2019
Resolved 7 April 2021
Resolution: O/O created pre-printed log books with a section to track and record this information
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 17 September 2019 Resolved
Excessive oil found in the engine room bilge. 46 CFR 176.830
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 19 October 2019
Resolved 7 April 2021
Resolution: E.R. space re-inspected and inspected at the vessel's last DD exam. E.R. was free and clear of excessive oil and debris at the time of this inspection.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 21 September 2018 Resolved
Trace wiring for sensor/alarm in engine compartment
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2018
Resolved 23 October 2018
Resolution: Wiring for sensors inthe E.R. compt. identified by the O/O
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 21 September 2018 Resolved
Make hatches on back deck watertight
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2018
Resolved 23 October 2018
Resolution: O/O removed the boxes/hatches on the aft deck and istalled rubber/ foam gasket material and rebolted the boxes/ hatches down over the deck openings.
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 21 September 2018 Resolved
Program MMSI into radio- 47CFR80
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2018
Resolved 7 November 2018
Resolution: Cleared outstanding def.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 21 September 2018 Resolved
Replace 02 adult life jackets
Action required: 10 - Deficiency Rectified
Due 21 September 2018
Resolved 21 September 2018
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 21 September 2018 Resolved
Label emergency fuel shutoffs
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2018
Resolved 23 October 2018
Resolution: Obsrved E./ Remote F/O shut off valves labled. O/O stated he is planning on re-painting the cover where the e. fuel stops are and should be re-checked at the next site visit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 21 September 2018 Resolved
Make preexisting installed bilge system operationally ready
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2018
Resolved 23 October 2018
Resolution: Observed bilge pump and operation. O/O demonstrated knowledge of use.
Lifesaving › Hand Flares › Expired
Issued 13 September 2017 Resolved
Replace 2 Flares that are expired and remove old flares from vessel.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 13 September 2017
Resolved 13 September 2017
Resolution: Corrected on the spot
Communications › Alarms/Indicators › Bilge Alarm
Issued 13 September 2017 Resolved
repair bilge alarm in aft compartment.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 13 September 2017
Resolved 13 September 2017
Resolution: corrected on the spot (float switch was replaced)
Communications › Radio Communications › EPIRB
Issued 7 October 2016 Resolved
Replace EPIRB hydrostatic release.
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 20 December 2016
Resolution: Operator installed new EPIRB hydrostatic release.
Engineering › Fuel Oil Service System › Valve
Issued 7 October 2016 Resolved
Replace aft fuel filter shutoff handle.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 20 December 2016
Resolution: Aft fuel filter shutoff valve handle replaced and operational test conducted.
Lifesaving › Lifebuoys › Serviceable
Issued 7 October 2016 Resolved
Replace port lifering.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 14 October 2016
Resolved 20 December 2016
Resolution: New lifering onboard vessel to replace old lifering.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 7 October 2016 Resolved
Renew deck hatch cover gasket material.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2017
Resolved 13 September 2017
Resolution: Gasket renewed
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 7 October 2016 Resolved
Attach all deck hatch covers to vessel.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 October 2016
Resolved 20 December 2016
Resolution: All deck hatch covers were secured to the vessel by chain link.
Construction/Loadline › Hull › Transverse Frame
Issued 7 October 2016 Resolved
Submit repair proposal to address wasted bow space wood and cracked sister.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 June 2018
Resolved 10 August 2018
Resolution: noted satisfactory repairs during inspection.
Construction/Loadline › Hull › Keel
Issued 16 June 2014 Resolved
Fasten Fwd section of worm shoe to the keel PTCHE.
Action required: 705 - Other - as specified
Due 16 July 2014
Resolved 28 July 2014
Resolution: Repaired.
Construction/Loadline › Hull › Side Shell
Issued 16 June 2014 Resolved
Refasten locations identified in fastener pull plan with silicone bronze screws (05) locations. PTCHE
Action required: 705 - Other - as specified
Due 16 July 2014
Resolved 28 July 2014
Resolution: Refastened.
Engineering › Shafting/Propeller Arrangements › Stern Tube
Issued 16 June 2014 Resolved
Removed wasted fasteners on shaft log and replace with approved size and type. PTCHE
Action required: 705 - Other - as specified
Due 16 July 2014
Resolved 28 July 2014
Resolution: fasteners WERE REPALCED INKINE.
Engineering › Shafting/Propeller Arrangements › Stern Tube
Issued 16 June 2014 Resolved
Replace wasted top portion on shaft log using proper scarf ratio. PTCHE
Action required: 705 - Other - as specified
Due 16 July 2014
Resolved 28 July 2014
Resolution: New section scarfed in using proper scarf ratio.
Construction/Loadline › Hull › Transverse Frame
Issued 16 June 2014 Resolved
Replace wasted deck frame stbd side 4the frame from aft in Compt# 2 PTCHE
Action required: 705 - Other - as specified
Due 16 July 2014
Resolved 28 July 2014
Resolution: Deck frame replaced.
Construction/Loadline › Hull › Longitudinal Frame
Issued 7 March 2005 Resolved
Longitudinal stringer in No 2 compartment deteriorated at bottom on surface where member meets planking. Repairs to be made
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 11 March 2005
Resolution: Removed rotted wood and sistered new wood to existing timber.
Construction/Loadline › Hull › Longitudinal Frame
Issued 7 March 2005 Resolved
PORT AND STBD STINGERS IN #2 COMPARTMENT HAVE WOOD ROTT ON THE FILLER PIECE BETWEEN THE HULL AND STRINGER. ALSO STRINGER ON PORT SIDE NEEDS TO BE RESISTERED WITH ORIGINAL FRAME.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 March 2005
Resolution: ROTTED WOOD WAS REMOVED. NEW WOOD INSERTED AND NEW BOLTS WERE INSTALLED IT SISTER FRAMES TOGETHER.
Engineering › Bilge Water Management System › Not Operational
Issued 7 March 2005 Resolved
Make installed bilge suction in forward compartment operable.
Action required: 705 - Other - as specified
Due 14 April 2005
Resolved 14 April 2005
Resolution: All bilge water manifold vlvs replaced as well as vlv inforward compartment. Tested and found to be sat
Operations/Management › Passenger Operations
Issued 21 March 2003 Resolved
Vessel restricted from the carriage of passengers until the completion of no-sail items issued on work-list.
Due 9 July 2003
Resolved 10 June 2003
Resolution: No-sail worklist items have been resolved.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 21 March 2003 Resolved
Post the following; COI, pollution placard, emergency broadcast placard, radio certificates, life jacket donning placards.
Due 10 July 2003
Resolved 19 April 2004
Construction/Loadline › Structures › Scuttle
Issued 21 March 2003 Resolved
Replace dogging screws on aft two hatches.
Due 10 July 2003
Resolved 19 April 2004
Engineering › Fuel Oil Service System
Issued 8 April 2002 Resolved
Permanently mark "EMERGENCY FUEL SHUT OFF" at both locations. LEGACY COMPONENT DESC: Valve
Due 8 May 2002
Resolved 26 April 2002
Resolution: Made proper marking.
Personnel › Certificates/Documents/Licenses
Issued 8 April 2002 Resolved
Show proof of mates enrollment into a CG approved drug testing program.
Due 8 May 2002
Resolved 26 April 2002
Resolution: Provided proof of mates enrollement in CG approved drug testing program.
Communications › Alarms/Indicators
Issued 8 April 2002 Resolved
Show proper operation of crash compartment visual alarm. LEGACY COMPONENT DESC: Bilge Alarm
Due 8 May 2002
Resolved 26 April 2002
Resolution: operationally tested satisfactory.
Unknown
Issued 20 April 2001 Resolved
REPLACE FORWARD MAIN ENGINE MOUNT SUPPORT BOLTS ON PORT AND STARBOARD SIDE.
Condition: Unknown
Due 20 April 2001
Resolved 20 April 2001
Documentation
Issued 20 April 2001 Resolved
PROVIDE PROOF OF 2001 ENROLLMENT IN APPROVED DRUG TESTING PROGRAM.
Condition: Unknown
Due 23 April 2001
Resolved 23 April 2001
Lifesaving
Issued 7 March 2001 Resolved
PROVIDE METHOD OF MEETING COLD WATER LIFESAVING REGULATIONS BY 11MAR01. IF UNABLE TO MEET THESE REGULATIONS VESSEL IS LIMITED COASTWISE NMT 3 NM FROM SHORE. THIS RESTRICTION IS IN EFFECT UNTIL 31MAY01.
Condition: Unknown
Due 7 March 2001
Resolved 7 March 2001
Fire Fighting
Issued 7 June 1999 Resolved
PROVIDE APPROVED HEAT DETECTION SYSTEM TO BE USED ICW THE ENGINE ROOM SEMI-PORTABLE CO2 FIRE FIGHTING SYSTEM.
Condition: Unknown
Due 7 June 1999
Resolved 7 June 1999
Fire Fighting
Issued 7 June 1999 Resolved
PROVIDE APPROVED CART FOR SEMI-PORTABLE CO2 SYSTEM USED FOR ENGINE ROOM FIRE PROTECTION SYSTEM.
Condition: Unknown
Due 7 June 1999
Resolved 7 June 1999
Navigation
Issued 5 May 1999 Resolved
PROVIDE OPERATIONAL AUXILIARY TILLER ARM FOR RUDDER SHAFT.
Condition: Unknown
Due 5 May 1999
Resolved 5 May 1999
Fire Fighting
Issued 5 May 1999 Resolved
PROVIDE ACCESS OPENING FOR DISCHARGE OF CO2 INTO MACHINERY SPACE.
Condition: Unknown
Due 5 May 1999
Resolved 5 May 1999
Lifesaving
Issued 5 May 1999 Resolved
REPLACE LINES BETWEEN FLOAT LIGHTS AND BOUYANT APPARATUS AND LINE BETWEEN BOTH BOUYANT APPARATUS.
Condition: Unknown
Due 5 May 1999
Resolved 5 May 1999
Fire Fighting
Issued 5 May 1999 Resolved
PROVIDE THREE FIRE BUCKET IAW 46CFR181.610.
Condition: Unknown
Due 5 May 1999
Resolved 5 May 1999
Lifesaving
Issued 5 May 1999 Resolved
PROVIDE COMPLETE AND APPROVED USCG FIRST AID KIT.
Condition: Unknown
Due 5 May 1999
Resolved 5 May 1999
Lifesaving
Issued 14 May 1998 Resolved
BUOYANT APPARATUS MISSING WEAK LINK, 100' PAINTER, AND 12' PENDANTS. ALSO, EACH BA NEEDS TO BE INDIVIDUALLY ATTACHED TO PAINTER.
Condition: Unknown
Due 14 May 1998
Resolved 16 May 1998
Documentation
Issued 14 May 1998 Resolved
GARBAGE AND CREW TRAINING LOGS MISSING._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 May 1998
Resolved 16 May 1998
Documentation
Issued 14 May 1998 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 14 May 1998
Resolved 14 May 1998
Construction/Loadline
Issued 14 May 1998 Resolved
MAIN BILGE PUMP IMPELLER FOUND WORN; BLADES MISSING.
Condition: Unknown
Due 14 May 1998
Resolved 16 May 1998
Documentation
Issued 14 May 1998 Resolved
EVIDENCE OF MARINE OPERATOR'S DRUG PROGRAM ENROLLMENT NOT AVAILABLE.
Condition: Unknown
Due 14 May 1998
Resolved 16 May 1998
Lifesaving
Issued 14 May 1998 Resolved
NO FIRST AID KIT ONBOARD VESSEL.
Condition: Unknown
Due 14 May 1998
Resolved 16 May 1998
Fire Fighting
Issued 14 May 1998 Resolved
B-I EXTINGUISHER NOT MOUNTED; B-II EXTINGUISHER NOT MOUNTED NEAR ACCESS TO ENGINE COMPARTMENT.
Condition: Unknown
Due 14 May 1998
Resolved 16 May 1998
Documentation
Issued 14 May 1998 Resolved
DOCUMENTS, CERTIFICATES, AND PLACARDS NOT MOUNTED ON BULKHEADS._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 14 May 1998
Resolved 16 May 1998
Lifesaving
Issued 3 May 1995 Resolved
PROVIDE A 100 FOOT LIFEFLOAT PAINTER THAT IS IN GOOD CONDITION.
Condition: Unknown
Due 3 May 1995
Resolved 3 May 1995
Lifesaving
Issued 3 May 1995 Resolved
PRIOR TO OPERATING WITH MORE THAN 16 PERSONS ON BOARD, PROVIDE 51 TOTAL USCG APPROVED TYPE I ADULT-SIZE LIFE PRESERVERS AND 6 USCG APPROVED TYPE I CHILD-SIZE LIFE PRESERVERS.
Condition: Unknown
Due 3 May 1995
Resolved 3 May 1995
Construction/Loadline
Issued 7 April 1995 Resolved
REPLACE CRACKED PLANK ON PORT SIDE 16 FEET FROM THE STEM, FORWARD 6.6 FEET.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Construction/Loadline
Issued 7 April 1995 Resolved
REPAIR SPRUNG PLANK ON STARBOARD SIDE 12 FEET FROM STEM AND SECOND PLANK UNDER GUNWALE.
Condition: Unknown
Due 19 April 1995
Resolved 19 April 1995
Construction/Loadline
Issued 7 April 1995 Resolved
PRIOR TO CARRYING PASSENGERS, PROVE THE SEAWORTHINESS OF THE VESSEL WITH ANUNDERWAY EXAM BY A USCG MARINE INSPECTOR.
Condition: Unknown
Due 7 April 1995
Resolved 7 April 1995
Construction/Loadline
Issued 19 March 1992 Resolved
REPAIR OR REPLACE IN KIND THE LOOSE SECTION OF WORM SHOE ON THE MIDSHIPS SECTION OF THE KEEL. AREA BETWEEN THE KEEL AND SHOE IS TO BE SCRAPED AND TREATED BEFORE THE SHOE IS FASTENED BACK TO THE KEEL._x001C_ _x001C_
Condition: Unknown
Due 24 April 1992
Resolved 24 April 1992
Engineering
Issued 19 March 1992 Resolved
REPLACE PROPELLER.
Condition: Unknown
Due 24 April 1992
Resolved 24 April 1992
Construction/Loadline
Issued 19 March 1992 Resolved
REPAIR OR REPLACE PROTECTIVE STRIPPING WHICH COVERS THE SEAM WHERE THE PLANKING MEETS THE KEEL. THE STRIPPING IN ALL PLACES IS EITHER ROTTED OR LOOSE._x001C_ _x001C_
Condition: Unknown
Due 24 April 1992
Resolved 24 April 1992
Documentation
Issued 20 May 1991 Resolved
PROVIDE DOCUMENTATION THAT VESSEL AND CREW ARE ENROLLED IN A DRUG MONITOR-_x001C_ING PROGRAM, VESSEL RESTRICTED FROM CARRYING PASSENGERS FOR HIRE UNTIL THISITEM IS SATISFIED.
Condition: Unknown
Due 20 May 1991
Resolved 20 May 1991
Navigation
Issued 17 April 1991 Resolved
PROVIDE A NIGHT LIGHT FOR THE MAGNETIC COMPASS, WHERE MISSING.
Condition: Unknown
Due 17 April 1991
Resolved 17 April 1991
Lifesaving
Issued 17 April 1991 Resolved
PROVIDE (3) ORANGE HAND HELD DISTRESS SIGNALS,PRESENTLY THE FLARES ONBOARD_x001C_ARE OUT DATED.
Condition: Unknown
Due 17 April 1991
Resolved 17 April 1991
Lifesaving
Issued 17 April 1991 Resolved
PROVIDE (1) FLOATING WATER LIGHT FOR THE BUOYANT APPARATUS, WHERE MISSING.
Condition: Unknown
Due 17 April 1991
Resolved 17 April 1991
Engineering
Issued 17 April 1991 Resolved
REPLACE ALL NON CG APPROVED FLEXIBLE FUEL LINES ON MAIN DIESEL ENGINE WITH_x001C_CG APPROVED TYPE.
Condition: Unknown
Due 17 April 1991
Resolved 17 April 1991
Engineering
Issued 17 April 1991 Resolved
PROVIDE LABELS FOR EACH VALVE ON THE FIXED MAIN BILGE MANIFOLD, WHERE MISS-ING.
Condition: Unknown
Due 17 April 1991
Resolved 17 April 1991
Documentation
Issued 17 April 1991 Resolved
PROVIDE A VALID FCC STATION LICENSE, WHERE MISSING.
Condition: Unknown
Due 17 April 1991
Resolved 17 April 1991
Construction/Loadline
Issued 24 May 1990 Resolved
PROVIDE MEANS OF SECURE HATCH COVERS ON THE WEATHER DECK.
Condition: Unknown
Due 24 May 1990
Resolved 24 May 1990
Engineering
Issued 24 May 1990 Resolved
REPLACE BILGE STRAINER LOCATED IN THE THIRD COMPARTMENT.
Condition: Unknown
Due 24 May 1990
Resolved 24 May 1990
Electrical
Issued 24 May 1990 Resolved
PROVIDE LABELS FOR FUSE PANEL LOCATED IN THE BRIDGE
Condition: Unknown
Due 24 May 1990
Resolved 24 May 1990
Engineering
Issued 24 May 1990 Resolved
REPLACE COOLENT HOSES ON THE MAIN ENG.
Condition: Unknown
Due 24 May 1990
Resolved 24 May 1990
Electrical
Issued 24 May 1990 Resolved
PROVIDE OVER CURRENT PROTECTIION FOR ALTERNATOR AND OUT PUT CONDUCTOR.
Condition: Unknown
Due 24 May 1990
Resolved 24 May 1990
Construction/Loadline
Issued 24 May 1990 Resolved
PRIOR TO CARRIAGE OF PASSENGERS REPAIR LEAK LOCATED IN THE WAY OF RUDDER POST.
Condition: Unknown
Due 24 May 1990
Resolved 24 May 1990
Navigation
Issued 30 June 1989 Resolved
PLACE COAST PILOT AND TIDE TABLE ON BOARD.
Condition: Unknown
Due 30 June 1989
Resolved 30 June 1989
Electrical
Issued 30 June 1989 Resolved
REMOVE WIRE NUTS ON MDS WATER PUMP AND REPLACE WITH CORRECT TYPE OF CONNECTION.
Condition: Unknown
Due 30 June 1989
Resolved 30 June 1989
Lifesaving
Issued 30 June 1989 Resolved
MARK STOWAGE OF CHILDREN'S LIFE PRESERVERS.
Condition: Unknown
Due 30 June 1989
Resolved 30 June 1989
Lifesaving
Issued 30 June 1989 Resolved
MARK NUMBER OF PERSONS ALLOWED ON EACH BA.
Condition: Unknown
Due 30 June 1989
Resolved 30 June 1989
Construction/Loadline
Issued 9 May 1989 Resolved
REPAIR ROTTED AREA OF DECK ON STBD SIDE IN WAY OF FWD BULKHEAD IN HEAD AND COMPARTMENT FWD OR HEAD. ORIGINAL COMPLIANCE DATE IS 09JUN89.
Condition: Unknown
Due 9 May 1989
Resolved 9 May 1989
Fire Fighting
Issued 28 May 1987 Resolved
PROVIDE ONE COAST GUARD APPROVED OR U. L. MARINE LISTED B-II PORTABLE FIRE EXTINGUISHER AS REPLACEMENT FOR NON-MARINE APPROVED EXTINGUISHER ON BOARD.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Navigation
Issued 28 May 1987 Resolved
PROVIDE TWO (2) BLACK DAY SHAPES, BALL TYPE, AS PER THE NAVIGATION RULES.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Lifesaving
Issued 28 May 1987 Resolved
PRIOR TO CARRYING PASSENGERS, RENEW BUOYANT APPARATUS PENDANTS AND SECURE GRABLINES IN WEBBING TO PREVENT SHIFTING.
Condition: Unknown
Due 28 May 1987
Resolved 28 May 1987
Lifesaving
Issued 20 May 1986 Resolved
PROVIDE OPERATIONAL WATERLIGHT FOR AND ATTACH TO THE RING BOUY.
Condition: Unknown
Due 20 May 1986
Resolved 20 May 1986
Construction/Loadline
Issued 20 May 1986 Resolved
SECURE THE VESSEL'S HATCHES WITH A RETAINING LINE OR CHAIN. [46 CFR 171.124(B)]
Condition: Unknown
Due 20 May 1986
Resolved 20 May 1986
Lifesaving
Issued 14 June 1985 Resolved
REPLACE LIFELINES ON LIFEFLOATS AND RING BUOY PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 14 June 1985
Resolved 14 June 1985
Documentation
Issued 14 June 1985 Resolved
PROVIDE ON BOARD OIL POLLUTION PLACARD PRIOR TO 19JUN85.
Condition: Unknown
Due 14 June 1985
Resolved 14 June 1985
Navigation
Issued 14 June 1985 Resolved
PROVIDE ON BOARD THE CURRENT EDITION OF NAVIGATION RULES PRIOR TO 19JUN85.
Condition: Unknown
Due 14 June 1985
Resolved 14 June 1985

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.