Records from 1985 to 1990. Most recent: inspection, 6 September 1990.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 22
6 September 1990
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1240431
12 October 1989
Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1347545
30 August 1989
COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1208045
14 April 1989
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 900622
6 January 1989
Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 893848
23 September 1988
COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1043383
5 July 1988
Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 897102
5 July 1988
Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1208064
16 March 1988
Re-Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1208063
2 December 1987
Administrative
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1027099
29 October 1987
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1018792
5 October 1987
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1010929
23 September 1987
COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1317110
18 December 1986
Deficiency Check
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1026128
4 December 1986
Hull Examination
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1329950
23 September 1986
COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1004657
10 September 1986
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 965444
11 October 1985
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1300974
24 September 1985
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 986330
24 September 1985
COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 990169
11 March 1985
Type not recorded
No type recorded · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 977815
11 March 1985
Credit Drydock
Administrative · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1300612
Fire Fighting
Issued 30 August 1989
Resolved
CONDUCT FIRE AND MAN-OVERBOARD DRILLS TO THE SATISFACTION OF THE ATTENDING COAST GUARD INSPECTOR PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 30 August 1989
Resolved 30 August 1989
Navigation
Issued 23 September 1988
Resolved
PROPERLY MOUNT NON FOLLOW-UP RUDDER CONTROL ON BRIDGE.
Condition: Unknown
Due 23 September 1988
Resolved 23 September 1988
Construction/Loadline
Issued 23 September 1988
Resolved
PROVE PROPER OPERATION OF SCUTTLE TO CO2 ROOM.
Condition: Unknown
Due 23 September 1988
Resolved 23 September 1988
Electrical
Issued 23 September 1988
Resolved
PROVE PROPER OPERATION OF PUBLIC/EMERGENCY LOUD-SPEAKER SYSTEM.
Condition: Unknown
Due 23 September 1988
Resolved 23 September 1988
Engineering
Issued 23 September 1988
Resolved
PROPERLY MOUNT REDUCTION GEAR LUBE OIL PRESSURE GAUGE.
Condition: Unknown
Due 23 September 1988
Resolved 23 September 1988
Engineering
Issued 23 September 1988
Resolved
PROPERLY ADJUST STARTING AIR RECIEVER RELIEF VALVES TO 250 PSI OR LESS.
Condition: Unknown
Due 23 September 1988
Resolved 23 September 1988
Construction/Loadline
Issued 23 September 1988
Resolved
PROVE ALL DECK VENT CHECK BALLS ARE FREE.
Condition: Unknown
Due 23 September 1988
Resolved 23 September 1988
Lifesaving
Issued 23 September 1987
Resolved
IN ACCORDANCE WITH 46 CFR 75.40-20, MARK THE STERN PFD STORAGE BOX WITH THENUMBER OF PFD'S STORED WITHIN.
Condition: Unknown
Due 23 September 1987
Resolved 23 September 1987
Fire Fighting
Issued 23 September 1987
Resolved
IN ACCORDANCE WITH 46 CFR 76.10-10 PROVIDE SPANNERS AT EACH FIRE STATION.
Condition: Unknown
Due 23 September 1987
Resolved 23 September 1987
Navigation
Issued 23 September 1987
Resolved
IN ACCORDANCE WITH RULE 33 PART D OF THE INTERNATIONAL NAVIGATION RULES PROVIDE A BELL ABOARD THE VESSEL.
Condition: Unknown
Due 23 September 1987
Resolved 23 September 1987
Engineering
Issued 23 September 1987
Resolved
PROVE THE PROPER OPERATION OF THE VESSEL'S BILGE PUMPING SYSTEM, TO A COASTGUARD MARINE INSPECTOR AS PROVIDED FOR UNDER 46 CFR 71.25-10.
Condition: Unknown
Due 23 September 1987
Resolved 23 September 1987
Lifesaving
Issued 23 September 1987
Resolved
IN ACCORDANCE WITH 46 CFR 75.40-10, PROVIDE AN ADDITIONAL 10 ADULT AND 3 CHILDREN'S PERSONAL FLOATATION DEVICES.
Condition: Unknown
Due 23 September 1987
Resolved 23 September 1987
Navigation
Issued 23 September 1986
Resolved
MAKE ADJUSTMENTS TO NAVIGATION LIGHT PANEL TO OPERATE PROPERLY. (REPLACE BULB).
Condition: Unknown
Due 23 September 1986
Resolved 23 September 1986
Fire Fighting
Issued 23 September 1986
Resolved
HAVE FIXED FIRE PROTECTION EQUIPMENT SERVICED ( WEIGHED, TEST TIME DELAYS,ALARMS, SHUT-DOWNS) DURING NEXT CREDIT DRYDOCK EXAMINATION.
Condition: Unknown
Due 23 September 1986
Resolved 23 September 1986
Engineering
Issued 23 September 1986
Resolved
INSTALL APPROVED P/V RELIEF VALVES ON AIR RECEIVERS (250 PSI OR LESS)
Condition: Unknown
Due 23 September 1986
Resolved 23 September 1986
Lifesaving
Issued 23 September 1986
Resolved
REPLACE ONE (01) LIFE RING BUOY PRIOR TO PLACING VSL INTO SERVICE.
Condition: Unknown
Due 23 September 1986
Resolved 23 September 1986
Navigation
Issued 23 September 1986
Resolved
INSTALL APPROVED ANCHOR LIGHT IN ACCORDANCE WITH APPLICABLE NAVIGATION REGULATIONS PRIOR TO NIGHT OPERATION.
Condition: Unknown
Due 23 September 1986
Resolved 23 September 1986
Lifesaving
Issued 23 September 1986
Resolved
REPAIR/RENEW LIFE PRESERVER STOWAGE COVER FORWARD END.
Condition: Unknown
Due 23 September 1986
Resolved 23 September 1986
Navigation
Issued 23 September 1986
Resolved
REPAIR INOPERATIVE RADAR.
Condition: Unknown
Due 23 September 1986
Resolved 23 September 1986