ANGLER is a 1943 passenger vessel (inspected). The Coast Guard has recorded 73 inspections since 1985, most recently in May 2026, along with 92 deficiencies.

Records from 1985 to 2026. Most recent: inspection, 6 May 2026.

Built
1943
Last inspected
6 May 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDA3575
Flag
UNITED STATES
366799870
Maury page id
psix-43715

Inspections, by type

…with no type recorded4
Years with a record 39 calendar years (1985–2026)
The 73 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)58.9 ft × 14.2 ft × 3.6 ft
Registered tonnagegross 16 / net 11
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderHUCKINS YACHT CORP · JACKSONVILLE, FL, UNITED STATES · built 1943
Hull materialWood
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portLEWES, DE
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 8 May 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it16 - Regulatory (Subpart C or D), Gross Ton
11 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDA3575MMSI 366799870 · active · compulsorily equipped · granted 28 January 2021, expires 8 February 2031
WCQ6834MMSI not assigned · expired · compulsorily equipped · granted 6 April 1995, cancelled 11 June 2005
WL7165MMSI not assigned · expired · compulsorily equipped · granted 23 March 1994, cancelled 1 August 2004
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 73

6 May 2026 Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 8390450
5 May 2025 Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 8127006
27 March 2025 Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 8096324
20 May 2024 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7909923
5 June 2023 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7694718
3 April 2023 Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7654350
15 October 2022 Type not recorded
No type recorded · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7580383
19 May 2022 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7452040
7 March 2022 Examination of Repairs
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7412022
10 June 2021 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7221152
15 March 2021 Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 7156231
6 May 2020 Deficiency Check · COI Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6945261
4 March 2020 Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6921319
4 June 2019 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6703031
4 April 2019 Deficiency Check · Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6655647
23 May 2018 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6421299
26 March 2018 In-Service Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6379721
9 May 2017 DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6141929
7 March 2017 Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 6100350
9 May 2016 DAPI Audit · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 5872252
27 May 2014 Annual Inspection · DAPI Audit · Deficiency Check
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4870287
30 May 2012 Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 4267586
25 January 2011 Annual Inspection · Hull Examination
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3931553
28 January 2009 Hull Examination
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3401333
24 April 2008 Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3191428
11 March 2008 In-Service Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 3162307
5 June 2007 Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2951975
18 January 2007 Hull Examination
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2854069
6 June 2006 Annual Inspection
Physical examination · Marine Safety Unit Lewes · USCG East District (CGD-E) · Activity 2670636
5 July 2005 Deficiency Check
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2414963
2 June 2005 COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2375565
21 March 2005 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2339911
7 February 2005 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2285734
27 April 2004 Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2053899
13 May 2003 Periodic Inspection · Hull Examination · Simplified Stability Test
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1848762
30 July 2002 Annual Inspection · Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1654157
15 May 2001 Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1379541
7 June 2000 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1460428
3 April 2000 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1454779
28 September 1999 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1345857
6 July 1999 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1381626
26 May 1999 Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 801918
6 July 1998 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 794224
29 May 1998 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1442711
28 April 1998 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1423020
20 October 1997 Drydock Extension
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1113342
27 August 1997 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1119802
10 June 1997 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1413204
15 January 1997 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1100210
10 June 1996 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 942713
11 April 1996 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1430159
1 August 1995 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 873096
10 July 1995 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 883534
16 June 1994 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1327815
8 June 1994 Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1018148
8 November 1993 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1157422
29 June 1993 Deficiency Check · Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1435392
23 April 1992 Hull Examination · Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 955089
14 May 1991 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1230314
30 April 1990 Hull Examination · Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 927717
31 May 1989 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1045154
30 May 1989 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1210023
9 May 1989 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1348302
31 May 1988 Hull Examination · COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1210292
2 October 1987 Administrative
Administrative · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1322649
28 August 1987 Type not recorded
No type recorded · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1008570
9 December 1986 Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1025167
28 May 1986 Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1301078
13 May 1986 Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1299643
26 August 1985 Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 989240
25 June 1985 Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1300595
16 May 1985 COI Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 989743
5 April 1985 Credit Drydock
Administrative · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 976263

Deficiency record · 92

11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 May 2025 Resolved
Placards with lfie jacketdonning instructions shall be visible to the crew and passengers. VSL has 03 types of life jackets and requires a donning instruction placard for each type for crew and pax to be familiar with. 46CFR185.516
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2025
Resolution: Life jacket donning instructions for each of the 03 life jacket types posted and crew familiar with them.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 5 May 2025 Resolved
An approved life preserver shall be on board for each person carried. VSL required 62 adult life preservers, 07 child. VSL has 55 adult and 07 child. VSL restricted to 53 total pax plus 02 crew. 46CFR180.25-5
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 6 May 2026
Resolution: Vessel has requisite number of lifejackets.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Cargo & other hatchways
Issued 5 May 2025 Resolved
Responsibility of Master to ensure hatches are properly secured prior to getting underway. Deck hatches were not dogging down in closed position. 46CFR185.20-15
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 May 2025
Resolution: MI inspected all deck hatches and verified each one dogged down in the locked position.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 20 May 2024 Resolved
Pre-engineered fixed gas fire extinguishing must be capable of manual and automatic actuation, and shutdown all engines with air intake. During test of engine overide, simulation of fireboy activation did not shut down the engines. 46CFR181.420 701C
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 May 2024
Resolved 21 May 2024
Resolution: MI witnessed fireboy simulation that shutdown the engines followed by an overide at the bridge. All sat.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 20 May 2024 Resolved
Pre-engineered fireboy shall be installed per manufacturer instructions. Vessel needs to ensure fire extinguishing agent says within the E/R space and does not escape out of the E/R vents. 46CFR181.420 701C
Condition: Placed in Improper Service
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 May 2024
Resolved 21 May 2024
Resolution: O/O purchased styrofoam noodels that fit the openings of the E/R vents. Each section was labeled and numbered for easy installation and proper fit.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 May 2024 Resolved
Machinery shall be installed and maintained to afford adequate protection from fire, failure and injury. STBD gland where the shaft exits the transmission sprayed oil exceeding the catch basin capacity. 46CFR182.05-1 50C
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 June 2024
Resolved 21 May 2024
Resolution: MI witnessed operation of the STBD engine. No oil spraying, drip pan has been cleaned out.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 20 May 2024 Resolved
Vessels are required to have life preservers for each person on board. COI allows 60 pax in warm waters with 2 crew. Vessel is restricted to a maximum of 58 pax and 2 crew until 02 additional life preservers are placed in service. 46CFR180.25-1 705C
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 May 2024
Resolved 21 May 2024
Resolution: MI verified an order slip for 02 type 1 life preservers that are enroute being delivered.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 5 June 2023 Resolved
A hatch exposed to the weather must suitable watertight hatch cover. The hatch cover must be attached to the hatch frame with a securing device of substantial strength to prevent its loss. Marine Inspector observed the first and second hatch cover from the bow of the vessel was missing a hatch cover securing device. 46CFR176.360(b)
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 19 June 2023
Resolved 5 June 2023
Resolution: Crewmembers attached securing devices attaching hatch cover to the frame.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 5 June 2023 Resolved
A hatch exposed to the weather must be watertight. Hatch cover dog handle on the second hatch cover was spinning freely. MI observed second hatch cover was not properly dogged down creating a watertight connection. 46 CFR 179.360(a)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 June 2023
Resolved 6 June 2023
Resolution: MI observed second compartment hatch cover dogs spinning properly and making a watertight seal on the deck.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 5 June 2023 Resolved
A hatch exposed to the weather must be watertight. MI observed the gasket on the fifth compartment aft hatch cover in a partially covered space was unattached affecting the watertight integrity of the space. 46 CFR 179.360(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 July 2023
Resolved 13 July 2023
Resolution: O/O attached gasket to hatch, verified proper watertight seal.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 19 May 2022 Resolved
A hatch exposed to the weather must suitable watertight hatch cover. The hatch cover must be attached to the hatch frame with a securing device of substantial strength to prevent its loss. Marine Inspector observed the first and second hatch cover from the bow of the vessel was missing a hatch cover securing device. 46 CFR 179.360(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2022
Resolved 19 May 2022
Resolution: MI observed hatch cover securing devices on hatch cover 1 and 2 from the bow.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 May 2022 Resolved
Every child size life jacket must be stowed in a location that is marked and separated from adult life jackets. Marine Inspector observed child size life jackets were mixed together with adult and was missing a marking at stowage location. 46 CFR 180.78(a)(5)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 June 2022
Resolved 19 May 2022
Resolution: MI observed adult and child life jackets stowed and marked in seperated compartments.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 19 May 2022 Resolved
An adult life jacket must be provided for each person carried on board a vessel. Marine Inspector inspected and approved for service 57 adult life jackets. Maximum number of persons carried reduced from 62 to 57 until life jackets are replaced to the satisfaction of the attending marine inspector. 46 CFR 180.71(a)
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 June 2022
Resolved 19 May 2022
Resolution: MI observed a total of 62 adult life jackets.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 June 2021 Resolved
The discharge ends of diesel fuel vent pipes shall terminate on the hull exterior or they shall terminate in U-bends as high above the weather deck as practicable and as far from any openings into living quarters. The discharge ends shall be fitted with flame screen or flame arresters. Stbd fuel vent is missing flame screen and both vents are missing U-bends. 46 CFR 182.20-35
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2021
Resolved 22 June 2021
Resolution: Verified fuel vents are now installed with u-bends and new flame screens.
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 10 June 2021 Resolved
A vessel must comply with the applicable requirements for any radio installation, including the requirements for a station license and installation certificates issued by the FCC. The radio safety certificate is expired. Vessel route restricted to less than 1,000 feet from shore.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2021
Resolved 14 June 2021
Resolution: Vessel was inspected by licensed FCC tech and issued a new FCC Safety Certificate.
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 10 June 2021 Resolved
The person in command of a documented vessel must have on board that vessel the original certificate of documentation currently in effect for that vessel. The COD is not available on board but is able to prove valid documentation. 46 CFR 67.313
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2021
Resolved 14 June 2021
Resolution: Vessel found its valid original COD.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 10 June 2021 Resolved
A power driven vessel underway shall exhibit sidelights. The stbd sidelight is inoperable. Vessel is restricted to daylight operations and periods without restricted visibility. 33 CFR 83.20
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2021
Resolved 22 June 2021
Resolution: Verified stbd side nav light works.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 May 2020 Resolved
An adult lifejacket shall be provided for each person carried. Vessel was found to have 58 adult life jackets. Vessel is restricted from 68 adult passengers to 56 adult passengers. 46 CFR 180.71(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 June 2020
Resolved 11 May 2020
Resolution: Vessel's master replaced four lifejackets on the vessel bringing the vessel to a total of 62 adult life jackets. Passenger maximum reduced to 60 on COI at the request of the vessel's operator.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 May 2020 Resolved
Each lifesaving item must be in a serviceable condition. Replace life ring prior to carrying passengers. 46 CFR 176.808
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 May 2020
Resolved 11 May 2020
Resolution: Life ring replaced.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 6 May 2020 Resolved
All electrical installations shall be to the satisfaction to the [name withheld] wires were found in the 2nd compartment, engine room, and near the loud hailer. A wire was found damaged in the battery compartment. Correct all prior to carrying passengers. 701c 46 CFR 183.01-15
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 May 2020
Resolved 15 May 2020
Resolution: All dead end wires removed or capped.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 6 May 2020 Resolved
Hatch covers must have securing devices and be attached by a captive device to prevent loss. 16c 46 CFR 171.124(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 May 2020
Resolved 11 May 2020
Resolution: Captive devices were installed on all hatches.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 6 May 2020 Resolved
Bilges shall not have excessive build up of trash and oil that may pose a fire hazard or clog bilge pumping. Excessive oil and debris was found in the 2nd compartment, battery compartment, and engine room. 60c 46 CFR 176.830(b)
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Due 6 May 2020
Resolved 11 May 2020
Resolution: Bilges were cleaned.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 6 May 2020 Resolved
All vessels shall be provided with a satisfactory means for draining watertight compartments. Vessel's fixed bilge system was unable to drain water from the #1 compartment. 60c 46 CFR 182.25-1
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Due 6 May 2020
Resolved 11 May 2020
Resolution: Bilge system was now operational.
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 4 June 2019 Resolved
Each hatch exposed to the weather must be watertight. All hatch covers must be repaired/replaced to ensure a watertight seal and ability to properly open/close. 46 CFR 171.124
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 4 June 2019
Resolved 5 June 2019
Resolution: Verified exposed hatches have been repaired.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 4 June 2019 Resolved
All vessels shall be provided with an approved adult lifejacket for each person carried. Replace/renew 04 adult lifejackets. 46 CFR 180.25-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 5 June 2019
Resolution: 04 new adult lifejackets provided.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 4 June 2019 Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts. No chart is provided for a limited coastwise voyage. 46 CFR 184.420
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 5 June 2019
Resolution: Adequate chart provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 4 June 2019 Resolved
Propulsion machinery shall be suitable in type and design for propulsion. Raw water line for port main engine is severely worn. Renew raw water line/hose. 46 CFR 182.05-1
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 5 June 2019
Resolution: New hose is installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 May 2018 Resolved
Overboard discharge and intake valves shall be checked for proper operation. Stbd raw water intake thru-hull valve is inoperable. Prove proper operation. 46 CFR 176.25-5
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 23 May 2018
Resolved 23 May 2018
Resolution: Proper operation of valve was witnessed prior to completion of inspection.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 May 2018 Resolved
Bilge suction lines shall be fitted with suitable strainers. Install strainers on bilge suction lines where missing. 46 CFR 182.25-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 June 2018
Resolved 25 May 2018
Resolution: Verified suitable strainers installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 23 May 2018 Resolved
Bilge suction lines shall be provided with a check valve at some accessible point in the bilge line. A stop-check valve located at the control point will meet the requirements. The bilge system is not currently fitted with check valves. 46 CFR 182.25-5
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2018
Resolved 4 March 2020
Resolution: Verified check valve now installed in bilge suction line near isolation valve.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 May 2018 Resolved
All vessels not limited to daytime operations shall have an approved floating water light provided with the ring life buoy and life floats. All floating water lights have expired batteries. Vessel is limited to daytime operations until verified corrected. 46 CFR 180.30-5
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 June 2018
Resolved 25 May 2018
Resolution: Verified new batteries are installed in all floating waterlights.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 23 May 2018 Resolved
At each inspection, watertight fixtures are examined to ensure they are in satisfactory condition and fit for the service for which it is intended. Port tailshaft packing is leaking excessively. 46 CFR 176.25-5 / 46 CFR 176.05-10
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 June 2018
Resolved 25 May 2018
Resolution: Verified the tailshaft packing is repaired.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 23 May 2018 Resolved
At each inspection vessel is examined for safe electrical conditions. Remove all dead end wires and install protective shielding over hot and neutral bus bars for deck lighting circuit. 46 CFR 176.25-15
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 23 June 2018
Resolved 4 March 2020
Resolution: Verified plastic cover is now installed over bus terminals.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 9 May 2017 Resolved
Renew expired items in first aid kit.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 May 2017
Resolved 19 May 2017
Resolution: Expired items were renewed with new items.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 9 May 2017 Resolved
Provide valid alcohol test device.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 May 2017
Resolved 19 May 2017
Resolution: Valid alcohol test kits are provided on board.
Navigation › Piloting/Steering › Marine Charts
Issued 9 May 2017 Resolved
Provide currrent chart, coast pilot and light list for area of operation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 May 2017
Resolved 19 May 2017
Resolution: New navigation charts and publications are provided on board.
Stability › Watertight Integrity › General
Issued 9 May 2016 Resolved
Provide hatch gasket for port steering compartment hatch.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 12 May 2016
Resolution: Operator installed hatch gasket. All sat.
Stability › Watertight Integrity › General
Issued 9 May 2016 Resolved
Provide lanyards for all compartment hatch covers.
Action required: 705 - Other - as specified
Due 9 June 2016
Resolved 22 July 2016
Resolution: Hatch cover lanyards installed.
Communications › Alarms/Indicators › Propeller Revolutions Rate Indicator
Issued 9 May 2016 Resolved
Repair port engine tachometer.
Action required: 705 - Other - as specified
Due 9 May 2016
Resolved 22 July 2016
Resolution: Port engine tachometer replaced.
Lifesaving › Lifefloat › Painter
Issued 9 May 2016 Resolved
Service life float lifeline attachment points and painter at next drydock. Provide cover for painter until then.
Action required: 705 - Other - as specified
Due 30 April 2017
Resolved 14 April 2017
Resolution: Verified that the lifefloats were repaired; new grablines installed, lifefloats were properly sealed and painted.
Communications › Alarms/Indicators › Bilge Alarm
Issued 27 May 2014 Resolved
Repair bilge alarm visual indicators.
Action required: 705 - Other - as specified
Due 27 June 2014
Resolved 17 June 2014
Resolution: Tested bilge alarm visual indicators. All sat.
Documentation › Markings/Placards › Garbage Placard
Issued 27 May 2014 Resolved
Garbage Placard - Missing
Action required: 705 - Other - as specified
Due 27 June 2014
Resolved 17 June 2014
Resolution: MARPOL placard provided.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 27 May 2014 Resolved
Provide Coast Pilot and Light List.
Action required: 705 - Other - as specified
Due 27 June 2014
Resolved 5 June 2014
Resolution: Coast Pilot and Light List provided.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 30 March 2011 Resolved
Label upper deck "CREW ONLY".
Due 6 April 2011
Resolved 8 April 2011
Resolution: O/O labeled upper deck with crew only verbiage.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 30 March 2011 Resolved
Prove proper operation of navigation lights.
Due 6 April 2011
Resolved 8 April 2011
Resolution: O/O provided operational nav lights.
Deck/Cargo › Holds/Tanks › Scuttle
Issued 30 March 2011 Resolved
Prove proper oepration of fwd scuttle on deck.
Due 6 April 2011
Resolved 8 April 2011
Resolution: O/O repaired to allow for proper operation.
Communications › Alarms/Indicators › Bilge Alarm
Issued 30 March 2011 Resolved
Install and prove proper oepration of a bilge high water alarm in the fwd most compartment.
Due 6 April 2011
Resolved 8 April 2011
Resolution: Vsl O/O installed high level alarm for fwd compartment.
Construction/Loadline › Hull › Longitudinal Frame
Issued 25 March 2011 Resolved
Repalce wasted bolts on the port side longitudanel frame in #6 compt.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 March 2011
Resolution: All bolts replaced with 1/4in galvinized carriage bolts.
Engineering › Bilge Water Management System › Piping
Issued 15 March 2011 Resolved
Make bulkhead in way around bilge pipe leading into #7 compt water tight.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2011
Resolution: Marine plywood used to seal the area around the pipe.
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 15 March 2011 Resolved
Prove proper operation of port MSD ovbd valve.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2011
Resolution: New 2in bronze ball valve installed.
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 March 2011 Resolved
Replace mising bolts in the sheer clamp in compt #5, #6 and #7 on both port and stbd sides.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 March 2011
Resolution: All missing bolts replaced with 3/8in galvanized carriage bolts.
Construction/Loadline › Hull › Bottom Plating
Issued 25 January 2011 Resolved
Vessel was shrink wrapped which did not allow for an examination of the hull . Vessel must complete dry dock prior to carrying passengers.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 March 2011
Resolution: Credit hull exam completed.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 24 April 2008 Resolved
system was not serviced as required.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 May 2008
Resolution: received report from local fire extinguisher service company attesting to proper servicing of vessels fixed fire extinguishing system. copy in file.
Engineering › Bilge Water Management System › Not Operational
Issued 24 April 2008 Resolved
#3 compartment bilge water float activator inoperative.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 April 2008
Resolution: replaced float switch and tested system all sat.
Lifesaving › Lifejacket/PFD (Type I) › Condition
Issued 24 April 2008 Resolved
lifejacket was excessively worn and unfit for service.
Action required: 705 - Other - as specified
Resolved 28 April 2008
Resolution: lifejacket was replaced with a proper lifejacket.
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 5 June 2007 Resolved
Repair fire system engine shutdown on port engine.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 June 2007
Resolved 5 June 2007
Resolution: Shutdown system repaired.
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 5 June 2007 Resolved
Provide one type I pfd.
Condition: Improper/Lack of Maintenance
Due 8 June 2007
Resolved 11 June 2007
Resolution: New jackets procured.
Lifesaving › Hand Flares › Expired
Issued 2 June 2005 Resolved
Prior to carrying passengers provide three red distress signals.
Due 2 June 2005
Resolved 2 June 2005
Engineering › Bilge Water Management System › Not Operational
Issued 2 June 2005 Resolved
Repair the high water bilge indicating lights at the operating station for the # 1 and #2 compartments.
Due 2 July 2005
Resolved 5 July 2005
Navigation › Piloting/Steering › Marine Charts
Issued 2 June 2005 Resolved
Provide updated charts for the vessel route as outlined on the Certificate of Inspection.
Due 2 July 2005
Resolved 5 July 2005
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 2 June 2005 Resolved
Provide updated eyewash and asprins for the vessels first aid kit.
Due 2 July 2005
Resolved 5 July 2005
Engineering › Fuel Oil Service System › Valve, Control
Issued 2 June 2005 Resolved
Label emergency fuel oil shut off valves on the main deck.
Due 2 July 2005
Resolved 5 July 2005
Engineering › Bilge Water Management System › Pump
Issued 2 June 2005 Resolved
Repair or replace the bilge pump indicating lights for the engine room and fuel tank compartments.
Due 2 July 2005
Resolved 5 July 2005
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 2 June 2005 Resolved
Label all adult and child life jacket stowage locations and provide the number at each stowage location.
Due 2 July 2005
Resolved 5 July 2005
Lifesaving › Lifejacket/PFD (General) › Marking
Issued 2 June 2005 Resolved
Provide a life jacket donning placard for the type life jackets onboard the vessel.
Due 2 July 2005
Resolved 5 July 2005
Engineering › Bilge Water Management System › Pump
Issued 2 June 2005 Resolved
Provide an operational 5 GPM hand pump for the vessel.
Due 2 July 2005
Resolved 5 July 2005
Construction/Loadline › Structures › Transverse Bulkhead
Issued 7 February 2005 Resolved
Seal numerous holes and openings in all watertight bulkheads throughout the vessel.
Condition: Improper/Lack of Maintenance
Due 31 March 2005
Resolved 21 March 2005
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 7 February 2005 Resolved
Provide watertight deck hatches for compartments 3, 4, 5 and 6 in accordance with 46 CFR 179.360.
Condition: Improper/Lack of Maintenance
Due 31 March 2005
Resolved 21 March 2005
Construction/Loadline › Hull › Bracket
Issued 7 February 2005 Resolved
Repair the loose knee second frame aft of the fwd bulkhead in the number five compartment stbd side. Complete this repair by through bolting all loose framing components.
Condition: Improper/Lack of Maintenance
Due 31 March 2005
Resolved 21 March 2005
Lifesaving
Issued 29 May 1998 Resolved
REPLACE/REPAIR 4 LIFEJACKETS.
Condition: Unknown
Due 29 May 1998
Resolved 24 June 1998
Navigation
Issued 29 May 1998 Resolved
REPAIR NAVIGATION LIGHTS.
Condition: Unknown
Due 29 May 1998
Resolved 24 June 1998
Fire Fighting
Issued 29 May 1998 Resolved
VESSEL TO HAVE ALL PORTABLE FIRE EXTINGUISHERS PROFESSEIONLY SERVICED.
Condition: Unknown
Due 1 June 1998
Resolved 24 June 1998
Construction/Loadline
Issued 11 April 1996 Resolved
REPLACE PLASTIC THROUGH HULL FITTING IN THE #3 COMPARTMENT WITH AN APPROVEDMETAL FITTING.
Condition: Unknown
Due 11 April 1996
Resolved 11 April 1996
Construction/Loadline
Issued 11 April 1996 Resolved
MAKE PROPER REPAIR TO 4 CRACKED FRAME SPACERS IN THE ENGINE COMPARTMENT.
Condition: Unknown
Due 11 April 1996
Resolved 11 April 1996
Construction/Loadline
Issued 11 April 1996 Resolved
MAKE PROPER REPAIR TO ALL FRAME SPACERS ON THE PORT SIDE FROM THE KEEL TO THE # 3 STRINGER COUNTING FROM THE KEEL IN THE #5 COMPARTMENT.
Condition: Unknown
Due 11 April 1996
Resolved 11 April 1996
Construction/Loadline
Issued 11 April 1996 Resolved
MAKE PROPER REPAIR TO THE #1&2 FRAME SPACERS AND SISTER THE #4 FRAME FOR STRENGTH UNDER THE STBD SHAFT WAY IN THE #5 COMPARTMENT.
Condition: Unknown
Due 11 April 1996
Resolved 11 April 1996
Construction/Loadline
Issued 11 April 1996 Resolved
PRIOR TO RETURN TO WATER PROVIDE ALL THROUGH HULL VALVES FOR INSPECTION.
Condition: Unknown
Due 11 April 1996
Resolved 11 April 1996
Engineering
Issued 11 April 1996 Resolved
REPLACE WORN PORT CUTLASS BEARINGON THE PORT SHAFT.
Condition: Unknown
Due 11 April 1996
Resolved 11 April 1996
Engineering
Issued 29 June 1993 Resolved
MARK ALL FUEL SHUTOFF LOCATIONS PROPERLY.
Condition: Unknown
Due 30 June 1993
Resolved 30 June 1993
Navigation
Issued 29 June 1993 Resolved
PROVIDE CURRENT FCC SAFETY RADIOTELEPHONY CERTIFICATE ON BOARD
Condition: Unknown
Due 30 June 1993
Resolved 30 June 1993
Construction/Loadline
Issued 29 June 1993 Resolved
PROVIDE VESSEL FOR UNDERWAY HULL INTEGRITY TEST.
Condition: Unknown
Due 30 June 1993
Resolved 30 June 1993
Accommodation/Occupational Safety
Issued 29 June 1993 Resolved
FASTEN ALL PASSENGER SEATING SECURLEY TO VESSEL.
Condition: Unknown
Due 30 June 1993
Resolved 30 June 1993
Lifesaving
Issued 29 June 1993 Resolved
LABEL ALL AREAS WHERE PERSONAL FLOTATION EQUIPMENT IS STORED WITH NUMBER OFADULT AND CHILD SIZES AND TYPE.
Condition: Unknown
Due 30 June 1993
Resolved 30 June 1993
Lifesaving
Issued 23 April 1992 Resolved
D1-VESSEL IS REDUCED TO 79 PERSONS TOTAL WHEN OPERATING WITH IN (1) MILE OFFSHORE, BETWEEN CAPE HENLOPEN, DE. AND OCEAN CITY,M MD.
Condition: Unknown
Due 11 May 1992
Resolved 26 May 1992
Engineering
Issued 14 May 1991 Resolved
REPAIR OR REPLACE EXHAUST RISER HOSE AT REAR OF PORT M/E.
Condition: Unknown
Due 14 May 1991
Resolved 14 May 1991
Lifesaving
Issued 14 May 1991 Resolved
REPLACE THREE FLOATFREE LINKS THAT ARE DETERIORATED ON LIFEFLOATS.
Condition: Unknown
Due 14 May 1991
Resolved 14 May 1991
Engineering
Issued 14 May 1991 Resolved
REPAIR OR REPLACE FUEL SHUTOFF VALVE TO STARBOARD FUEL TANK.
Condition: Unknown
Due 14 May 1991
Resolved 14 May 1991
Lifesaving
Issued 30 April 1990 Resolved
PROVIDE AN ADDITIONAL 13 ADULT PFD'S. NUMBER OF PERSONS ALLOWED ONBOARD IS LIMITED TO 77 UNTIL REQUIRED AMOUNT OF PFD'S ARE ONBOARD.
Condition: Unknown
Due 30 April 1990
Resolved 30 April 1990
Construction/Loadline
Issued 28 May 1986 Resolved
RENEW SIDE AND FLOOR FRAMES AS NECESSARY.
Condition: Unknown
Due 28 May 1986
Resolved 28 May 1986
Construction/Loadline
Issued 13 May 1986 Resolved
INSTALL FLOOR FRAMES IN 2ND COMPARTMENT ON 2ND THRU 8TH FRAMES. REFASTEN CHINE KNEES AS NECESSARY.
Condition: Unknown
Due 13 May 1986
Resolved 13 May 1986
Fire Fighting
Issued 13 May 1986 Resolved
PROVIDE ONE ADDITIONAL B-II FIRE EXTINGUISHER PRIOR TO CARRYING PASSENGERS.
Condition: Unknown
Due 13 May 1986
Resolved 13 May 1986
Construction/Loadline
Issued 5 April 1985 Resolved
RENEW ROTTED FRAMES, DECK BEAMS, FLOORS AND HULL PLATING NOTED ON WORKLIST ISSUED 19OCT84.
Condition: Unknown
Due 5 April 1985
Resolved 5 April 1985

Ownership record