Records from 1985 to 2025. Most recent: inspection, 25 September 2025.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 73
25 September 2025
Annual Inspection · In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8240594
7 January 2025
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8060527
17 December 2024
In-Service Inspection · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8037152
2 July 2024
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7966502
23 May 2024
In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7917984
27 June 2023
Administrative Inspection · Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7746460
7 October 2022
Administrative Inspection · Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Sturgeon Bay · USCG Great Lakes District (CGD-GL) · Activity 7573609
1 August 2022
COI Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7504738
4 April 2022
In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7433442
3 January 2022
Deficiency Check · Plan Review "T" Boat · In-Service Inspection · Examination of Repairs · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7379893
21 October 2021
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7337543
10 February 2021
Internal Structural Exam · Examination of Repairs · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7138594
27 October 2020
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7084768
6 January 2020
In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6883608
4 November 2019
In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6848969
30 October 2019
DAPI Audit · Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6858944
20 November 2018
Liferaft Servicing
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6619778
14 September 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6540261
12 June 2018
COI Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6436768
24 May 2018
Hull Examination
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6423436
10 May 2018
Administrative Inspection
Administrative · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6411128
20 September 2017
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6274473
19 October 2016
In-Service Inspection · Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6029460
5 October 2016
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6017416
29 September 2016
In-Service Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6015375
22 September 2016
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6015044
21 March 2016
Plan Review "T" Boat · In-Service Inspection · Construction Oversight · Administrative Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5837951
17 February 2016
Type not recorded
No type recorded · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5849131
6 January 2016
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5792891
14 October 2015
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5748307
23 September 2015
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5731852
9 November 2010
DAPI Audit · COI Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3888552
4 May 2009
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3468620
24 April 2008
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3199466
3 May 2007
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2924238
24 May 2006
Periodic Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2658265
27 April 2005
COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 2344368
25 October 2004
Hull Examination · Examination of Repairs
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 2228062
6 July 2004
Periodic Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 2123749
1 April 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2045236
29 April 2003
Periodic Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1784857
23 April 2002
Periodic Inspection · Annual Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1607739
13 June 2001
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1070677
9 May 2001
Type not recorded
No type recorded · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 102898
19 April 2001
Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1420511
16 September 2000
Hull Examination
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1468648
26 April 2000
COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1472549
29 July 1999
Excursion Permit
Administrative · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1107705
10 June 1999
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 880603
3 May 1999
Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1384156
16 April 1998
Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1402649
24 June 1997
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 776290
29 April 1997
COI Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1092581
8 August 1996
Excursion Permit
Administrative · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1086715
27 July 1996
Excursion Permit
Administrative · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1086931
24 May 1996
Re-Inspection · Inclining Experiment · Hull Examination
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1161489
17 April 1995
Deficiency Check
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 1161271
4 April 1995
Re-Inspection
Physical examination · MSO SAULT STE MARIE · USCG Great Lakes District (CGD-GL) · Activity 867161
2 May 1994
COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1377181
12 May 1993
Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 839190
11 August 1992
Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 955168
1 October 1991
Hull Examination
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1251700
3 May 1991
COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1214982
7 May 1990
Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 922039
7 May 1990
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 927835
3 April 1989
COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 898303
20 April 1988
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1342541
4 April 1988
Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1030538
7 April 1987
Re-Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1328554
1 October 1986
Credit Drydock
Administrative · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1006518
10 April 1986
COI Inspection
Physical examination · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1307738
5 July 1985
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 987615
17 April 1985
Type not recorded
No type recorded · Marine Safety Unit Toledo · USCG Great Lakes District (CGD-GL) · Activity 1286719
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 December 2024
Resolved
Vessels hot water heating auxiliary boiler has been replaced with new unit of same design and manufacturer. Boiler is prohibited from use until installation inspection, hydrostatic testing and the witnessing of all safety shutdown devices is completed.
Action required: 705 - Other - as specified
Due 17 December 2024
Resolved 30 December 2024
Resolution: Witnessed satisfactory hydrostatic test at 70 deg F to 40PSIG just over 125%MAWP.
Internal visual inspection and safety function checks were completed by certified technician, all sat.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 23 May 2024
Resolved
For fixed-gas fire extinguishing systems, the inspections and tests required by Table 176.810(b) of this section, in addition to the tests required by 46 CFR 147.60 and 147.65. The owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. If any of the equipment or records have not been properly maintained, a qualified servicing facility may be required to perform the required inspections, maintenance procedures, and hydrostatic pressure tests. Vessel owner/operator failed to complete or provide record of completion of required inspections and/or maintenance of and fixed fire suppression system. 46 CFR 176.810(b)(2)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 May 2024
Resolution: Fire service technician attended vessel and conducted inspection/servicing of equipment.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 23 May 2024
Resolved
The owner or managing operator must be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment. Inspection and testing of all smoke and fire detection systems, including sensors and alarms. Vessel owner/operator failed to complete or provide record of completion of required inspections and/or maintenance of the fire detection system. 46 CFR 176.810(a)(7)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 23 May 2024
Resolution: Fire service technician attended vessel and conducted inspection/servicing of equipment.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 1 August 2022
Resolved
Maindeck port side RLB lifeline is deteriorated. RLB must be replaced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2022
Resolved 11 August 2022
Resolution: replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 1 August 2022
Resolved
Engineroom bilges have rags & debris, all other bilges have excessive dirt & debris, all require cleaning.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2022
Resolved 11 August 2022
Resolution: corrected.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 1 August 2022
Resolved
Anchor stock bent making anchor unusable/ineffective. Must be repaired/replaced.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 August 2022
Resolved 11 August 2022
Resolution: corrected.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 21 October 2021
Resolved
EPIRB battery is expired. Service EPIRB or replace with new unit.
** Vessel is limited to NMT 3 NM from land until deficiency is corrected.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 21 November 2021
Resolved 25 October 2021
Resolution: replaced with new EPIRB.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 21 October 2021
Resolved
Port rudder packing leaking. Monitor and continue with approved maintenance practices. If leak worsens, OCMI notification is required.
Packing must be replaced no later than at next dry-docking.
Action required: 705 - Other - as specified
Due 31 May 2023
Resolved 4 April 2022
Resolution: corrected.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 19 February 2021
Resolved
Based on reports from the CGC BISCAYNE BAY, THE SENATOR was observed operating in 6-10" of Plate/Rubble ice on a transit from St. Ignace, MI to Mackinac Island, [name withheld] becoming beset by the ice, THE SENATOR had to be assisted by the Coast Guard ice breaker to free them. Based on previous history of damage to this vessel while being operated in ice and reports of the conditions that day, the Coast Guard suspects the possibility of damage to hull plating or structural members that may affect the sea worthiness of this vessel. Prior to the vessel's movement, Coast Guard Marine Inspectors will conduct an internal structural examination, and based on those findings, may require the vessel to be drydocked or taken out of service to assess the extent of any damage found, and to effect any necessary repairs in accordance with 46 CFR 176.600(d). You are reminded, that in accordance with 46 CFR 176.700(a), repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI.
Action required: 60 - Rectify deficiencies prior to movement
Due 19 February 2021
Resolved 5 March 2021
Resolution: Conducted ISE.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 10 February 2021
Resolved
Vessel has sustained structural fractures at the swosh
bulkhead vertical support stiffeners in voids 3 and 4,
and on the wing overhead transverse frames in voids 3,
4, & in the engine room on the starboard side. Submit a
repair proposal to effect permanent repairs to damaged
areas. If owners desire to operate prior to permanent
repairs, submit proposed interim operating procedures
which include loading documentation and a monitoring
plan. Meticulous loading logs shall be maintained for
all deck cargo transits. Include cargo weights and some
form of mapping of the distribution of cargo on deck.
Each trip record must be signed by the Master attesting
to the accuracy of the record. All transits must be in
full compliance with the vessels issued stability
letter. Proposal must also include a plan for the
company to monitor known damage via weekly inspections
and document the findings. Company loading documentation
and documented inspection results will be reviewed by
Coast Guard Marine Inspectors at follow-up inspections.
Any further degradation shall be reported immediately to
the [name withheld].
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 April 2021
Resolved 4 April 2022
Resolution: repair plan complied with, all repairs verified complete.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 10 February 2021
Resolved
Electrical shore tie cable has a temporary splice made and is kinked. Replace shore tie cable
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 April 2021
Resolved 6 April 2021
Resolution: Corrected.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 10 February 2021
Resolved
Lazarette hatch cover T-handle is broken and makes hatch not watertight. Repair/replace T-handle and make hatch serviceable to the satisfaction of the attending Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 April 2021
Resolved 6 March 2021
Resolution: Corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 October 2020
Resolved
Each lifering must have the vessel's name marked clearly in legible block capital letters. The Starboard side fwd lifering does not have the name legibly on it.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2020
Resolved 5 November 2020
Resolution: Corrected
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 27 October 2020
Resolved
Rudder packing is leaking and needs maintenance.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2020
Resolved 5 November 2020
Resolution: Corrected.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Deck - hold/tank, etc.
Issued 27 October 2020
Resolved
Escape hatch from the engine room and ladder below passenger cabin must be labeled with "EMERGENCY EXIT, KEEP CLEAR" in 2 inch letters.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2020
Resolved 5 November 2020
Resolution: Corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 27 October 2020
Resolved
Vessel needs four more distress signals based on route.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2020
Resolved 5 November 2020
Resolution: Corrected.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 27 October 2020
Resolved
When Class 1 materials are being loaded, handled, or unloaded on a vessel, the vessel must exhibit the following signals: By day, flag “B” (Bravo) of the international code of signals; and By night, an all-round fixed red light.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 November 2020
Resolved 15 December 2020
Resolution: Corrected.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 30 October 2019
Resolved
Fire stations do not have spanner wrenches, install spanner wrenches at each fire station.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 November 2019
Resolved 6 January 2020
Resolution: installed.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 30 October 2019
Resolved
All batteries must be properly chocked to prevent shifting.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 November 2019
Resolved 6 January 2020
Resolution: corrected.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 30 October 2019
Resolved
Replace dilapidated pfd.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 30 October 2019
Resolved 30 October 2019
Resolution: replaced prior to my departure.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 14 September 2018
Resolved
The vessel is currently broadcasting (1) Improper Call Sign.
Condition: Invalid
Action required: 705 - Other - as specified
Due 14 October 2018
Resolved 1 May 2019
Resolution: Received notification of AIS broadcasting correction from vessel owner. Verified no errors in VIVS.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 12 June 2018
Resolved
Replace 3 child size PFDs, prior to carrying more than 120 adults and more than 12 children.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 13 June 2018
Resolved 13 June 2018
Resolution: Owner replaced and labeled, per photos and master statement.
01 - Certificates & Documentation › 012 - Crew Certificates › Training and qualification MLC - Personnel safety training
Issued 12 June 2018
Resolved
Provide Hazmat Employee Training certificates for master and crew prior to carrying hazardous materials in cargo
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 12 July 2018
Resolved 2 August 2018
Resolution: Sighted satisfactory crew training documentation.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access Deck - hold/tank, etc.
Issued 12 June 2018
Resolved
Removeable gates/deck railing at bow loading area not in use while underway, master believed it was not needed when passengers not aboard. Corrected during inspection.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 12 June 2018
Resolved 12 June 2018
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 12 June 2018
Resolved
Improper size portable fire extinguishers has been substituted during recent servicing/inspection by servicing company. Required correction prior to operation, completed during inspection, master was counseled on ensuring proper fire extinguishers are always aboard as per the COI.
Condition: Placed in Improper Service
Action required: 10 - Deficiency Rectified
Due 12 June 2018
Resolved 12 June 2018
Construction/Loadline › Hull › Bottom Plating
Issued 10 May 2018
Resolved
Complete temporary repairs to lazarette hull plate fracture per approved repair plan.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 11 May 2018
Resolved 10 May 2018
Resolution: completed
Construction/Loadline › Hull › Bottom Plating
Issued 10 May 2018
Resolved
Complete permanent repairs to lazarette hull plate fracture.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 May 2018
Resolved 18 May 2018
Navigation › Piloting/Steering › Marine Charts
Issued 20 September 2017
Resolved
Replace outdated nav rules, nautical chart, light list and coast pilot.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 October 2017
Resolved 13 October 2017
Resolution: replaced.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Instructions
Issued 20 September 2017
Resolved
Post operating instructions for fixed E/R extinguishing systems at control station.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 20 October 2017
Resolved 13 October 2017
Resolution: posted.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 20 September 2017
Resolved
Make RLB strobe light operational.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 September 2017
Resolved 20 September 2017
Resolution: Corrected prior to my deaprture from vessel.
Documentation › Manuals/Policy Documentation › Emergency Instructions
Issued 22 September 2016
Resolved
Post EP's at operating station
Condition: Improper Installation
Due 22 October 2016
Resolved 5 October 2016
Resolution: Instructions placed at operating station.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 22 September 2016
Resolved
Portable fire extinguishers need anti-chafe material between extingishers and mounting bracket to prevent continued wear/corrosion.
Due 22 October 2016
Resolved 5 October 2016
Resolution: Anti-chafe material installed.
Operations/Management › Equipment Service/Testing › EPIRB
Issued 22 September 2016
Resolved
EPIRB monthly testing must be logged.
Due 22 October 2016
Resolved 5 October 2016
Resolution: Monthly tests properly logged.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 22 September 2016
Resolved
Main deck escape hatch for engineroom needs to be re-stenciled.
Due 22 October 2016
Resolved 5 October 2016
Resolution: Escape route properly marked.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 22 September 2016
Resolved
Mark upper deck with maximum passengers allowed per stability ltr.
Condition: Improper Installation
Due 22 October 2016
Resolved 5 October 2016
Resolution: Upper deck properly marked.
Engineering › Fuel Oil Storage/Transfer System › Piping
Issued 22 September 2016
Resolved
Flexible sections of fuel fill piping must be properly bonded to prevent static electricity build up.
Due 22 October 2016
Resolved 5 October 2016
Resolution: Bonding properly installed.
Engineering › Pressure Vessel › Marking and Stamping
Issued 22 September 2016
Resolved
Mark boiler with reduced MAWP at 30 psi for water per 46CFR53.01-10(b)(2).
Due 22 October 2016
Resolved 19 October 2016
Engineering › Pressure Vessel › Maximum Allowable Working Pressure
Issued 22 September 2016
Resolved
Make boiler available for examination and 1.25 hydro test in presence of Marine Inspector.
Due 22 October 2016
Resolved 19 October 2016
Resolution: Witnessed hydrostatic test at 39PSGI and 70 deg F.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 23 September 2015
Resolved
Replace missing safety cap on cylcinder control head and tighten loose conduit fittings for control cables at cylinders.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2015
Resolved 14 October 2015
Resolution: replaced cap.
Engineering › Steering Gear System › Piping
Issued 23 September 2015
Resolved
Repair leaks in steering hydraulic piping inside operating station console and in steering room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2015
Resolved 14 October 2015
Resolution: leak repaired.
Stability › Freeing Ports › General
Issued 23 September 2015
Resolved
Relocate Ring Life Buoy away from non-return flap at starbooard freeing port.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 September 2015
Resolved 14 October 2015
Resolution: freeing port free to move, life ring satisfactorily moved.
Fire Fighting › Portable CO2 Fire Extinguisher › Condition
Issued 23 September 2015
Resolved
Replace deteriorated hose and horn assemlies on both portable CO2 fire extinguishers on weather deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2015
Resolved 14 October 2015
Resolution: new hoses and horns installed.
Engineering › Steam Boiler (auxiliary/waste heat) › Automation Equipment
Issued 23 September 2015
Resolved
Demonstrate proper operation of auxiliary hot water heating boiler safety devices, or provide report showing annual inspection and servicing has been completed within the past 12 months, to include all operatring controls, safety alarms and shut-downs.
Action required: 705 - Other - as specified
Due 23 November 2015
Resolved 6 January 2016
Engineering › Freshwater System (cylinder head cooling) › Piping
Issued 23 September 2015
Resolved
Repair engine coolant leaks on starboard main engine.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 October 2015
Resolved 14 October 2015
Resolution: replaced coolant holding tank, no leak.
Fire Fighting › Combustible Materials › Insulation
Issued 23 September 2015
Resolved
Install oil resistant insulation on exposed areas on all engine exhaust systems.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 23 October 2015
Resolved 14 October 2015
Resolution: new insulation installed.
Documentation › Markings/Placards › Warning Signs
Issued 23 September 2015
Resolved
Label emergency exit from engineroom "Emergency Exit - Keep Clear".
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 23 November 2015
Resolved 14 October 2015
Resolution: label properly applied.
Lifesaving › Lifebuoys › Serviceable
Issued 23 September 2015
Resolved
Renew deteriorated lines on Ring Life Buoy at Port Main Deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 October 2015
Resolved 14 October 2015
Resolution: new lines installed.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 23 September 2015
Resolved
Provide an approved first aid kit or one with equivalent contents.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 October 2015
Resolved 14 October 2015
Resolution: Kit updated.
Documentation › Certificates/Documents › Stability Letter
Issued 23 September 2015
Resolved
Post stability letter at operating station.
Condition: Improper Installation
Due 25 September 2015
Resolved 28 September 2015
Resolution: Resolved per emailed pictures.
Communications › Radio Communications › EPIRB
Issued 23 September 2015
Resolved
Install EPRIB in accordance with 46 CFR 180.64, meanwhile vessel must operate within 3 miles of land.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 23 October 2015
Resolved 14 October 2015
Navigation › Piloting/Steering › Marine Charts
Issued 23 September 2015
Resolved
Provide current official marine charts for operating area.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 October 2015
Resolved 14 October 2015
Fire Fighting › Miscellaneous Items › Waste Receptacles
Issued 23 September 2015
Resolved
Replace plastic trash cans with noncombustible or metal containers.
Condition: Improper Installation
Due 23 October 2015
Resolved 14 October 2015
Fire Fighting › Semiportable Chemical-Foam Fire Extinguishers › Securing Means
Issued 23 September 2015
Resolved
Wheeled B-V Dry Chemical unit not secured for underway opeartion, corrected.
Condition: Improper Installation
Due 23 September 2015
Resolved 23 September 2015
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 9 November 2010
Resolved
Place retro reflective tape on ring lifebuoy as required by 46 CFR 185.604 (i) prior to operation.
Action required: 705 - Other - as specified
Due 9 November 2010
Resolved 7 April 2011
Resolution: RETRO REFLECTIVE TAPE ON RING BUOY REPLACED WITH NEW.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 9 November 2010
Resolved
Repair or replace damage to wire mesh STBD rail next to pilot house to proper condition as required by 46 CFR 177.35.
Action required: 705 - Other - as specified
Due 9 December 2010
Resolved 7 April 2011
Resolution: Cropped and newed damaged section of wire mesh on the strb rail.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 9 November 2010
Resolved
Replace expired items in first aid kit as required by 46 CFR 184.710.
Action required: 705 - Other - as specified
Due 9 December 2010
Resolved 7 April 2011
Resolution: Expired items in first aid kit replaced with new.
Lifesaving › Hand Flares › Quantity
Issued 9 November 2010
Resolved
Provide proper number of flares per vessel route as required by 180.68 (a) prior to operation.
Action required: 705 - Other - as specified
Due 9 November 2010
Resolved 7 April 2011
Resolution: Vessels has the correct number of flares.
Electrical › Electrical Distribution System (service) › Wiring
Issued 9 November 2010
Resolved
Remove/ cap dead end wires in engine room as required by 46 CFR 183.
Action required: 705 - Other - as specified
Due 9 December 2010
Resolved 7 April 2011
Resolution: Removed/capped dead end wires in engine room.
Lifesaving › Lifefloat › Serviceable
Issued 9 November 2010
Resolved
Repair or replace 22 person life float to proper condition as required by 46 CFR 180.200.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 November 2010
Resolved 7 April 2011
Resolution: Serviceable 22 person life float onboard.
Lifesaving › Lifefloat › Lifeline
Issued 9 November 2010
Resolved
Replace aging life lines on two 15 person life floats as required by 46 CFR 180.200.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 November 2010
Resolved 7 April 2011
Resolution: Replaced aging life lines with new on the two 15 person life float.
Fire Fighting › Means of Escape › Escape Route Signs
Issued 9 November 2010
Resolved
Mark emergency exit on both sides using at least 1 inch letters as required by 46 CFR 185.30-15.
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 November 2010
Resolved 7 April 2011
Resolution: Both sides of emergency exit marked with 1 inch letters.
Accommodation/Occupational Safety › Occupational Safety › Smoking
Issued 9 November 2010
Resolved
Post "NO SMOKING" signs on outside deck as required by 46 CFR 185.20-20 (c).
Action required: 705 - Other - as specified
Due 9 December 2010
Resolved 7 April 2011
Resolution: "NO SMOKING" signs on outside deck posted.
Communications › Internal Communications System › Portable Radios
Issued 9 November 2010
Resolved
Provide proper means of communication between steering station and engine room as required by 46 CFR 184.35-1.
Action required: 705 - Other - as specified
Due 9 December 2010
Resolved 7 April 2011
Resolution: Provided two-way handled radios for the Captain and the Mate.
Construction/Loadline › Hull › Stiffener
Issued 27 April 2007
Resolved
CROP AND RENEW 3" FRACTURE IN WELD IN #2 COMP STRUCTURAL OVHD FRAMING PORT SIDE
Due 1 June 2007
Resolved 1 June 2007
Construction/Loadline › Hull › Stiffener
Issued 27 April 2007
Resolved
CROP AND RENEW 4" FRACTURE IN OVHD PORTSIDE 24" OUTBOARD OF CENTERLINE.
Due 1 June 2007
Resolved 1 June 2007
Construction/Loadline › Hull › Side Shell
Issued 27 April 2007
Resolved
CROP AND RENEW 1" CRACK IN WELD ON AFT BLKHD PORT SIDE.
Due 1 June 2007
Resolved 1 June 2007
Lifesaving › Lifefloat › Platform
Issued 27 April 2007
Resolved
MAKE REPAIRS TO SKIN OF LIFEFLOAT OR RENEW AND PROVIDE VESSELS NAME ON OARS.
Due 1 June 2007
Resolved 1 June 2007
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Service
Issued 24 May 2006
Resolved
Affix proper servicing tag to main deck and E/R fire extinguishers.
Condition: Unknown
Due 31 May 2006
Resolved 31 May 2006
Lifesaving › Buoyant Apparatus › Float Free
Issued 24 May 2006
Resolved
Install adequate spacers between life floats.
Condition: Improper Installation
Due 24 June 2006
Resolved 8 June 2006
Lifesaving › Visual Distress Signals (General) › Expired
Issued 24 May 2006
Resolved
Replace expired EPIRB battery.
Condition: Unknown
Due 24 June 2006
Resolved 15 June 2006
Construction/Loadline › Hull › Stiffener
Issued 27 April 2005
Resolved
Repair 8 weld fractures in #3 compartment.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 27 May 2005
Resolution: Weld repairs conducted.
Navigation › Electronic Positioning › GPS/DGPS Receiver
Issued 27 April 2005
Resolved
Replace Hydro-static release for EPIRB.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 30 May 2005
Resolution: Replaced hydrostatic release
Fire Fighting › Fire Main › Material
Issued 27 April 2005
Resolved
Repair #1 fire station pipe stanchion on main deck.
Condition: Unknown
Action required: 705 - Other - as specified
Due 30 May 2005
Resolved 30 May 2005
Resolution: Re-welded
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 6 July 2004
Resolved
Provide current Documentation of vessel.
Condition: Unknown
Due 6 August 2004
Resolved 6 July 2004
Fire Fighting › Fire Hoses › Condition
Issued 6 July 2004
Resolved
Replace fire hose stbd side aft station.
Condition: Unknown
Due 6 August 2004
Resolved 6 July 2004
Lifesaving › Hand Flares
Issued 23 April 2002
Resolved
Condition: Improper/Lack of Maintenance
Due 30 April 2002
Resolved 30 April 2002
Construction/Loadline › Markings
Issued 23 April 2002
Resolved
Mark vessel port bow with vessel name. LEGACY COMPONENT DESC: Vessel Name/Home Port
Condition: Improper/Lack of Maintenance
Due 23 May 2002
Resolved 13 May 2002
Lifesaving › Buoyant Apparatus
Issued 23 April 2002
Resolved
Replace deteriorated lines on one 15-man life float and clean moss and fungus from all survival craft. LEGACY COMPONENT DESC: Lines
Condition: Improper/Lack of Maintenance
Due 7 May 2002
Resolved 13 May 2002
Lifesaving › Buoyant Apparatus
Issued 23 April 2002
Resolved
Label life float paddles with vessel name. LEGACY COMPONENT DESC: Markings
Condition: Improper/Lack of Maintenance
Due 7 May 2002
Resolved 13 May 2002
Accommodation/Occupational Safety › Potable Water System
Issued 23 April 2002
Resolved
Label water spigot in head with warning that the water is unfit for drinking. LEGACY COMPONENT DESC: Unsafe for drinking
Condition: Improper/Lack of Maintenance
Due 7 May 2002
Resolved 13 May 2002
Electrical › Electrical Distribution System (service)
Issued 23 April 2002
Resolved
Provide metallic supports for wiring in void spaces, not more than 24" apart. LEGACY COMPONENT DESC: Wiring
Condition: Improper Installation
Due 7 May 2002
Resolved 13 May 2002
Engineering › Diesel Engine (propulsion-reduction gear)
Issued 23 April 2002
Resolved
Prove proper operation of port main engine lube oil alarm. LEGACY COMPONENT DESC: Instruments and alarms
Condition: Unknown
Due 7 May 2002
Resolved 30 April 2002
Lifesaving
Issued 19 April 2001
Resolved
FIRST AID KIT INCOMPLETE AND CONTAINS EXPIRED ITEMS, TO BE CORRECTED BEFORETHE COMPLIANCE DATE.
Condition: Unknown
Due 19 May 2001
Resolved 10 May 2001
Electrical
Issued 19 April 2001
Resolved
CLEAN TERMINALS AND CONNECTIONS ON MAIN BATTERY TERMINALS BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 26 April 2001
Resolved 8 May 2001
Engineering
Issued 19 April 2001
Resolved
PROVE OPERATION OF MAIN FUEL OIL REMOTE SHUT OFF VALVE.
Condition: Unknown
Due 8 May 2001
Resolved 8 May 2001
Accommodation/Occupational Safety
Issued 19 April 2001
Resolved
PROVE PROPER OPERATION OF AIR COMPRESSOR CONTROL AND AIR RECEIVER RELIEF VALVE BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 26 April 2001
Resolved 10 May 2001
Lifesaving
Issued 19 April 2001
Resolved
CONDUCT AND PROVIDE DOCUMENTATION OF CREW EMERGENCY TRAINING AND DRILLS, DEMONSTRATE CREW PROFICIENCY IN MAN-OVERBOARD AND FIRE DRILLS BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 19 April 2001
Resolved 19 April 2001
Engineering
Issued 19 April 2001
Resolved
PROVIDE REMOTE MEANS OF OPERATING FUEL OIL SHUT OFF VALVE FOR SHIP SERVICE GENERATOR, AS PER 46 CFR 182.455, TO BE COMPLETED BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 19 May 2001
Resolved 10 May 2001
Construction/Loadline
Issued 19 April 2001
Resolved
REMOVE SWITCH FROM BILGE ALARM CIRCUIT TO PREVENT UNINTENDED DISABLING OF THE BILGE ALARMS, TO BE COMPLETED PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 19 May 2001
Resolved 10 May 2001
Electrical
Issued 19 April 2001
Resolved
GLASS GLOBE BROKEN IN LIGHTING FIXTURE IN 3RD VOID SPACE, CORRECTED DURING INSPECTION.
Condition: Unknown
Due 10 May 2001
Resolved 10 May 2001
Lifesaving
Issued 19 April 2001
Resolved
PROVIDE EFFECTIVE MEANS FOR RECOVERING A HELPLESS PERSON FROM THE WATER, PROVE EFFECTIVENESS TO THE ATTENDING CG MARINE INSPECTOR, TO BE COMPLETED BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 19 April 2001
Resolved 19 April 2001
Engineering
Issued 19 April 2001
Resolved
PROVIDE PROOF THE HOT WATER HEATING BOILER HAS BEEN INSTALLED, SERVICED ANDTESTED IN ACCORDANCE SECTION IV OF THE ASME CODE, VIA AFFIDAVIT FROM ASME QUALIFIED SHOP.
Condition: Unknown
Due 19 April 2001
Resolved 19 April 2001
Lifesaving
Issued 19 April 2001
Resolved
VESSEL'S CAPACITY IS REDUCED TO 90 TOTAL PERSONS UNTIL SUFFICIENT LIFE FLOATS ARE PROVIDED TO ACCOMODATE AT LEAST 50% OF THE TOTAL PERSONS ALLOWEDON THE CERTIFICATE OF INSPECTION, TO BE ACCOMPLISHED BEFORE THE COMPLIANCE DATE.
Condition: Unknown
Due 19 May 2001
Resolved 10 May 2001
Lifesaving
Issued 19 April 2001
Resolved
BATTERIES DEAD IN FLOAT LIGHTS, CORRECTED DURING INSPECTION. REMINDED OWNER OF REGULATORY REQ'T TO REPLACE ANNUALLY REGARDLESS OF CONDITION.
Condition: Unknown
Due 10 May 2001
Resolved 10 May 2001
Construction/Loadline
Issued 26 April 2000
Resolved
FOREPEAK BILGE SUCTION NOT OPERABLE FROM OUTSIDE COMPARTMENT, SYSTEM DISABLED AND PLUGGED AT COLLISION BULKEHEAD, PORTABEL BILGE PUMP PROVED ADEQUATE, SEE MINS.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Lifesaving
Issued 26 April 2000
Resolved
GRABLINE DETERIORATED ON ONE RING LIFE BUOY, CORRECTED.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Lifesaving
Issued 26 April 2000
Resolved
FLOAT LIGHT WATER-FILLED ON ONE LIFE FLOAT, CORRECTED.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Lifesaving
Issued 26 April 2000
Resolved
DETERIORATED PADDLE ON ONE LIFE FLOAT, CORRECTED.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Lifesaving
Issued 26 April 2000
Resolved
ITEMS MISSING OR EXPIRED IN FIRST AID KIT, CORRECTED.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Accommodation/Occupational Safety
Issued 26 April 2000
Resolved
PROVE ENGINEROOM AIR RECEIVER MEETS ASME OR U/L STANDARDS. CORRECTED PER FAX REPORT 5/24/00, REMOVED AND INSTALLED U/L APPROVED SELF-CONTAINED SYSTEM.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Engineering
Issued 26 April 2000
Resolved
LABEL FUEL OIL REMOTE SHUT OFF VALVES. CORRECTED PER FAX REPORT, 4/48/00.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Accommodation/Occupational Safety
Issued 26 April 2000
Resolved
LABEL ENGINEROOM ESCAPE, COMPLETED 4/28/00 PER FAX REPORT.
Condition: Unknown
Due 8 June 2000
Resolved 8 June 2000
Lifesaving
Issued 3 May 1999
Resolved
Provide container for distress signals prior to the compliance date.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Lifesaving
Issued 3 May 1999
Resolved
LABEL LOCATION FOR STOWAGE OF LIFEJACKETS PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Engineering
Issued 3 May 1999
Resolved
INSTALL REMOTE FUEL SHUT OFF VALVE OUTISDE OF ENGINEE ROOM PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Documentation
Issued 3 May 1999
Resolved
Provide logbook to document drills, training and required inspections priorto the compliance date.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Lifesaving
Issued 3 May 1999
Resolved
PROVIDE PROPER WEAKLINK AND WATERLIGHT LANYARDS FOR THREE (3) LIFEFLOATS PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Lifesaving
Issued 3 May 1999
Resolved
PROVIDE PADDLES FOR THREE (3) LIFEFLOATS PRIOR TOT HE COMPLIANCE DATE.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Unknown
Issued 3 May 1999
Resolved
LABLE UPPERDECK WITH THE MAXIMUM NUMBER OF PASSENGERS PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Documentation
Issued 3 May 1999
Resolved
POST STABILITY LETTER AND COI AT OPERATING STATION PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 3 May 1999
Resolved 7 June 1999
Lifesaving
Issued 3 May 1999
Resolved
LABEL FOUR (4) ADULT LIFE JACKETS PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Unknown
Issued 3 May 1999
Resolved
PROVE PROPER OPERATION OF PA SYSTEM PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Engineering
Issued 3 May 1999
Resolved
INSTALL FUEL PIPING SYSTEM FOR VESSEL GENERATOR AS REQUIRED BY 46 CFR 182.455 AND 182.720 PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Engineering
Issued 3 May 1999
Resolved
INSTALL 30 X 30 FLAME SCREENS ON PORT AND STARBOARD FUEL VENTS PRIOR TO THECOMPLIANCE DATE.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Engineering
Issued 3 May 1999
Resolved
INSTALL EXHAUST LAGGING ON PORT AND STARBOARD MDE EXHAUST PIPING PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Engineering
Issued 3 May 1999
Resolved
INSTALL PROTECTIVE COVERS ON ENGINE ROOM OVERHEAD LIGHTS PRIOR TO THE COMPLIANCE DATE.
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Fire Fighting
Issued 3 May 1999
Resolved
PROVE PROPER OPERATION OF PORT MDE POWER FIRE PUMP PRIOR TO CARRYING PASSENGERS (VSL ALLOWED TO CARRY CARGO TRUCKS W/DRIVERS).
Condition: Unknown
Due 3 May 1999
Resolved 3 May 1999
Electrical
Issued 29 April 1997
Resolved
Equip vessel with emergency lighting in the wheelhouse.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Lifesaving
Issued 29 April 1997
Resolved
Replace waterlight attached to lifering on wheelhouse.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Unknown
Issued 29 April 1997
Resolved
Provide and maintain a first aid kit on board.
Condition: Unknown
Due 8 May 1997
Resolved 8 May 1997
Fire Fighting
Issued 29 April 1997
Resolved
Install water pressure gauge on firemain, in the vicinity of the firepump outlet.
Condition: Unknown
Due 29 April 1997
Resolved 29 April 1997
Construction/Loadline
Issued 4 April 1995
Resolved
Install check valves in each bilge pipeline.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Accommodation/Occupational Safety
Issued 4 April 1995
Resolved
Remove PVC sewage pipeline that passes through aft engine room bulkhead andrenew the watertight integrity of the bulkhead no later than next scheduleddrydock.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Construction/Loadline
Issued 4 April 1995
Resolved
Renew main deck hatch coamings no later than next scheduled drydocking.
Condition: Unknown
Due 4 April 1995
Resolved 4 April 1995
Fire Fighting
Issued 4 April 1988
Resolved
SERVICE ALL PORTABLE, SEMI-PORTABLE AND FIXED FIRE EXTINGUISHERS IAW 46CFR 176.25-25.
Condition: Unknown
Due 4 April 1988
Resolved 4 April 1988
Electrical
Issued 10 April 1986
Resolved
SOLDER ALL BATTERY TERMINAL CONNECTIONS.
Condition: Unknown
Due 10 April 1986
Resolved 10 April 1986
Documentation
Issued 10 April 1986
Resolved
POST STABILITY LETTER DATED 03JUL85.
Condition: Unknown
Due 10 April 1986
Resolved 10 April 1986
Fire Fighting
Issued 10 April 1986
Resolved
HYDROSTATICALLY TEST B-II EXTINGUISHER AT TOP OF ENGINEROOM LADDER.
Condition: Unknown
Due 10 April 1986
Resolved 10 April 1986
Fire Fighting
Issued 10 April 1986
Resolved
SERVICE B-III EXTINGUISHER IN ENGINEROOM.
Condition: Unknown
Due 10 April 1986
Resolved 10 April 1986
Construction/Loadline
Issued 17 April 1985
Resolved
PLACE NAME AND HAILING PORT ON THE STERN OF THE VESSEL.
Condition: Unknown
Due 17 April 1985
Resolved 17 April 1985