MAURY USCG vessel records
← All vessels

MSC KOREA

MSC KOREA is a freight ship. The Coast Guard has recorded 21 inspections since 2016, most recently in April 2024, along with 12 deficiencies and 2 operational controls.

Records from 2016 to 2024. Most recent: inspection, 23 April 2024.

Built
Not recorded
Last inspected
23 April 2024
Documentation
Not in the documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 23 April 2024
Operational controls None recorded without a removal date
Years with a record 6 calendar years (2016–2024)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

9123154
437680
Flag
PANAMA
Maury page id
psix-437680

Documentation record

Tonnage as PSIX records it37518 - Convention (Subpart B), Gross Ton
22460 - Convention (Subpart B), Net Ton
49442 - Dead Weight, Metric Ton
63414 - Displacement, Metric Ton
This hull's Official Number is not in the NVDC file dated 10 August 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 21

23 April 2024 PSC B
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 7897068
14 December 2023 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7839162
29 September 2023 PSC B
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7800217
14 March 2023 PSC B
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7650011
9 March 2023 Administrative Inspection · PSC B · Deficiency Check · In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7648226
21 August 2022 PSC A
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7539280
30 January 2022 PSC A
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7385834
9 November 2021 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7348234
24 September 2021 PSC B · Ballast Water Examination
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 7315005
21 September 2021 PSC B · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7316928
13 May 2021 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 7195761
11 May 2021 Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7194569
19 March 2021 MARPOL Annex VI Survey · PSC A
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7159372
4 August 2017 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6230563
7 July 2017 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6201046
14 June 2017 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6175833
31 March 2017 ISPS II Exam · PII Safety Exam · Ballast Water Examination
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6114968
25 February 2017 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6094560
2 September 2016 Ballast Water Examination · ISPS III Exam · PII Safety Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5990221
20 April 2016 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5858481
22 March 2016 PII Safety Exam · Ballast Water Examination · ISPS II Exam
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 5837980

Deficiency record · 12

09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 29 September 2023 Resolved
The machinery, boilers and other pressure vessels, associated piping system and fittings shall be of design and construction adequate for the service for which they are intended…Guard for prime movers was not installed appropriately.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 October 2023
Resolved 14 December 2023
Resolution: See attached class report for repairs made.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 September 2023 Resolved
Measures shall be taken to the satisfaction of the Administration to ensure that the equipment is functioning in a reliable manor…Scrubber system piping was leaking salt water and salt residuals.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 October 2023
Resolved 14 December 2023
Resolution: See attached class reports for repairs made.
09 - Working and Living Conditions › 091 - Living Conditions › Drainage
Issued 29 September 2023 Resolved
After any survey of the ship under regulations 7, 8, 9 or 10 has been completed, no change shall be made in the structural arrangements… At least two temp repairs using soft patches in sealing leaking pipes on draining system.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 29 October 2023
Resolved 14 December 2023
Resolution: See attached class reports for repairs made.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 29 September 2023 Resolved
The machinery, boilers and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed…Crank case inspection cover have four wasted bolts.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 29 October 2023
Resolved 14 December 2023
Resolution: See attached class reports for repairs made.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 9 March 2023 Resolved
1) The company should establish procedures to ensure that the ship is maintained in conformity with The provisions of the relevant rules and regulations, and with any additional requirements which may be established by the company. Multiple fuel oil leaks were observed in the engine room. E/R log states rounds are being conducted every four hours but there is no guidance as to which items are to be checked and at what frequency. SMS states oil leaks shall be cleaned, but multiple catch basins were observed throughout E/R, including approximately 2 inches oil under M/E shaft seal near cylinder 4 and 5. None of these fuel leaks have been reported to the company for rectification. Based on the objective evidence sited above, the vessel is not in substantial compliance with the relevant conventions, this questioning the adequacy and overall implementation of the vessels SMS. An external audit conducted by the flag or RO to determine the ship is operating in accordance with the ISM Code is required. 74SOLAS(20) IX/3.1 ISM CODE 10.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 11 March 2023
Resolved 11 March 2023
Resolution: Received and reviewed submitted documentation from DNV, ship has implemented new engineroom checklists and SMS procedures to ensure compliance with relevant regulations.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 9 March 2023 Resolved
2) In a ship which oil fuel is used, the arrangements for the storage, distribution, and utilization of the oil shall be such to ensure the safety of the ship. PSCO observed fuel oil leaks in numerous locations including, but not limited to, Main Engine Shaft Seal near cylinder #4 and #5, M/E crankcase, pooled oil in m/e containment, lube oil purifier pump, and aux generator piping. Crew was observed removing manufactured catch basins full of oil and oil soaked rags in areas where oil leaks were observed. In addition, Excessive amounts of pooled fuel oil were discovered under step of main engine, coming from M/E shaft seal near cylinder #4 and #5. 74SOLAS(97) II-2/15.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 10 March 2023
Resolved 11 March 2023
Resolution: Received satisfactory documentation from DNV that repairs have been carried out and engine room has been reasonably cleaned of oil leaks.
14 - Pollution Prevention › 146 - MARPOL Annex VI › Diesel engine relating to air pollution control
Issued 24 September 2021 Resolved
The Administration of a party may allow any fitting, material, applinmace or apparatus to be fitted in a ship other than procedures and shall communicate to the organization for a circulation to the parties particulars thereof. Scrubber system operates properly. However, RO has not been notified of alternative arrangements.
Condition: Improper Installation
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 9 November 2021
Resolved 9 November 2021
Resolution: RO has been properly notified of the alternative arrangements. *See documents*
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 24 September 2021 Resolved
The ORB part 1 shall be completed on each occassion on a tank to tank basis whenever there is collection and disposal of oil residue (sludge). Sludge tank cap was removed and 200L of water from scrubber system gets pumped into the sludge tank unrecoreded.
Condition: Placed in Improper Service
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
Due 9 November 2021
Resolved 9 November 2021
Resolution: On board training of how to properly complete entries in the Oil Record Book given to the crew by the Chief Engineer.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 21 September 2021 Resolved
15109 - The company should establish procedures to ensure that the ship is maintained in conformity with the provisions of the relevant rules and regulations and with any additional requirements which may be established by the company. PSCO requested the vessel's daily checklists for engine room maintenance. The daily work report for 9/20/21 stated the engine room was cleaned and painted and the daily work report for 9/18/21 stated the main engine crank case was inspected. Additionally, permits to work for 9/21/21, 9/16/21, and 9/15/21 stated cleaning was being conducted in the engine room. Due to objective evidence in the above deficiencies, the vessel is not in substantial compliance with relevant conventions. The Captain of the Port questions the adequacy and overall implementation of the vessel's SMS under the ISM Code. An external audit conducted by the Flag or RO is required to determine whether the ship is operating in accordance with the ISM Code. Provide a copy of the completed audit report to USCG prior to departure from port. 74 SOLAS (20) IX/3.1 ISM Code 10.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 21 September 2021
Resolved 22 September 2021
Resolution: Received satisfactory ISM Audit from DNV.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 21 September 2021 Resolved
07126 - In a ship which oil fuel is used, the arrangements for the storage, distribution and utilization of the oil shall be such to ensure the safety of the ship. PSCO observed fuel oil running down both sides of the main engine, fuel oil leaking from the gasket on crankcase #2, oil soaked rags stuffed in numerous spaces on the main engine and all 4 generators, oil splattered on lighting in the vicinity of the main engine, fuel oil leaks and pooled oil around all fuel pumps for the main engine, and fuel leaking from the injector on the #6 cylinder. Additionally, there were fuel oil leaks from multiple crank cases on all 4 generators, oil leaks and pooled oil on top of the generators, and leaking pipelines around generators. 74 SOLAS (97) II-2/15.2
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Due 21 September 2021
Resolved 22 September 2021
Resolution: Received Class Report attesting to rectification of deficiencies.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 21 September 2021 Resolved
02108 - Main and emergency switchboards shall be so arranged as to give easy access as may be needed to a apparatus and equipment, without danger to personnel. The sides and rear, and where necessary, the front of switchboards shall be suitably guarded. PSCO observed openings on front and rear of main switchboard in ECR. 74SOLAS(04)II-1/45.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 21 September 2021
Resolved 22 September 2021
Resolution: Received Class Report attesting to rectification of deficiencies.
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 21 September 2021 Resolved
02105 - The condition of the ship and its equipment shall be maintained to conform with the provisions of the present regulations. PSCO observed hydraulic oil leak, with a rag soaking up the leak, on the steering gear. 74SOLAS(20)I/11(a)
Action required: 17 - Rectify deficiencies prior to departure
Due 21 September 2021
Resolved 22 September 2021
Resolution: Received Class Report attesting to rectification of deficiencies.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.