Records from 2006 to 2026. Most recent: inspection, 30 April 2026.
Inspection history · 20
30 April 2026
Examination of Repairs
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8380824
17 March 2026
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8327603
11 September 2025
Deficiency Check · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8229356
21 May 2025
Deadweight Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8140496
19 May 2025
Construction Oversight · Drydock Exam · Plan Review "T" Boat
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8140487
26 September 2024
Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 8019920
28 June 2024
Drydock Extension · COI Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7941861
19 September 2023
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7794312
13 October 2022
Annual Inspection · Administrative Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7575801
28 June 2022
Internal Structural Exam · Examination of Repairs · Administrative Inspection · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7489644
18 October 2021
Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7335010
15 October 2020
Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7077732
2 June 2020
Deficiency Check · Internal Structural Exam · Drydock Exam · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6966013
18 July 2019
COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6732516
25 January 2019
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6615143
1 November 2018
Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6572345
13 June 2018
Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6442968
2 November 2017
DAPI Audit · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6299180
7 November 2016
Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6035283
1 June 2016
Internal Structural Exam · Drydock Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5892499
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 11 September 2025
Resolved
A self priming, power driven fire pump must be installed on each vessel: Of not more than 19.8 meters (65 feet) in length that carries more than 49 passengers
Vessel is required to have fire pump. Vessel must have a functioning fire pump. Passengers are not allowed on board until fire pump is functional.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 September 2025
Resolved 19 September 2025
Resolution: Valve misalignment. Conducted training.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 11 September 2025
Resolved
Gauges to indicate engine revolutions per minute (RPM), jacket water discharge temperature, and lubricating oil pressure must be provided for all propulsion engines installed in the vessel. The gauges must be readily visible at the operating station.
Vessels starboard engine gauges at helm must be operable.
Action required: 701 - Prior to carriage of passengers/cargo
Due 25 September 2025
Resolved 19 September 2025
Resolution: Replaced Gauge.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 11 September 2025
Resolved
Each vessel must be equipped with at least two operable portable battery lights. One of these lights must be located at the operating station and the other at the access to the propulsion machinery space.
MI's witnessed the portable light at the operating station did not have batteries and the machinery space did not have one. Vessel must carry two operable portable lights.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 September 2025
Resolved 19 September 2025
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 11 September 2025
Resolved
A hatch cover must: Be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss.
Vessel must secure aft watertight hatches.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 September 2025
Resolved 19 September 2025
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 11 September 2025
Resolved
A vessel must carry one floating waterlight: Each floating waterlight installed after March 11, 1997, on a vessel carrying only one ring buoy, must be attached to the lanyard with a corrosion-resistant clip. The clip must have a strength of at least 22.7 kilograms (50 pounds), and allow the waterlight to be quickly disconnected from the ring life buoy.
Vessel must replace corroded clip on life buoy.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 September 2025
Resolved 19 September 2025
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 11 September 2025
Resolved
All engines must have at least two means for stopping the engine(s) under any operating conditions. The fuel oil shutoff required at the engine by § 182.455(b)(4) will satisfy one means of stopping the engine.
Vessel must replace "C" clip on generator.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 September 2025
Resolved 19 September 2025
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 28 June 2024
Resolved
NO PERSONS MAY USE A VESSEL TO WHICH THIS PART APPLIES UNLESS: IT HAS A NUMBER ISSUED ON A CERTIFICATE OF NUMBER BY THE ISSUING AUTHORITY IN THE STATE OF PRINCIPAL OPERATION.OBTAIN VALID FL STATE REGISTRATION.
33 CFR 173.15(a)(1)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 13 August 2024
Resolution: All sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 June 2024
Resolved
EACH FIXED POWER BULGE PUMP MUST BE SELF PRIMING ... IT MUST BE PERMANENTLY CONNECTED TO THE BILGE MANIFOLD ... LABEL ALL MANIFOLD VALVE SUCTIONS FOR EACH COMPARTMENT AND PROVIDE CREW KNOWLEDGE TRAINING. POWER BILGE PUMPING SYSTEM WAS NONOPERATIONAL IN COMPARTMENTS ON BOTH PORT AND STARBOARD SIDE.
46 CFR 182.520 (c)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2024
Resolution: All manifold valves labeled, check valves cleaned and operational. Bilge pump test completed in all compartments, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 September 2023
Resolved
Exhaust gas must not leak from the piping or any connections. Port exhaust piping of the port side engine manifold is wasted and leaking exhaust.
46 CFR § 182.430 Engine exhaust pipe installation.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 September 2023
Resolution: Exhaust piping welded, tested sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 September 2023
Resolved
External inspection of fuel tanks and inspection of tank vents, piping, and pipe fittings. MI identified fuel fitting leaking in porst side fuel tank.
46 CFR § 176.804 Machinery.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 21 September 2023
Resolution: Pipe fitting cleaned and resealed, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 19 September 2023
Resolved
46 CFR 182.610 (a)(1): A vessel must be provided with a main steering gear that is of adequate strength and capable of steering the vessel at all service speeds. Port and STBD steering rams were leaking at hydrulic seals, repair/replace to the satisfaction of CG MI.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2023
Resolved 11 December 2023
Resolution: Seals replaced, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 19 September 2023
Resolved
46 CFR 180.70 (d)(2): Each ring life buoy with a floating waterlight must have a lanyard of at least 3ft but no more than 6ft securing the waterlight around the body of the ring life buoy with a Corrosion resistant clip. Replace existing waterlight line and clip.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2023
Resolved 21 September 2023
Resolution: lifering light line and corrosion resistant clip replaced, all sat.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 19 September 2023
Resolved
46 CFR 180.05-1(b)/46 CFR 199.175 (b) (10): Specifications for lifesaving equipment items required to be of an approved type have been promulgated and are contained in Subchapter Q(specifications) of this chapter. In general, such spcifications are of interest only to the manufacturer of specific items of equipment. Each first-aid kit must meet the requirements in ISO 18813:2006 (E) paragraph 4.12(incorporated by reference, see 199.05).
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2023
Resolved 11 December 2023
Resolution: First aid kit items ordered, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 19 September 2023
Resolved
46 CFR 182.455 (b) (4): Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines. Fuel shutoff valve tabs are cracked off and will not hit valve stop tabs. Replace valve handles with tabbs as a stopping point for valve actuation.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 3 October 2023
Resolved 21 September 2023
Resolution: Valve handle replaced, all sat.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 13 October 2022
Resolved
On a vessel of not more than 19.8 meters (65 feet) in length carrying more than 49 passengers... the minimum capacity of the fire pump must be 189 liters (50 gallons) per minute at a pressure of not less than 414 kPa (60 psi) at the pump outlet. The pump outlet must be fitted with a pressure gauge. Pressure from fire hose appeared to not perform at required pressure. Gauge on fire pump was wasted/broken and was unable to confirm pressure. Replace gauge and maintain a minimum of 60psi as required. Correct within 7 days.
46 CFR 181.300(b)
Action required: 705 - Other - as specified
Due 27 October 2022
Resolved 26 October 2022
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 13 October 2022
Resolved
On a vessel of at least 7.9 meters (26 feet) in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces: A space with a non-watertight closure, such as a space with a non-watertight hatch on the main deck. Gasket providing watertightness was wasted. Replace gasket prior to the carriage of passengers not to exceed 7 days.
46 CFR 182.530(a)3
Action required: 705 - Other - as specified
Due 20 October 2022
Resolved 13 October 2022
Resolution: General manager provied proof of installation
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 13 October 2022
Resolved
An adult life jacket must be provided for each person carried on board a vessel. 33 adult life jackets have damage to protective layer exposing the interior foam. Replace all damaged life jackets within 30 days.
46 CFR 180.71(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 5 November 2022
Resolved 26 October 2022
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 18 October 2021
Resolved
Examine all accesible parts of the exterior and interior...and weather deck. Marine Inspectors identified rotted wood affecting frams and deck in the Port side fresh water tank compartment, water intrusion causing damage to stringer on STBD side storage compartment, and rotted wood in frames and deck on both sides of the lazarette. Provide repair proposal.
46CFR176.25-5(1)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 November 2021
Resolution: All repairs were completed IAW with repair plan.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 18 October 2021
Resolved
Filling/sounding pipe shall be arrange...liquid cannot escape to the inside of teh vessel. MIs identified filling pipe with loose seal at the Diesel tank. Fix seal.
46CFR182.20-30(b)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 November 2021
Resolution: Vessel replaced seal. Test Sat
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 October 2021
Resolved
Extension cord going into port side battery room needs to be hardwire. Remove extension cord.
46CFR183.01-15(a)
Action required: 10 - Deficiency Rectified
Resolved 18 October 2021
Resolution: Extension Cord removed.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 October 2021
Resolved
All electricall installations shall be to the satisfaction of the OCMI. Vessel was utilizing power strip in a 20AMP outlet. All electrical connections must be permanent.
46CFR183.01-15(a)
Action required: 10 - Deficiency Rectified
Resolved 18 October 2021
Resolution: Power Strip removed prior to MIs departure.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 18 October 2021
Resolved
Battery connections shall be of permanent type connectors. Wing nuts found in battery room port side install on terminals. Make permanent connections.
46CFR183.05-02(c)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 8 November 2021
Resolution: Connections were made permanent.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 18 October 2021
Resolved
All life preservers shall be of an approved type IAW Q specs. 15 children life jackets need retroreflective tape.
46CFR180.25-25
Action required: 10 - Deficiency Rectified
Resolved 18 October 2021
Resolution: All retroreflective tape replaced.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 2 June 2020
Resolved
Grab rails for swim platform are wasted. Renew grab rails.
Action required: 705 - Other - as specified
Due 2 June 2020
Resolved 5 June 2020
Resolution: Grab rails renewed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 January 2019
Resolved
A vessel must have two independent means of controlling each propulsion engine. Control must be provided for the engine speed, direction of shaft rotation, and engine shutdown. The vessel reported that due to an earlier maintenance issue, they were unable to control the governor for the main engine from the helm, causing the vessel to allide with another moored vessel.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 25 January 2019
Resolved 25 January 2019
Resolution: Vessel confirmed the issue was due to a missing safety pin from earlier maintenance and has been rectified and vessel operating normally.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 1 November 2018
Resolved
Light for the ring buoy is missing light bulb and battery. Replace bulb and battery with proper type. Prove proper operation.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 November 2018
Resolution: light bulb and battery were replaced. Cleared on the spot.
Operations/Management › Drug and Alcohol Testing › Testing, Equipment
Issued 7 November 2016
Resolved
Alcohol test strips are expired. Replace strips or provide other means of testing for alcohol. 46CFR16.240
Condition: Improper/Lack of Maintenance
Due 21 November 2016
Resolved 16 November 2016
Resolution: recieved copy of the receipts for the sensors.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 7 November 2016
Resolved
Ring buoy retro-reflective tape tape missing on front side. Place tape on ring buoy in accordance with 46 CFR 160.50.
Due 21 November 2016
Resolved 18 November 2016