Records from 1982 to 2012. Most recent: inspection, 14 June 2012.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 40
14 June 2012
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4335853
13 July 2009
Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3527814
7 April 2008
Examination of Repairs · COI Inspection · Administrative Inspection · Internal Structural Exam · MTSA Verification · Cargo Tank Internal · Hull Examination
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 3179135
6 September 2006
Annual Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 2762800
3 August 2005
Periodic Inspection
Physical examination · MIDET HARVEY CANAL DETAIL · USCG Heartland District (CGD-H) · Activity 2450148
1 November 2004
Deficiency Check
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2232224
17 August 2004
Annual Inspection · MTSA Verification
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 2168506
18 February 2004
Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 2015630
15 July 2003
Annual Inspection
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1846201
20 June 2002
COI Inspection · Internal Structural Exam
Physical examination · MIDET WEST DETAIL · USCG Heartland District (CGD-H) · Activity 1626303
2 April 2001
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 642519
13 March 2001
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1447057
4 June 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 804936
28 May 1999
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 802988
30 April 1999
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1456688
15 May 1998
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1125252
30 April 1998
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1364713
1 May 1997
COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1406081
13 March 1996
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1447549
17 March 1995
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1405668
21 March 1994
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1165674
16 March 1994
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1389789
22 March 1993
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1466307
12 June 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 943951
20 May 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1259189
12 May 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 955441
23 March 1992
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 962413
25 March 1991
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1211492
28 March 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 918584
10 April 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1197152
29 March 1989
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1341460
8 April 1988
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1339520
17 April 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1004993
3 April 1987
Hull Examination · COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1309570
11 February 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1320120
24 October 1986
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1014440
4 March 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1293850
12 November 1985
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1304134
13 October 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1276808
19 July 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1273291
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 1 November 2004
Resolved
Install Rising Stem Valves on cargo piping.
Condition: Unknown
Due 1 May 2007
Resolved 14 April 2008
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 17 August 2004
Resolved
Make proper and permanent repairs to crack in weld between tank and deck. Crack location was tank #1 portside AFT. Requirements for repairs to crack is to drill stop, gouge and reweld.
Condition: Unknown
Action required: 705 - Other - as specified
Due 18 October 2004
Resolved 1 November 2004
Construction/Loadline › Hull › Hull Plating
Issued 17 August 2004
Resolved
Make proper and permanent repairs to fractures in void deck at vessel centerline where forward end of cargo tank meets void deck of # 2 Port and STBD void tanks. Requirements for repair to fractures are to drill stop,gouge and reweld.
Condition: Unknown
Action required: 705 - Other - as specified
Due 18 October 2004
Resolved 1 November 2004
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 17 August 2004
Resolved
Make proper and permanent repairs to fracture in weld between the deck and cargo tank on the # 3 tank portside AFT. Requirements for repair are to drill stop,gouge and reweld.
Condition: Unknown
Due 18 October 2004
Resolved 1 November 2004
Deck/Cargo › Holds/Tanks › Bulkhead
Issued 17 August 2004
Resolved
Make proper and permanent repairs to fractured weld between deck and cargo tank #4 STBD side forward. Requirements for repair to fracture are to crop out damaged area and renew.
Condition: Unknown
Due 18 October 2004
Resolved 1 November 2004
Construction/Loadline › Hull › Hull Plating
Issued 17 August 2004
Resolved
Make proper and permanent repairs to a fractured weld in void deck portside of tank #4 Forward. Requirements for repair to fracture are to crop out damaged area and renew as marked.
Condition: Unknown
Due 18 October 2004
Resolved 1 November 2004
Construction/Loadline › Hull › Weld
Issued 17 August 2004
Resolved
Make proper and permanent repairs to fractured weld on padeye STBD side AFT. Fracture has extended to deck knuckle. Requirements for repair are to drill stop, gouge and reweld.
Condition: Unknown
Due 18 October 2004
Resolved 1 November 2004
Deck/Cargo › Cargo Heating › General
Issued 17 August 2004
Resolved
Install pressure relief valve for steam system.
Condition: Improper Installation
Due 18 September 2004
Resolved 1 November 2004
Pollution Prevention/Response › Prevention Equipment › Fixed Containment
Issued 17 August 2004
Resolved
Install plugs and valves for cargo containment.
Condition: Improper Installation
Due 18 September 2004
Resolved 1 November 2004
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 17 August 2004
Resolved
Clean,inspect and repair all hatches, dogs and gaskets.
Condition: Improper/Lack of Maintenance
Due 18 September 2004
Resolved 1 November 2004
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pressure/Vacuum Relief Valve
Issued 14 July 2003
Resolved
Threaded piping for #1 Stbd PV Valve was rusted through and piping broke.
Due 15 July 2003
Resolved 15 July 2003
Resolution: Corrected while inspectors were still present.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 5 June 2002
Resolved
Issued CG 835 to install rising stem valves on cargo pipeline by next CTIE. LEGACY COMPONENT DESC: Piping
Condition: Improper Installation
Due 1 May 2007
Resolved 1 November 2004
Deck/Cargo
Issued 13 March 2001
Resolved
MAKE PERMANENT REPAIR TO VENT PIPE ENTERING #4 STARBOARD CARGO TANK._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 13 April 2001
Resolved 2 April 2001
Documentation
Issued 13 March 2001
Resolved
CONDUCT INSPECTION FOR CERTIFICATION DUE TO MISSED REINSPECTION.
Condition: Unknown
Due 13 March 2001
Resolved 19 March 2001
Construction/Loadline
Issued 28 May 1999
Resolved
#3 HOPPER SPACE PORT SIDE FRACTURE BOTTOM PLATE. DRYDOCK VESSEL, SUBMITT REPAIR PROPOSAL FOR DAMAGE. GAUGE READINGS REQUIRED AROUND FRACTURED AREA. NO CARGO OPERATIONS WITH EXCEPTION OF OFFLOADING PRESENT CARGO.
Condition: Unknown
Due 28 June 1999
Resolved 4 June 1999
Construction/Loadline
Issued 30 April 1999
Resolved
MAKE PERMANENT AND PROPER REPAIRS TO FRACTURE IN WAY OF PORT BOW RAKE DECK KNUCKLE PRIOR TO LOADING ANY CARGO.
Condition: Unknown
Due 30 April 1999
Resolved 30 April 1999
Deck/Cargo
Issued 30 April 1999
Resolved
REPAIR PUMP ENGINE REMOTE SHUTDOWN CABLE RUN.
Condition: Unknown
Due 30 April 1999
Resolved 30 April 1999
Construction/Loadline
Issued 30 April 1998
Resolved
REPLACE ALL GASKETS AND INSTALL ALL FASTENERS ON ALL CENTERLINE VOID COVERS.
Condition: Unknown
Due 15 May 1998
Resolved 15 May 1998
Lifesaving
Issued 30 April 1998
Resolved
STENCIL AND INSTALL CORRECT MOUNTING BRACKET FOR LIFE RING; STENCEL AND INSTALL LIFE RING WITH CORRECT RETRO TAPE.
Condition: Unknown
Due 15 May 1998
Resolved 15 May 1998
Construction/Loadline
Issued 13 March 1996
Resolved
Repair as original watertight hatches leading to voids- #1 P/S and Stern P/S .
Condition: Unknown
Due 13 April 1996
Resolved 9 April 1996
Documentation
Issued 22 March 1993
Resolved
OBTAIN PROPER DOCUMENTATION FOR CERTIFICATE OF FINANCIAL RESPONSIBILITY. CERTIFICATE IS CURRENTLY IN "NON-COMPLIANCE." VESSEL IS NOT TO ENGAGE IN ANY TRANSFER OPERATIONS OR DEPART AVONDALE GAS FREE PLANT PRIOR TO NOTIFICATION TO COAST GUARD NEW ORLEANS OFFICE OF FULL COMPLIANCE.
Condition: Unknown
Due 22 March 1993
Resolved 22 March 1993
Accommodation/Occupational Safety
Issued 22 March 1993
Resolved
MAKE PERMANENT REPAIRS TO SNAPPED HANDRAIL UPRIGHT AT AFT PORT CARGO TANK.
Condition: Unknown
Due 22 March 1993
Resolved 22 March 1993
Construction/Loadline
Issued 22 March 1993
Resolved
CLEAN AND MAKE AVAILABLE FOR VISUAL EXAM BOW VOID PUMP AREA.
Condition: Unknown
Due 22 March 1993
Resolved 22 March 1993
Deck/Cargo
Issued 22 March 1993
Resolved
REMOVE AUXILIARY CARGO MANIFOLD AND REPLACE WITH BLIND FLANGE OR INSTALL PROPER CONTAINMENT AT MANIFOLD VALVE.
Condition: Unknown
Due 22 March 1993
Resolved 22 March 1993
Construction/Loadline
Issued 12 May 1992
Resolved
REMOVE ANGLES EXTENDING FROM SIDESHELL, THREE (3) PORT SIDE, TWO (2) STBD SIDE #3 HOPPER SPACE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 12 June 1992
Resolved 16 June 1992
Construction/Loadline
Issued 12 May 1992
Resolved
REMOVE TWO (2) ANGLES EXTENDING FROM SIDE SHELL, ONE JUST FWD OF FIRST SWASH PLATE STBD SIDE, AND ONE JUST FWD OF FIRST SWASH PLATE PORT SIDE #2 HOPPER SPACE._x001C_ _x001C_
Condition: Unknown
Due 12 June 1992
Resolved 16 June 1992
Deck/Cargo
Issued 12 May 1992
Resolved
REPAIR TWO (2) CRACKS #4 STBD CARGO TANK, BOTTOM AFT, BY WAY OF STERN VOID.
Condition: Unknown
Due 19 May 1992
Resolved 20 May 1992
Construction/Loadline
Issued 12 May 1992
Resolved
REPAIR SIX (6) FRACTURES ON RAKE BOW VOID (THREE FWD PORT CORNER AREA, THREE STBD CORNER AREA)._x001C_
Condition: Unknown
Due 12 June 1992
Resolved 16 June 1992
Construction/Loadline
Issued 12 May 1992
Resolved
REPAIR FRACTURE #3 HOPPER VOID SPACE STARBOARD SIDE APROX. 6" FROM DECK, AND 8' FROM AFT BKHD._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 May 1992
Resolved 20 May 1992
Deck/Cargo
Issued 12 May 1992
Resolved
REPAIR / REPLACE LEAKING SEAL ON GEAR PUMP, RAKE BOW VOID SPACE.
Condition: Unknown
Due 12 June 1992
Resolved 16 June 1992
Construction/Loadline
Issued 12 May 1992
Resolved
REPAIR BROKEN WELDS #1 HOPPER SPACE STBD SIDE OF SWASH PLATE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 12 June 1992
Resolved 16 June 1992
Construction/Loadline
Issued 12 May 1992
Resolved
REPAIR BROKEN WELDS, #2 HOPPER SPACE, PORT AND STBD SIDES OF FIRST SWASHPLATE._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 12 June 1992
Resolved 16 June 1992
Electrical
Issued 29 March 1989
Resolved
REMOVE OPEN-ENDED AND DEAD END WIRING FOR THE ELECTRIC (12V BATTERY) CHARGING AND STARTING SYSTEM ON THE CARGO PUMP DIESEL ENGINE.
Condition: Unknown
Due 29 March 1989
Resolved 29 March 1989