Records from 1981 to 1993. Most recent: inspection, 2 February 1993.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 71
2 February 1993
Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1141027
17 December 1992
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 828916
5 March 1992
Administrative
Administrative · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1317366
19 January 1992
Type not recorded
No type recorded · MSD CONCORD · USCG Southwest District (CGD-SW) · Activity 505654
26 December 1991
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 458396
12 November 1991
Type not recorded
No type recorded · MSO GUAM · USCG Oceania District (CGD-O) · Activity 495015
8 November 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1250775
5 November 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1357900
28 October 1991
Type not recorded
No type recorded · MSD CONCORD · USCG Southwest District (CGD-SW) · Activity 443662
25 October 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 938267
18 October 1991
Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 940798
9 October 1991
COI Inspection
Physical examination · MSO PUGET SOUND · USCG Northwest District (CGD-NW) · Activity 1249197
9 May 1991
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 922384
15 April 1991
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 527465
30 January 1991
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 920832
17 October 1990
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 924858
26 September 1990
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 914746
13 August 1990
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 470056
30 March 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 900701
15 March 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 917982
9 March 1990
Damage Survey
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1236453
28 February 1990
Hull Examination
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 920289
1 November 1989
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1312282
27 October 1989
Drydock Extension
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 895584
25 October 1989
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 898143
12 May 1989
Deficiency Check
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 895929
13 February 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1036344
5 January 1989
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1351964
2 January 1989
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 477836
4 November 1988
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 898279
30 October 1988
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 889646
25 October 1988
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 486257
25 October 1988
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 889871
7 March 1988
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 485942
29 October 1987
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1328807
2 February 1987
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 483516
29 January 1987
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1325622
6 January 1987
Examination of Repairs · Hull Examination
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1017124
14 October 1986
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1317216
9 October 1986
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1318279
1 August 1986
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 531948
31 July 1986
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 448928
16 July 1986
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 986296
3 July 1986
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 532504
24 February 1986
Examination of Repairs
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1295914
23 February 1986
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1296243
19 December 1985
Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 1295005
24 October 1985
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1293898
22 October 1985
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 988199
17 October 1985
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1294685
27 September 1985
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 304508
20 March 1985
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 527088
11 March 1985
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1288056
24 January 1985
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1286919
14 January 1985
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1284969
20 December 1984
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1285879
4 December 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 976425
16 October 1984
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 975255
12 October 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 974598
26 July 1984
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 974787
1 February 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1279624
13 January 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 975603
18 October 1983
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 966918
14 October 1983
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 965037
12 October 1983
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 968938
12 October 1983
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1271267
9 October 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 966368
3 May 1983
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1272258
25 June 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1279830
29 January 1982
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1276048
23 September 1981
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1277037
Engineering
Issued 8 November 1991
Resolved
MAKE REPAIRS AS OUTLINED IN LYKES LETTER OF 07NOV91 TO [name withheld] (LEAK FROM DT NO. IV FUEL OIL TANK TO ENGINE ROOM PORTSIDE). THIS ITEM TO BE ACCOMPLISHED PRIOR TO 31 JAN. 1992 TO THE SATISFACTION OF THE COGNIZANT [name withheld] F.O. TANK SHALL REMAIN EMPTY TILL THIS REQUIREMENT IS MET.
Condition: Unknown
Due 31 January 1992
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Construction/Loadline
Issued 5 November 1991
Resolved
MAKE REPAIR PROPOSALS TO O.C.M.I. SAN FRANCISCO BAY FOR THE LEAK FROM PORT FUEL OIL DEEP TANK NO. IV TO THE ENGINEROOM BILGES. FUEL OIL IN THIS PORT TANK SHOULD BE TRANSFERED TO ANOTHER TANK TO LOWER THE OIL LEVEL AND PREVENT ANY FURTHER CONTAMINATION OF THE ENGINEROOM BILGES.
Condition: Unknown
Due 5 November 1991
Resolved 5 November 1991
Engineering
Issued 25 October 1991
Resolved
DISCHARGE OF OUTBOARD EVAP HEATER SHELL RELIEF VALVE AIMED TOWARDS PERSONNEL. PIPE MUST BE INSTALLED OR VALVE REORIENTED TO DIRECT DISCHARGE TO BILGE OR OVERHEAD.
Condition: Unknown
Due 25 October 1991
Resolved 25 October 1991
Engineering
Issued 9 October 1991
Resolved
REPLACE MAIN CIRCULATION AND EDUCTOR SUCTION SPOOL PIECES ON PORT FORWARD SEA CHEST.
Condition: Unknown
Due 31 January 1992
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Construction/Loadline
Issued 9 October 1991
Resolved
EXAMINE ALL SEA CHESTS AT NEXT DRYDOCKING AND RENEW PLATING AS REQUIRED.
Condition: Unknown
Due 31 January 1992
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 9 October 1991
Resolved
PROVE PROPER OPERATION OF GENERAL ALARM BELLS ON THE O-1 DECK.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Documentation
Issued 9 October 1991
Resolved
UPDATE THE OIL TRANSFER PROCEDURES TO CONFORM TO 33 CFR 155.750.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Engineering
Issued 9 October 1991
Resolved
MAKE BOTH BOILERS AVAILABLE FOR FIRESIDE AND WATERSIDE EXAM.
Condition: Unknown
Due 31 January 1992
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Engineering
Issued 9 October 1991
Resolved
CONDUCT AN INTERNAL EXAM OF THE DC HEATER
Condition: Unknown
Due 31 January 1992
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 9 October 1991
Resolved
CONDUCT SATISFACTORY WEIGHT TEST OF PORT LIFEBOAT
Condition: Unknown
Due 21 October 1991
Resolved 21 October 1991
Engineering
Issued 9 October 1991
Resolved
REPLACE ALL DAMAGED INDICATORS ON THE BOILER CONTROL PANEL.
Condition: Unknown
Due 31 January 1992
Resolved 18 May 2002
Resolution: MISLE Maintenance - Resolved all open deficiencies issued prior to 6/1/1997 where activity was closed and deficiency due date was past
Lifesaving
Issued 9 October 1991
Resolved
PROPERLY ADJUST STARBOARD LIFEBOAT FALLS.
Condition: Unknown
Due 29 October 1991
Resolved 29 October 1991
Engineering
Issued 9 October 1991
Resolved
PROVE PROPER OPERATION OF 200 LB. STEAM REDUCING STATION RELIEF.
Condition: Unknown
Due 9 October 1991
Resolved 9 October 1991
Fire Fighting
Issued 26 September 1990
Resolved
POST APPROVED FIRE CONTROL PLAN THAT CONFORMS TO THE CURRENT CONFIGURATION OF THE VESSEL AND REMOVE PLAN DATED 1956.
Condition: Unknown
Due 26 September 1990
Resolved 26 September 1990
Construction/Loadline
Issued 15 March 1990
Resolved
EFFECT PERMANENT REPAIRS TO PLATE AND INTERNALS IN WAY OF COLLISION DAMAGE_x001C_ABOVE THE WATERLINE ON STARBOARD BOW PER 46CFR 92.07-90 AND 46CFR 92.01-10.
Condition: Unknown
Due 15 March 1990
Resolved 15 March 1990
Lifesaving
Issued 25 October 1989
Resolved
WEIGHT TEST STBD. LIFEBOAT NO LATER THAN 04 NOV89 AND PRIOR TO SAILING FOREIGN.
Condition: Unknown
Due 25 October 1989
Resolved 25 October 1989
Fire Fighting
Issued 4 November 1988
Resolved
REPAIR LEAKING VALVE FOR FIRE STATION #1 PRIOR TO DEPARTURE OF PORT.
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988
Fire Fighting
Issued 4 November 1988
Resolved
PROVIDE FIRE SERVICE REPORT TO MSO PORT ARTHUR, TEXAS.
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988
Lifesaving
Issued 4 November 1988
Resolved
REPAIR OR REPLACE FORWARD GRIPE ON #2 LIFEBOAT.
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988
Navigation
Issued 4 November 1988
Resolved
DEMONSTRATE THE PROPER OPERATION OF THE STEERING GEAR LOSS OF POWER ALARM IN THE PILOTHOUSE PRIOR TO DEPARTURE FROM PORT.
Condition: Unknown
Due 4 November 1988
Resolved 4 November 1988
Engineering
Issued 29 October 1987
Resolved
MAKE AVAILABLE DC HEATER FOR INTERNAL INSPECTION BY A U. S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 29 October 1987
Resolved 29 October 1987
Construction/Loadline
Issued 14 October 1986
Resolved
REPAIR OR REPLACE THE MAIN INJECTION VALVE STRAINER AT THE NEXT SCHEDULED DRYDOCKING.
Condition: Unknown
Due 14 October 1986
Resolved 14 October 1986
Lifesaving
Issued 19 December 1985
Resolved
MAKE PERMANENT REPAIRS TO STBD LIFEBOAT ENGINE.
Condition: Unknown
Due 19 December 1985
Resolved 19 December 1985
Lifesaving
Issued 17 October 1985
Resolved
WEIGHT TEST STARBOARD MOTOR LIFEBOAT AND TEST RELEASING GEAR TO THE SATIS- FACTION OF THE ATTENDING COAST GUARD INSPECTOR. THESE TESTS TO BE CONDUCT-ED PRIOR TO SAILING FOREIGN BUT IN NO CASE LATER THAN 31OCT85.
Condition: Unknown
Due 17 October 1985
Resolved 17 October 1985
Unknown
Issued 17 October 1985
Resolved
TEST SLUDGE BURNER SYSTEM UNDERWAY WITH AT LEAST 50% ON THE STARBOARD BOIL-ER AND SUBMIT LETTER OF RESULTS TO [name withheld] AT COMPLETION OF THE NEXT FOREIGN VOYAGE BUT IN NO CASE LATER THAN 31JAN86.
Condition: Unknown
Due 17 October 1985
Resolved 17 October 1985
Unknown
Issued 17 October 1985
Resolved
PROVE PROPER OPERATION OF THE SLUDGE BURNER FIREYE TO THE SATISFACTION OF THE COGNIZANT [name withheld] 31OCT85.
Condition: Unknown
Due 17 October 1985
Resolved 17 October 1985
Engineering
Issued 14 January 1985
Resolved
PROVIDE SUITABLE DOCUMENTATION THAT PORT AND STBD DRUM(4) AND SUPERHEATER (2) SAFETY VALVES ARE APPROVED AS PER 46CFR162.001, OR REPLACE WITH APPROVED TYPE VALVES.
Condition: Unknown
Due 14 January 1985
Resolved 14 January 1985
Fire Fighting
Issued 12 October 1984
Resolved
CONDUCT TEST OF CARGO HOLD SMOKE DETECTION SYSTEM PRIOR TO 25 OCTOBER 1984 OR SAILING FOREIGN WHICH EVER IS EARLIER. TEST TO BE CONDUCTED TO THE SATISFACTION OF THE ATTENDING COAST GUARD INSPECTOR.
Condition: Unknown
Due 12 October 1984
Resolved 12 October 1984
Unknown
Issued 12 October 1984
Resolved
THE FOLLOWING DEFICIENCIES PERTAIN TO THE M/V NANCY LYKES, O.N. 286650.
Condition: Unknown
Due 12 October 1984
Resolved 12 October 1984
Lifesaving
Issued 12 October 1984
Resolved
REPAIR OR REPLACE ENGINE IN MOTORLIFEBOAT AND DEMONSTRATE SATISFACTORY OPERATION OF SAME TO ATTENDING COAST GUARD INSPECTOR NOT LATER THAN 20 OCTOBER 1984.
Condition: Unknown
Due 12 October 1984
Resolved 12 October 1984
Lifesaving
Issued 12 October 1984
Resolved
CONDUCT FIRE AND BOAT DRILL PRIOR TO 19 OCTOBER 1984. DRILLS TO BE CON- DUCTED TO THE SATISFACTION OF THE ATTENDING COAST GUARD INSPECTOR.
Condition: Unknown
Due 12 October 1984
Resolved 12 October 1984
Unknown
Issued 13 January 1984
Resolved
THE FOLLOWING ITEMS PERTAIN TO THE M/V NANCY LYKES, O.N. 286650.
Condition: Unknown
Due 13 January 1984
Resolved 13 January 1984
Construction/Loadline
Issued 13 January 1984
Resolved
CROP & RENEW TO GOOD METAL THE PORT SIDE AFT TANKTOP IN #6 CARGO HOLD FOR #5 PORT DEEP TANK AT THE NEXT DRYDOCK TO THE SATISFACTION OF THE COGNIZANT
Condition: Unknown
Due 13 January 1984
Resolved 13 January 1984
Unknown
Issued 13 January 1984
Resolved
CLEARED ITEM E4 OF CG-835 ISSUED 12OCT83 MIO HOUSTON.
Condition: Unknown
Due 13 January 1984
Resolved 13 January 1984
Unknown
Issued 13 January 1984
Resolved
(REQUIREMENT D-1 CONTINUED) OCMI.
Condition: Unknown
Due 13 January 1984
Resolved 13 January 1984
Engineering
Issued 14 October 1983
Resolved
MAKE PERMANENT REPAIRS TO #1 OUTBOARD ECONOMIZER TUBE ON STARBOARD BOILER.
Condition: Unknown
Due 14 October 1983
Resolved 14 October 1983
Unknown
Issued 12 October 1983
Resolved
REPAIR OR REPLACE THE REVERSE POWER RELAY FOR THE NO. 2 S/S GENERATOR AND CONDUCT OPERATIONAL TEST OF SAME.
Condition: Unknown
Due 12 October 1983
Resolved 12 October 1983
Unknown
Issued 12 October 1983
Resolved
PROVIDE FOR INTERNAL EXAMINATION OF THE STARBOARD BOILER.
Condition: Unknown
Due 12 October 1983
Resolved 12 October 1983
Unknown
Issued 12 October 1983
Resolved
MAKE TEMPORARY REPAIRS TO DETERIORATED BULKHEAD OF PORT, AFTER, FUEL OIL SETTLER TANK AT JUNCTION OF NO. 4 DEEP TANK.
Condition: Unknown
Due 12 October 1983
Resolved 12 October 1983
Unknown
Issued 12 October 1983
Resolved
REMOVE TEMPORARY REPAIRS AND MAKE PERMANENT REPAIRS TO BULKHEAD AT THE ABOVE LOCATION.
Condition: Unknown
Due 12 October 1983
Resolved 12 October 1983