Professional
The full record for this vessel
Behind this panel: 3 inspections, each with its date, unit and type; 9 deficiencies with the resolution recorded against each, 1 without one; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; no NVDC documentation record for this Official Number. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Maintenance of the ship and equipment
Issued 27 July 2024
Resolved
The company and the ship shall comply w/ the requirement of the ISM Code. The company should establish procedures to ensure that the ship is maintained in conformity w/ the provisions of the relevant rules and regulations. The technical and operational nature of deficiencies 02,03,04,05,06, and 07 provide objective evidence of a serious failure of the implementation of the ISM
Code.
74SOLAS(20)
IX/3
ISM 10.1
Condition: Improper/Lack of Maintenance
Action required: 30 - Ship detained
Resolved 30 July 2024
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 27 July 2024
Resolved
Hydraulic power-operated steering gear shall be provided w/ the following: A fixed storage tank having sufficient capacity to recharge at least one power actuating system including the reservoir.
PSCO observed tank leaking, with only 1/4 of the required oil inside.
74SOLAS(01)
II-1/29.12.3
Condition: Improper/Lack of Maintenance
Action required: 60 - Rectify deficiencies prior to movement
Resolved 30 July 2024
02 - Structural Conditions › N/A - No Subsystem › Steering gear
Issued 27 July 2024
No resolution recorded
Hydraulic power operated steering gear shall be provided w/ the following: Arrangement to maintain the cleanliness of the hydraulic fluid.
PSCO observed hydraulic leaks on both #1 & #2 steering gear systems. Including #3 and #4 gear rams.
74SOLAS(01)
II-1/29-12.2
Condition: Improper/Lack of Maintenance
Action required: 40 - Rectify deficiencies prior to next US port after sailing foreign
15 - Safety Management Systems (ISM) › N/A - No Subsystem › Shipboard operations
Issued 27 July 2024
Resolved
The company and the ship shall comply w/ the requirements of the ISM Code. The Company should establish procedures, plans and instructions, including checklists as appropriate, for key shipboard operations concerning the safety of personnel.
PSCO observed lock-out/tag-out procedures not being followed as per Company SMS procedures. #1 diesel generator was not tagged out in accordance with SMS as breaker was not tagged out in the open position and not tagged out in the open position and start air valve was not tagged out in closed position. Also #2 boiler water circ. pump was not tagged out properly as the breaker was not secured in the open position.
74SOLAS(20)
IX/3
ISM 7
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 July 2024
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 27 July 2024
Resolved
Indicators shall be provided for all sliding doors and for hinged doors in watertight bulkheads.
PSCO observed indicators for the port watertight door from E/R to cargo tunnel not operational. Observed indicators for both port and starboard water tight doors from E/R to cargo tunnel found not operational on the bridge.
74SOLAS(01)
II-1/23-1.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 July 2024
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 27 July 2024
Resolved
Watertight trunks shall be of the same strength as watertight bulkheads at corresponding levels. The means used for making them watertight, and the arrangements adopted for closing openings in them, shall be to the satisfaction of the Administration.
PSCO Observed watertight rolling door to aft engine room inoperable as designed, open, capable of only being closed with hand pump. No flag/classification society documentation could be provided allowing this type of operation.
74SOLAS(04)
II-1/19.1
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 July 2024
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 27 July 2024
Resolved
In a ship in which oil fuel is used, the arrangements for the storage, distribution and utilization of the oil fuel shall be such as to ensure the safety of the ship and persons onboard.
PSCO Observed significant Fuel oil leaks on transfer pump following F/O bunkering, Non-approved oil catch pans in purifier space, and oil leaks with oil soaked lagging on A/E #3.
74SOLAS(97)
II-2/15.2
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 30 July 2024
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 27 July 2024
Resolved
No person may cause a vessel to enter into or get underway on the navigable waters of the United States unless no more than 12 hours before entering or getting underway, the following equipment has been tested:Primary and secondary steering gear. The test procedure includes a visual inspection of the steering gear and its connecting linkage.
PSCO observed significant hydraulic oil leaks on both steering gear systems as well as insignificant oil in reserve tank during inspection after vessel was moored. Condition was not identified on vessel checklist prior to port entry.
33 CFR 164.25 (a)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 27 July 2024
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 4 March 2024
Resolved
Before the ship leaves port and at all times during the voyage, all life-saving appliances shall be in working order and ready for immediate use. Crew was unable to raise lifeboat on port side from embarkation back to cradle via hydraulic or manual means.
74SOLAS(97)III/19.2 60ac
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 March 2024
Resolution: Received class report attesting to repairs. Class report attached.