Records from 1984 to 1992. Most recent: inspection, 8 October 1992.
Documentation record
Registered dimensions (L × B × D)297.5 ft × 52.5 ft × 12.9 ft
Registered tonnagegross 1,744 / net 1,744
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
Builderbuilder not recorded · HOUSTON, TX, UNITED STATES · built 1961
Hull materialSteel
PropulsionNone
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNot recorded
Trade endorsementsCoastwise, unrestricted
DocumentationInvalid
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it1744 - Regulatory (Subpart C or D), Gross Ton
1744 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 40
8 October 1992
Administrative
Administrative · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1264223
11 March 1992
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 948619
14 February 1992
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 84039
9 September 1991
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 507805
27 March 1991
COI Inspection
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1211204
27 March 1991
Administrative
Administrative · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1211206
16 January 1991
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 464651
10 July 1990
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 520505
18 April 1990
Damage Survey · Examination of Repairs · Re-Inspection
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1232612
7 January 1990
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 460824
12 June 1989
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 442275
6 March 1989
COI Inspection
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 888595
13 February 1989
Deficiency Check
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1345738
6 January 1989
Damage Survey
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1041935
16 November 1988
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 467062
10 May 1988
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 440483
13 April 1988
Administrative
Administrative · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1034500
19 February 1988
Re-Inspection · Damage Survey · Examination of Repairs
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1023433
29 October 1987
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 511557
30 March 1987
COI Inspection · Hull Examination
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1327834
24 February 1987
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 474581
8 January 1987
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 523784
16 December 1986
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 445648
11 December 1986
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 493999
25 September 1986
Deficiency Check · Examination of Repairs
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1294250
21 July 1986
Damage Survey
Physical examination · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 990270
28 April 1986
Type not recorded
No type recorded · MSO CINCINNATI · Activity 463222
28 April 1986
Type not recorded
No type recorded · MSO CINCINNATI · Activity 984774
28 March 1986
Type not recorded
No type recorded · MSO Pittsburgh · USCG Heartland District (CGD-H) · Activity 530821
20 March 1986
Damage Survey · Deficiency Check
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1297634
26 February 1986
Type not recorded
No type recorded · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1298273
24 February 1986
Damage Survey
Physical examination · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 989774
22 February 1986
Damage Survey
Physical examination · MSO CINCINNATI · Activity 1300627
3 January 1986
COI Inspection · Damage Survey
Physical examination · MSO HUNTINGTON · USCG Heartland District (CGD-H) · Activity 1294915
11 June 1985
Type not recorded
No type recorded · MSO CINCINNATI · Activity 462925
11 June 1985
Type not recorded
No type recorded · MSO CINCINNATI · Activity 980139
13 February 1985
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 475324
17 December 1984
Type not recorded
No type recorded · MSO Paducah · USCG Heartland District (CGD-H) · Activity 446017
24 September 1984
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 529886
29 August 1984
Type not recorded
No type recorded · MSO LOUISVILLE · USCG Heartland District (CGD-H) · Activity 472281
Construction/Loadline
Issued 6 January 1989
Resolved
PERMANENTLY REPAIR BARGE WHERE DAMAGED IN WAY OF PORT SIDE OF HEAD LOG PRIOR TO LOADING CARGO BUT NO LATER THAN 06 FEB 89.
Condition: Unknown
Due 6 January 1989
Resolved 6 January 1989
Construction/Loadline
Issued 21 July 1986
Resolved
MAKE PERMANENT REPAIRS TO DAMAGED BOW RAKE , PORT SIDE PRIOR TO CARGO LOADING BUT NOT LATER THAN 29AUG86.
Condition: Unknown
Due 21 July 1986
Resolved 21 July 1986
Deck/Cargo
Issued 28 April 1986
Resolved
REPLACE THE BRAKE PAD ON THE PORT AFT WINCH.
Condition: Unknown
Due 28 April 1986
Resolved 28 April 1986
Construction/Loadline
Issued 24 February 1986
Resolved
MAKE PERMANENT REPAIRS TO FRACTURE IN THE SIDE SHELL APPROX.2 FEET DOWN FROM THE MAIN DECK IN #2 CARGO TANK. REPAIRS ARE TO BE COMPLETED PRIOR TO THE CARRIAGE OF CARGO...
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Construction/Loadline
Issued 24 February 1986
Resolved
MAKE PERMANENT REPAIRS TO FRACTURE IN #2 CARGO TANK BELOW THE WATER LINE. PRODUCT WAS NOTED TO BE COMING FROM THIS AREA.TANK WAS CHECKED AND APPROX. 26" OF WATER FOUND IN #2.REPAIRS ARE TO BE COMPLETED PRIOR TO THE CARRIAGE OF CARGO.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Construction/Loadline
Issued 22 February 1986
Resolved
MAKE PERMANENT REPAIRS TO THE FRACTURE IN THE DECK KNUCKLE AT THE PORT AFT TIMBER HEAD.
Condition: Unknown
Due 22 February 1986
Resolved 22 February 1986
Construction/Loadline
Issued 22 February 1986
Resolved
MAKE TEMPORARY REPAIRS TO THE FRACTURE ALONG THE DECK KNUCKLE AT THE AFT STARBOARD TIMBERHEAD. THIS ITEM IS TO BE COMPLETED PRIOR TO DEPARTING THE PORT OF CINCINNATI OR THE DATE OF COMPLIANCE, WHICHEVER OCCURS FIRST.
Condition: Unknown
Due 22 February 1986
Resolved 22 February 1986
Construction/Loadline
Issued 22 February 1986
Resolved
MAINTAIN TEMPORARY REPAIRS TO THE DECK KNUCKLE FRACTURE AT THE AFT STAR- BOARD TIMERHEAD UNTIL PERMANENT REPAIRS ARE MADE.
Condition: Unknown
Due 22 February 1986
Resolved 22 February 1986
Deck/Cargo
Issued 11 June 1985
Resolved
PROVIDE EVIDENCE OF A RECENT ANNUAL HYDRO TEST OF THE CARGO PIPING OR TEST THE PIPING.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985
Deck/Cargo
Issued 11 June 1985
Resolved
REPAIR OR REPLACE THE TACHOMETER ON THE CARGO PUMP ENGINE.
Condition: Unknown
Due 11 June 1985
Resolved 11 June 1985