Records from 2016 to 2025. Most recent: inspection, 12 May 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls and the documentation record — is Professional, $39 a month. Sign in.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 12 May 2025
Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired. Life float shows signs of damage to overall structure and grab line attachment points. Repair/replace to MI satisfaction.
46 CFR 176.808(b)
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 May 2025
Resolved 13 June 2025
Resolution: Completed satisfactory repairs.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 12 May 2025
Resolved
Each item of lifesaving equipment determined by the Marine Inspector to not be in serviceable condition must be repaired. Life ring found damaged. Replace to MI satisfaction.
46 CFR 176.808(b)
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Resolved 12 May 2025
02 - Structural Conditions › N/A - No Subsystem › Ballast, fuel and other tanks
Issued 13 May 2024
Resolved
Fuel lines must be accessible, protected from mechanical injury, and effectively secured against excessive movement and vibration by the use of soft nonferrous metal straps which have no sharp edges and are insulated to protect against corrosion. Where passing through bulkheads, fuel lines must be protected by close fitting ferrules or stuffing boxes. All fuel lines and fittings must be accessible for inspection. Fuel hose on PORT/STBD side found to be secured to electrical cables.
46 CFR 182.455(b)(3)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2024
Resolved 27 May 2024
Resolution: Operator provided photographs of proper fuel hose mounting.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 13 May 2024
Resolved
Each rescue boat and ring life buoy must be marked with Type II retro reflective material approved in accordance with 46 CFR 164.018 or other standard specified by the Commandant. PORT side life float retro reflective found to be deteriorated.
46 CFR 185.604(i)
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2024
Resolved 1 July 2024
Resolution: Received photograph of replaced retroreflective material.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 29 April 2022
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with its Certificate of Inspection giving consideration to provisions for a seaworthy hull. Plastic cable pass through to battery compartment open to the elements. Submit repair proposal prior to credit drydock.
46 CFR 177.100
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 15 May 2023
Resolution: Watertight sleaves and tubing installed to outboard controls.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 29 April 2022
Resolved
On a vessel of at least 26ft in length a visual and audible alarm must be provided ath operating station at each of the following spaces; A space with non-watertight closure, such as a space with a non-water tight hatch on the main deck. Ensure high water alarm is conectted to the operating station.
46 CFR 182.530(a)(3)
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2022
Resolved 2 June 2022
Resolution: High water alarm added.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 April 2022
Resolved
Electrical equipment on a vessel must be installed and maintained to protect passengers, crew, other persons and the vessel from electrical hazards. 02 holes were found in the port bulkhead leading from the battery compartment to the hull. Ensure watertight integrity is maintained.
46 CFR 183.200(b)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2022
Resolved 2 June 2022
Resolution: Holes were covered and sealed around the edges.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 29 April 2022
Resolved
A hatch exposed to the weather must be watertight. Weatherstripping on battery compartments worn and inoperable. Replace gasket material.
46 CFR 179.360(a)
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 June 2022
Resolved 2 June 2022
Resolution: Gasket material replaced.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 29 April 2022
Resolved
The construction and arrangement of a vessel must allow the safe operation of the vessel in accordance with the terms of its certificate of inspection giving considerations to a sea worthy hull. Deck between battery compartments and port battery support wasted and delaminating. Repair prior to credit drydock.
46 CFR 177.100
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 15 May 2023
Resolution: Delaminated shelf for batteries is still in good structural condition. Compartment has been made watertight to prevent further delam.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 June 2020
Resolved
A submersible electric bilge pump used as a power bilge pump must be permanently mounted. Center compartment bilge pump mounting base broken/missing. Pump is plastic wired tied in place. Replace.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2020
Resolved 23 June 2020
Resolution: Operator provided photograph of newly installed bilge pump.
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 17 June 2020
Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents and instructions. Required items as listed in Table 160.041 missing.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2020
Resolved 1 July 2020
Resolution: Received photograph of new first aid kit.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 17 June 2020
Resolved
As per 46 CFR 160.027-2, each life float must have Type II retroreflective material meeting subpart 46 CFR 160.018 on each side and end. Life float retroreflective tape wasted an requires renewal.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 1 July 2020
Resolved 6 July 2020
Resolution: Photograph of new retroreflective tape affixed to life float
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 17 June 2020
Resolved
At each initial and subsequent inspection for certification the owner or operator shall be prepared to test and make available for inspection all item's in the ships outfit. The following ships outfits was not available to be sighted by the MI during the inspection:
1) portable radios used between the balloon pilot, launch/recovery personnel, and bridge.
2) hand tools suitable for cutting the tether lines.
3) propeller guards not installed on the launch/recovery vessel outboard lower units.
4) 160:B semi-portable fire extinguisher
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 July 2020
Resolved 22 June 2021
Resolution: Verified all equipment during annual inspection.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 3 October 2019
Resolved
Closed spaces containing gasoline fuel tanks shall have natural supply and mechanical exhaust ventilation. Port and Starboard fuel tank space and interconnected aft void spaces do not have mechanical exhaust ventilation. 46 CFR 182.15-45
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 1 April 2020
Resolved 17 June 2020
Resolution: Vessel removed fuel filter from aft void and relocated it to fuel tank space. Aft void bulkhead was sealed with firestop to seperated two spaces. Fuel tanks space determined to be partially enclosed and not needing mechanical ventilation.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 October 2019
Resolved
Machinery shall be maintained to afford adequate protection against fire and explosion. Fuel Hoses for port and starboard tanks are cracking.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 April 2020
Resolved 17 June 2020
Resolution: Fuel Hoses were replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 6 August 2018
Resolved
Vessel must carry 3 orange smoke and 3 red flare distress signals. 2 flares are missing.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 August 2018
Resolved 8 August 2018
Resolution: Vessel rep landed new flares onboard.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 6 August 2018
Resolved
All vessels must have navigation lights that are in compliance with the applicable sections of the International andInland Navigation Rules. Port (red) navigation light installation needs to be adjusted so the light is not obstructed. Must be repaired prior to operating at night or when visibility is below 01 NM.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 6 August 2018
Resolved 8 August 2018
Resolution: Vessel rep fixed installation.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 30 July 2018
Resolved
VSL must undergo an annual inspection within the 3 months before or after each anniversary date. VSL is currently overdue.
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Due 30 July 2018
Resolved 6 August 2018
Resolution: Conducted annual inspection
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 30 July 2018
Resolved
The owner or managing operator must provide satisfactory evidence of the required servicing to the marineinspector. All four portable fire extinguishers require annual servicing.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 August 2018
Resolved 8 August 2018
Resolution: Technician conducted required servicing.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 July 2018
Resolved
A vessel must carry either a first-aid kit approved under approval series 160.041 or a kit with equivalent contents andinstructions. First aid kit is missing multiple required items.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 22 August 2018
Resolved 8 August 2018
Resolution: Vessel rep had an approved first aid kit ordered and delivered.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 9 August 2017
Resolved
Label ring buoy with vessel name 46 CFR 185.604
Due 8 September 2017
Resolved 14 August 2017
Resolution: Ring buoy properly labelled with vessel name.
Lifesaving › Lifefloat › Paddle
Issued 9 August 2017
Resolved
Label life float paddles with vessel name. 46 CFR 185.604
Due 8 September 2017
Resolved 14 August 2017
Resolution: Paddles properly labelled with vessel name.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 9 August 2017
Resolved
Provide functioning float light for ring buoy 46 CFR 180.70d
Due 8 September 2017
Resolved 15 August 2017
Resolution: Owner purchased new float light.
Lifesaving › Hand Flares › Expired
Issued 9 August 2017
Resolved
Provide 2 additional flares for a total of 6.
Due 8 September 2017
Resolved 9 August 2017
Resolution: Purchased new flares.
Fire Fighting › Fire Bucket › Availability
Issued 9 August 2017
Resolved
Provide 1 additional fire bucket with lanyard.
Due 8 September 2017
Resolved 9 August 2017
Resolution: Added fire bucket to vessel.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 6 May 2016
Resolved
Conduct MOB Drills with newly assigned master and crew
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 6 May 2016
Resolved 5 September 2017
Resolution: Conducted MOB in AUG 2017.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Location
Issued 6 May 2016
Resolved
Install one B-II dry chemical portable extinguisher in aft accomodation space.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 June 2016
Resolved 2 June 2016
Resolution: Vessel owner installed B-II in aft accomodation space.