← All vessels
PEACE RIVER
PEACE RIVER is a 1962 tank barge. The Coast Guard has recorded 33 inspections since 1984, most recently in December 2003, along with 39 deficiencies.
Records from 1984 to 2003. Most recent: inspection, 30 December 2003.
- Built
- 1962
- Last inspected
- 30 December 2003
- Documentation
- Not in the documentation file of 10 September 2026
- Deficiencies
- 39 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
Identity
287990
44246
Flag
UNITED STATES
—
Maury page id
psix-44246
Inspections, by type
…with no type recorded13
Years with a record
13 calendar years (1984–2003)
The 33 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
This record may be incomplete: the most recent inspection recorded for this vessel was 23 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.
Documentation record
Tonnage as PSIX records it1832 - Regulatory (Subpart C or D), Gross Ton
1832 - Regulatory (Subpart C or D), Net Ton
1832 - Regulatory (Subpart C or D), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.
Radio station licence
No FCC ship-station licence is recorded against this Official Number in the file of
6 September 2026. That is a fact about the licence file, not about the radio.
Inspection history · 33
30 December 2003
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1979887
25 August 1995
Administrative
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1192245
19 December 1994
Hull Examination · COI Inspection
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 848088
31 October 1994
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1180236
9 August 1994
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1356764
4 October 1993
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1156644
28 October 1992
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1362657
10 October 1991
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1247057
18 March 1991
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 916689
12 March 1991
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 468675
28 February 1991
Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 923690
18 January 1991
Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 905957
18 December 1990
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 906903
30 January 1990
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 503172
19 December 1989
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1216383
20 November 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1221791
13 October 1989
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1038897
12 October 1989
COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1043005
15 February 1989
Type not recorded
No type recorded · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1039785
30 November 1988
Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1043026
5 April 1988
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 465924
16 October 1987
COI Inspection · Hull Examination
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1011256
30 July 1987
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 440313
8 January 1987
Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1007066
4 December 1986
Administrative
Administrative · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1329088
6 November 1986
Deficiency Check · Damage Survey · Drydock Extension
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1014779
31 October 1986
Re-Inspection
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 1326052
2 June 1986
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 446048
11 October 1985
COI Inspection · Deficiency Check
Physical examination · MIO PHILADELPHIA · USCG East District (CGD-E) · Activity 990978
11 July 1985
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 303228
24 April 1985
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 523330
6 March 1985
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 511163
24 July 1984
Type not recorded
No type recorded · COTP PHILADELPHIA · USCG East District (CGD-E) · Activity 500583
Deficiency record · 39
Deck/Cargo
Issued 4 October 1993
Resolved
PRIOR TO THE CARRIAGE OF CARGO AND PRIOR TO USE OF THE AIR RECEIVER, CONDUCT A HYDROSTATIC TEST OR INTERNAL EXAM OF THE AIR RECEIVER TO THE SATISFACTION OF THE ATTENDING USCG MARINE INSPECTOR.
Construction/Loadline
Issued 28 October 1992
Resolved
PRIOR TO CARRYING NEXT CARGO PRESENT VESSEL FOR CREDIT HULL EXAMINATION.
Construction/Loadline
Issued 28 October 1992
Resolved
PRIOR TO CARRYING NEXT CARGO PRESENT ALL VOID COMPARTMENTS FOR CREDIT INTERNAL STRUCTURAL EXAMINATION.
Construction/Loadline
Issued 28 October 1992
Resolved
MAINTAIN TEMPORARY PATCH ON 3/8" HOLE WASTED IN MAIN DECK IN WAY OF #1 PORTCARGO TANK IN VICINITY OF FWD BLKHD OUTSIDE FORWARD DECK PERIMETER OIL CONTAINMENT. MAKE PERMANENT REPAIRS PRIOR TO COMPLETION OF CREDIT HULL EXAMINATION AND C.T. INTERNAL EXAM.
Construction/Loadline
Issued 28 October 1992
Resolved
PRIOR TO COMPLETION OF CREDIT HULL EXAM, INSTALL CLOSURE BALLS IN AFTER COMPARTMENT/VOID GOOSENECK VENTS LOCATED PORTSIDE AFT OF ACCOMMODATION HOUSE ON MAIN DECK.
Lifesaving
Issued 28 October 1992
Resolved
PRIOR TO CARRYING NEXT CARGO PLACE ALL LIFESAVING AND FIRE FIGHTING GEAR ABOARD THE VESSEL AND PRESENT FOR COAST GUARD INSPECTION.
Construction/Loadline
Issued 28 October 1992
Resolved
PRIOR TO CARRYING NEXT CARGO PRESENT CARGO TANKS IN A GAS FREE CONDITION FOR A CREDIT CARGO TANK INTERNAL EXAMINATION.
Electrical
Issued 28 October 1992
Resolved
PRIOR TO COMPLETION OF CREDIT HULL EXAM, PROVIDE COVERS FOR TWO STARTING BATTERIES IN MACHINERY SPACE.
Engineering
Issued 28 October 1992
Resolved
PRIOR TO COMPLETION OF CREDIT HULL EXAM, REPAIR EXHAUST LEAK IN MACHINERY SPACE LOCATED IN AFT RAKE.
Electrical
Issued 28 October 1992
Resolved
PRIOR TO COMPLETION OF CREDIT HULL EXAM, PROVIDE BLANK IN OPEN CIRCUIT BREAKER PANEL LOCATED NEXT TO ENTRANCE LADDER FOR AFT ACCOMMODATIONS COMPARTMENT.
Lifesaving
Issued 28 October 1992
Resolved
PRIOR TO COMPLETION OF CREDIT HULL EXAM, PROVIDE LIFELINE FOR SELF CONTAINED BREATHING APPARATUS (SCBA).
Fire Fighting
Issued 28 October 1992
Resolved
PRIOR TO COMPLETION OF CREDIT HULL EXAM, SERVICE PORTABLE FIRE EXTINGUISHERS REQUIRING HYDROSTATIC TESTING AND PROVIDE SAFETY _x001C_ RETAINING SEALS.
Electrical
Issued 28 October 1992
Resolved
PRIOR TO COMPLETION OF CREDIT HULL EXAM, INSTALL COVER FOR LIGHT FIXTURE OVER BUNK IN ACCOMMODATIONS AND DISCONNECT WIRING OR INSTALL ACCEPTABLE LIGHT FIXTURE.
Construction/Loadline
Issued 28 October 1992
Resolved
PRIOR TO COMPLETION OF CREDIT HULL EXAM AND CARGO TANK INTERNAL EXAMINATIONIDENTIFY CAUSE FOR AREAS OF PANTING MAIN DECK IN VARIOUS LOCATIONS OVER CARGO TANKS.
Engineering
Issued 10 October 1991
Resolved
PROVE OPERATION OR REPLACE SAFETY RELIEF VALVE ON AIR RECEIVER.
Lifesaving
Issued 18 December 1990
Resolved
REPLACE INFLATABLE RING ON SURVIVAL SUIT.
Deck/Cargo
Issued 18 December 1990
Resolved
DEMONSTRATE OPERATION OF ANCHOR WINCH.
Lifesaving
Issued 18 December 1990
Resolved
REPLACE LIFELINES ON BUOYANT APPARATUS.
Electrical
Issued 18 December 1990
Resolved
INSTALL U.L. APPROVED RUBBER ELECTRICAL MATS IN FRONT OF ELECTRICAL SWITCH-BOARDS.
Deck/Cargo
Issued 12 October 1989
Resolved
OPEN AND CLEAN ALL P/V VALVES THROGHOUT THE VESSEL.
Deck/Cargo
Issued 12 October 1989
Resolved
REPLACE ALL P/V VALVE FLAME SCREENS WHERE CLOGGED.
Deck/Cargo
Issued 12 October 1989
Resolved
MAKE PERMENANT REPAIRS TO PANTING DECK ABOVE CARGO TANK #1 PORT AND STAR- BOARD SIDES.
Construction/Loadline
Issued 6 November 1986
Resolved
GRIND OUT AND REWELD THE CRACK LOCATED IN WAY OF THE INTERSECTION OF #3 WEBFROM FWD END OF #4 PORT CARGO TANK AND #2 SIDESHELL STIFFENER. REQUIREMENTTO BE COMPLETED AT VESSEL'S NEXT DRYDOCKING.
Construction/Loadline
Issued 31 October 1986
Resolved
CROP OUT AND RENEW THE SIDESHELL PORT SIDE IN WAY OF THE THIRD FRAME AFT OFTHE HEAD LOG AT NEXT DRYDOCK PERIOD.
Construction/Loadline
Issued 31 October 1986
Resolved
CROP OUT AND RENEW THE LONGITUDINAL STIFFENER LOCATED IN WAY OF THE THIRD FRAME FROM THE HEAD LOG, PORT SIDE AT NEXT DRYDOCK PERIOD.
Construction/Loadline
Issued 31 October 1986
Resolved
CROP OUT AND RENEW THE UNDERDECK BRACKETS PORT SIDE AFTER RAKE AT NEXT DRYDOCK PERIOD.
Construction/Loadline
Issued 31 October 1986
Resolved
CROP OUT AND RENEW THE BRACKETS IN WAY OF THE STBD SIDESHELL AND AFTER RAKEFWD BULKHEAD AT NEXT DRYDOCK PERIOD.
Deck/Cargo
Issued 31 October 1986
Resolved
CONDUCT A HYDROSTATIC TEST OF THE CARGO PIPING TO 1.5 TIMES THE MAWP. (33 CFR 156.170)
Deck/Cargo
Issued 31 October 1986
Resolved
DEMONSTRATE THE PROPER OPERATIONS OF THE DIESEL PUMPING ENGINE GOVERNORS.
Construction/Loadline
Issued 31 October 1986
Resolved
PROVIDE A NUT AND BOLT TO ENABLE SECURING OF THE AFT STBD SIDE VENT COVER.
Construction/Loadline
Issued 31 October 1986
Resolved
EFFECT PERMANENT REPAIRS TO LEAK IN #1 STBD CARGO TANK PRIOR TO CARRYING CARGO.
Construction/Loadline
Issued 31 October 1986
Resolved
DEMONSTRATE THE WATERTIGHT INTEGRITY OF THE PORT AND STBD AFTER DECK SCUTTLES.
Fire Fighting
Issued 31 October 1986
Resolved
PROVIDE A COPY OF THE SERVICING REPORT FOR THE B-II EXTINGUISHERS.
Construction/Loadline
Issued 31 October 1986
Resolved
CROP OUT AND RENEW BRACKET NUMBER 2 AND 3 FROM THE PORT SIDE IN WAY OF THE HEAD LOG AT NEXT DRYDOCK PERIOD.
Construction/Loadline
Issued 31 October 1986
Resolved
GRIND OUT AND REWELD THE TRANSVERSE STIFFENER IN WAY OF #2 AND #3 HEAD LOG BRACKETS AT NEXT DRYDOCK PERIOD.
Construction/Loadline
Issued 31 October 1986
Resolved
CROP OUT AND RENEW PORT SIDE STIFFENER IN WAY OF FRACTURE.
Construction/Loadline
Issued 31 October 1986
Resolved
PROVIDE A GUARD FOR THE REFRIGERATOR COMPRESSOR.
Accommodation/Occupational Safety
Issued 31 October 1986
Resolved
REPAIR THE PORT SIDE AFT SAFETY RAIL STANCHION.
Construction/Loadline
Issued 11 October 1985
Resolved
REPAIR CRACK AT WELD AT #7 BULKHEAD STIFFNER AT TIE IN BRACKET TO BOTTOM LONGITUDINAL FRAME IN FWD RAKE.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.