MAURY USCG vessel records Sign in
← All vessels

ENDEAVOUR

ENDEAVOUR is a 1996 freight ship. The Coast Guard has recorded 9 inspections since 1997, most recently in July 2012, along with 4 deficiencies and 3 operational controls.

Records from 1997 to 2012. Most recent: inspection, 8 July 2012.

Built
1996
Last inspected
8 July 2012
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

9131541 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
443081
Flag
PANAMA
—
Maury page id
psix-443081

Inspections, by type

…with no type recorded5
Years with a record 5 calendar years (1997–2012)
The 9 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 14 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Bulk Carrier class in Maury's sources begin in 1981.

Documentation record

Tonnage as PSIX records it71319 - Dead Weight, Ton
81598 - Displacement, Ton
38205 - Convention (Subpart B), Gross Ton
24113 - Convention (Subpart B), Net Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

No FCC ship-station licence is recorded against this Official Number in the file of 6 September 2026. That is a fact about the licence file, not about the radio.

Inspection history · 9

8 July 2012 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4369779
6 July 2012 Type not recorded
No type recorded · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 4369989
27 March 2008 PII Safety Exam · ISPS II Exam · Ballast Water Examination
Physical examination · Sector Mobile · USCG Heartland District (CGD-H) · Activity 3169853
8 November 2004 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 2237439
8 September 2004 Administrative Inspection
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2190023
25 June 2004 PII Safety Exam · ISPS II Exam
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2153491
16 January 1998 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 411765
15 January 1997 Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 399559
13 January 1997 Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 399153

Deficiency record · 4

Operations/Management › EPA Vessel General Permit (VGP) › 1.5.1-VGP Notice of Intent (NOI)
Issued 6 July 2012 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 705 - Other - as specified
Due 8 July 2012
Resolved 8 July 2012
Navigation › Collision/Grounding Avoidance › Radar
Issued 27 March 2008 Resolved
Vessel Requested LOD for inoperable secondary radar.
Condition: Unknown
Action required: 17 - Rectify deficiencies prior to departure
Resolved 27 March 2008
Resolution: Received tech report attesting to proper operation of radar.
Engineering › Steering Gear System › Feedback Unit
Issued 25 June 2004 Resolved
Conduct permanent repairs to motor for three way valve on steering gear pump No.2 within 30 days to the satisfaction of class society surveyor.
Condition: Unknown
Action required: 705 - Other - as specified
Due 25 July 2004
Resolved 8 September 2004
Resolution: Recieved statement from superintendent with copies of correction reports stating item has been corrected and tested to the satisfaction of attending surveyor.
Construction/Loadline › Hull › Hull Plating
Issued 25 June 2004 Resolved
Conduct permanent repair's of insets on the hull plating port side, aft to the satisfaction of attending class society surveyor.
Condition: Unknown
Action required: 705 - Other - as specified
Due 25 July 2004
Resolved 8 September 2004
Resolution: Recieved statement from superintendent of repairs conducted to the satisfaction of attending class surveyor.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.