MAURY USCG vessel records Sign in
← All vessels

CAPTAIN DAVE III

CAPTAIN DAVE III is a 1962 passenger vessel (inspected). The Coast Guard has recorded 83 inspections since 1985, most recently in May 2026, along with 75 deficiencies, 1 operational control and 1 casualty investigation in 2006.

Records from 1985 to 2026. Most recent: inspection, 12 May 2026.

Built
1962
Last inspected
12 May 2026
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

WDH3789
Flag
UNITED STATES
367610930
Maury page id
psix-44358

Inspections, by type

…with no type recorded8
Years with a record 40 calendar years (1985–2026)
The 83 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.

Documentation record

Registered dimensions (L × B × D)85.7 ft × 21.0 ft × 8.0 ft
Registered tonnagegross 92 / net 62
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBLOUNT MARINE CORP · WARREN, RI, UNITED STATES · built 1962
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portSHEEPSHEAD BAY, NY
Trade endorsementsCoastwise, unrestricted, Fishery
DocumentationValid · issued 5 November 2025 · expires 30 November 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it92 - Regulatory (Subpart C or D), Gross Ton
62 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

WDH3789MMSI 367610930 · active · compulsorily equipped · granted 21 February 2024, expires 20 March 2034 · licensed under a name not among this hull’s recorded names (not shown)
WT9992MMSI 367087110 · expired · compulsorily equipped · granted 18 January 2006, cancelled 28 May 2016
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

Inspection history · 83

12 May 2026 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 8371892
1 April 2026 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8333644
3 April 2025 Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8095731
26 February 2025 Deficiency Check · Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8084856
23 January 2025 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8068787
4 March 2024 Deficiency Check · Annual Inspection · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7872719
8 March 2023 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7647170
24 February 2023 Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7616449
18 March 2022 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7398428
18 June 2021 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7229239
27 May 2021 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7208533
15 May 2021 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7197603
14 May 2021 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 7197303
13 May 2021 Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 7235781
11 March 2021 Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7154552
19 February 2021 Internal Structural Exam · Hull Examination · Deficiency Check · Administrative Inspection · Examination of Repairs
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7143089
14 January 2020 COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6888921
3 June 2019 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6702491
5 March 2019 Internal Structural Exam · Examination of Repairs · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6636357
19 March 2018 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6374548
21 November 2017 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6310655
30 October 2017 Administrative Inspection
Administrative · Navigation Center · Activity 6297849
25 July 2017 Type not recorded
No type recorded · Station New York · USCG Northeast District (CGD-NE) · Activity 6220034
25 July 2017 Type not recorded
No type recorded · Station New York · USCG Northeast District (CGD-NE) · Activity 6220041
15 March 2017 Hull Examination · Deadweight Survey · Internal Structural Exam · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6106842
6 March 2017 Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6099355
28 March 2016 Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5841709
2 May 2014 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 4848703
28 February 2012 Annual Inspection · DAPI Audit
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4246569
1 December 2011 Administrative Inspection
Administrative · Sector Delaware Bay · USCG East District (CGD-E) · Activity 4199061
21 January 2010 COI Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3666611
23 March 2009 Annual Inspection · Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3438365
26 February 2008 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3152944
12 October 2007 Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 3078339
29 March 2007 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2896590
28 February 2006 Hull Examination
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2632352
7 February 2006 Annual Inspection
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2580073
9 January 2006 Damage Survey · Examination of Repairs
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2580099
3 January 2006 Type not recorded
No type recorded · Sector Delaware Bay · USCG East District (CGD-E) · Activity 2560673
24 January 2005 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 2279672
29 January 2004 Internal Structural Exam · Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1993785
13 January 2004 Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1982239
1 July 2003 Deficiency Check
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1831820
10 April 2003 Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1770376
19 February 2002 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1487633
4 February 2002 Annual Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1483855
13 February 2001 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1058297
10 April 2000 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1049153
27 January 2000 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 813937
28 January 1999 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 789573
17 February 1998 Re-Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1119080
9 February 1998 Hull Examination
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1381153
28 January 1997 COI Inspection
Physical examination · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1374853
2 July 1996 Administrative
Administrative · MSO PHILADELPHIA · USCG East District (CGD-E) · Activity 1087348
26 March 1996 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1078588
12 February 1996 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 876305
29 January 1996 COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 882937
29 January 1996 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1192880
30 January 1995 COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 834811
15 February 1994 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 854188
10 February 1994 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 854176
2 February 1993 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1138841
15 July 1992 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1262697
21 May 1992 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1259726
3 February 1992 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 949042
22 April 1991 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1215216
21 March 1991 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1240826
4 February 1991 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 901047
16 November 1990 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 909512
5 February 1990 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 905031
15 May 1989 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1341887
25 April 1989 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1035242
7 February 1989 COI Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1351849
9 February 1988 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1334235
24 December 1987 Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1008688
21 October 1987 Drydock Extension
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1325125
4 March 1987 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1317699
11 February 1987 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1012993
27 June 1986 Excursion Permit
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1294973
29 April 1986 Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1294972
14 February 1986 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1292936
14 February 1985 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 978803
7 February 1985 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 975360

Deficiency record · 75

07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 1 April 2026 Resolved
Vessels described by 46 CFR 175.110(c) must have an interconnected fire detection system in compliance with § 181.450 installed in all enclosed areas where passengers and crew have routine access, including accommodation spaces and machinery spaces. MI observed vessel on Oceans Route with fire detection unable to demonstrate means of interconnected installation. Vessel limited to operations 20 miles offshore. 46CFR181.405(c), 46CFR175.110(c)(2), & 46CFR181.450
Action required: 705 - Other - as specified
Resolved 13 April 2026
Resolution: Smoke detection system tested satisfacty
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 1 April 2026 Resolved
MI observed expired alcohol swabs. Replace with new ones.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2026
Resolved 2 April 2026
Resolution: New swabs on board.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 1 April 2026 Resolved
"Life floats and buoyant apparatus must not be stowed in tiers more than 1,220 millimeters (4 feet) high. When stowed in tiers, the separate units must be kept apart by spacers." MI observed missing spacers for life floats. Install appropriate spacers for life floats.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2026
Resolved 2 April 2026
Resolution: Life float spacers installed.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 1 April 2026 Resolved
"Life floats. Each life float must be fitted with a lifeline, pendants, two paddles, a painter, and a light." MI observed no presence of life float light. Install appropriate light for life float.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2026
Resolved 6 April 2026
Resolution: Life float light replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 1 April 2026 Resolved
"Grab line. The finished length of the grab line shall be four times the outside diameter of the buoy. The ends of the grab line shall be securely and neatly spliced together, or shall be hand whipped with a needle and both ends securely and smoothly seized together. The grab line shall encircle the buoy and shall be held in place by the beckets. The spliced or seized ends of the grab line shall be placed in the center of the width of one of the beckets." MI observed life ring grab line in unsatisfactory condition. Replace life ring.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2026
Resolved 2 April 2026
Resolution: Grab line replaced.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 1 April 2026 Resolved
"As appropriate for the intended voyage, a vessel must carry adequate and up-to-date:(1) Charts of large enough scale to make safe navigation possible;(2) U.S. Coast Pilot or similar publication;(3) Coast Guard Light List..." MI observed outdated charts, light list, and coast pilots. Replace with updated navigation equipment.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2026
Resolved 6 April 2026
Resolution: Recieved photo of new publications on board.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 1 April 2026 Resolved
"All cable and wire must: Be installed with metal supports spaced not more than 610 millimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage." MI observed only plastic zip ties supporting cable wiring along both sides of vessel. Replace with appropriate supports.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 15 April 2026
Resolved 6 April 2026
Resolution: Supports installed
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 3 April 2025 Resolved
Each survival craft must be: Stowed so that when the vessel sinks the survival craft floats free and, if inflatable, inflates automatically. Life float lines are taped together on all five life floats.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 April 2025
Resolved 10 April 2025
Resolution: Attended vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 3 April 2025 Resolved
Life floats. Each life float must be fitted with a lifeline, pendants, two paddles, a painter, and a light. 10-person life float is inoperable.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 April 2025
Resolved 10 April 2025
Resolution: Attended vessel.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 April 2025 Resolved
Each "L" vessel will be equipped with (1) fire axe located in or adjacent to the pilothouse. Fire axe was not stowed correctly.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 April 2025
Resolved 10 April 2025
Resolution: Attended vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 3 April 2025 Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears, machinery, etc. Both main engines and port generator have exposed rotating machinery.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 17 April 2025
Resolved 10 April 2025
Resolution: Attended vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 26 February 2025 Resolved
Auxiliary machinery shall be suitable in type and design for the purpose intended. Port side generator oil filter hose and gasket around oil pan was found leaking. Repair to satisfaction of attending Marine Inspector. 46 CFR 182.10(a) (Old T)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 3 April 2025
Resolution: Replaced oil pan and repaired oil hose leak.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 23 January 2025 Resolved
A vessel to which this subchapter applies may not be operated without having on board a valid U.S. Coast Guard Certificate of Inspection. Vessel's COI Expired on 22JAN2025, thus rendering it invalid. Vessel must undergo an inspection for a new COI prior to the carriage of passengers. 46 CFR 176.100.a
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 April 2025
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 6 March 2024 Resolved
respective of build date, a vessel to which this subchapter applies must meet 46 CFR 181.405, 181.450, 181.500, 185.364, and 185.420(b), if it is not a ferry, and if it— (1) Has overnight accommodations for passengers; or (2) Is operating on a Coastwise or Oceans route. Outfit vessel with interconnected fire detection system.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 March 2024
Resolution: Vessel installed interconnected fire detection system. MI witnessed satisfactory test of system.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 4 March 2024 Resolved
New installations of electrical equipment and material, and the repair or replacement of wire and cable, on an existing vessel, which are completed to the satisfaction of the cognizant Officer in Charge, Marine Inspection (OCMI) on or after March 11, 1996, must comply with this part. Replacement of existing equipment, not including wire or cable, installed on the vessel prior to March 11, 1996 need not comply with the regulations in this part. Vessel installed a new generator in October 2023 with no Coast Guard oversight. Submit to Marine Safety Center for plan review.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 April 2024
Resolution: Confirmed installation of generator.
07 - Fire Safety › N/A - No Subsystem › Fire-dampers
Issued 4 March 2024 Resolved
At each initial and subsequent inspection for certification, the owner or managing operator must be prepared to conduct tests and have the vessel ready for inspection of its fire protection equipment... IDENTIFIED VARIOUS NON- AIR TIGHT OPENINGS TO ENGINE ROOM. MAKE AIR TIGHT.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 March 2024
Resolution: Vessel outfitted with firestop and hinged dampers.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 4 March 2024 Resolved
Each item of survival craft equipment must be of good quality, and efficient for the purpose it is intended to serve... ATTENDING MARINE INSPECTOR IDENTIFIED THAT THE LIFEFLOAT WATER LIGHT AND AFT PILOTHOUSE WERE INOPERABLE. OUTFIT VESSEL WITH WORKING WATER LIGHTS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 March 2024
Resolution: Lights are operational.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 March 2024 Resolved
In the design of a control, interlock, or indicator circuit, the disconnect device and its connections, including each terminal block for terminating the vessel's wiring, must not have any electrically unshielded or uninsulated surfaces. ATTENDING MARINE INSPECTOR IDENTIFIED A SWITCHBOARD IN THE AFT ENGINE ROOM BULKHEAD THAT HAD AN OPENING. OUTFIT SWITCHBOARD WITH BLANKS.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 March 2024
Resolution: Blanks installed.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 4 March 2024 Resolved
Mechanically propelled "S" vessels which are ferry vessels or which carry more than 49 passengers and mechanically propelled "L" vessels shall comply with the provisions of Subchapter F of this chapter. ATTENDING MARINE INSPECTOR IDENTIFIED NONMETALLIC COUPLINGS ON VESSEL'S BILGE SYSYTEM. OUTFIT BILGE SYSTEM WITH METALLIC PIPING.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 March 2024
Resolution: Piping renewed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 4 March 2024 Resolved
hatch exposed to the weather must be watertight... ATTENDING MARINE INSPECTOR IDENTIFIED AN INOPERABLE GASKET ON THE LAZARETTE HATCH. REPLACE GASKET ON HATCH
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 March 2024
Resolution: Vessel replaced gasket on lazarette hatch. MI conducted water test to ensure watertight integrity.
02 - Structural Conditions › N/A - No Subsystem › Bulkhead -corrosion
Issued 4 March 2024 Resolved
At each initial and subsequent inspection for certification the marine inspector shall conduct inspections of the hull structure and its appurtenances... examine all accessible parts of the exterior and interior of the hull the watertight bulk heads and weather deck. FORWARD CENTER LINE BULKHEAD ENGINE ROOM IN WAY OF BILGE, FOUND DEFORMED AND SCALING. PROVIDE UT OF BOTTOM 6" OF BULKHEAD.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 March 2024
Resolution: Bulkhead renewed.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Scuppers, inlets and discharges
Issued 4 March 2024 Resolved
At each initial and subsequent inspection for certification the marine inspector shall conduct inspections of the hull structure and its appurtenances... examine all accessible parts of the exterior and interior of the hull the watertight bulk heads and weather deck. PORT SIDE DECK DRAIN INTO ENGINE ROOM IS WASTED. PERMANENTLY REPAIR DRAIN.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 18 March 2024
Resolution: Drain renewed.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 27 May 2021 Resolved
33 CFR 164.46 Vessel must have on board a properly installed, operational Coast Guard type approved AIS.
Action required: 17 - Rectify deficiencies prior to departure
Due 27 May 2021
Resolved 27 May 2021
Resolution: while underway and notified vessel was able to transmit AIS.
09 - Working and Living Conditions › 092 - Working Conditions › Legal documentation on work and rest hours
Issued 15 May 2021 Resolved
Marine employers shall establish programs for chemical testing for dangerous drugs on a random basis of crew members on inspected vessels who occupy a position, or perform the duties and functions of a position required by the vessel’s certificate of inspection. Vessel was underway with alternate crew members that were not subject to the vessel’s established drug and alcohol program. Vessel is restricted to operating no more than 12 hours away from the dock until the alternate crew are enrolled in drug and alcohol program to the satisfaction of the coast guard. Cite: 46 CFR 16.230(a)(1) Code: 705 (Prior to operations greater than 12 hours) Action: C
Action required: 705 - Other - as specified
Resolved 18 March 2022
Resolution: Vessel's alternate crew are enrolled in its drug/alcohol program.
09 - Working and Living Conditions › 092 - Working Conditions › Fitness for duty - intoxication
Issued 15 May 2021 Resolved
Acceptable evidence of when a vessel operator is under the influence of alcohol or a dangerous drug includes but is not limited to: (a) Personal observations of an individual’s movement, manner, disposition, speech, general appearance or behavior. On May 13th 2021 a passenger witnessed crew members smoking marijuana and drinking alcohol while operating the vessel. Owner/marine employer must ensure reasonable cause testing is conducted. Cite: 33 CFR 95.030(a) Action: 16 Code: C
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 March 2022
Resolution: Vessel relieved all called out crewmembers. Vessel belongs to consortium. Vessel is able to get testing in required time frames.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 15 May 2021 Resolved
Prior to getting underway with passengers for more than 12 hours, the vessel must conduct a safety assessment and provide results to Sector New York Inspections Office. The safety assessment shall include but is not limited to; operation for conducting overnight passenger voyage, procedures for crew on watch and roaming patrolman, expectations on recording in the bridge log, how to limit electrical hazards like excessive cell phone chargers, actions taken to reduce excessive luggage and personal items from impeding egress, restrictions on alcohol on board, etc. Additionally items to be addressed during the safety assessment are to update the station watch bill to reflect current crew members, provide proof that a prepared voyage plan is occurring verbally or written prior to departure and provide the provisions to accurately record a passenger and crew list. Cite: 46 CFR 185.100 Action: 16 Code: C
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 18 March 2022
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 14 May 2021 Resolved
During an at sea USCG boarding it was determined that the vessel was not operating with the required crew compliment on board. Vessel was underway on a voyage exceeding 12 hours with no alternate crew provided not in accordance with the certificate of inspection. Proceed directly to hailing port. Vessel is required to contact local USCG Sector Command Center every 2 hours on VHF Channel 22A.
Action required: 705 - Other - as specified
Resolved 15 May 2021
Resolution: Vessel returned to port.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 11 March 2021 Resolved
Damaged fire main piping on port and starboard risers at the main deck.
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 March 2021
Resolved 15 March 2021
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 14 January 2020 Resolved
Each life jacket carried on a vessel on an oceans route, must have a life jacket light approved in accordance with § 161.012 in subchapter Q of this chapter. 32 adult and 02 child size life jackets require new batteries in the life jacket lights.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2020
Resolved 15 January 2020
Resolution: O/O sent pictures of purchased batteries
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 14 January 2020 Resolved
Each vessel that operates on the high seas, must have on board a FCC Type Accepted Category 1, 406 MHz EPIRB, installed to automatically float free and activate. NOAA registration for EPIRB was not provided during inspection.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2020
Resolved 15 January 2020
Resolution: O/O sent picture of current registration from NOAA
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 January 2020 Resolved
Each distribution panel or switchboard must be totally enclosed to prevent a person from accidentally contacting energized parts. There is an opening in the electrical panel located in the engine room space on the most forward bulkhead.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 January 2020
Resolved 15 January 2020
Resolution: O/O sent picture of blank installed in open part of breaker panel
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 3 June 2019 Resolved
WIRING JOINTS AND SPLICES SHALL BE MECHANICALLY SECURE AND MADE IN JUNCTION BOXES. WIRING CONNECTIONS IN ALL SPACES FOR HIGH BILGE ALARM WERE NOT MADE IN BOXES.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 12 June 2019
Resolution: Junction boxes were installed for all splices.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 June 2019 Resolved
THE BILGE SUCTIONS SHALL BE FITTED WITH SUITABLE STRAINERS HAVING AN OPEN AREA NOT LESS THAN THREE TIMES THE AREA OF THE BILGE PIPE. STORAGE SPACE BILGE SUCTION LACKED SUITABLE STRAINER.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 10 June 2019
Resolved 12 June 2019
Resolution: pre-manufactured bilge strainer installed.
11 - Life Saving Appliances › N/A - No Subsystem › On board training and instructions
Issued 3 June 2019 Resolved
PREPARE AND POST EMERGENCY CHECKOFF LISTS IN A CONSPICUOUS PLACE ACCESSIBLE TO CREW AND PASSENGERS. EMERGENCY INSTRUCTIONS MUST BE REVISED AND POSTED.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 12 June 2019
Resolution: instructions updated and posted at operating station
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 3 June 2019 Resolved
EACH VESSEL THAT OPERATES ON THE HIGH SEAS MUST HAVE ON BOARD A 406 MHz EPIRB INSTALLED TO AUTOMATICALLY FLOAT FREE AND ACTIVATE. EPIRP HYDROSTATIC RELEASE UNIT IS EXPIRED.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 3 June 2019
Resolution: OWNER PROCURED AND INSTALLED A NEW HRU
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 3 June 2019 Resolved
ALL MACHINERY AND EQUIPMENT MUST MAINTAINED IN SUCH A MANNER AS TO AFFORD ADEQUATE PROTECTION FROM MACHINERY FAILURE. GENERATOR ENGINE RADIATOR WAS CLOGGED.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 12 June 2019
Resolution: raditor cleaned
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 3 June 2019 Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Action required: 16 - Rectify deficiencies w/in 14 days
Due 18 June 2019
Resolved 3 June 2019
Resolution: CREW APPLIED RETRO TAPE
Documentation › Logs/Records › Logbook/Record (unofficial)
Issued 19 March 2018 Resolved
LB06: Provide logs of monthly EPIRB testing and lifesaving inspections.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 April 2018
Resolved 22 March 2018
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 19 March 2018 Resolved
LB07: Seal hole located in bulkhead between the #3 void space and the engine room.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 20 April 2018
Resolved 22 March 2018
Pollution Prevention/Response › Prevention Equipment › Marine Sanitation Device, Type III
Issued 19 March 2018 Resolved
LB01: When the vessel is operating in a no discharge area the MSD system must be secured in accordance with one of the ways described in 33CFR159.7(c).
Condition: Improper Installation
Action required: 60 - Rectify deficiencies prior to movement
Resolved 22 March 2018
Engineering › Steam Boiler (auxiliary/waste heat) › Mount
Issued 19 March 2018 Resolved
LB02: Vessel has an oil fired package boiler onboard that is required to be inspected in accordance with Subchapter F. This discrepancy was noted in 2014 when the system was tagged out of service and the crew was informed it would need to be inspected prior to any further use. The boiler was being used and has not been inspected and is not annotated on the COI at this time. Vessel's master was informed that he needs to tag out the boiler until proper tests and inspections can be conducted.
Action required: 705 - Other - as specified
Resolved 18 March 2022
Resolution: Vessel's master tagged out its boiler.
Navigation › Piloting/Steering › Marine Charts
Issued 19 March 2018 Resolved
LB03: Provide updated charts, Coast Pilot, and Light List
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 April 2018
Resolved 22 March 2018
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 19 March 2018 Resolved
LB04: Provide DAPI enrollment/results for deckhand.
Action required: 705 - Other - as specified
Due 20 April 2018
Resolved 22 March 2018
Documentation › Markings/Placards › Warning Signs
Issued 19 March 2018 Resolved
LB05: Provide station bill.
Condition: Invalid
Action required: 705 - Other - as specified
Due 20 April 2018
Resolved 22 March 2018
Operations/Management › Passenger Operations › Safety Orientation
Issued 28 March 2016 Resolved
Vessel must provide saftey orientation public announcement to passengers before getting underway.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 1 April 2016
Resolved 31 March 2016
Resolution: Vessel provided written safety orientation to Coast Guard.
Lifesaving › Lifefloat › Paddle
Issued 28 March 2016 Resolved
Life flooat paddles shall be lashed on the sides of the life floats to which they belong.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 28 March 2016
Resolved 28 March 2016
Resolution: Life float paddles were properly lashed to lifefloats.
Documentation › Logs/Records › Drug Test Records
Issued 28 March 2016 Resolved
Vessel shall provide proof of pre-employment drug tests.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 May 2016
Resolved 7 April 2016
Resolution: Operator provided proof of pre-employment testing of crew.
Lifesaving › Lifebuoys › Serviceable
Issued 28 February 2012 Resolved
Lifebuoy has hole in outer covering making it unserviceable..
Condition: Damaged By Earlier Event
Due 28 February 2012
Resolved 28 February 2012
Resolution: Corrected on the spot.
Stability › Incline Test › General
Issued 1 December 2011 Resolved
The Coast Guard amended its regulations governing the maximum weight and the number of passengers that may be safely be permitted on board a passenger vessel based on a new Assumed Average Weight Per Person (AAWPP) of 185lbs per person. Based on the new AAWPP your vessel has been restricted to the following passenger count of 88 passengers and 04 crew.
Action required: 705 - Other - as specified
Resolved 10 January 2012
Resolution: Owner requested voluntary reduction in passenger count.
Engineering › Bilge Water Management System › Valve
Issued 21 January 2010 Resolved
Found check valve frozen in the closed position position in the lazarette.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 21 January 2010
Resolution: Check Valve replaced during the inspection. Tested sat.
Lifesaving › Lifefloat › Platform
Issued 21 January 2010 Resolved
The canvas floor of the life float was found to be torn and excessively UV degraded.
Action required: 705 - Other - as specified
Due 21 February 2010
Resolved 2 February 2010
Resolution: Received photogrraphs of completed repair/replacement to the canvas flooring of the life floats.
Construction/Loadline › Hull › Hull Plating
Issued 23 March 2009 Resolved
Hull plate below stbd shaft excessively pitted,
Action required: 705 - Other - as specified
Resolved 16 April 2009
Resolution: Hull plate cropped and renewed. Please see narrative for details of repair. Repair plan has been scanned and attached to the vessels MISLE documentation file.
Engineering › Steering Gear System › Fastener
Issued 12 October 2007 Resolved
Make proper repairs to steering sheaves. The support bulkhead is deterioted.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 8 November 2007
Resolution: Bulkheads had been repaired, steering inspected and tested.
Construction/Loadline › Hull › Hull Plating
Issued 12 October 2007 Resolved
Make proper repairs to fantail deck and aft bulkhead.
Due 16 November 2007
Resolved 14 November 2007
Resolution: Several square feet of decking had been renewed.
Engineering › Diesel Engine (propulsion-reduction gear) › Crankcase
Issued 29 March 2007 Resolved
Renew oil hoses for crank case breathers on both MDE's
Due 15 April 2007
Resolved 10 April 2007
Resolution: Both hoses re-newed.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 29 March 2007 Resolved
Renew lagging on both SSDG's.
Due 15 April 2007
Resolved 10 April 2007
Resolution: Lagging re-newed.
Lifesaving › Lifefloat › Float-free Link
Issued 29 March 2007 Resolved
Install proper weak link for life floats.
Due 15 April 2007
Resolved 10 April 2007
Resolution: Weak links procures, installed and verified, all sat.
Engineering › Steering Gear System › Rudder Bearing
Issued 28 February 2006 Resolved
Rudder bearing was worn and leaking, water into the steering gear room.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 7 March 2006
Resolution: Renewed bearing
Construction/Loadline › Penetrations › Weld
Issued 28 February 2006 Resolved
Handrail on second deck, weld cracked at the base.
Due 28 March 2006
Resolved 7 March 2006
Resolution: Stantion cleaned and rewelded, all secure.
Engineering
Issued 27 January 2000 Resolved
Effect repairs to port main diesel engine exhaust piping leak.
Condition: Unknown
Due 29 February 2000
Resolved 29 February 2000
Lifesaving
Issued 27 January 2000 Resolved
Replace expired medication in vessel's First Aid kit.
Condition: Unknown
Due 29 February 2000
Resolved 29 February 2000
Engineering
Issued 27 January 2000 Resolved
Prove proper operation of main engine oil pressure gauges.
Condition: Unknown
Due 29 February 2000
Resolved 29 February 2000
Electrical
Issued 29 January 1996 Resolved
PROPERLY WIRE STARBOARD BATTERY CHARGER.
Condition: Unknown
Due 12 February 1996
Resolved 12 February 1996
Fire Fighting
Issued 29 January 1996 Resolved
REPAIR CRACKED NIPPLE ON STARBOARD FIRE PUMP DISCHARGE
Condition: Unknown
Due 12 February 1996
Resolved 12 February 1996
Lifesaving
Issued 3 February 1992 Resolved
REFURBISH LIFEFLOAT PENDANTS AND FLOORS AS INDICATED. TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 3 February 1992
Resolved 3 February 1992
Electrical
Issued 4 February 1991 Resolved
INSTALL COVERS FOR ALL BATTERY BOXES IN MACHINERY SPACE.
Condition: Unknown
Due 4 February 1991
Resolved 4 February 1991
Construction/Loadline
Issued 25 April 1989 Resolved
PROVIDE ULTRASONIC GAUGING OF MAIN DECK IN WAY OF WELDED INSERTS, FOREDECK GENERALLY AND DECK TO BULWARK SEAMS.
Condition: Unknown
Due 25 April 1989
Resolved 25 April 1989
Construction/Loadline
Issued 25 April 1989 Resolved
RENEW LAZARETTE HATCH GASKET.
Condition: Unknown
Due 25 April 1989
Resolved 25 April 1989
Construction/Loadline
Issued 25 April 1989 Resolved
MAKE WATERTIGHT REPAIR TO BURN-THRU AT TOP STBD CORNER OF COLLISION BULKHEAD FOLLOWING GOOD MARINE PRACTICE.
Condition: Unknown
Due 25 April 1989
Resolved 25 April 1989
Construction/Loadline
Issued 25 April 1989 Resolved
REPAIR SLUGGED WELD IN INSERT AT OVERHEAD IN FOREPEAK.
Condition: Unknown
Due 25 April 1989
Resolved 25 April 1989
Lifesaving
Issued 7 February 1989 Resolved
REPLACE EXTERIOR GRAB LINES, TAGLINES, AND PAINTERS ON ALL LIFEFLOATS.
Condition: Unknown
Due 7 February 1989
Resolved 7 February 1989
Engineering
Issued 11 February 1987 Resolved
MARK OR STENCIL LOCATION OF VALVES ON BILGE MANIFOLD VALVES, WHERE MISSING.
Condition: Unknown
Due 11 February 1987
Resolved 11 February 1987
Accommodation/Occupational Safety
Issued 11 February 1987 Resolved
PROVIDE RUNNING WATER TO WASH BASIN IN MEN'S HEAD, WHERE MISSING.
Condition: Unknown
Due 11 February 1987
Resolved 11 February 1987
Lifesaving
Issued 11 February 1987 Resolved
MARK OR STENCIL NAME OF VESSEL AND AMOUNT OF PERSONS ON 5 BUOYANT APPARATUSWHERE MISSING.
Condition: Unknown
Due 11 February 1987
Resolved 11 February 1987
Engineering
Issued 11 February 1987 Resolved
REPLACE 6 NON COAST GUARD APPROVED FLEX FUEL LINES ON AUXILIARY GENERATORS,WITH COAST GUARD APPROVED ONES.
Condition: Unknown
Due 11 February 1987
Resolved 11 February 1987

Casualty record · 1

3 January 2006Routine · role: Involved in a Marine Casualty · activity 2560673
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

JAMAICA II (2006). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.