Records from 1999 to 2023. Most recent: inspection, 29 November 2023.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 June 2025
No resolution recorded
Replace fuel tank disimilar metal plugs at the bottom and top of the tank.
Action required: 705 - Other - as specified
Lifesaving › Hand Flares › Quantity
Issued 17 January 2018
Resolved
Vessel is required 12 distress signals but only has 11 onboard.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 January 2018
Resolution: Operator purchased aditional flares and now has 12 good distress signals onboard
Lifesaving › Hand Flares › Storage
Issued 17 January 2018
Resolved
The handle of the watertight container used for stowage of the distress signals is broken causing the container to no longer be watertight.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 17 January 2018
Resolution: Operator purchased and labeled a new watertight container for stowage of vessel's distress signals.
Communications › Radio Communications › EPIRB
Issued 17 January 2018
Resolved
The hydrostatic release for the EPIRB expired in May 2017.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 21 February 2018
Resolution: Received proof of installation of new hydrostatic release for EPIRB.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 17 January 2018
Resolved
Red and Green running side lights are inoperable.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Resolved 17 January 2018
Resolution: Operator installed new running side lights.
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 18 January 2017
Resolved
Does not have the current DAPI Drug Free Environment Sticker posted.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 23 February 2017
Resolution: Pictures of the DAPI sticker installed on the vessel were sent via e-mail.
Electrical › Electrical Distribution System (service) › Wiring
Issued 18 January 2017
Resolved
Properly bundle the wires and remove dead ended cables behind the console.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 2 February 2017
Resolution: Wires have been properly bundeled and the dead ended wires removed.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 18 January 2017
Resolved
The current lifeline is only 45ft and must be replaced with a 60ft lifeline.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 2 February 2017
Resolution: Replaced the life line with a proper 60ft life line.
Lifesaving › Lifebuoys › Serviceable
Issued 18 January 2017
Resolved
The current lifebuoy is degraded and must be replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 23 February 2017
Resolution: Pictures of the life ring buouy with reflective tape were sent via e-mail
Lifesaving › Lifejacket/PFD (Type I) › Quantity
Issued 18 January 2017
Resolved
Vessel only has 18 servicable PFDs onboard. COI allows for carriage of 19 persons. Vessel carriage is limited to 18 people until 19 PFDs are onboard.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 2 February 2017
Resolution: The vessel now has the required 19 PFDs
Lifesaving › Hand Flares › Not on Board
Issued 18 January 2017
Resolved
The vessel needs 6 red flares, but only has 4 red flares onboard and must provide 2 additional.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 2 February 2017
Resolution: The vessel now has 6 red flares.
Lifesaving › Lifefloat › Lifeline
Issued 18 January 2017
Resolved
Vessel does not have the 18ft line for the water light attached to the lifefloat.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 2 February 2017
Resolution: Vessel replaced the 18ft line for the water light attached to the lifefloat.
Lifesaving › Lifefloat › Lifeline
Issued 18 January 2017
Resolved
Sections of the lifeline attached to the life floats are age degraded and must be replaced.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 9 February 2017
Resolution: The age degraded sections of the lifeline attached to the life floats have been replaced.
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 18 January 2017
Resolved
Multiple lifejackets do not have sufficient retroreflective material
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 2 February 2017
Resolution: The proper amount of retroreflective material has been added to the PFDs
Documentation › Certificates/Documents › Certificate of Inspection
Issued 18 January 2017
Resolved
Only the first page of the COI is posted onboard the vessel. All pages must be displayed.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 1 February 2017
Resolved 2 February 2017
Resolution: All sections of the COI have been posted onboard the vessel.
Construction/Loadline › Hull › Hull Plating
Issued 30 September 2016
Resolved
Properly secure freeing port flaps
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 3 November 2016
Resolution: freeing port flaps were secured
Construction/Loadline › Hull › Hull Plating
Issued 30 September 2016
Resolved
port quarter missing eye
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 3 November 2016
Resolution: port quarter eye inserted
Construction/Loadline › Hull › Hull Plating
Issued 30 September 2016
Resolved
PVC elbows at port and stbd quarters / loose, approved material
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 3 November 2016
Resolution: PVC elbows replaced with approved material
Construction/Loadline › Hull › Side Shell
Issued 30 September 2016
Resolved
repair broken FRP at rubrail
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 3 November 2016
Resolution: rubrail replaced
Construction/Loadline › Penetrations › Gasket
Issued 30 September 2016
Resolved
install gaskets on both weathertight hatches
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 3 November 2016
Resolution: gasket installed in weathertight hatches
Electrical › Electrical Distribution System (service) › Wiring
Issued 30 September 2016
Resolved
fix electrical wire splices
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 3 November 2016
Resolution: wire splices fixed
Electrical › Electrical Distribution System (service) › Metallic Enclosure/Frame
Issued 30 September 2016
Resolved
fix unsupported wire and cables in head
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 3 November 2016
Resolution: frame inserted
Engineering › Fuel Oil Service System › Suction Strainer
Issued 30 September 2016
Resolved
replace both strainers on main engine
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 3 November 2016
Resolution: strainer replaced
Engineering › Bilge Water Management System › Pump
Issued 30 September 2016
Resolved
bilge pump not UL listed
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 3 November 2016
Resolution: bilge pump replaced
Fire Fighting › Fixed CO2 Fire Extinguishing System › Quantity of CO2
Issued 13 October 2015
Resolved
Pre-engineered system found to be heavily corroded and discharged.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 December 2015
Resolution: Replaced and proved proper operation of fixed fire fighting system.
Electrical › Electrical Distribution System (service) › Cable
Issued 13 October 2015
Resolved
The starboard MDE Perko switch wiring connections were found to be heavily corroded and showing signs of Ohmic heating due to corrosion and subsequent resistance.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2015
Resolution: Replaced electrical wiring found to have excessive resistance.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 13 October 2015
Resolved
Rotating machinery guard on the front of the Port MDE was found to be missing.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 November 2015
Resolution: Installed rotating machinery guard on Port MDE to the satisfaction of the attending MI.
Engineering › Sea-water System (primary cooling) › Piping
Issued 13 October 2015
Resolved
Several clamps on the raw water system on both MDE were found to be corroded and loose. Replace all identified faulty clamps in the raw water system of both MDE to the satisfaction of the attending MI.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 December 2015
Resolution: Replaced all identified faulty clamps in the raw water system.
Fire Fighting › Ventilation Systems › Ducts
Issued 13 October 2015
Resolved
The engine room vent closures were found inoperable.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 December 2015
Resolution: Proved proper operation of vent closures to the satisfaction of the attending MI.
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 27 September 2010
Resolved
Replace heavily rusted transmission oil cooler hoses and fuel hoses for both port and stbd engines.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 2 October 2010
Resolved 2 October 2010
Electrical › Electric Generation Source (service) › Ground Detection
Issued 27 September 2010
Resolved
Properly address grounding current issue that has corroded most transmission & fuel lines.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 1 October 2010
Resolution: Ground wires were installed according with specifications and approved by attending Marine Inspector.
Construction/Loadline › Penetrations › Gasket
Issued 27 September 2010
Resolved
Replace gaskets on both port and stbd side steering hatch covers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 1 October 2010
Resolution: New gaskets were installed.
Construction/Loadline › Hull › Bottom Plating
Issued 27 September 2010
Resolved
Porperly repair four areas of blistering over both port & stbd propellers.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 1 October 2010
Resolution: Holes were corrected.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 27 September 2010
Resolved
Replace both port & stbd cutlass bearings.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Resolved 1 October 2010
Resolution: New cutlass bearings were installed.
Construction/Loadline › Hull › Hull Plating
Issued 27 September 2010
Resolved
Repair and seal 2 holes used for sea water drainage, detected at both port & stbd sides, forward of vessel in a space currently being used for anchor rope storage.
Condition: Improper Installation
Action required: 705 - Other - as specified
Resolved 2 October 2010
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 27 September 2010
Resolved
Replace with correct according with 46 CFR 182.710 (e)(i), SAE J-1942, SAE J-1475, or provide proof of pressure for current newly installed transmission oil cooler hoses. Current hoses are design for fuel systems and not for hydraulic systems.
Action required: 705 - Other - as specified
Resolved 2 October 2010
Documentation › Certificates/Documents › FCC Vessel Bridge-to-Bridge Radiotelephony Cert.
Issued 27 September 2010
Resolved
Provide FCC Radiotelephone Safety Certificate
Action required: 705 - Other - as specified
Due 5 November 2010
Resolved 28 October 2010
Lifesaving › Lifefloat › Capacity
Issued 27 September 2010
Resolved
Provide additional lifefloat to meet the 50% passenger count requirement. Vessel restricted to 14 passenger until fitted with approved lifefloat.
Action required: 705 - Other - as specified
Due 4 January 2012
Resolved 4 January 2012
Resolution: Additional lifefloat placed on board.