Records from 1985 to 2024. Most recent: inspection, 25 November 2024.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 75
25 November 2024
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8086166
15 November 2023
Internal Structural Exam · Administrative Inspection · Annual Inspection · SIP Inspection/Audit
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7825810
1 December 2022
Drydock Exam · Internal Structural Exam · Examination of Repairs · In-Service Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7602452
16 November 2022
DAPI Audit · SIP Inspection/Audit · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7596859
2 December 2021
Annual Inspection · SIP Inspection/Audit
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7361383
12 November 2020
Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7114658
5 November 2020
SIP Inspection/Audit · COI Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7078332
10 December 2019
SIP Inspection/Audit
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6866220
10 October 2019
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6831976
5 September 2019
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6804420
21 May 2019
Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6665113
12 December 2018
SIP Inspection/Audit
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6434157
13 December 2017
SIP Inspection/Audit
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6323560
19 May 2017
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6325035
10 November 2016
In-Service Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6038165
3 November 2016
SIP Inspection/Audit
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6037296
7 September 2016
COI Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5994692
18 November 2015
SIP Inspection/Audit
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5765759
3 February 2012
Plan Review "T" Boat · Examination of Repairs
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 4239340
12 September 2011
SIP Inspection/Audit · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 4156195
4 January 2011
Plan Review "T" Boat · Examination of Repairs · Deficiency Check · Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3920956
16 September 2010
SIP Inspection/Audit
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3849680
1 April 2009
Internal Structural Exam · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3438279
30 June 2008
Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3255499
19 December 2007
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3118091
24 July 2007
Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3005967
19 October 2006
Internal Structural Exam · Examination of Repairs · Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2803707
11 September 2006
COI Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2775473
6 December 2005
Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 2546713
9 March 2005
Hull Examination · Internal Structural Exam
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 2306878
15 November 2004
In-Service Inspection
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 2241051
30 September 2003
Annual Inspection
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1916721
26 March 2003
Internal Structural Exam · Hull Examination
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1760222
17 December 2002
Administrative Inspection · ACP COI Oversight
Administrative · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1722850
8 October 2002
Re-Inspection
Physical examination · MSFO LONG ISLAND · USCG Northeast District (CGD-NE) · Activity 1686863
24 September 2002
SIP Initial Entry
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 3595686
12 September 2001
COI Inspection · MARPOL Annex V Examination · Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1407015
5 July 2001
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1397665
1 February 2001
Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1369988
13 September 2000
MARPOL Annex V Examination · Re-Inspection
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1446982
27 June 2000
Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1473508
20 October 1999
Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1448026
15 June 1999
Plan Review "T" Boat · Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1423194
11 February 1999
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1130204
22 January 1999
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1124636
7 January 1999
Plan Review "T" Boat
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1390938
16 September 1998
COI Inspection · MARPOL Annex V Examination · Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 804596
13 May 1998
Administrative
Administrative · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1125971
19 October 1997
Deficiency Check
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1364408
16 September 1997
Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1108092
23 June 1997
Hull Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 776449
5 December 1996
Type not recorded
No type recorded · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 1093441
17 September 1996
Re-Inspection · MARPOL Annex V Examination
Physical examination · GROUP/MSO LONG ISLAND SOUND · USCG Northeast District (CGD-NE) · Activity 962721
1 December 1995
Deficiency Check · Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1187748
20 September 1995
COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1187780
22 June 1995
MARPOL Annex V Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1187779
10 November 1994
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1179149
29 September 1994
Re-Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1174009
23 November 1993
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1159388
1 April 1993
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 831885
21 July 1992
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 954802
28 May 1992
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 958051
30 April 1991
Deficiency Check · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1250404
14 December 1990
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1231775
15 November 1990
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 908278
1 May 1990
Deficiency Check · COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 930102
12 June 1989
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1340894
26 May 1989
Hull Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 900556
13 May 1988
Re-Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 888469
11 December 1987
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1004161
1 May 1987
COI Inspection · Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1024708
30 June 1986
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 995054
18 June 1986
Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 995053
28 May 1986
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1297420
9 May 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 983494
Construction/Loadline › Structures › Superstructure
Issued 10 November 2016
Resolved
The uppper deck handrail is wasted and needs replacement.
Action required: 705 - Other - as specified
Resolved 19 May 2017
Resolution: completed
Electrical › Electrical Distribution System (service) › Junction Box
Issued 3 November 2016
Resolved
Replace electrical box on port side engine room, remove dead end wires. Prior to credit dry dock
Action required: 705 - Other - as specified
Due 3 November 2016
Resolved 19 May 2017
Resolution: completed
Engineering › Steering Gear System › Pin
Issued 3 November 2016
Resolved
Bolts on steering gear arm need to be turned w/cotter pins facing the bottom/keel. Prior to credit dry dock.
Action required: 705 - Other - as specified
Due 3 November 2016
Resolved 19 May 2017
Resolution: completed.
Construction/Loadline › Structures › Superstructure
Issued 3 February 2012
Resolved
Pilothouse leaks and has wasted internal framing. Owner proposes to replace pilothouse w/ the same structure as the sister vessel.
Action required: 705 - Other - as specified
Resolved 27 April 2012
Resolution: Repairs completed.
Communications › Alarms/Indicators › Bilge Alarm
Issued 12 September 2011
Resolved
No light on compt #4 bilge alarm. Maintenance crew started repairs. A bad bulb was determined to be the fault
Action required: 705 - Other - as specified
Resolved 28 September 2011
Resolution: Verified completion of repair.
Construction/Loadline › Hull › Transverse Frame
Issued 4 January 2011
Resolved
Chine knees IWO port & stbd fuel tanks found fractured IWO penetration for chine bolts. (This is a common failure when steam bent frames are over flexed. The bolt penetration is a weak point and also the greatest bend stress point.) (Owners worklist) (Owners worklist // found when fuel tank removed.)
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 April 2011
Resolution: All midship frames repaired IWO fractures on port & stbd sides. Laminated frames and reinforcing knees fitted.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 4 January 2011
Resolved
Replace fuel tanks.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 10 January 2011
Resolution: New tanks fabricated to match originals but utilizing .25" 5052 Al plate.
Accommodation/Occupational Safety › Other Accommodation Spaces › Open Deck Space
Issued 4 January 2011
Resolved
Passenger seating work and several fractures found in supports and surface areas. (Owners worklist)
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 1 April 2011
Resolution: New seat constructed to match size of originals and installed. Deck covering renewed.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 16 September 2010
Resolved
Open deck IWO port & stbd fuel tanks to permit further examination of fuel tanks. (SIP representative from company reports that tanks, where visible appear to have excess wastage. SIP advisor concurrs.) Vessel will be pulled from service at the end of the
Action required: 705 - Other - as specified
Due 5 January 2011
Resolved 4 January 2011
Resolution: Deck opened prior to visit and repairs made. Seven chine knees R&R on each side IWO tank area. Side frames sistered and renewed as needed. Replacement fuel tanks obtained and in process of installation.
Engineering › Shafting/Propeller Arrangements › Propeller (fixed pitch)
Issued 1 April 2009
Resolved
R&R both props.
Action required: 705 - Other - as specified
Due 1 April 2009
Resolved 1 April 2009
Resolution: Conducted per owners work list.
Engineering › Bilge Water Management System › Valve
Issued 1 April 2009
Resolved
Free stiff bilge manifold valves #3 & # 4.
Action required: 705 - Other - as specified
Due 1 April 2009
Resolved 1 April 2009
Resolution: Corrected
Construction/Loadline › Structures › Machinery Space Opening
Issued 1 April 2009
Resolved
Owner replaced worn wood coaming IWO E/R access.
Condition: Damaged By Earlier Event
Due 1 April 2009
Resolved 1 April 2009
Resolution: Completed.
Construction/Loadline › Hull › Hull Plating
Issued 30 June 2008
Resolved
Make permanent repairs to shear strake where gouged and fractured from excessively hard & abusive landings on the dock pilings.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 September 2008
Resolved 12 August 2008
Resolution: Planking replaced in kind. Only outer plank renewed .
Operations/Management › Vessel Safety Management › Master's Responsiblity/Authority
Issued 30 June 2008
Resolved
Damage to vessel hulls IWO shear strake appears to be caused by hard landings on the dock pilings. The damage appears excessive for normal & reasonable operation. Crew training and possibly additional dock protective gear need to be considered.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 July 2008
Resolved 12 August 2008
Resolution: Examination of dock at Water Island determined to have exposed bolts and other material that was damaging boats. Repairs to the dock fendering completed and operator''s crews were advised to report any defects to docks that could damage the boats.
Construction/Loadline › Hull › Side Shell
Issued 19 October 2006
Resolved
Renew hull planking on port bow.
Action required: 705 - Other - as specified
Due 31 March 2007
Resolved 26 March 2007
Resolution: Corrected.
Construction/Loadline › Hull › Longitudinal Frame
Issued 19 October 2006
Resolved
Renew fractured longitudinal at chine between the stem and collision bhd; port & stbd sides.
Action required: 705 - Other - as specified
Due 31 March 2007
Resolved 26 March 2007
Resolution: Corrected.
Construction/Loadline › Hull › Transverse Frame
Issued 19 October 2006
Resolved
Renew fractured frames between stem and collision bhd.
Due 31 March 2007
Resolved 26 March 2007
Resolution: Corrected.
Construction/Loadline › Hull › Bottom Plating
Issued 19 October 2006
Resolved
Remove original bronze screws and refasten bottom and side shell. Refasten inner planking to outer planking.
Action required: 705 - Other - as specified
Due 31 March 2007
Resolved 26 March 2007
Resolution: Corrected. Vessel refastened from keel to 1'' above the waterline.
Construction/Loadline › Hull
Issued 8 October 2002
Resolved
Make permanent repair to port shear strake, cap rail, rub rail & associated internals. LEGACY COMPONENT DESC: Sheerstrake
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 30 November 2002
Resolved 2 October 2003
Construction/Loadline
Issued 12 September 2001
Resolved
INSTALL A BILGE ALARM FOR THE FOWRARD COMPARTMENT.
Condition: Unknown
Due 3 October 2001
Resolved 3 October 2001
Lifesaving
Issued 12 September 2001
Resolved
PROPERLY STOW BUOYANT APPARATUS PENDANTS.
Condition: Unknown
Due 3 October 2001
Resolved 3 October 2001
Navigation
Issued 12 September 2001
Resolved
ENTER VESSEL SPECIFIC DATA INTO EMERGENCY BROADCAST PLACARD.
Condition: Unknown
Due 3 October 2001
Resolved 3 October 2001
Accommodation/Occupational Safety
Issued 12 September 2001
Resolved
REFASTEN BENCHES ON UPPER DECK.
Condition: Unknown
Due 3 October 2001
Resolved 3 October 2001
Engineering
Issued 12 September 2001
Resolved
SEAL STBD FUEL FILL AT MAIN DECK.
Condition: Unknown
Due 3 October 2001
Resolved 3 October 2001
Lifesaving
Issued 12 September 2001
Resolved
REPLACE WORN LINE ON BUOYANT APPARATUS WATERLIGHT.
Condition: Unknown
Due 3 October 2001
Resolved 3 October 2001
Accommodation/Occupational Safety
Issued 16 September 1998
Resolved
REVEW FORE DECK RAIL.
Condition: Unknown
Due 24 September 1998
Resolved 1 October 1998
Accommodation/Occupational Safety
Issued 16 September 1998
Resolved
REPAIR FLOOR BOARDS AFT DECK PORT SIDE.
Condition: Unknown
Due 18 September 1998
Resolved 18 September 1998
Construction/Loadline
Issued 23 June 1997
Resolved
SCRAPE OUT ANGEL HAIR AND TREAT W/CUPRINOL THE AREAS THAT REQUIRE IT IN COMPARTMENTS 3, 4, AND 5.
Condition: Unknown
Due 1 July 1997
Resolved 24 June 1997
Construction/Loadline
Issued 23 June 1997
Resolved
INSTALL DRAFT MARKS ON VESSEL.
Condition: Unknown
Due 1 July 1997
Resolved 24 June 1997
Construction/Loadline
Issued 23 June 1997
Resolved
RENEW KEEL BOLTS.
Condition: Unknown
Due 23 June 1997
Resolved 23 June 1997
Engineering
Issued 23 June 1997
Resolved
RENEW CUTLESS BEARINGS, P & S SIDES.
Condition: Unknown
Due 1 July 1997
Resolved 24 June 1997
Navigation
Issued 23 June 1997
Resolved
RENEW RUDDERS, P & S SIDES.
Condition: Unknown
Due 1 August 1997
Resolved 24 June 1997
Construction/Loadline
Issued 23 June 1997
Resolved
REFASTEN VESSEL, INCLUDING PLANKS FROM CHINE TO KEEL, P&S SIDES, WATERLINE TO CHINE EXCLUDING ENGINE ROOM AREA, P&S SIDES, ALL CHINE BOLTS, ALL KEEL BOLTS.
Condition: Unknown
Due 1 July 1997
Resolved 24 June 1997
Construction/Loadline
Issued 10 November 1994
Resolved
REPAIR TRANSOM IN WAY OF TEMPORARY REPAIRS.
Condition: Unknown
Due 10 November 1994
Resolved 10 November 1994
Lifesaving
Issued 30 April 1991
Resolved
REPLACE 5 ADULT PFD'S. (103 MAX PERSONS UNTIL CLEARED)
Condition: Unknown
Due 3 October 1991
Resolved 3 October 1991
Fire Fighting
Issued 30 April 1991
Resolved
REPLACED MISSING BI FIRE EXTINGUISHER BRACKET IN WHEELHOUSE.
Condition: Unknown
Due 3 October 1991
Resolved 3 October 1991
Construction/Loadline
Issued 30 April 1991
Resolved
RENEWED 3 FRAMES AT CHINE PORTSIDE FWD (REPAIRED PRIOR TO OPERATION)
Condition: Unknown
Due 3 October 1991
Resolved 3 October 1991
Navigation
Issued 30 April 1991
Resolved
RENEWED STERN LIGHT. (REPAIRED PRIOR TO OPERATION)
Condition: Unknown
Due 3 October 1991
Resolved 3 October 1991
Lifesaving
Issued 30 April 1991
Resolved
RENEWED SUN ROTTED PENDANT ON BUOYANT APPARATUS (REPAIRED PRIOR TO OPERATION)_x001C_ _x001C_
Condition: Unknown
Due 3 October 1991
Resolved 3 October 1991
Construction/Loadline
Issued 15 November 1990
Resolved
REPAIR FRACTURED FRAMES AT CHIME (PORT AND STBD) IN COMPART. FWD OF MACHINESPACE. RENEW FRACTURED KNEES (2) PORTSIDE OF ENG RM. TIGHTEN FRAME & KNEE BOLTS IN ENG. ROOM. DRILL & PIN CHECK STRINGER (PORT & STBD) ENG. ROOM. WORK TO BE COMPLETED PRIOR TO RETURN TO SERVICE.
Condition: Unknown
Due 15 November 1990
Resolved 15 November 1990
Lifesaving
Issued 1 May 1990
Resolved
RENEWED LIFE LINES ON BUOYANT APPARATUS.
Condition: Unknown
Due 1 May 1990
Resolved 1 May 1990
Fire Fighting
Issued 1 May 1990
Resolved
REPLACED BROKEN BRACKET ON BI FIRE EXTENGUISHER ON BRIDGE.
Condition: Unknown
Due 1 May 1990
Resolved 1 May 1990
Lifesaving
Issued 1 May 1990
Resolved
RENEWED REFLECTIVE TAPE ON PFDS WHICH HAVE MISSING SECTIONS.
Condition: Unknown
Due 1 May 1990
Resolved 1 May 1990
Construction/Loadline
Issued 26 May 1989
Resolved
COMPLETE REPLACEMENT OF RUB RAILS AND AFT DECK HATCH.
Condition: Unknown
Due 26 May 1989
Resolved 26 May 1989
Lifesaving
Issued 26 May 1989
Resolved
SECURE SEA PAINTER TO VESSEL.
Condition: Unknown
Due 26 May 1989
Resolved 26 May 1989
Lifesaving
Issued 26 May 1989
Resolved
REMARK RING BUOY.
Condition: Unknown
Due 26 May 1989
Resolved 26 May 1989
Fire Fighting
Issued 26 May 1989
Resolved
REMOUNT ALL FIRE EXTINGUISHER.
Condition: Unknown
Due 26 May 1989
Resolved 26 May 1989
Accommodation/Occupational Safety
Issued 26 May 1989
Resolved
COMPLETE INSTALLATION OF NEW VENTS.
Condition: Unknown
Due 26 May 1989
Resolved 26 May 1989
Electrical
Issued 26 May 1989
Resolved
LABLE ALL BREAKERS IN WHEEL HOUSE.
Condition: Unknown
Due 26 May 1989
Resolved 26 May 1989
Electrical
Issued 26 May 1989
Resolved
TAPE ALL SPLICES IN ENGINE ROOM WIRING.
Condition: Unknown
Due 26 May 1989
Resolved 26 May 1989
Accommodation/Occupational Safety
Issued 26 May 1989
Resolved
COMPLETE REPLACEMENT OF RAILS ABOUT PASSENGER DECK AFT.
Condition: Unknown
Due 26 May 1989
Resolved 26 May 1989
Electrical
Issued 26 May 1989
Resolved
PROVIDE FLASH LIGHT FOR EMERGENCY LIGHTING.
Condition: Unknown
Due 26 May 1989
Resolved 26 May 1989
Construction/Loadline
Issued 26 May 1989
Resolved
CONDUCT AN UNDERWAY EXAM.
Condition: Unknown
Due 26 May 1989
Resolved 26 May 1989
Electrical
Issued 13 May 1988
Resolved
PROVIDE OVER CURRENT PROTECTION FOR HOT LEAD FROM STARTER ON PORT MDE.
Condition: Unknown
Due 13 May 1988
Resolved 13 May 1988
Electrical
Issued 13 May 1988
Resolved
REMOVE WIRE NUTS ON ELECTRICAL WIRING SPLICES.
Condition: Unknown
Due 13 May 1988
Resolved 13 May 1988
Engineering
Issued 13 May 1988
Resolved
PROVIDE LAGGING ON EXHAUST PIPE OF BOTH MDES.
Condition: Unknown
Due 13 May 1988
Resolved 13 May 1988
Electrical
Issued 1 May 1987
Resolved
REPLACE ALL WIRENUTS ON VESSEL.
Condition: Unknown
Due 1 May 1987
Resolved 1 May 1987
Lifesaving
Issued 1 May 1987
Resolved
REPALCE LINE ON BUOYANT APPARATUS.
Condition: Unknown
Due 1 May 1987
Resolved 1 May 1987
Electrical
Issued 1 May 1987
Resolved
PROVIDE GLOBES AND GUARD FOR ENGINE ROOM LIGHT FIXTURES.
Condition: Unknown
Due 1 May 1987
Resolved 1 May 1987
Engineering
Issued 18 June 1986
Resolved
REPAIR PORT AND STARBOARD MAIN ENGINE SEA SUCTION PIPING TO MINIMIZE FLEX HOSE APPLICATION. DOUBLE HOSE CLAMP AREAS OF FLEX HOSE.
Condition: Unknown
Due 18 June 1986
Resolved 18 June 1986
Construction/Loadline
Issued 18 June 1986
Resolved
MAKE FORWARD ENGINEROOM BULKHEAD WATERTIGHT. OPEN BULKHEAD AREAS AND THROUGH HULL PENETRATIONS SHALL BE SEALED TO PREVENT PROGRESSIVE FLOODING TO BATTERY STORAGE AREA.
Condition: Unknown
Due 18 June 1986
Resolved 18 June 1986