Records from 1996 to 2019. Most recent: inspection, 8 July 2019.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 20
8 July 2019
Administrative Inspection · COC-CVE Annual
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6743455
15 June 2018
COC-CVE Annual · Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6444851
6 June 2017
COC-CVE Annual · Administrative Inspection
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6167247
22 June 2016
COC-CVE Annual
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5915665
15 May 2012
COC-CVE Annual
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 4306513
21 April 2009
COC-CVE Annual
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 3636980
9 May 2007
Deficiency Check
Physical examination · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2959545
17 April 2007
COC-CVE Annual
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2909591
18 April 2006
COC-CVE Annual
Administrative · Sector Eastern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 2626274
26 July 2005
COC-CVE Annual · Deficiency Check
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2426300
20 July 2004
COC-CVE Annual
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 2139024
28 July 2003
Certificate of Compliance
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1860268
8 August 2002
Certificate of Compliance
Administrative · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1658316
13 August 2001
Type not recorded
No type recorded · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1069001
10 August 2000
Control Verification
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1432368
20 August 1999
Control Verification
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1388901
24 April 1998
Control Verification
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1468440
8 July 1997
Control Verification
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1114612
9 May 1997
Control Verification
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1385981
23 July 1996
Control Verification
Physical examination · MSO BUFFALO · USCG Great Lakes District (CGD-GL) · Activity 1414669
Fire Fighting › Structural Fire Protection - General › Deckhouse Construction
Issued 17 April 2007
Resolved
Fill holes in deck where component connections pass from engine space. Engine room should be well sealed to prevent the release of extinguishing agent.
Action required: 705 - Other - as specified
Due 17 April 2007
Resolved 9 May 2007
Resolution: Witnessed satisfactory correction of penetrations to engine space.
Engineering › Fuel Oil Service System › Ventilation
Issued 17 April 2007
Resolved
Install fuel ventilation with 30x30 mesh omitted from new arrangement.
Action required: 705 - Other - as specified
Due 17 April 2007
Resolved 9 May 2007
Resolution: Witnessed installation of mesh.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 17 April 2007
Resolved
Replace retro reflective markings on buoys.
Action required: 705 - Other - as specified
Due 17 April 2007
Resolved 9 May 2007
Resolution: Witnessed renew of retro.
Engineering › Bilge Water Management System › Not Operational
Issued 26 July 2005
Resolved
Replace and properly mount high water alarm in engine space. (Identified wires not properly secured, switch installed with one screw vice two and interpretative switch). Scheduled follow-up visit 7/27/05 to demonstrate proper operation of system.
Action required: 705 - Other - as specified
Due 5 August 2005
Resolved 27 July 2005
Resolution: Attended vessel and witnessed satisfactory operation of system.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 26 July 2005
Resolved
Repair cracks identified in engine room; forward water tight bulkhead portside, number one port forward vertical stiffener at union of bottom longitudinal frame, and the number two port forward vertical stiffener at union of gusset and bottom longitudinal frame.
Action required: 705 - Other - as specified
Due 5 August 2005
Resolved 10 September 2005
Resolution: Received email confirmation of completion of requirement from operations manager.
Electrical › Electrical Distribution System (service) › Wiring
Issued 26 July 2005
Resolved
Within engine space electrical wires/cables, fuel hoses and hydraulic hoses requiring chaffing protection and supports to prevent damage as they pass through or over framing. Identified several lines where outer protective coating has been damaged requiring replacement. Inspect all lines and replace as necessary, properly apply protective material and properly secure as required.
Action required: 705 - Other - as specified
Due 5 August 2005
Resolved 10 September 2005
Resolution: Received email confirmation of completion of requirement from operations manager.
Fire Fighting › Ventilation Systems › Ducts
Issued 26 July 2005
Resolved
Fire damper required to seal compartment when closed by means of adequate pressure not allow free passage of extinguishing agent from engine space. (Recommended that mating surface be free from obstruction (bolts), attach gasket to surface and closing spring implemented. Also, compartment protected by fire extinguishing agent should be free of excessive penetration such as old bolt holes.
Action required: 705 - Other - as specified
Due 5 August 2005
Resolved 10 September 2005
Resolution: Received email confirmation of completion of requirement from operations manager.
Operations/Management › Vessel Safety Management › Reports and Analysis
Issued 26 July 2005
Resolved
Provide report from Transport Canada regarding the serviceability of vessel.
Action required: 705 - Other - as specified
Due 5 August 2005
Resolved 7 October 2005
Resolution: Received report form Transport Canada attesting to their examination of vessels and satisfactory completion of issued discrepancies.