MAURY USCG vessel records Sign in
← All vessels

CAPE AVINOF

CAPE AVINOF is a 1963 freight ship. The Coast Guard has recorded 58 inspections since 1985, most recently in August 2019, along with 164 deficiencies.

Records from 1985 to 2019. Most recent: inspection, 7 August 2019.

Built
1963
Last inspected
7 August 2019
Documentation
Valid · documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

5004398 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
UNITED STATES
366491000 (licence lapsed)
Maury page id
psix-44441

Inspections, by type

…with no type recorded22
Years with a record 20 calendar years (1985–2019)
The 58 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 7 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Registered dimensions (L × B × D)573.3 ft × 75.1 ft × 29.1 ft
Registered tonnagegross 11,310 / net 6,809
ITC dimensions (L × B × D)541.0 ft × 75.0 ft × 42.8 ft
ITC tonnagegross 11,580 / net 5,884
BuilderINGALLS SHIPBUILDING CORP · PASCAGOULA, MS, UNITED STATES · built 1963
Hull materialSteel
PropulsionSteam Turbine
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portNORFOLK, VA
Trade endorsementsRegistry
DocumentationValid · issued 13 February 2026 · expires 28 February 2027
Service, as the file records itFreight Ship
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it11580 - Convention (Subpart B), Gross Ton
11310 - Regulatory (Subpart C or D), Gross Ton
12932 - Dead Weight, Ton
20110 - Displacement, Ton
5884 - Convention (Subpart B), Net Ton
6809 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.

Radio station licence

KCOAMMSI 366491000 · expired · compulsorily equipped · granted 26 May 1992, cancelled 26 May 1997
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 58

7 August 2019 Load Line/Change of Employment · Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6775661
1 April 2019 Load Line/Change of Employment
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 6653352
27 July 2007 Administrative Inspection
Administrative · Sector Virginia · USCG East District (CGD-E) · Activity 3008751
31 May 2004 Administrative Inspection
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 2083686
24 April 2002 Drydock Extension
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1608933
1 August 2001 Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1443251
16 October 2000 Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1053830
16 October 2000 Administrative
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1057216
17 March 2000 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 25506
17 March 2000 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 58770
24 February 2000 COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1397461
15 September 1999 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 96929
3 March 1999 Re-Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1388778
10 November 1998 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1400874
27 February 1998 COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1439979
5 September 1997 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1121236
8 May 1997 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1102255
8 April 1997 Hull Examination · Re-Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1462564
14 February 1997 Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1383461
19 June 1996 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 885868
7 May 1996 Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 1082444
12 April 1996 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1078052
29 February 1996 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1402209
28 February 1996 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 52267
2 March 1995 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1165246
14 November 1994 COI Inspection · MARPOL Annex V Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 863701
29 June 1994 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1171783
29 September 1992 Administrative
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 950321
16 June 1992 Type not recorded
No type recorded · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 932204
16 June 1992 Hull Examination
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 944644
16 June 1992 Permit to Proceed
Administrative · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 945768
16 June 1992 COI Inspection
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 1261558
24 July 1991 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1249479
17 July 1991 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1250521
18 June 1991 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 518364
17 June 1991 Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 469264
30 April 1991 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1211010
28 April 1991 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 173029
10 February 1991 Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1219695
5 February 1991 Administrative
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 993475
28 January 1991 Hull Examination · Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1214107
12 January 1991 COI Inspection
Physical examination · MSO PORTLAND MAINE · USCG Northeast District (CGD-NE) · Activity 1211626
4 October 1990 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1211767
20 February 1990 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 912083
13 October 1989 Type not recorded
No type recorded · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1341515
12 October 1989 Deficiency Check
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1341839
5 July 1989 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1339303
7 June 1989 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1196657
30 November 1988 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1205895
13 October 1988 COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 886637
28 January 1988 Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1324750
13 October 1987 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1018329
5 August 1986 Examination of Repairs
Physical examination · MSO PROVIDENCE · USCG Northeast District (CGD-NE) · Activity 1000693
14 March 1986 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1300762
14 January 1986 Permit to Proceed
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 996873
8 January 1986 COI Inspection
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1299620
4 March 1985 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1290642
8 February 1985 Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 978258

Deficiency record · 164

Lifesaving
Issued 1 August 2001 Resolved
Properly affix aft sheave base of port life boat to davit structure.
Condition: Unknown
Due 18 September 2001
Resolved 18 September 2001
Lifesaving
Issued 1 August 2001 Resolved
Renew all turnbuckles w/ locking fasteners for port and stbd lifeboat davits at deadend of falls, and adjust fall lengths to mid-point of turnbuckles.
Condition: Unknown
Due 18 September 2001
Resolved 18 September 2001
Lifesaving
Issued 1 August 2001 Resolved
Renew all sheave block fasteners w/ locking type fasteners in kind as per manufacturer's dwgs.
Condition: Unknown
Due 18 September 2001
Resolved 18 September 2001
Unknown
Issued 27 February 1998 Resolved
PRIOR TO GETTING U/W, PROVIDE ALL HOSPITAL AND FIRST AID EQUIPMENT FOR INSPECTION BY USCG MARINE INSPECTOR.
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Lifesaving
Issued 27 February 1998 Resolved
PRIOR TO GETTING U/W, CONDUCT SAT BOAT AND FIRE DRILL TO THE SATISFACTION OF USCG MARINE INSPECTOR.
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Navigation
Issued 27 February 1998 Resolved
PRIOR TO GETTING U/W, PROVIDE ALL CHARTS & PUBLICATIONS, CURRENTLY UPDATED,FOR INSPECTION BY CG MARINE INSPECTOR.
Condition: Unknown
Due 27 February 1998
Resolved 27 February 1998
Documentation
Issued 8 April 1997 Resolved
PRIOR TO ACTIVATION, PROVIDE COPY OF CARGO SHIP SAFETY RADIO CERTIFICATE.
Condition: Unknown
Due 8 April 1997
Resolved 8 April 1997
Lifesaving
Issued 8 April 1997 Resolved
PRIOR TO ACTIVATION, MAKE ALL HOSPITAL AND FIRST-AID EQUIPMENT AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 8 April 1997
Resolved 8 April 1997
Engineering
Issued 8 April 1997 Resolved
REPLACE BOILER SAFETY HAND RELIEVING CABLE IWO STARBOARD BOILER.
Condition: Unknown
Due 8 April 1997
Resolved 8 April 1997
Fire Fighting
Issued 8 April 1997 Resolved
REPLACE MISSING INTERNATIONAL SHORE CONNECTION.
Condition: Unknown
Due 8 April 1997
Resolved 8 April 1997
Unknown
Issued 12 April 1996 Resolved
PROVE PROPER OPERATION OF AIR RECEIVER RELIEF VALVES ON DG STARTING AIR RECEIVER, SS AIR RECEIVER, POTABLE WATER PRESSURE TANK, AND SANITARY WATER PRESSURE TANK.
Condition: Unknown
Due 12 April 1996
Resolved 12 April 1996
Lifesaving
Issued 12 April 1996 Resolved
PROVIDE CORROSION RESISTANT NAME PLATES FOR EACH DAVIT ARM IN ACCORDANCE WITH 46 C.F.R. 160.032-5(d).
Condition: Unknown
Due 12 April 1996
Resolved 12 April 1996
Construction/Loadline
Issued 29 February 1996 Resolved
REPAIR AND PROPERLY MARK THE INDICATOR FOR THE REMOTE WATERTIGHT DOOR CLOSURE LOCATED IN THE CREWS MESS ROOM. ALSO PROVIDE DRAWINGS OF THE DOOR AND THE REMOTE CLOSURE, TO DETERMINE IF THE DOOR WAS ORIGINALY APROVED TO BE ABLE TO BE OPENED FROM THE REMOTE LOCATION.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Engineering
Issued 29 February 1996 Resolved
TEST ALL AIR RECEIVER RELIEF VALVES WITH AIR.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Unknown
Issued 29 February 1996 Resolved
PROVIDE MSO HAMPTON ROADS WITH A LIST OF OF ALL ITEMS REMOVED FROM OTHER RRF VESSELS IN ORDER TO COMPLETE THE COI. ALSO PROVIDE A LIST OF THE VESSELS USED FOR PARTS.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Lifesaving
Issued 29 February 1996 Resolved
CONDUCT SATISFACTORY BOAT DRILL IN PRESENSE OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Construction/Loadline
Issued 29 February 1996 Resolved
MAKE PERMANENT REPAIRS TO FRACUTRED WHEEL BRACKET I.W.O. #5 CARGO HATCH,_x001C_ AFT PORTSIDE.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Lifesaving
Issued 29 February 1996 Resolved
PROVIDE CORROSION RESISTANT NAMEPLATES FOR EACH LIFEBOAT IAW 46 CFR_x001C_ 160.035-13(c).
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Lifesaving
Issued 29 February 1996 Resolved
PROVIDE CORROSION RESISTANT NAMEPLATES FOR EACH DAVIT ARM _x001C_ IAW 46 CFR 160.032-5(d).
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Lifesaving
Issued 29 February 1996 Resolved
CONDUCT OPERATIONAL TEST OF LIMIT SWITCHES FOR PORT AND STARBOARD_x001C_ LIFEBOATS.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Construction/Loadline
Issued 29 February 1996 Resolved
REPAIR/REPLACE LEAKING GASKETS I.W.O. CARGO HATCHES #2,3,6, & 7. CONDUCT HOSE TEST AFTER REPAIRS IN PRESENCE OF ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Engineering
Issued 29 February 1996 Resolved
REPLACE BROKEN GLASS FOR THE PEEP HOLE ON THE LOWER PORT BURNER ON THE PORTBOILER.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Lifesaving
Issued 29 February 1996 Resolved
MAKE PERMANENT REPAIRS TO CRACKS & LEAKS I.W.O. STEM, STERN, AND PORT HULL OF PORT LIFE BOAT.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Lifesaving
Issued 29 February 1996 Resolved
MAKE PERMANENT REPAIRS TO CRACKS & LEAKS I.W.O. STEM, STERN, AND KEEL OF STARBOARD MOTOR LIFE BOAT.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Engineering
Issued 29 February 1996 Resolved
PROVIDE GAGS FOR BOILER SAFETY VALVES AS REQUIREED BY 46CFR52.01-120(a)9.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Fire Fighting
Issued 29 February 1996 Resolved
PROPERLY MARK THE FIRE STATION ON THE LOWER LEVEL OF THE ENGINE ROOM NEAR THE PORT BOILER.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Accommodation/Occupational Safety
Issued 29 February 1996 Resolved
REPAIR LEAKING PIPE IN WAY OF THE CROSS SHIPS PASSAGEWAY NEAR THE REFRIGERATOR SPACE WHICH IS LABELED "EXCESS TO THE DISTILLER TANK".
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Electrical
Issued 29 February 1996 Resolved
REPLACE ALL MISSING GLOBES AND GUARDS FOR LIGHTING FIXTURES IN THE ENGINE ROOM.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Navigation
Issued 29 February 1996 Resolved
REPAIR/REPLACE LIGHT FOR GYRO REPEATER IN THE STEERING GEAR ROOM.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Electrical
Issued 29 February 1996 Resolved
PROVIDE GROUND DETECTION INDICATORS FOR THE TRANSFORMERS IN THE LAUNDRY ROOMS AS REQUIRED BY 46CFR111.05-21(d).
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Engineering
Issued 29 February 1996 Resolved
REPAIR LEAKING MAIN FEED PUMP DISCHARGE VALVE ON THE OUTBOARD FEED PUMP.
Condition: Unknown
Due 29 February 1996
Resolved 29 February 1996
Fire Fighting
Issued 14 November 1994 Resolved
PROVIDE REQUIRED FIREMAN'S OUTFITS WITH ALL ASSOCIATED EMERG. EQUIPMENT PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Engineering
Issued 14 November 1994 Resolved
RENEW ALL MISSING/DAMAGED FLAME SCREENS IN VENTS ON MAIN DECK PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Navigation
Issued 14 November 1994 Resolved
PROVE PROPER OPERATION OF ALL NAVIGATION ELECTRICAL EQUIPT PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Accommodation/Occupational Safety
Issued 14 November 1994 Resolved
MAKE ALL HOSPITAL AND FIRST AID EQUIPMENT AVAILABLE FOR CG INSPECTION PRIORTO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Construction/Loadline
Issued 14 November 1994 Resolved
CONDUCT AN OPERATIONAL LEAK TEST OF ALL CARGO HOLD HATCH COVERS IN PRESENCEOF AN ATTENDING MARINE INSPECTOR PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Lifesaving
Issued 14 November 1994 Resolved
PROVIDE REQUIRED RING BUOYS, PROPERLY MARKED AND EQUIPPED AS PER 46 CFR 94.43 PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Lifesaving
Issued 14 November 1994 Resolved
PROVIDE ALL REQUIRED USCG APPROVED TYPE-I PFDS WITH CG/SOLAS APPRVD LIGHTS AND WHISTLES, PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Electrical
Issued 14 November 1994 Resolved
PROPERLY REMOVE DEAD ENDED CABLES FROM CO2 ROOM, ABOVE DOOR, PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Navigation
Issued 14 November 1994 Resolved
PROVE PROPER OPERATION OF ALL NAVIGATION LIGHTS PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Engineering
Issued 14 November 1994 Resolved
PROVE PROPER OPERATION OF ALL BILGE/BALLAST REMOTE ACTIVATED VALVES ON MAINDECK PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Construction/Loadline
Issued 14 November 1994 Resolved
PROVE PROPER OPERATION OF BILGE PIPING SYSTEM PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Documentation
Issued 14 November 1994 Resolved
PROVIDE COPIES OF ALL APPLICABLE CFR REGULATIONS ONBOARD PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Fire Fighting
Issued 14 November 1994 Resolved
CONDUCT FIRE AND BOAT DRILLS IN PRESENCE OF ATTENDING MARINE INSPECTOR PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Documentation
Issued 14 November 1994 Resolved
PROVIDE COPY OF CARGO SHIP SAFETY RADIO CERTIFICATE PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Documentation
Issued 14 November 1994 Resolved
PROVIDE A COPY OF CURRENT CARGO SHIP SAFETY CONSTRUCTION CERTIFICATE, INDICATING CURRENT ANNUAL ENDORSEMENT, PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Documentation
Issued 14 November 1994 Resolved
PROVIDE COPY OF OIL TRANSFER PROCEDURES PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Lifesaving
Issued 14 November 1994 Resolved
PROVIDE 80 IMMERSION SUITS PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Lifesaving
Issued 14 November 1994 Resolved
HAVE LIFEBOAT FALLS CABLES END FOR ENDED PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Construction/Loadline
Issued 14 November 1994 Resolved
PROVE PROPER OPERATION OF BILGE PIPING SYSTEM PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Lifesaving
Issued 14 November 1994 Resolved
STRIP, CLEAN, AND OVERHAUL BOTH LIFEBOATS PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Engineering
Issued 14 November 1994 Resolved
PROVE PROPER OPERATION OF STBD PROPULSION BOILER LOW WATER LEVEL ALARM PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Engineering
Issued 14 November 1994 Resolved
PROVE PROPER OPERATION OF STBD PROPULSION BOILER WATER LEVEL INDICATOR (METER) PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Accommodation/Occupational Safety
Issued 14 November 1994 Resolved
INSTALL SCHRAEDER VALVE ARRANGEMENT ON AIR FILL CONNECTION ON POTABLE WATERTANK.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Electrical
Issued 14 November 1994 Resolved
PROVE PROPER OPERATION OF REVERSE POWER RELAY, #1 TURBO GENERATOR CONTROL PANEL, PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Electrical
Issued 14 November 1994 Resolved
READJUST OVERSPEED GOVERNORS ON #1 AND #2 TURBO GENS TO TRIP BETWEEN 110- 115% OF RATED SPEED, PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Lifesaving
Issued 14 November 1994 Resolved
MAKE LIFEBOAT DISENGAGING APPARTATUS AVAILABLE FOR INSPECTION AND OPERATIONAL TESTING PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Engineering
Issued 14 November 1994 Resolved
PROVE PROPER OPERATION OF REMOTE OPERATED FUEL VALVES IN ENGINE ROOM PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Electrical
Issued 14 November 1994 Resolved
PROPERLY REMOVE DEAD ENDED CABLE IWO NAV. TABLE IN PILOT HOUSE.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Construction/Loadline
Issued 14 November 1994 Resolved
PROVE PROPER OPERATION OF ELECTRIC BILGE PUMP IN ENGINE ROOM PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Lifesaving
Issued 14 November 1994 Resolved
PROVIDE LINE THROWING APPARTUS PRIOR TO ACTIVATION.
Condition: Unknown
Due 14 November 1994
Resolved 14 November 1994
Lifesaving
Issued 16 June 1992 Resolved
MAKE AVAILABLE FOR INSPECTION ALL LIFEBOAT EQUIPMENT PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
PLACE ALL FIRE FIGHTING AND LIFESAVING EQUIPMENT ON STATION PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
RENEW ALL DATED PYROTECHNICS FOR LINE THROWING APPARATUS PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
MAKE AVAILABLE FOR INSPECTION ALL LINE THROWING APPARATUS WITH REQUIRED EQUIPMENT PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
RENEW ALL DATED DISTRESS FLARES PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
MAKE AVAILABLE FOR INSPECTION ALL DISTRESS FLARES PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
RENEW BATTERY IN VESSEL'S EPIRB PRIOR TO ACTIVATION.
Condition: Unknown
Due 5 October 1992
Resolved 5 October 1992
Lifesaving
Issued 16 June 1992 Resolved
CONDUCT EMERGENCY FIRE AND BOAT DRILLS WITH ALL HANDS IN PRESENCE OF COAST GUARD MARINE INSPECTOR PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
RENEW ALL DATED LIFEBOAT EQUIPMENT PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Documentation
Issued 16 June 1992 Resolved
PROVIDE VALID LICENSES FOR SHIP'S OFFICERS PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
MAKE AVAILABLE FOR INSPECTION AND PROVE OPERATION OF VESSEL'S EPIRB PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Documentation
Issued 16 June 1992 Resolved
PROVIDE CURRENTLY CORRECTED CHARTS AND PUBLICATIONS FOR THE AREA TO BE TRANSITED PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Documentation
Issued 16 June 1992 Resolved
MAKE AVAILABLE FOR INSPECTION ALL CHARTS AND PUBLICATIONS FOR AREA OF OPERATION PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Unknown
Issued 16 June 1992 Resolved
RENEW ALL DATED HOSPITAL SUPPLIES PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Unknown
Issued 16 June 1992 Resolved
MAKE AVAILABLE FOR INSPECTION ALL HOSPITAL SUPPLIES PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
RENEW ALL DATED EQUIPMENT FOR FIREMANS OUTFITS PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
MAKE AVAILABLE FOR INSPECTION ALL EQUIPMENT FOR FIREMANS OUTFITS PRIOR TO ACTIVATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Fire Fighting
Issued 16 June 1992 Resolved
CONDUCT EMERGENCY FIRE AND BOAT DRILLS WITH ALL HANDS IN PRESENCE OF COAST GUARD MARINE INSPECTOR PRIOR TO PLACING VESSEL IN OPERATION.
Condition: Unknown
Due 23 June 1992
Resolved 23 June 1992
Lifesaving
Issued 16 June 1992 Resolved
PROVIDE LINE THROWING APPARATUS WITH REQUIRED EQUIPMENT.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
RENEW HOSPITAL SUPPLIES AND MAKE HOSPITAL AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
RENEW EQUIPMENT FOR FIREMANS OUTFITS AND MAKE AVAILABLE FOR INSPECTION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Engineering
Issued 16 June 1992 Resolved
INSTALL ROTATING SHAFT GUARD TO FLASH EVAPORATOR BRINE PUMPS.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Electrical
Issued 16 June 1992 Resolved
INSTALL CABLE SUPPORTS ON NEW WIRE INSTALLATION ABOVE PORT BOILERS.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Engineering
Issued 16 June 1992 Resolved
PROVIDE PROPER OPERATION OF EVAPORATOR FEED HEATERS FOLLOWING REPAIRS TO_x001C_ TUBE BUNDLES.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Engineering
Issued 16 June 1992 Resolved
REPLACE STARBOARD BILER (SUPER HEATHER SAFETY VALVE) STEAM ESCAPE EXPANSIONJOINT FLEX COUPLING.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Engineering
Issued 16 June 1992 Resolved
HYDROSTATICALLY TEST PORT BOILER FOLLOWING REPAIRS TO NUMBER SIX (6) SCREENTUBE.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
PROVIDE CURRENT DISTRESS FLARES.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Documentation
Issued 16 June 1992 Resolved
PROVIDE VALID LICENSE FOR SHIP'S OFFICERS.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Navigation
Issued 16 June 1992 Resolved
PROVIDE CURRENT AND CORRECTED NAUTICAL CHARTS AND PUBLICATIONS FOR AREA OF OPERATION.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
RENEW AND MAKE AVAILABLE FOR INSPECTION ALL LIFEBOAT EQUIPMENT.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Fire Fighting
Issued 16 June 1992 Resolved
REINSTALL FIXED CO2 SYSTEM DISCHARGE PIPE AND SMOKE DETECTION PIPE TO NUMBER 4 AND 5 PORT AND STARBOARD CARGO/OIL DEEP TANKS.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
PROVIDE AND PROVE OPERATION OF VESSEL'S EPIRBS.
Condition: Unknown
Due 16 June 1992
Resolved 16 June 1992
Lifesaving
Issued 16 June 1992 Resolved
PLACE ALL FIRE FIGHTING AND LIFESAVING EQUIPMENT ON STATION.
Condition: Unknown
Due 23 June 1992
Resolved 23 June 1992
Engineering
Issued 17 July 1991 Resolved
CONDUCT INTERNAL STRUCTURAL EXAMINATION OF DOUBLE BOTTOM FUEL TANKS #1, 3 PORT, 4 STBD, 5 CENTERLINE AND 6 CENTER LINE NOT LATER THAN SEPTEMBER 30, 1991.
Condition: Unknown
Due 17 July 1991
Resolved 17 July 1991
Fire Fighting
Issued 28 January 1991 Resolved
OPERATION OF STEAM SMOTHERING FOR DEEP TANKS #4 AND #5 PORT AND STBD TO BE PROVEN TO THE SATISFACTION OF THE COGNIZANT OCMI PRIOR TO THE CARRIAGE OF CARGO OIL.
Condition: Unknown
Due 28 January 1991
Resolved 28 January 1991
Fire Fighting
Issued 28 January 1991 Resolved
PROVIDE PROPER FIRE FIGHTING FOAM NOZZLES FOR HELO DECK SYSTEM PRIOR TO CONDUCTING VERTICAL REPLENISHMENT.
Condition: Unknown
Due 28 January 1991
Resolved 28 January 1991
Construction/Loadline
Issued 28 January 1991 Resolved
MAKE THE FOLLOWING FUEL OIL TANKS AVAILABLE FOR INTERNAL EXAM BY COGNIZANT_x001C_OCMI: DOUBLE BOTTOM TANKS #1,#2P,#3P,#3S,#4P,#4S,#5S,#5CL,#5P,#6P,#6CL,#6S, #7P,#7S; DEEP TANKS #1,#3P,#3S,#7S; AND FUEL OIL SETTLER TANKS.
Condition: Unknown
Due 28 January 1991
Resolved 28 January 1991
Deck/Cargo
Issued 28 January 1991 Resolved
TIGHTNESS OF HATCH COVERS FOR DEEP TANKS #4 AND #5 PORT AND STBD TO BE PROVEN TO THE SATISFACTION OF THE COGNIZANT OCMI PRIOR TO THE CARRIAGE OF LIQUIDS IN THESE TANKS._x001C_
Condition: Unknown
Due 28 January 1991
Resolved 28 January 1991
Engineering
Issued 12 January 1991 Resolved
MAKE PERMANENT REPAIR TO HOLED BUNKER LINE TO STARBOARD REFUELING_x001C_ MANIFOLD.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Unknown
Issued 12 January 1991 Resolved
COMPLETE BATTERY CHARGER RELOCATION FROM CARGO HOLDS TO DECK HOUSES_x001C_ TO SATISFACTION OF ATTENDING MARINE INSPECTOR._x001C_
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Construction/Loadline
Issued 12 January 1991 Resolved
CONDUCT FULL CREDIT DRYDOCK TO INCLUDE GAUGING OF SPOOL PIECES _x001C_ AND SEA CHESTS.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Accommodation/Occupational Safety
Issued 12 January 1991 Resolved
PROVIDE SUFFICIENT LAUNDRY EQUIPMENT FOR VESSEL.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Construction/Loadline
Issued 12 January 1991 Resolved
HOSE TEST INSERTS BETWEEN CARGO HOLDS 5, 6, & 7 TO ESCAPE TRUNK. _x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Deck/Cargo
Issued 12 January 1991 Resolved
MAKE PERMANENT REPAIRS TO SHAFT ALLEY BILGE SUCTION LINE.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Electrical
Issued 12 January 1991 Resolved
PROVE OPERATION OF AUX. INBOARD CIRC PUMP._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Construction/Loadline
Issued 12 January 1991 Resolved
PROVE PROPER OPERATION OF SIDE PORTS, INCLUDING DOGS & WEDGES.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Engineering
Issued 12 January 1991 Resolved
PROVE OPERATION OF ENGINE ROOM ELECTRIC BILGE PUMP TAKING SUCTION_x001C_ ON CARGO HOLDS, SHAFT ALLEY AND MACHINERY SPACE.
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Accommodation/Occupational Safety
Issued 12 January 1991 Resolved
PROVIDE COMPLETE HOSPITAL OUT-FIT AND FIRST AID EQUIPMENT. _x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Accommodation/Occupational Safety
Issued 12 January 1991 Resolved
REPAIR OR REPLACE GALLY STEAM COOKER._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Fire Fighting
Issued 12 January 1991 Resolved
PROVE HELICOPTER FOAM FIRE FIGHTING SYSTEM AND PROVIDE SUFFICIENT _x001C_ FOAM._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 12 January 1991
Resolved 12 January 1991
Electrical
Issued 13 October 1988 Resolved
REPLACE ALL MISSING LIGHTS, GUARD AND GLOBES.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Documentation
Issued 13 October 1988 Resolved
PROVIDE OIL TRANSFER PROCEDURES AND OIL RECORD BOOK.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Engineering
Issued 13 October 1988 Resolved
REBRICK THE FRONT WALL ON THE PORT AND STARBOARD BOILERS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Fire Fighting
Issued 13 October 1988 Resolved
PROVE OPERATION OF ALL FIRE PUMPS AND RELIEF VALVES.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Construction/Loadline
Issued 13 October 1988 Resolved
DETERMINE EXTENT OF DETERIORATION ON HATCH COVERS AND CROP AND RENEW AS NECESSARY.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Construction/Loadline
Issued 13 October 1988 Resolved
REPAIR OR RENEW THE WASTED HATCH ON FANTAIL LEADING TO STEERING SPACE.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Construction/Loadline
Issued 13 October 1988 Resolved
WELD CLOSED OR MAKE WEATHER TIGHT THE HOLED AND PITTED AREAS ON THE AFT DECK HOUSE AND VENT DUCTING.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Fire Fighting
Issued 13 October 1988 Resolved
DEMONSTRATE PROPER OPERATION OF THE FIRE DAMPERS IN FRONT OF #2 BOILER, ON THE FLYING BRIDGE, IN THE STACK AREA, AND FOR AFT COMPARTMENTS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Deck/Cargo
Issued 13 October 1988 Resolved
DRESS OR RENEW BRAKE LININGS ON PORT AND STARBOARD ANCHOR WINDLASS HAND BRAKES AND PROVE PROPER OPERATION.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Deck/Cargo
Issued 13 October 1988 Resolved
RENEW WASTED SPRING LOADED TENSIONERS FOR ANCHOR WINDLASS BRAKES.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Deck/Cargo
Issued 13 October 1988 Resolved
REPAIR THE CRACK IN ANCHOR WINDLASS FOUNDATION WELD ON THE STARBOARD SIDE, AFT CORNER, NEAR THE BASE. (THE CRACK WAS PAINTED OVER AND MAY BE CONCEALED).
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Deck/Cargo
Issued 13 October 1988 Resolved
RENEW TWO 3 FOOT SECTIONS OF SEVERELY PITTED HYDRAULIC PIPING FROM FOC'SLE DECK TO CONTROLLER ON ANCHOR WINDLASS HYDRAULIC SYSTEM.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Electrical
Issued 13 October 1988 Resolved
PROVE PROPER OPERAITON OF AUTOMATIC DAMPERS FOR EMERGENCY GENERATOR (AIR) COOLING.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Electrical
Issued 13 October 1988 Resolved
CONDUCT TEST OF EMERGENCY GENERATOR OVERSPEED & LOW LUBE OIL TRIPS AND HIGHJACKET WATER ALARM. OVERSPEED DEVICE MALFUNCTIONED BY ACTIVATING DURING START UP IN AUTOMATIC MODE.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Navigation
Issued 13 October 1988 Resolved
PROVIDE APPROVED PLANS FOR THE RED/WHITE/RED RESTRICTED IN MANUEVERABILITY NAVIGATION LIGHT INSTALLATION, AND FIRE AND SAFETY PLAN.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Lifesaving
Issued 13 October 1988 Resolved
REPAIR OR REPLACE PORT & STARBOARD LIFEBOAT DAVIT WINCH FOUNDATIONS AND HOUSINGS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Lifesaving
Issued 13 October 1988 Resolved
REPAIR OR REPLACE PORT & STARBOARD LIFEBOAT DAVITS WHICH WERE CONDEMNED DUETO CORROSION.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Construction/Loadline
Issued 13 October 1988 Resolved
CROP AND RENEW OR BUILD-UP WASTED SECTIONS OF AFT BULWARK WHERE VERTREP DECK SUPPORTS ATTACH, PARTICULARLY AT THE TWO AFTMOST ROUND PILLAR STANCHIONS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Engineering
Issued 13 October 1988 Resolved
OPERATE UNDER A LOAD AND TEST SAFETY DEVICES OF EACH FEEDWATER PUMP.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Engineering
Issued 13 October 1988 Resolved
PROVE SETTING OF RELIEF VALVES ON ALL PRESSURE VESSELS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Engineering
Issued 13 October 1988 Resolved
OPERATE FUEL OIL SERVICE AND TRANSFER PUMPS AND TEST REMOTE SHUTDOWNS FOR SAME.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Lifesaving
Issued 13 October 1988 Resolved
REPROVISION, SERVICE AND PROPERLY STATION APPROVED LIFERAFTS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Construction/Loadline
Issued 13 October 1988 Resolved
REPAIR/RENEW NUMEROUS WEATHERDECK VENTS AND CLOSURES.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Fire Fighting
Issued 13 October 1988 Resolved
PROVIDE ADDITIONAL FIRE CONTROL PLAN TO BE STORED PERMANENTLY AND PROMINENTLY MARKED IN A WEATHERTIGHT ENCLOSURE OUTSIDE THE DECKHOUSE.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Fire Fighting
Issued 13 October 1988 Resolved
PRESSURE TEST ALL REQUIRED AND SPARE FIRE HOSES AND OUTPIT FIRE STATIONS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Engineering
Issued 13 October 1988 Resolved
TEST OPERATION OF MAIN PROPULTION SAFETY DEVICES.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Engineering
Issued 13 October 1988 Resolved
MAKE PORT AND STARBOARD BOILERS AVAILABLE FOR EXAMINATION OF FIRESIDES AND WATERSIDES.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Engineering
Issued 13 October 1988 Resolved
CONDUCT HYDROSTATIC TEST OF EACH BOILER FOR CREDIT AND REQUIRED MAIN AND AUXILIARY STEAM PIPING.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Engineering
Issued 13 October 1988 Resolved
SET AND SEAL STEAM DRUM AND SUPERHEATER SAFET VALVES.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Lifesaving
Issued 13 October 1988 Resolved
PROVIDE APPROVED LIFESAVING EQUIPMENT, AS REQUIRED, INCLUDING: LIFEBOAT PROVISIONS, LIFE PRESERVERS, RINGBUOYS, LINE THROWING APPARATUS, LIFEBOAT RADIO, EPIRB AND EXPOSURE SUITS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Fire Fighting
Issued 13 October 1988 Resolved
PROVIDE ALL REQUIRED FIRE PROTECTION EQUIPMENT AND SERVICING FOR FIXED, SEMI-PORTABLE AND PORTABLE EXTINGUISHING SYSTEMS AND SMOKE DETECTION SYSTEMS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Unknown
Issued 13 October 1988 Resolved
PROVIDE FOR INSPECTION OF ALL EMERGENCY EQUIPMENT.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Accommodation/Occupational Safety
Issued 13 October 1988 Resolved
INSPECT AND TEST REMOTE CONTROLS TO POWER VENTILATION AND MECHANICAL VENT CLOSURES.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Navigation
Issued 13 October 1988 Resolved
TEST ALL NAVIGATION LIGHTS AND ELECTRONIC NAVIGATION EQUIPMENT.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Navigation
Issued 13 October 1988 Resolved
PROVIDE ALL REQUIRED NAVIGATIONAL CHARTS, PUBLICATIONS, REQUIRED FORMS AND NOTICES.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Deck/Cargo
Issued 13 October 1988 Resolved
DEMONSTRATE SATISFACTORY OPERATION OF GROUND TACKLE AND WARPING CAPSTANS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Construction/Loadline
Issued 13 October 1988 Resolved
PROVIDE FOR INSPECTION AND TESTING OF HULL AND DECK FITTINGS AS FOLLOWS: VALVES AND CONTROLS FOR BILGE WELLS, COFFERDAMS & SUCTIONS; DECK OPENINGS/ CLOSURES; CARGO GEAR, WATERTIGHT DOORS AND SIDEPORTS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Accommodation/Occupational Safety
Issued 13 October 1988 Resolved
PROVIDE HOSPITAL AND FIRST AID EQUIPMENT.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Lifesaving
Issued 13 October 1988 Resolved
CONDUCT FIRE AND BOAT DRILLS IN PRESENCE OF USCG MARINE INSPECTOR.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Lifesaving
Issued 13 October 1988 Resolved
CONDUCT WEIGHT TESTS OF LIFEBOATS AND LIFEBOAT DAVITS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Accommodation/Occupational Safety
Issued 13 October 1988 Resolved
PROVIDE APPROVED PILOT LADDER.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Engineering
Issued 13 October 1988 Resolved
PROVE OPERATION OF BILGE PUMPS, ANY REMOTE START OR STOP SWITCHES, AND TESTOILY WATER SEPARATOR.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Accommodation/Occupational Safety
Issued 13 October 1988 Resolved
PROVE OPERATION OF AIR COMPRESSORS, AIR CONDITIONING AND REFRIGERATION SYSTEMS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Engineering
Issued 13 October 1988 Resolved
PROVE OPERATION OF DISTILLING PLANT AND PORTABLE WATER PUMPS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Engineering
Issued 13 October 1988 Resolved
PROVE OPERATION OF LUBE OIL SERVICE PUMPS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Electrical
Issued 13 October 1988 Resolved
TEST OPERATION OF SERVICE GENERATORS-INCLUDING OVERSPEED TRIPS, LOW LUBE OIL PRESSURE TRIPS, LOW LUBE OIL PRESSURE ALARMS REVERSE POWER TRIPS, PARALLEL OPERATION, AND VOLTAGE REGULATION.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Electrical
Issued 13 October 1988 Resolved
TEST GROUND FAULT DETECTORS ON MAIN AND EMERGENCY SWITCHBOARDS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Electrical
Issued 13 October 1988 Resolved
PROVE PROPER OPERATION OF EMERGENCY BATTERIES AND THEIR CHARGING SYSTEMS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Accommodation/Occupational Safety
Issued 13 October 1988 Resolved
PROVE OPERATION OF REQUIRED MARINE SANITATION DEVICE.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Navigation
Issued 13 October 1988 Resolved
PROVE OPERATION OF ENGINE ORDER TELEGRAPH, EOT FAILURE ALARM AND 1JV PHONE CIRCUIT.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Lifesaving
Issued 13 October 1988 Resolved
PROVE LIFEBOAT WINCHES INCLUDING LIMIT SWITCHES, MASTER SWITCH AND EMERGENCY DISCONNECT.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Fire Fighting
Issued 13 October 1988 Resolved
TEST REMOTE SHUTDOWNS FOR ENGINEROOM VENTILATION, FORCED DRAFT FANS, FUEL OIL PUMPS AND CARGO SPACE FANS.
Condition: Unknown
Due 13 October 1988
Resolved 13 October 1988
Construction/Loadline
Issued 13 October 1987 Resolved
PROVIDE COAST GUARD APPROVED PLANS AND REVISED STABILITY INFORMATION FOR HELO DECK MODIFICATION NOW IN PROGRESS.
Condition: Unknown
Due 13 October 1987
Resolved 13 October 1987

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.