Records from 1982 to 2000. Most recent: inspection, 14 August 2000.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 34
14 August 2000
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 820891
16 August 1999
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 777692
4 August 1998
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1431998
16 December 1997
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1457521
3 March 1997
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1107094
7 January 1997
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1449996
2 November 1996
Permit to Proceed
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 859869
15 August 1996
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1385775
9 September 1995
Administrative
Administrative · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 878596
20 April 1995
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 857991
23 March 1993
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1147113
16 March 1993
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1443358
4 March 1993
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 646186
2 March 1993
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 186
30 November 1992
Examination of Repairs
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1134703
30 November 1992
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1139477
15 July 1992
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 938127
2 March 1992
Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 957536
24 May 1991
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1238042
14 May 1991
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1214407
24 April 1991
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 928175
17 April 1991
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1221114
20 March 1991
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1242360
4 March 1991
COI Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 915350
17 January 1991
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1241501
28 February 1989
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1204284
11 August 1987
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1026680
27 March 1987
Examination of Repairs
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1328616
23 January 1987
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1007716
5 May 1986
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1308947
24 January 1986
Credit Drydock
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 989019
28 June 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 983717
13 March 1985
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1289098
29 September 1982
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 963898
Construction/Loadline
Issued 4 August 1998
Resolved
CROP & RENEW HOLES IN MAIN DECK & SIDE HULL IWO FWD ROLLING CHOCKS (PORT & STBD). NEAR FRAMES #5 & #6
Condition: Unknown
Due 26 August 1998
Resolved 1 September 1998
Navigation
Issued 4 August 1998
Resolved
PROVIDE UPDATED NAV CHARTS & PUBS
Condition: Unknown
Due 4 August 1998
Resolved 4 August 1998
Unknown
Issued 4 August 1998
Resolved
PRIOR TO ACTIVATION, CONDUCT OPERATIONAL TEST OF BOILERS, MAIN PROPULSION, TURBINE GENERATORS, ALL AUX ENGINEERING EQUIPMENT & SET BOILER SAFETIES.
Condition: Unknown
Due 4 August 1998
Resolved 4 August 1998
Electrical
Issued 4 August 1998
Resolved
Repair loose connection on J/W temperature probe
Condition: Unknown
Due 13 August 1998
Resolved 14 August 1998
Navigation
Issued 4 August 1998
Resolved
REPLACE BULBS FOR STEERING FAILURE ALARM, POWER FAILURE ALARM FOR PORT STEERING FAILURE & ANCHOR [name withheld].
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Deck/Cargo
Issued 4 August 1998
Resolved
COMPLETE TIGHTNESS TEST FOR ALL CARGO HOLD HATCHES
Condition: Unknown
Due 25 August 1998
Resolved 25 August 1998
Fire Fighting
Issued 4 August 1998
Resolved
Repair/replace rotted pipe&defective valve on drain line for main fire pmp & hydrostatically test repair/replacement
Condition: Unknown
Due 25 August 1998
Resolved 25 August 1998
Engineering
Issued 4 August 1998
Resolved
Repair EDG prime mover shut-down control/device so that eng will run without shutting down on start-up under no load condition.
Condition: Unknown
Due 13 August 1998
Resolved 14 August 1998
Electrical
Issued 4 August 1998
Resolved
Provide operating&shutdown instructions for EDG
Condition: Unknown
Due 13 August 1998
Resolved 14 August 1998
Electrical
Issued 4 August 1998
Resolved
Provide electrical protection mat at reefer/deck cargo controller panel
Condition: Unknown
Due 13 August 1998
Resolved 14 August 1998
Documentation
Issued 4 August 1998
Resolved
Provide oil discharge placard at all bilge/ballast pmp control stations&ovbd discharge valve
Condition: Unknown
Due 13 August 1998
Resolved 14 August 1998
Construction/Loadline
Issued 4 August 1998
Resolved
Properly adjust shaft alley W/T door
Condition: Unknown
Due 13 August 1998
Resolved 14 August 1998
Electrical
Issued 4 August 1998
Resolved
Replace faulty resistors in EDG panel and prove proper operation of EDG on line under load.
Condition: Unknown
Due 13 August 1998
Resolved 14 August 1998
Lifesaving
Issued 4 August 1998
Resolved
PROVIDE 8 GUNWALE SOCKETS & 1 STANCHION FOR SOLAS LIFEBOAT COVERS.
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Unknown
Issued 4 August 1998
Resolved
CONDUCT FIRE & BOAT DRILL
Condition: Unknown
Due 4 August 1998
Resolved 4 August 1998
Navigation
Issued 4 August 1998
Resolved
REPLACE BINNACLE LIGHT SWITCH & DIMMER
Condition: Unknown
Due 18 August 1998
Resolved 18 August 1998
Lifesaving
Issued 15 August 1996
Resolved
CROP/RENEW HOLED PORTION OF PORT LIFEBOAT AFT DAVIT ARM LOCATED BENEATH THELOWER SHEAVE. REPAIRS AND ASSOCIATED LIFEBOAT DAVIT WEIGHT TEST TO BE CONDUCTED TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR BY 15SEP96.
Condition: Unknown
Due 15 September 1996
Resolved 19 September 1996
Fire Fighting
Issued 16 March 1993
Resolved
REPAIR AND CLEAN CORROSION FROM NAVY ALL PURPOSE NOZZLES.
Condition: Unknown
Due 16 March 1993
Resolved 1 April 1993
Fire Fighting
Issued 16 March 1993
Resolved
REPAIR AND PROVE OPERATION OF FIRE/SMOKE ALARM INDICATING PANEL ON BRIDGE FOR ZONE 19-35.
Condition: Unknown
Due 16 March 1993
Resolved 1 April 1993
Unknown
Issued 16 March 1993
Resolved
SCBA'S FOR FIREFIGHTERS HYDRO IS EXPIRED.
Condition: Unknown
Due 16 March 1993
Resolved 1 April 1993
Lifesaving
Issued 16 March 1993
Resolved
CHANGE LABELING ON ALL RING BUOYS FROM WASHINGTON, DC TO NORFOLK, VA.
Condition: Unknown
Due 16 March 1993
Resolved 1 April 1993
Navigation
Issued 16 March 1993
Resolved
REMOVE PAINT OVERSPRAY FROM PORT AND STARBOARD RUNNING LIGHTS.
Condition: Unknown
Due 16 March 1993
Resolved 1 April 1993
Unknown
Issued 16 March 1993
Resolved
CROP AND RENEW WASTED PIPING FROM FLYING BRIDGE DECK DRAIN STARBOARD SIDE.
Condition: Unknown
Due 16 March 1993
Resolved 1 April 1993
Accommodation/Occupational Safety
Issued 4 March 1991
Resolved
PROVIDE ALL SUPPLIES FOR HOSPITAL PRIOR TO NEXT VOYAGE (AFTER SEA TRIALS)_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 March 1991
Resolved 4 March 1991
Construction/Loadline
Issued 4 March 1991
Resolved
PROVIDE COPY OF MOST RECENT AUDIO-GAGING OF PORT AND STBD BOAT DECK AREAS IN WAY OF NUMEROUS DOUBLERS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 March 1991
Resolved 4 March 1991
Documentation
Issued 4 March 1991
Resolved
COMPLETE WORKLIST DATED 04MAR91 (EIGHT ITEMS)_x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 March 1991
Resolved 4 March 1991
Lifesaving
Issued 4 March 1991
Resolved
CONDUCT SUSPENSION (WEIGHT) TEST OF PORT LIFEBOAT, AND CONDUCT SUSPENSION AND RELEASE TEST OF STBD LIFEBOAT AFTER COMPLETION OF SEA TRIALS, AND PRIORTO DEPARTURE FROM [name withheld]
Condition: Unknown
Due 4 March 1991
Resolved 4 March 1991
Engineering
Issued 4 March 1991
Resolved
PROVE PROPER OPERATION OF OIL CONTENT MONITOR OF OILY WATER SEPARATOR._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 4 March 1991
Resolved 4 March 1991
Unknown
Issued 17 January 1991
Resolved
PAINT LOCKER NEEDS EXPLOSION PROOF JUNCTION BOXES WITH EXPLOSION PROOF FITTINGS AND THE LIGHT NEEDS EXPLOSION PROOF FITTINGS.
Condition: Unknown
Due 17 January 1991
Resolved 17 January 1991
Unknown
Issued 17 January 1991
Resolved
COMPLETE WORKLIST ITEM 3 FROM DRYDOCK CASE NO. MI91003584
Condition: Unknown
Due 17 January 1991
Resolved 17 January 1991
Unknown
Issued 17 January 1991
Resolved
CROP AND RENEW WASTED AREAS IN BOTH THE VENTILATION SHAFTS IN #3 CARGO HOLDAND DECK HOUSE FOR #5 AND #6 CARGO HOLDS
Condition: Unknown
Due 17 January 1991
Resolved 17 January 1991
Unknown
Issued 17 January 1991
Resolved
INSTALL DOGS AS NEEDED ON CARGO HATCHES
Condition: Unknown
Due 17 January 1991
Resolved 17 January 1991
Unknown
Issued 17 January 1991
Resolved
CROP AND RENEW DECK IN BOSUN'S STORES FWD OF HATCH IN MAIN DECK IN WAY OF HOLES
Condition: Unknown
Due 17 January 1991
Resolved 17 January 1991
Unknown
Issued 17 January 1991
Resolved
REPAIR AND RENEW BULB, GUARDS AND GLOBES FOR LIGHTS IN FWD BOSUN'S STORES
Condition: Unknown
Due 17 January 1991
Resolved 17 January 1991
Unknown
Issued 17 January 1991
Resolved
FREE UP ALL REACH RODS THROUGH OUT CARGO HOLDS
Condition: Unknown
Due 17 January 1991
Resolved 17 January 1991
Engineering
Issued 27 March 1987
Resolved
HYDROSTATICALLY TEST THE STARBOARD BOILER TO 1.25 PSI IN THE PRESENCE OF A USCG MARINE INSPECTOR.
Condition: Unknown
Due 27 March 1987
Resolved 27 March 1987
Engineering
Issued 27 March 1987
Resolved
RENEW THREE PLUGGED SCREEN TYPES IN THE STARBOARD BOILER.
Condition: Unknown
Due 27 March 1987
Resolved 27 March 1987
Electrical
Issued 23 January 1987
Resolved
INSTALL BLANKS IN UNPROTECTED SWITCH OPENINGS IN ELECTRICAL PANELS AS NEEDED THROUGHOUT THE VESSEL.
Condition: Unknown
Due 23 January 1987
Resolved 23 January 1987
Engineering
Issued 24 January 1986
Resolved
MAKE PERMANENT REPAIRS TO WASTED BRACKETS ON THE STARBOARD SIDE OF THE REDUCTION GEAR FOUNDATION, AT THE TANK TOP LEVEL.
Condition: Unknown
Due 24 January 1986
Resolved 24 January 1986
Engineering
Issued 24 January 1986
Resolved
RENEW DRAIN PIPING ON THE INBOARD EVAPORATOR.
Condition: Unknown
Due 24 January 1986
Resolved 24 January 1986
Engineering
Issued 24 January 1986
Resolved
RENEW DRAIN PIPING ON THE CONTAMINATED EVAPORATOR.
Condition: Unknown
Due 24 January 1986
Resolved 24 January 1986