Records from 2016 to 2026. Most recent: inspection, 8 June 2026.
Documentation record
Registered dimensions (L × B × D)61.9 ft × 17.4 ft × 11.0 ft
Registered tonnagegross 49 / net 33
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderJ W NOLAN & SONS, INC · ERIE, PA, UNITED STATES · built 1963
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portLELAND, MI
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationExpired · issued 30 June 2004
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it49 - Regulatory (Subpart C or D), Gross Ton
33 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 16
8 June 2026
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8402874
9 June 2025
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 8163117
10 June 2024
COI Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7915961
2 May 2024
Hull Examination · Internal Structural Exam
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7939410
24 May 2023
Administrative Inspection · Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7770322
3 May 2022
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7454067
15 February 2022
Liferaft Servicing
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 7396613
13 May 2021
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 7199835
17 June 2020
Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6989089
2 May 2019
DAPI Audit · COI Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6674863
26 April 2019
Hull Examination · Deficiency Check · Examination of Repairs
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6673496
28 December 2018
Liferaft Servicing
Physical examination · Marine Safety Unit Chicago · USCG Great Lakes District (CGD-GL) · Activity 6624433
15 May 2018
Annual Inspection · DAPI Audit
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6416434
27 June 2017
Deficiency Check
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6251516
23 May 2017
DAPI Audit · Administrative Inspection · Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 6181821
2 May 2016
Administrative Inspection · Annual Inspection
Physical examination · Sector Northern Great Lakes · USCG Great Lakes District (CGD-GL) · Activity 5867364
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 May 2023
Resolved
RLB light inop, replaced in my presence.
Action required: 10 - Deficiency Rectified
Due 24 May 2023
Resolved 24 May 2023
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 24 May 2023
Resolved
1 adult PFD rejected, replaced in my presence.
Action required: 10 - Deficiency Rectified
Due 24 May 2023
Resolved 24 May 2023
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 24 May 2023
Resolved
FFE flexible loops found only hand tightened. Properly torqued in my presence.
Action required: 10 - Deficiency Rectified
Due 24 May 2023
Resolved 24 May 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 13 May 2021
Resolved
Forward portside pilothouse window is cracked, impairs operator visibility, must be replaced.
46CFR177.1030, not in Cite drop down pick list.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 June 2021
Resolved 25 May 2021
Resolution: Received photos from vsl owmer with new window installed.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 2 May 2019
Resolved
Each disposable hydrostatic release unit must be marked with an expiration date of two years after the date on which the unit is installed. Two disposable hydrostatic releases installed on the inflatable life rafts are expired. Replace with non-expired hydrostatic releases labeled for life raft use, prior to operating with passengers.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 23 May 2019
Resolved 24 May 2019
Resolution: Replaced and properly installed 2 disposable hydrostatic release units.
Navigation › Piloting/Steering › Marine Charts
Issued 23 May 2017
Resolved
Provide current navigational chart, Coast Pilot [name withheld], CG Light List and Notice to Mariners.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 June 2017
Resolved 27 June 2017
Navigation › Piloting/Steering › Magnetic Compass
Issued 23 May 2017
Resolved
Provide light for magnetic compass.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 June 2017
Resolved 27 June 2017
Electrical › Electrical Distribution System (service) › Switch
Issued 23 May 2017
Resolved
Reconfigure inverter 12VDC power supply to be connected after the main power disconnect switch.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 23 June 2017
Resolved 27 June 2017
Stability › Freeing Ports › General
Issued 23 May 2017
Resolved
All freeing port non-returns must be made fully operable, lubricated and freed up.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 June 2017
Resolved 27 June 2017
Stability › Freeing Ports › General
Issued 2 May 2016
Resolved
Install missing scupper on port quarter.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 17 June 2016
Resolved 14 June 2016
Resolution: Owner sent photos demonstrating satisfactory installation.