Documentation record
Registered dimensions (L × B × D)55.0 ft × 25.0 ft × 4.7 ft
Registered tonnagegross 54 / net 43
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDIVERSIFIED MARINE INC · PORTLAND, OR, UNITED STATES · built 1996
Hull materialSteel
PropulsionElectric Motor
Hull shapeBox
Hull configurationMonohull
Hailing portCANBY, OR
Endorsements, as the file codes themcw_un
DocumentationValid · issued 6 May 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it54 - Simplified, Gross Ton
43 - Simplified, Net Ton
30 - Dead Weight, Ton
101 - Displacement, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 15 inspections, each with its date, unit and type; 8 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 15
18 May 2026
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8420441
22 May 2025
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8151245
7 May 2024
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7909420
8 June 2023
Annual Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7723964
9 June 2022
Hull Examination · COI Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7431961
15 November 2021
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7351534
25 October 2021
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7360699
9 November 2020
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7097204
4 November 2019
Annual Inspection · DAPI Audit
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6850625
20 February 2019
Administrative Inspection
Administrative · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6629145
5 November 2018
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6577316
23 October 2017
COI Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6306338
16 May 2017
Deficiency Check · Hull Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6297963
10 November 2016
Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6039082
24 October 2016
Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6028464
Engineering › Bilge Water Management System › Strainer
Issued 16 May 2017
Resolved
Raise installed bilge strainers so that they can function as intended; inspector to verify the presence of inlet screens.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 June 2017
Resolved 16 June 2017
Resolution: Bilge strainer housing were raised off the deck approximately 1/2"; inlet screens were verified on all suction bells.
Construction/Loadline › Hull › Transverse Frame
Issued 16 May 2017
Resolved
Remove "fire-stop" caulking and install proper (ROCTEX) watertight blocks or fittings on electrical cables passing through bulkhead penetrations. As another alternative, RISE sleeves may be used in the MCT windows that do not have enough space for ROCTEX blocks.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 16 June 2017
Resolved 16 June 2017
Resolution: MCT penetrations were sealed satisfactorily.
Engineering › Sea-water System (primary cooling) › Piping
Issued 16 May 2017
Resolved
Provide threaded pipe caps on the two drain lines installed on the fire pump suction line to prevent accidental flooding of the void space. (Drain line presently have 1/4 valves.)
Action required: 705 - Other - as specified
Due 16 June 2017
Resolved 16 June 2017
Resolution: Drain lines were capped to prevent a potential source of flooding.
Electrical › Electrical Distribution System (service) › Grounding Conductor
Issued 16 May 2017
Resolved
Attach ground wires on the harmonic filters (2) in accordance with the approved drawings.
Action required: 705 - Other - as specified
Due 16 June 2017
Resolved 16 June 2017
Resolution: Grounding wires were installed for both harmonic filters located in the machinery void space.
Electrical › Electric Supply System (service) › Cable
Issued 16 May 2017
Resolved
Terminate all dead-end wires in a junction box, or remove unused wiring.
Action required: 705 - Other - as specified
Due 16 June 2017
Resolved 16 June 2017
Resolution: All unterminated/dead-end wiring identified during the dry-dock exam was removed from the vessel or properly terminated in a junction box.
Fire Fighting › Fire Pumps › Arrangement
Issued 16 May 2017
Resolved
Provide adequate structural support of the newly installed duplex strainer housing located adjacent to the sea-chest. (Fire pump suction line from the sea-chest.)
Action required: 705 - Other - as specified
Due 16 June 2017
Resolved 16 June 2017
Resolution: A bracket was built to support the duplex housing strainer located adjacent to the sea-chest.
Electrical › Electrical Distribution System (service) › Cable
Issued 24 October 2016
Resolved
PROPERLY RE-SECURE CABLE ON HYD. SYSTEM FILTER HOUSING (HYD. PRESSURE ALARM) SO THAT IT IS MADE WEATHERTIGHT AND TIED DOWN.
Condition: Improper Installation
Due 24 November 2016
Resolved 10 November 2016
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 24 October 2016
Resolved
PROVIDE FIRST AID KIT APPROVED BY COAST GUARD (160.041) OR EQUIVALENT.
Condition: Improper Installation
Due 24 November 2016