Records from 2005 to 2025. Most recent: inspection, 11 March 2025.
Inspection history · 20
11 March 2025
COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8091736
4 March 2025
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8088266
7 August 2024
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7977973
6 August 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7975351
26 February 2024
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7869412
1 June 2023
In-Service Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7703939
29 November 2022
Administrative Inspection · Deficiency Check · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7595936
28 July 2022
Drydock Exam · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7523213
13 April 2022
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7431984
16 March 2021
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7157357
28 August 2020
Annual Inspection · DAPI Audit
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7025554
13 July 2020
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7004885
23 January 2020
Internal Structural Exam · Hull Examination
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6895305
18 April 2019
Annual Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6665399
23 July 2018
Examination of Repairs · Damage Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6488203
21 July 2018
Type not recorded
No type recorded · Sector New York · USCG Northeast District (CGD-NE) · Activity 6488139
12 April 2018
COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6390079
5 December 2017
Examination of Repairs · Hull Examination · Internal Structural Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6339609
13 March 2017
MTSA Verification · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6103546
31 March 2016
Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 5844199
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 March 2025
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspections. MI observed multiple dead end wires in bridge breaker panel.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 April 2025
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 11 March 2025
Resolved
All escape hatches and other emergency exits used as means of escape must be marked on both sides in clearly legible letters at least 50 millimeters (2 inches) high: “EMERGENCY EXIT, KEEP CLEAR”, unless such markings are deemed unnecessary by the cognizant OCMI.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 15 April 2025
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 6 March 2025
Resolved
"Your vessel must undergo an annual inspeciton within the 3 months before or after each anniversary date." Vessel did not complete annual inspection within 3 months of anniversary date of November 29; last annual inspection was February 26, 2024. Complete an annual inspection.
46 CFR 176.600(c)(1)
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 2 April 2025
Resolution: Completed COI renewal.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 August 2024
Resolved
A vessel that is exposed to salt water more than three months in any 12 month period since the last examination must undergo a drydock examination and an internal structural at least once every two years...
Vessel lapsed required inspection dates 01AUG2024. Make vessel ready for drydock and internal structures examination. Prior to carriage of passengers/cargo, vessel must receive credit drydock.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 6 September 2024
Resolution: Vessel completed credit DDX/ISE
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 26 February 2024
Resolved
Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Port fuel tank access cover is leaking small amounts of fuel oil. Vessel shall fix fuel oil leak.
46 CFR 182.100
Action required: 705 - Other - as specified
Due 26 February 2024
Resolved 26 March 2024
Resolution: Vessel removed fuel, cleaned and replaced gasket. Deficency has been resolved.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 February 2024
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Port 01 deck breaker panel box has wires going through breaker box without proper penetration. Vessel shall install proper wire penetration.
46 CFR 183.01-15(a)OLD T
Action required: 50 - Rectify deficiencies w/in 30 days
Due 26 February 2024
Resolved 26 March 2024
Resolution: Vessel installed new wire penetration on breaker box. Deficency has been resolved.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 February 2024
Resolved
All electrical installations shall be to the satisfaction of the Officer in Charge, Marine Inspection. Wiring underneath bridge console was discovered loose. Vessel shall tighten loose wiring.
46 CFR 183.01-15(a)OLD T
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 February 2024
Resolved 26 March 2024
Resolution: Vessel has corrected loose wiring underneath bridge. Deficency has been resolved.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 26 February 2024
Resolved
At each initial and subsequent inspection for certification, re inspection and at every other vessel inspection the marine inspector shall require that
all observed unsafe practices and hazardous situations be corrected. Two sections of mirrors on main deck are cracked. Vessel shall repair identified areas.
46 CFR 176.25-50 (A) OLD-T
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 March 2024
Resolution: Vessel has removed cracked mirrors from vessel. Deficiency has been resolved.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 26 February 2024
Resolved
At each initial and subsequent inspection for certification and re inspection the marine inspector shall examine the passenger and crew quarters,toilet and washing spaces, galleys, serving pantries, lockers, etc., to determine that they are serviceable and in a sanitary condition. Fittings attached to sewage tank are broken/missing.
46 CFR 176.25-45 OLD T
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 26 March 2024
Resolution: Vessel has replaced cracked fitting. Deficency has been resolved.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 26 February 2024
Resolved
At each initial and subsequent inspection for certification, the marine inspector shall view the vessel afloat and shall conduct the tests and inspections of the hull structure and its appurtenances. Examine all weather tight closures above weather deck. Vessel's weather tight doors on 01 deck were not in serviceable condition at the time of inspection. Vessel is to provide repair proposal.
46 CFR 176.25-5 OLD T
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 11 April 2024
Resolution: Vessel conducted mainteance on doors and brought them into servicable condition. MI's witnessed the operation of the doors.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 29 November 2022
Resolved
AT EACH INITIAL AND SUBSEQUENT INSPECTION FOR CERTIFICATION THE MARINE INSPECTOR SHALL REQUIRE THAT ALL OBSERVED UNSAFE PRACTICES AND HAZARDOUS SITUATIONS BE CORRECTED. INSPECTORS OBSERVED MULTIPLE ELECTRICAL SWITCHES AT THE OPERATING STATION THAT DID NOT HAVE LABELS, AS WELL AS A SWITBOARD WITH OPEN BREAKERS. LABEL OR REMOVE SWITCHES AS OPERATING STATION AND INSTALL BLANKS IN SWITCHBOARD.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 December 2022
Resolved 18 January 2023
Resolution: Received pictures of the labeled operating station electrical switches.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 29 November 2022
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 December 2022
Resolved 18 January 2023
Resolution: Received copies of renewed drug and alcohol certificates for company employees.
07 - Fire Safety › N/A - No Subsystem › Remote Means of control (opening,pumps,ventilation,etc.) Machinery spaces
Issued 28 August 2020
Resolved
Shutoff valves installed so as to close against the fuel flow shall be fitted in the fuel supply lines. Fuel shutoff valves were tested, upon initial test the shut off valve on the starboard tank did not close. Once inspected there was removable tape limiting the valve closing. Crew addressed and fixed the discrepancy on the spot by removing the tape.
46 old cfr 182.20-40(b)(3)
Action required: 10 - Deficiency Rectified
Resolved 28 August 2020
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 August 2020
Resolved
The bilge suctions shall be fitted with suitable strainers having an open area not less than three times the are of the area of the bilge pipe. Bow thruster void not properly fitted.
46 old cfr 182.25-5 (b)
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 July 2021
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 August 2020
Resolved
Receptacle outlets and attachment plugs for the attachment of portable lamps, tools, and similar apparatus supplies as ships equipment and operating at 100 volts or more shall a grounding pole and a grounding conductor. TV's on main deck require grounding plug.
46 old cfr 183.10-20 (n)
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 30 July 2021
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 28 August 2020
Resolved
All portable fire extiguishers must be of approved type. Fire extinguisher on bridge not in the bracket it was approved with.
46 old cfr 181.30-5
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 30 July 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 28 August 2020
Resolved
provide repair proposal for bilge suction line in bow thruster space. Pending approval, provide plan to rectify.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 4 August 2021
Resolution: replaced pipes and ran test of system. all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 18 April 2019
Resolved
Vessel is equipped with a fuel gauge sight glass and shutoff valves. MI could not determine if system is in compliance with heat resistant sight gauge and auto shut-off valves. Provide proof sight gauge is heat resistant and the valves are auto shut-off type or replace equipment meeting said standards. Vessel has 30 days to correct deficiency.
Action required: 705 - Other - as specified
Resolved 24 April 2019
Resolution: Operator provided proof system is in compliance. The fuel gauge sight glass and auto shut-off valves are of the John C. Ernst Co. Standard Model 436 meeting the heat resistance and auto shut-off feature.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 23 July 2018
Resolved
The propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. The vessel experienced a fracture to the weld holding the throttle bracket rendering unresponsive throttle controls. Prove proper operation of throttles and main engine prior to carrying passengers.
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 July 2018
Resolution: See narrative.
Electrical › Electric Generation Source (service) › Ground Detection
Issued 12 April 2018
Resolved
Vessel must either conform with ungrounded electrical system requirements as per 46 CFR 183.10-30 (old T) OR install ground detection as per 46 CFR 111.30-15 (old J).
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 5 February 2020
Resolution: MI attended vessel and verified installation of ground detection meter.