Records from 1985 to 2006. Most recent: inspection, 7 August 2006.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 74
7 August 2006
Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2738697
20 May 2005
Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2363106
7 April 2005
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2322050
19 January 2005
COI Inspection · MTSA/ISPS Verification
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 2289362
3 June 2004
MTSA/ISPS Verification
Physical examination · Commandant (CG-CVC) · Activity 2087488
29 January 2004
Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 1996751
10 August 2003
Administrative Inspection
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1871800
21 October 2002
Administrative Inspection
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1693447
28 June 2002
Internal Structural Exam
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1639329
13 December 2001
Hull Examination · Cargo Tank Internal · Permit to Proceed
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1473809
11 November 2001
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1414040
28 June 2001
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1362329
26 April 2001
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1064040
24 July 2000
Administrative
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 820222
9 June 2000
COI Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1365820
4 January 2000
Administrative
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 811887
20 December 1999
Examination of Repairs
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1399230
6 November 1999
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 14284
17 June 1999
Re-Inspection · Hull Examination
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1384100
29 April 1999
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 792178
29 April 1999
Administrative
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 1128910
28 December 1998
Administrative
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 809389
30 October 1998
Type not recorded
No type recorded · Activities Far East · USCG Oceania District (CGD-O) · Activity 803731
4 August 1998
COI Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1128383
15 July 1998
Type not recorded
No type recorded · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 166647
17 April 1998
Administrative
Administrative · Activities Far East · USCG Oceania District (CGD-O) · Activity 789357
9 November 1997
Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1123477
3 September 1997
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 785496
11 August 1997
Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1117405
22 July 1997
Deficiency Check
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 780674
14 July 1997
Type not recorded
No type recorded · Marine Inspections Unit Singapore · USCG Oceania District (CGD-O) · Activity 73597
14 July 1997
Damage Survey
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1115808
20 May 1997
Examination of Repairs · Re-Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 1368297
30 November 1996
Type not recorded
No type recorded · Activities Europe · Activity 214278
11 October 1996
Type not recorded
No type recorded · Activities Europe · Activity 1152616
9 September 1996
Deficiency Check
Physical examination · Activities Europe · Activity 1261304
1 August 1996
Hull Examination · COI Inspection
Physical examination · Activities Europe · Activity 1355828
10 June 1996
Administrative
Administrative · Activities Europe · Activity 1355830
2 October 1995
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 227696
1 September 1995
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 216654
28 May 1995
MARPOL Annex V Examination · Re-Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 874914
8 May 1995
Re-Inspection
Physical examination · Activities Far East · USCG Oceania District (CGD-O) · Activity 875938
7 February 1995
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 220536
2 August 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 862367
21 May 1994
Hull Examination · MARPOL Annex V Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1403798
28 March 1994
Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 855543
24 December 1993
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 221584
19 June 1993
Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 844723
29 May 1993
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 230209
15 April 1993
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1136536
25 March 1993
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 837810
24 March 1993
Damage Survey
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1414144
5 November 1992
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1464456
8 June 1992
Hull Examination · COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1258591
26 December 1991
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1270688
21 November 1991
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 949738
4 March 1991
Examination of Repairs
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1242163
9 February 1991
Hull Examination · Damage Survey
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1230721
3 January 1991
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1211109
27 December 1990
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 913189
18 December 1990
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1220242
8 November 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1225145
13 August 1990
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1227494
8 June 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 909640
26 March 1990
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1219969
11 January 1989
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1194863
25 April 1988
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1034076
1 March 1988
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 988313
15 October 1986
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1009462
6 October 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1006845
29 September 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1005108
6 March 1986
COI Inspection · Credit Drydock
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1302659
22 August 1985
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 1297174
6 August 1985
Re-Inspection · Initial Construction-Excluding Oversight
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 984806
Electrical › Electrical Distribution System (service) › Wiring
Issued 8 March 2005
Resolved
Prior to any cargo operations, properly seal wire run in lower pump room. Vessel must remain gas free until resolved.
Condition: Improper Installation
Due 7 April 2005
Resolved 7 April 2005
Resolution: Witnessed, satisfactory.
Pollution Prevention/Response › Prevention Equipment › Bilge Monitor
Issued 8 March 2005
Resolved
Prior to use, prove proper operation of ODME
Due 7 April 2005
Resolved 7 April 2005
Resolution: Witnessed satisfactory test.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 8 March 2005
Resolved
Provide original Certificate of Documentation.
Condition: Unknown
Due 8 April 2005
Resolved 31 May 2005
Fire Fighting › Nozzles › Condition
Issued 8 March 2005
Resolved
Remove and clean out foam heads in pump room.
Condition: Improper/Lack of Maintenance
Due 8 April 2005
Resolved 7 April 2005
Resolution: Nozzles cleaned.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Transfer Hose
Issued 8 March 2005
Resolved
Provide hydrostatic test report for hoses on port side lifeboat deck and floating cargo lines amidships.
Due 8 April 2005
Resolved 7 April 2005
Resolution: Received test reports.
Construction/Loadline › Structures › Deck Plating
Issued 8 March 2005
Resolved
Repair/replace deteriorated catwalk and " I-beam " located under aft section of on deck barge.
Due 8 April 2005
Resolved 7 April 2005
Resolution: Catwalk repaired.
Construction/Loadline › Structures › Deck Plating
Issued 8 March 2005
Resolved
Replace flat bar support on catwalk amidships.
Due 8 April 2005
Resolved 7 April 2005
Resolution: Flat bar replaced.
Construction/Loadline › Structures › Deck Plating
Issued 8 March 2005
Resolved
Repair/replace as original framing in HP room amidships.
Due 8 April 2005
Resolved 7 April 2005
Resolution: Renewed framing.
Engineering › Steam Boiler (propulsion) › Automation Equipment
Issued 8 March 2005
Resolved
Provide USCG approved automation test procedures for both boilers.
Due 8 April 2005
Resolved 7 April 2005
Resolution: Approved procedures provided.
Engineering › Compressed Air System (control) › Receiver/Bottle
Issued 8 March 2005
Resolved
Provide data plates for pressure vessels.
Due 8 April 2005
Resolved 31 May 2005
Lifesaving › Lifeboat › Embarkation/Disembarkation Capabilities
Issued 21 October 2002
Resolved
Falls renewed on 26 July, 2002. Weight test not completed. Vessel may not get underway until weight test is completed to the satisfaction of the attending marine inspector. LEGACY COMPONENT DESC: Embarkation/Disembarkation Capabilities
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 8 March 2005
Construction/Loadline › Structures › Deck Plating
Issued 28 June 2002
Resolved
Crop and renew to good steel wasted area inthe port double bottom tank top.
Condition: Unknown
Action required: 705 - Other - as specified
Resolved 26 July 2002
Resolution: 18x18" insert attended by ABS.
Deck/Cargo › Holds/Tanks
Issued 13 December 2001
Resolved
Complete Internal Structural Exam to the satisfaction of cognizant OCMI.
Due 13 January 2002
Resolved 26 July 2002
Resolution: COMPLETED INTERNAL STRUCTURE EXAM. SEE NARRATIVE FOR DETAILS.
Deck/Cargo › Inert Gas System › Venting System
Issued 28 June 2001
Resolved
Prove proper operation of IGS.
Condition: Unknown
Due 29 July 2002
Resolved 8 March 2005
Engineering
Issued 28 June 2001
Resolved
Return OWS sample water interlock to original spec. (loss of smapling watermust prevent ovbd discharge.)
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Engineering › Compressed Air System (control) › Piping
Issued 28 June 2001
Resolved
Conduct required hydrostatic test for underwater conduit hose on reel's #1,#4, #5, #6.
Condition: Unknown
Due 29 July 2002
Resolved 8 March 2005
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 28 June 2001
Resolved
Conduct annuyal fixed cargo piping hydrostatic test.
Condition: Unknown
Due 29 July 2002
Resolved 8 March 2005
Fire Fighting
Issued 28 June 2001
Resolved
Provide annual fixed/portable fire extinguishing service report, including foam analysis.
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Construction/Loadline
Issued 28 June 2001
Resolved
Prove proper operation of upper deck stbd fire door.
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Engineering
Issued 28 June 2001
Resolved
Install means to prevent the introduction of flushing water to OCM while pump is in operation.
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Electrical
Issued 28 June 2001
Resolved
Prove proper operation of emergency generator breaker (must operate withoutcrew intervention)
Condition: Unknown
Due 28 June 2001
Resolved 28 June 2001
Engineering
Issued 28 December 1998
Resolved
MAKE PERMANENT REPAIRS TO FEED PUMP SUCTION PIPING TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR. WELD PERFORMANCE AND PROCEDURE QUALIFICATIONS PER 46 CFR PART 57 ARE REQUIRED.
Condition: Unknown
Due 28 December 1998
Resolved 28 December 1998
Construction/Loadline
Issued 4 August 1998
Resolved
Make permanent repairs to port aft bulkhead in lower opds storeroom, #2 deep bulkhead repair at frame 113, up 12" from port to starboard side. To be completed no later than 21May99 or next drydock period.
Condition: Unknown
Due 4 August 1998
Resolved 4 August 1998
Deck/Cargo
Issued 4 August 1998
Resolved
PRIOR TO ANY CARGO PUMP OPERATIONS, HAVE A 3RD PARTY TECHNICIAN DIAGNOSE AND DETERMINE CAUSE OF #1 CARGO PUMP/TURBINE EXPLOSION TO SHAFTING AND CASING. DIAGNOSIS TO INCLUDE METALLURGICAL ANALYSIS IF REQUIRED. IF CAUSEDETERMINED TO BE MATERIAL FAILURE, CONDUCT INSPECTIONS OF 2-5 CARGO PUMPS._x001C_
Condition: Unknown
Due 4 August 1998
Resolved 4 August 1998
Construction/Loadline
Issued 14 July 1997
Resolved
OBTAIN CLASS SOCIETY CONCURRENCE IN SCOPE OF REPAIRS REQUIRED BY H1.
Condition: Unknown
Due 14 July 1997
Resolved 14 July 1997
Construction/Loadline
Issued 14 July 1997
Resolved
PRIOR TO DEPARTING DIEGO GARCIA, MAKE REPAIRS TO SHELL PLATE & INTERNALS INWAY OF DOCK STRIKE IN LOWER BOSUN'S STORES, STBD SIDE APPROX FROM STEM TO 2ND FRAME FROM FORWARD & 37 FT TO 43 FT WATERLINE. INFORM COAST GUARD MIO ASIA WHEN REPAIRS ARE COMPLETE.
Condition: Unknown
Due 14 July 1997
Resolved 14 July 1997
Accommodation/Occupational Safety
Issued 20 May 1997
Resolved
Revise current fire control plan to reflect current condition and configuration of vessel as per 46 CFR 33.10-3.
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Electrical
Issued 20 May 1997
Resolved
All lighting, switches, and junction boxes for aft port misc deck storage (Bos'n Locker), stbd fwd hydraulic room, and fwd port misc storage (Emergency Gear Locker) must meet 46 CFR 111.105-3 and 111.105-9, IEEE section 43 and NEC 500-505.
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Fire Fighting
Issued 20 May 1997
Resolved
In accordance with 46 CFR 34.15-10(f) provide an approved delayed dischargeand mechanical alarm for the fixed CO2 flooding system which discharges to the OPDS equipment storage area. System shall remain disconnected until approved or dismantled._x001C_
Condition: Unknown
Due 22 May 1997
Resolved 22 May 1997
Engineering
Issued 11 October 1996
Resolved
Set and seal replacement safety valve for port propulsion boiler superheater at next CG inspection. Valve was installed without a CG inspector in attendance.
Condition: Unknown
Due 11 October 1996
Resolved 11 October 1996
Deck/Cargo
Issued 1 August 1996
Resolved
PROVE PROPER INSTALLATION/OPERATION OF 5 NEWLY INSTALLED CARGO PUMPS. TESTSINCLUDE: HYDRO AFFECTED STEAM, CONDENSATE & CARGO PIPING TO 1.5 MAWP; PROVEPROPER OPS OF LOCAL & REMOTE SHUTDOOWNS FOR PUMP ROOM VENTILATION SYSTEMS &CARGO PUMPS; & REINSTALL & TEST GENERAL ALARM BELL IN PUMP ROOM.
Condition: Unknown
Due 1 August 1996
Resolved 1 August 1996
Construction/Loadline
Issued 1 August 1996
Resolved
REGAIN WATERTIGHT INTEGRITY OF LOWER FIRE ROOM & PUMP ROOM. WORK TO INCLUDEREPLACING CUT OUT IN BULK HEAD BETWEEN FIRE ROOM/PUMP ROOM, INSTALLING JACK SHAFT SEALS, & RECONNECTING CARGO PUMP COOLER OVERBOARD DISCHARGE LINE TO SEA VALVE. TEMP REPAIRS PERMITTED IF VSL SHIFTS YARDS.
Condition: Unknown
Due 1 August 1996
Resolved 1 August 1996
Deck/Cargo
Issued 28 May 1995
Resolved
CONDUCT CARGO PIPE HYDROSTATIC TEST AT 1.5 MAWP.
Condition: Unknown
Due 28 May 1995
Resolved 28 May 1995
Deck/Cargo
Issued 19 June 1993
Resolved
INSTALL FIXED CONTAINMENT IWO PORT + STBD MAIN CARGO MANIFOLDS TO PROPERLY PROTECT 3 CONNECTIONS ON PORT SIDE + 1 CONNECTION ON STBD SIDE WHICH, AT PRESENT, DO NOT HAVE FIXED CONTAINMENT BENEATH THEM. THIS REQUIREMENT TO BEMET TO THE SATISFACTION OF ATTENDING MARINE INSPECTOR AT NEXT DRYDOCK EXAM.
Condition: Unknown
Due 19 June 1993
Resolved 19 June 1993
Documentation
Issued 19 June 1993
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
Condition: Unknown
Due 19 June 1993
Resolved 19 June 1993
Engineering
Issued 19 June 1993
Resolved
INSTALL REMOTE PULL CABLE FOR AUXILIARY GENERATOR DIESEL TANK DISCHARGE VALVE OUTSIDE OF ENGINEROOM TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR NLT 30JULY93.
Condition: Unknown
Due 26 July 1993
Resolved 26 July 1993
Construction/Loadline
Issued 19 June 1993
Resolved
SUBMIT PLANS TO [name withheld] FOR NEWLY INSTALLED BALLAST/CARGO PUMP ROOM BILGE MONITOR SYSTEM._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 19 June 1993
Resolved 19 June 1993
Electrical
Issued 19 June 1993
Resolved
PROVE PROPER OPERATION OF STBD STEAM TURBINE GENERATOR TO INCLUDE TESTING OF REVERSE POWER RELAYS AND PARALLEL OPERATION, TO BE WITNESSED BY ABS, ANDPROVIDE ABS REPORT AND LETTER FROM [name withheld], NEW YORK. STATING ALL OPERATION TEST SAT, NLT 30JUL93.
Condition: Unknown
Due 26 July 1993
Resolved 26 July 1993
Fire Fighting
Issued 19 June 1993
Resolved
ENSURE THAT FORCED VENTILATION TO IGS ROOM CAN BE PROPERLY SECURED.
Condition: Unknown
Due 19 June 1993
Resolved 19 June 1993
Construction/Loadline
Issued 19 June 1993
Resolved
PROVIDE PLANS FOR APPROVAL ON NEWLY INSTALLED VIKING BILGE PUMP TO [name withheld] 30 JULY 93.
Condition: Unknown
Due 19 June 1993
Resolved 19 June 1993
Engineering
Issued 19 June 1993
Resolved
INSTALL RELIEF VALVE WITH HAND RELIEVING GEAR FOR DC HEATER AND PROVE PROPER OPERATION OF THE SAME TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR NLT 30JULY93.
Condition: Unknown
Due 26 July 1993
Resolved 26 July 1993
Construction/Loadline
Issued 15 April 1993
Resolved
PROVIDE [name withheld] WITH REPORT FROM ABS DETAILING PERMANENT REPAIRS TO SIDE SHELL DAMAGE IN WAY OF CARGO TANK 1C AND 1P. THE ABOVE REQUIREMENT TO BE COMPLETED NO LATER THAN 06MAY93.
Condition: Unknown
Due 15 April 1993
Resolved 15 April 1993
Construction/Loadline
Issued 24 March 1993
Resolved
OFF LOAD ALL CARGO FROM NUMBER 1 PORT CARGO TANK IMMEDIATLY AND MAKE REPAIRS TO DAMAGED AREA. CARRY NO CARGO IN THE NO 1 PORT TANK UNTIL REPAIRSARE MADE TO THE SATISFACTION OF THE COGNIZANT OCMI.
Condition: Unknown
Due 24 March 1993
Resolved 24 March 1993
Deck/Cargo
Issued 5 November 1992
Resolved
PERMANENTLY REPAIR THE HYDRAULIC LINES UNDER THE REEL CONTROL STATION TO PREVENT OIL LEAKAGE DURING OPERATION.(THIS CONTROL THE REELS FOR THE CARGO HOSES LOCATED ATOP A DECK STORAGE HOUSE MAIN DECK)
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Fire Fighting
Issued 5 November 1992
Resolved
UPDATE ALL FIRE CONTROL PLANS TO SHOW NEW FIRE FIGHTING EQUIPMENT INSTALLED.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Fire Fighting
Issued 5 November 1992
Resolved
INSTALL AND DEMONSTRATE PROPER OPERATION OF A SEMI-FIXED B-V FIRE EXTENGUISHER FOR THE 750 GALLON GASOLINE TANK.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Engineering
Issued 5 November 1992
Resolved
REPAIR LUBE OIL LEAKS IN THE HIGH AND LOW PRESSURE STEAM TURBINES.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Engineering
Issued 5 November 1992
Resolved
REPLACE HAND RELIEVING GEAR ON THE RELIEF VALVES FOR BOTH AIR COMPRESSORS IN THE MACHINERY SPACE.
Condition: Unknown
Due 5 November 1992
Resolved 5 November 1992
Deck/Cargo
Issued 8 June 1992
Resolved
CONDUCT VISUAL INSPECTION AND TESTING OF ALL O.P.D.S. HOSE REEL HOSES.
Condition: Unknown
Due 8 June 1992
Resolved 8 June 1992
Electrical
Issued 8 June 1992
Resolved
PROVIDE APPROVED ONE LINE DIAGRAM FOR NEW GENERATOR INSTALLATION IN ACCORDANCE WITH G-MSC LETTER E-20321 DATED 23 APRIL 1992.
Condition: Unknown
Due 8 June 1992
Resolved 8 June 1992
Engineering
Issued 8 June 1992
Resolved
PROVIDE ASME APPROVED RELIEF VALVE FOR NEW AIR RECEIVER TO REPLACE NON APPROVED VALVE.
Condition: Unknown
Due 8 June 1992
Resolved 8 June 1992
Navigation
Issued 8 June 1992
Resolved
REPLACE THE DIRECTION CHART IN THE STEERING GEAR ROOM AND LABEL ALL VALVES.
Condition: Unknown
Due 1 July 1992
Resolved 1 July 1992
Engineering
Issued 9 February 1991
Resolved
PROVE PROPER OPERATION OF THE BOILER AUTOMATION SYSTEM.
Condition: Unknown
Due 9 February 1991
Resolved 9 February 1991
Unknown
Issued 18 December 1990
Resolved
PROVE PROPER OPERATION OF OILY WATER SEPARATOR. RETAIN ALL OILY WATER/BILGEWATER ON BOARD UNTIL COMPLETE
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVE PROPER OPERATION OF EVAPORATOR
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVIDE ON BOARD OIL TRANSFER PROCEDURES
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
REPAIR LEAKING EMERGENCY GENERATOR FUEL PUMP
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVE PROPER OPERATION OF EMERGENCY GENERATOR LOW L. O. PRESSURE ALARM
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
CLEAR ALL REMAINING ITEMS FROM THE ENGINEERING WORKLIST ISSUED 18DEC90
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVE PROPER OPERATION OF BOTH FORWARD FUEL OIL TRANSFER PUMPS & REMOTE SHUTDOWN
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVE PROPER OPERATION OF THE D. C. HEATER RELIEF VALVE
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVIDE ON BOARD THE MARINE SANITATION DEVICE LABEL REQUIRED BY 33CFR159.55
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVE PROPER OPERATION OF THE MARINE SANITATION DEVICE & PROVIDE REQUIRED CHEMICALS
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVE PROPER OPERATION OF CARGO PUMP STEAM TURBINE OVERSPEED TRIPS
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVE PROPER OPERATION OF ALL CARGO PUMP REMOTE SHUTDOWNS
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVIDE [name withheld] WITH A PROPOSAL FOR REPLACEMENT OF IGS SYSTEM EXPANDABLE PLUGS WITH AN ACCEPTABLE MEANS OF ISOLATING TANKS FROM IGS. ABOVE TO BE COMPLETED PRIOR TO LOADING OIL CARGO OR SAILING FOREIGN BUT IN NO CASE LATER THAN 18JAN91
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVIDE ON BOARD APPLICABLE SECTION OF CODE OF FEDERAL REGULATIONS
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVIDE ON BOARD INT'L SHARE CONNECTION
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVIDE PROOF OF SATISFACTORY FOAM ANALYSIS
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVIDE PROOF OF A SATISFACTORY HYDRO-STATIC TEST OF #4 SYSTEM CROSSOVER LINE INTO #6 WING CARGO TANKS
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
CONDUCT A FIRE AND BOAT DRILL
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
RELABEL BREAKERS IN EMERGENCY PANEL L2
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVE PROPER OPERATION OF PORT AND STARBOARD BOILER MAIN STEAM LOW PRESSUREALARMS
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVE PROPER OPERATION OF BUTTERWORTH PUMP
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
RELABEL BREAKES IN WHEELHOUSE EMERGENCY PANEL
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Unknown
Issued 18 December 1990
Resolved
PROVE PROPER OPERATION OF ENGINEER'S CALL
Condition: Unknown
Due 18 December 1990
Resolved 18 December 1990
Fire Fighting
Issued 15 October 1986
Resolved
PROVIDE ONBOARD ONE (1) ADDITIONAL EMERGENCY OUTFIT AS REQUIRED BY 46 CFR 35.30-20.
Condition: Unknown
Due 15 October 1986
Resolved 15 October 1986
Construction/Loadline
Issued 15 October 1986
Resolved
PROVIDE THE RENEWED TAILSHAFT BEARING CLEARANCES TO THE OFFICER IN CHARGE, MARINE INSPECTION, MOBILE, AL.
Condition: Unknown
Due 15 October 1986
Resolved 15 October 1986
Fire Fighting
Issued 15 October 1986
Resolved
CONDUCT A FIRE AND BOAT DRILL IN THE PRESENCE OF A U.S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 15 October 1986
Resolved 15 October 1986
Construction/Loadline
Issued 15 October 1986
Resolved
CONDUCT A SATISFACTORY OPERATIONAL TEST OF THE DC HEATER SAFETY RELIEF VALVE.
Condition: Unknown
Due 15 October 1986
Resolved 15 October 1986
Fire Fighting
Issued 6 August 1985
Resolved
PROPERLY MOUNT APPROVED VESSEL FIRE CONTROL PLAN.
Condition: Unknown
Due 6 August 1985
Resolved 6 August 1985
Lifesaving
Issued 6 August 1985
Resolved
PROVIDE PROPER DUMMY LOAD FOR LIFEBOAT PORTABLE RADIO AND DEMOSTRATE PROPEROPERATION ON 500KC.
Condition: Unknown
Due 6 August 1985
Resolved 6 August 1985
Deck/Cargo
Issued 6 August 1985
Resolved
RESTENCIL MIDSHIP HOUSE AND PUMPROOM CARGO PUMP EMERGENCY SHUTDOWN STATIONS
Condition: Unknown
Due 6 August 1985
Resolved 6 August 1985
Deck/Cargo
Issued 6 August 1985
Resolved
PRIOR TO SCHEDULED SALM DEMO RESET HIGH PRESSURE CARGO PUMP RELEIF VALVES TO 720 PSI AND DEMOSTRATE SATISFACTORY OPERATION OF ALL CARGO PUMP RELIEF VALVES.
Condition: Unknown
Due 6 August 1985
Resolved 6 August 1985
Deck/Cargo
Issued 6 August 1985
Resolved
FOLLOWING SALM DEMO DESIGN AND INSTALL ADEQUATE HYDRAULIC HOSE STORAGE SYESTEMS FOR SALM LAUNCHING SYESTEMS UPPER TRAVELING GRIPPERS.
Condition: Unknown
Due 6 August 1985
Resolved 6 August 1985
Electrical
Issued 6 August 1985
Resolved
PRIOR TO LOADING CARGO REMOVE OR RELOCATE NON-EXPLOSION PROOF ELECTRICAL RECPTICLES IN AFT MAIN DECK AND PORT MIDSHIP DECK STORAGE LOCKERS AND PROPERLY PLUG EXPLOSION PROOF LIGHT FIXTURES.
Condition: Unknown
Due 6 August 1985
Resolved 6 August 1985
Engineering
Issued 6 August 1985
Resolved
RENEW THE FLEXIABLE SPOOL PIECE IN THE MAIN CIRCULATION LINE, IN WAY OF THEMAIN CONDENSOR PRIOR TO THE VESSEL BEING PUT BACK IN SERVICE.
Condition: Unknown
Due 6 August 1985
Resolved 6 August 1985
Engineering
Issued 6 August 1985
Resolved
PROVIDE PORT BOILER SUPERHEATER SAFETY VALVE HAND RELEIVING GEAR WITH GARTER SPRING AND RECONNECT SV DRAIN LINE.
Condition: Unknown
Due 6 August 1985
Resolved 6 August 1985
Navigation
Issued 6 August 1985
Resolved
REPAIR CIRCUIT BREAKER OPEN ALARM ON STEERING GEAR FEEDER PI. REVERIFY ALL MOTOR FAILURE, MOTOR OVERLOAD, CB OPEN AND CONTROL POWER FAILURE ALARMS.
Condition: Unknown
Due 6 August 1985
Resolved 6 August 1985
Engineering
Issued 6 August 1985
Resolved
REINSTALL ALL MOTOR COUPLING GUARDS IN MACHINERY ROOM.
Condition: Unknown
Due 6 August 1985
Resolved 6 August 1985
Electrical
Issued 6 August 1985
Resolved
REPLACE 4 TUBE FLOURCENT LIGHT ON EVAP FLAT WITH ACCEPTABLE MARINE FIXTURE.
Condition: Unknown
Due 6 August 1985
Resolved 6 August 1985
Fire Fighting
Issued 6 August 1985
Resolved
RESTENCIL STEAM SMOTHERING LINE FOR AFTER PAINT LOCKER.
Condition: Unknown
Due 6 August 1985
Resolved 6 August 1985