Records from 2009 to 2025. Most recent: inspection, 15 August 2025.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 15 May 2024
Resolved
Each survival craft must be: stowed so that when the vessel sinks the survival craft floats free and, if inflatable, inflates automatically.
Hydrostatic release units (HRUs) for both 50 person IBAs expired this month. Prior to carrying passengers, replace HRUs and properly install to satisfaction of a Marine Inspector.
46 CFR 180.430(a)(2)
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 May 2024
Resolved 1 June 2024
Resolution: HRUs replaced.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 15 May 2024
Resolved
Each rescue boat and ring life buoy must be marked with Type II retroreflective material approved in accordance with 46 CFR 164.018 or other standard specified by the Commandant. The arrangement of the retroreflective material applied after March 11, 1996, must be as specified by IMO Resolution A.658(16).
Retro reflective material on all 03 ring buoys was not approved for marine use. Replace all retro reflective material to satisfaction of a Marine Inspector.
46 CFR 185.604(i)
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 May 2024
Resolved 1 June 2024
Resolution: Proper retro reflective material installed.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 15 May 2024
Resolved
A vessel must be operated in accordance with applicable laws and regulations and in such a manner as to afford adequate precaution against hazards that might endanger the vessel and the persons being transported.
Emergency escape from the galley to the main deck was frozen in the closed position and could not be opened from the galley. Crew was able to pry open the escape hatch from the main deck. Recommended greasing the knife edge to ease emergency egress from the space. Also recommended monthly maintenance and opening the hatch each trip prior to taking passengers to ensure operability.
46 CFR 185.100
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 15 May 2024
Resolved 15 May 2024
Resolution: Crew was able to operate escape hatch from main deck. Discussed maintenance and testing frequency.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 13 May 2022
Resolved
A vessel must be provided with a satisfactory
arrangement for draining any watertight compartment,
other than small buoyancy compartments, under all
practicable conditions. Vessel was unable to drain water
from port generator, starboard e/r/, and starboard
library using fixed bilge system. Make fixed bilge
system in compliance with regulatory requirement to
satisfaction of attending Marine Inspector.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 27 May 2022
Resolved 19 May 2022
Resolution: Made fixed bilge system in compliance with regulatory requirement to the satisfaction of the attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 5 May 2022
Resolved
Each vessel that relies on electricity to power The
vital systems listed in 46 CFR 182.710, must be arranged
so that the loads can be energized from two sources of
electricity. Vessel's port generator was inoperable due
to a faulty alternator and unable to provide power to
the vessel's fire main. Make vessel's port generator in
compliance with regulatory requirement to satisfaction
of attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 May 2022
Resolution: Replaced alternator, made vessel's port generator in compliance with regulatory requirement to satisfaction of attending Marine Inspector.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 5 May 2022
Resolved
A vessel must be provided with a satisfactory
arrangement for draining any watertight compartment,
other than small buoyancy compartments, under all
practicable conditions. Vessel was unable to drain water
from port generator, starboard e/r/, and starboard
library using fixed bilge system. Make fixed bilge
system in compliance with regulatory requirement to
satisfaction of attending Marine Inspector. To be
cleared prior to credit for next dry-docking.
Action required: 705 - Other - as specified
Resolved 19 May 2022
Resolution: Made fixed bilge system in compliance with regulatory requirement to satisfaction of attending Marine Inspector.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 15 July 2021
Resolved
A pre-engineered fixed gas fire extinguishing system
must automatically shut down all power ventilation
systems and all engines that draw intake air from within
the protected space. Power ventilation did not shut down
when testing pre-engineered fixed gas fire extinguishing
sys in STBD E/R. Ensure satisfactory operation of power
ventilation shut down to attending Marine Inspector.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 July 2021
Resolution: Proved satisfactory operation of power ventilation shut down to attending Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Evaluation, testing and approval
Issued 15 July 2021
Resolved
Each vessel certificated to operate on an oceans route
in cold water must be provided with inflatable buoyant
apparatus (IBA) of an aggregate capacity that will
accommodate at least 100% of the total number of persons
permitted on board. One (50 Person) IBA is not currently
on-board. Vessel COI is temporarily reduced to 108
"Total Persons Allowed" until O/O can provide proof of
satisfactory primary lifesaving, to attending Marine
Inspector, to cover total number of persons allowed onboard
as per vessel's COI.
Action required: 705 - Other - as specified
Resolved 12 August 2021
Resolution: Satisfactory IBA installed on-board.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 15 July 2021
Resolved
Penetrations of required watertight decks and bulkheads
by any rigid plastic pipe are prohibited unless each
penetration is accomplished using an acceptable metallic
through bulkhead fitting that is welded or otherwise
attached to the bulkhead or deck by an accepted method.
Valves in "Library" were found wasted. Repair/replace all wasted fixed bilge system valves to
satisfaction of attending Marine Inspector. Vessel is
only able to continue operation under the conditions
that the vessel stays within 3 NM of the mainland of
their current operating zone as stated on the vessel's
COI, all installed electric bilge pumps are
satisfactorily operating, and rounds are made of the
spaces and logged on an hourly basis of all spaces where
valves are found unsatisfactory.
* NOTE AMENDING AM3 - AM3 Penetrations of required watertight decks and bulkheads by any rigid plastic pipe are prohibited unless each penetration is accomplished using an acceptable metallic through bulkhead fitting that is welded or otherwise attached to the bulkhead or deck by an accepted method. Bilge system valves in "Library" (and throughout vessel) were found wasted. Have comprehensive repair proposal submitted to attending Marine Inspector within 14 days of this amended deficiency for review. This repair proposal shall consist of a drawing of the current vessel bilge system configuration noting/marking valves in need of repair/replacement. All wasted fixed bilge system valves that are accessible without drydocking the vessel shall be repaired/replaced to satisfaction of attending Marine Inspector within 30 days. All other valves determined to need access during drydocking will need to be addressed to the satisfaction of the attending Marine Inspector at the next credit drydocking. Vessel is only able to continue operation under the conditions that the vessel stays within 3 NM of the mainland of their current operating zone as stated on the vessel's COI, all installed electric bilge pumps are satisfactorily operating, and rounds are made of the spaces and logged on an hourly basis of all spaces where valves are found unsatisfactory. AMENDED to an Action 705 (To be cleared during next drydocking).
Action required: 705 - Other - as specified
Due 29 July 2021
Resolved 31 January 2023
Resolution: Vessel replaced all unsat valves and installed capability to close valves from above the bulkhead deck at; STBD stateroom bulkhead, PORT stateroom bulkhead, and Galley bulkhead. Vessel is in compliance with 46 CFR 182.720(d)(ii)(A).
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 15 July 2021
Resolved
At each initial and subsequent inspection for
certification, the owner or managing operator must be
prepared to conduct tests and have the vessel ready for
inspection of its fire protection equipment, including
the inspection of each portable fire extinguisher. 01 2-
A portable fire extinguisher was not serviced as per
NFPA 10. Provide proof of servicing to attending Marine
Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 July 2021
Resolved 16 July 2021
Resolution: Uninspected fire extinguisher removed from vessel. Vessel has more satisfactory fire extinguishers then required by the regulations.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 15 July 2021
Resolved
Each vessel must have adequate emergency lighting fitted
along the line of escape to the main deck from all
passenger and crew accommodation spaces located below
the main deck. Emergency lighting along starboard
berthing area egress route was not operable. Repair/
replace to satisfaction of attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 July 2021
Resolved 16 July 2021
Resolution: Repaired emergency lighting to satisfaction of attending Marine Inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 15 July 2021
Resolved
A vessel must carry either a first-aid kit approved
under approval series 160.041 or a kit with equivalent
contents and instructions. For equivalent kits, the contents must be stowed in a suitable, watertight
container that is marked “First-Aid Kit”. First aid kit
contents expired. Replace required contents of first aid
kit with unexpired items.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 July 2021
Resolved 12 August 2021
Resolution: Replaced required contents of first aid kit with unexpired items.
05 - Radio Communications › N/A - No Subsystem › Main installation
Issued 15 July 2021
Resolved
A vessel must comply with the applicable requirements
for any radio and Electronic Position Indicating
Radiobeacon (EPIRB) installations, including the
requirements for a station license and installation
certificates to be issued by the Federal Communications
Commission, as set forth in 47 CFR part 80. Vessel did
not have Safety Radiotelephony Certificate on-board.
Provide proof of satisfactory Safety Radiotelephony
Certificate to attending Marine Inspector.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 29 July 2021
Resolved 8 September 2021
Resolution: Provided satisfactory Safety Radiotelephony Certificate to attending Marine Inspector.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 15 July 2021
Resolved
At each initial and subsequent inspection for
certification of a vessel, the owner or managing
operator shall be prepared to conduct tests and have the
vessel ready for inspections of the hull structure and
its appurtenances, including inspection of the
condition of the superstructure, masts, and similar
arrangements constructed on the hull, and on a sailing
vessel all spars, standing rigging, running rigging,
blocks, fittings, and sails. Have written preventative
maintenance plan (developed in accordance with NVIC
02-16) developed and presented to attending Marine
Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 August 2021
Resolved 12 August 2021
Resolution: Preventative maintenance plan developed and presented to attending Marine Inspector.
04 - Emergency Systems › N/A - No Subsystem › Muster list
Issued 15 July 2021
Resolved
The master and crew of a vessel will be familiar with the content of and have mounted at the operating
station, emergency instructions containing the actions
to be taken in the event of fire, heavy weather, or man
overboard conditions. Except when in the judgment of the
cognizant OCMI the operation of a vessel does not
present one of the hazards listed, the emergency
instruction placard should contain at least the
applicable portions of the “Emergency Instructions”
listed in §185.512. The emergency instructions must be
designed to address the particular equipment,
arrangement, and operation of each individual vessel.
Vessel must update emergency procedures as addressed
during vessel's annual inspection to address the
particular equipment, arrangement, and operation of the
vessel.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 August 2021
Resolved 12 August 2021
Resolution: Vessel has updated emergency procedures.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 15 July 2021
Resolved
Electrical equipment on a vessel must be installed and maintained to provide services necessary for safety under normal and emergency conditions. Battery (low voltage) sensor for port engine faulty. Have sensor repaired/replaced to satisfaction of attending Marine Inspector by submitting report/short e-mail from technician/repair person explaining cause of issue and how it was repaired.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 July 2021
Resolved 12 August 2021
Resolution: Low voltage sensor has not alerted since inspection and battery is still fully charged. Special note will be placed in vessel profile for attending Marine Inspector during 2022 annual inspection.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 19 June 2020
Resolved
The cognizant OCMI may require that a vessel and its equipment undergo any additional test or inspection deemed reasonable and necessary to determine that the vessel and its equipment are suitable for the service in which they are to be employed.
While in Drydock vessels mast was unstepped for inspection and serviced. Most of vessels sail rigging was also replaced. Due to vessel schedule the attending Marine Inspector was unable to conduct a sea trial under auxilary sail power. Vessel is restricted to MDE operations only, until a satisfactory sea trial is conducted.
Action required: 705 - Other - as specified
Due 19 June 2020
Resolved 2 July 2020
Resolution: MI witnessed satisfactory sea trial under sail power.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 25 July 2019
Resolved
Provide current drug and alcohol program covered crewmemebr list to include mate.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 August 2019
Resolved 26 August 2019
Resolution: Document provided.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 25 July 2019
Resolved
Provide sail rigging inventory and maintenance program IAW NVIC 02-16.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2019
Resolved 26 August 2019
Resolution: Sail rigging plan provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 July 2019
Resolved
Provide correct battery for stbd aft ring lfebuoy waterlight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2019
Resolved 26 August 2019
Resolution: Battery provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 July 2019
Resolved
Provide 3-6 foot lanyard for waterlight on stbd aft ring lifebuoy.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2019
Resolved 26 August 2019
Resolution: Landyard provided.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 July 2019
Resolved
Provide 60 foot throw line for stbd aft ring lifebuoy.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2019
Resolved 26 August 2019
Resolution: Line provided.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 July 2019
Resolved
Demonstrate proper operation of port side fire hose vari-nozzle.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2019
Resolved 26 July 2019
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 25 July 2019
Resolved
Provide current coast pilot, light list, tides and currents.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2019
Resolved 26 August 2019
Resolution: Documents provided.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 25 July 2019
Resolved
Demosntrate proper operation of starboard hull generator room bilge high level alarm light.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2019
Resolved 26 August 2019
Resolution: Light is working.
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 25 July 2019
Resolved
Demonstrate MMSI and GPS input to VHF DSC radio.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2019
Resolved 26 August 2019
Resolution: Demonstration completed.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 25 July 2019
Resolved
Provide lights on PFD's located in pilot house.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2019
Resolved 26 August 2019
Resolution: Lights provided.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 July 2019
Resolved
Provide spanner wrench at each fire station.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 24 August 2019
Resolved 26 August 2019
Resolution: Spanner wrench provided.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 2 August 2018
Resolved
Prove proper operation of the stbd genset prior to carrying passengers.
Action required: 10 - Deficiency Rectified
Due 2 August 2018
Resolved 2 August 2018
Resolution: Genset tested sat.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 2 August 2018
Resolved
Renew EPIRB battery and hydrostatic release prior to operating beyond 3nm from shore.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2018
Resolved 23 August 2018
Resolution: New battery and hydrostatic installed.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 2 August 2018
Resolved
Prove proper operation of emergency lighting in state rooms prior to operating at night/overnight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2018
Resolved 23 August 2018
Resolution: Emergency lighting tested sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 2 August 2018
Resolved
Properly mark port lifering with vessel name.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2018
Resolved 23 August 2018
Resolution: Lifering marked.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 2 August 2018
Resolved
Remove dead end wire in stbd genset space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2018
Resolved 23 August 2018
Resolution: Wire placed in junction box.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 2 August 2018
Resolved
Remove oil soaked rags under port genset.
Action required: 10 - Deficiency Rectified
Due 2 August 2018
Resolved 2 August 2018
Resolution: Rags removed.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 2 August 2018
Resolved
Properly mark port fire hose station.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 September 2018
Resolved 23 August 2018
Resolution: Port fire hose station marked.
Documentation › Safety/Response Plans/Programs › Fire Control Plans
Issued 30 May 2017
Resolved
Submit plan/proposal to restore B-15 fire boundary on inboard bulkhead of galley.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 15 June 2017
Fire Fighting › Structural - B Class Divisions › Main Galleys
Issued 30 May 2017
Resolved
Remove unapproved microwave shelf from inboard bulkhead in galley, and restore B-15 boundary iaw original USCG-approved vessel plans.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 30 July 2017
Resolved 1 August 2017
Resolution: B-15 boundary restored in galley.
Electrical › Electrical Distribution System (service) › Outlet Box
Issued 30 May 2017
Resolved
Remove unapproved electric receptacle installed behind compromised B-15 boundary in galley.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 30 June 2017
Resolved 1 August 2017
Fire Fighting › Remote Fuel Shutoff › General
Issued 19 May 2017
Resolved
Prove proper operation of port MDE remote fuel shutoff valve.
Action required: 701 - Prior to carriage of passengers/cargo
Due 19 May 2017
Resolved 22 May 2017
Fire Fighting › Fixed Gas Fire Extinguishing System › Quantity of Gas
Issued 19 May 2017
Resolved
Re-fill Fireboy bottle for port genset compartment prior to operation of port genset.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 1 August 2017
Resolution: Fireboy serviced/re-filled and emergency shutdown tested sat.
Documentation › Certificates/Documents › FCC SSL
Issued 19 May 2017
Resolved
Renew FCC SSL.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 19 June 2017
Communications › Radio Communications › Radiotelephone Transceiver (2-27.5 MHz)
Issued 19 May 2017
Resolved
Provide user manual for SSB radio.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 19 June 2017
Lifesaving › Hand Flares › Expired
Issued 19 May 2017
Resolved
Renew flares by August 2017.
Action required: 705 - Other - as specified
Due 1 August 2017
Resolved 19 June 2017
Communications › Radio Communications › EPIRB
Issued 19 May 2017
Resolved
Re-register EPIRB with NOAA.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 1 August 2017
Resolution: EPIRB registered with NOAA.
Engineering › Fuel Oil Service System › Suction Strainer
Issued 19 May 2017
Resolved
Clean fuel oil strainers.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 19 June 2017
Fire Fighting › Portable CO2 Fire Extinguisher › Service
Issued 19 May 2017
Resolved
Hydro test CO2 extinguisher on bridge or replace.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 1 August 2017
Resolution: Extinguisher was replaced.
Fire Fighting › Fixed Gas Fire Extinguishing System › Control Valve
Issued 19 May 2017
Resolved
Properly mark manual pull stations for P/S MDE fireboys.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 22 May 2017
Operations/Management › Drug and Alcohol Testing › EAP Display Requirements
Issued 19 May 2017
Resolved
Post EAP hotline #.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 19 June 2017
Operations/Management › Drug and Alcohol Testing › EAP Training Requirements
Issued 19 May 2017
Resolved
Complete 1-hour EAP training.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 19 June 2017
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 19 May 2017
Resolved
Provide copy of MIS Report.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 19 June 2017
Operations/Management › Bilge/Bilge System Management › Control of Excess Water
Issued 19 May 2017
Resolved
Clean bilges in P/S laz and E/R.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 19 June 2017
Engineering › Bilge Water Management System › Pump
Issued 19 May 2017
Resolved
Secure submersible bilge pump in port laz.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 19 June 2017
Documentation › Markings/Placards › Capacity Marking
Issued 19 May 2017
Resolved
Clean P/S genset name plates.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 19 June 2017
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 19 May 2017
Resolved
Establish visual indicator for deck hatch dogs.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 19 June 2017
Sail Rigging › Running Rigging › Blocks
Issued 19 May 2017
Resolved
Repair wasted fastener for double block assembly on main mast boom.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 1 August 2017
Resolution: Fastener renewed on double block assembly.
Electrical › Lighting (service) › Lighting Fixture
Issued 19 May 2017
Resolved
Provide cover for light fixture in stbd E/R.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 19 June 2017
Operations/Management › Vessel Activity › Underway
Issued 19 May 2017
Resolved
Make vessel available for underway operational test of sails/rigging.
Action required: 705 - Other - as specified
Due 19 June 2017
Resolved 1 August 2017
Resolution: Underway operational test of sails and rigging completed sat.
Engineering › Pressure Vessel › Relief Valve
Issued 23 August 2016
Resolved
Install pressure relief valve on P/V that will release at or below 200 psi.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 September 2016
Resolved 15 September 2016
Fire Fighting › Fixed Fire Detection System › Arrangement
Issued 23 August 2016
Resolved
Prove proper operation of fixed smoke detection system.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 23 September 2016
Resolved 2 September 2016
Communications › Radio Communications › EPIRB
Issued 9 August 2016
Resolved
Renew hydrostatic release on EPIRB; vessel may not operate beyone 3NM until corrected.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2016
Resolved 23 August 2016
Navigation › Piloting/Steering › Magnetic Compass
Issued 9 August 2016
Resolved
Prove proper operation of magnetic compass light
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 September 2016
Resolved 23 August 2016
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 9 August 2016
Resolved
Prove proper servicing of fixed firefighting system in galley.
Action required: 705 - Other - as specified
Due 9 September 2016
Resolved 23 August 2016
Navigation › Piloting/Steering › Coast Guard Light List
Issued 9 August 2016
Resolved
Provide current charts and publications.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 September 2016
Resolved 23 August 2016
Personnel › Certificates/Documents/Licenses › License, GMDSS Radio Operator
Issued 9 August 2016
Resolved
Provide valid marine radio operator permit.
Condition: Invalid
Action required: 705 - Other - as specified
Due 9 September 2016
Resolved 23 August 2016
Operations/Management › Pollution › Control of Discharge of Oil
Issued 9 August 2016
Resolved
Clean & remove oily water from stbd E/R and stbd genset compartment.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 9 September 2016
Resolved 23 August 2016
Engineering › Fuel Oil Service System › Valve, Control
Issued 9 August 2016
Resolved
Provide EMERGENCY FUEL SHUT-OFF placard for cabinet door in stbd berthing. Disconnect reach rods and remove main deck stenciling. Label crossover valve as out-of-service.
Condition: Design Flaw
Action required: 705 - Other - as specified
Due 9 September 2016
Resolved 23 August 2016
Engineering › Pressure Vessel › Relief Valve
Issued 9 August 2016
Resolved
Make P/V available for internal inspection.
Action required: 705 - Other - as specified
Due 9 September 2016
Resolved 23 August 2016
Lifesaving › Inflatable Liferafts › Hydrostatic Release Unit
Issued 9 August 2016
Resolved
Painter was made off to HRU incorrectly; corrected on the spot.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 9 August 2016
Resolved 9 August 2016
Construction/Loadline › Hull › Side Shell
Issued 28 June 2016
Resolved
Repair area approximately 4" x 5" starboard side forward of propeller that is missing fiberglass.
Action required: 705 - Other - as specified
Due 29 June 2016
Resolved 29 June 2016
Resolution: Hull repaired by Al Larsons Shipyard