Records from 1985 to 2011. Most recent: inspection, 4 January 2011.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 49
4 January 2011
Uninspected Other · Load Line/Change of Employment
Physical examination · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3919447
22 December 2010
Administrative Inspection
Administrative · Sector San Francisco · USCG Southwest District (CGD-SW) · Activity 3916582
23 February 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1163835
22 February 1994
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 853648
12 November 1993
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 827801
11 February 1992
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 945783
13 November 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 933189
22 October 1991
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 942916
20 September 1991
Deficiency Check
Physical examination · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 942912
11 September 1991
Type not recorded
No type recorded · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 937430
12 August 1991
Deficiency Check
Physical examination · MSO BOSTON · USCG Northeast District (CGD-NE) · Activity 942113
4 July 1991
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 220654
12 June 1991
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 933639
6 May 1991
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 918617
4 March 1991
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1242357
16 January 1991
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1211922
10 January 1991
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 899558
10 January 1991
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 909376
6 January 1991
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 931397
18 December 1990
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1227828
14 December 1990
Hull Examination · Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1298087
3 October 1990
Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1234103
29 August 1990
Re-Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1229991
18 June 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1231682
5 June 1990
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 931747
5 February 1990
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 978868
17 January 1990
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 919522
12 January 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 920417
2 November 1989
Type not recorded
No type recorded · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1308440
27 August 1989
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 896778
22 May 1989
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1338865
30 April 1989
Hull Examination
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1040400
5 December 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1207470
10 November 1988
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 891333
4 May 1988
Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1208855
14 January 1988
Type not recorded
No type recorded · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1012260
17 December 1987
Examination of Repairs · Deficiency Check
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 1323614
18 October 1987
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1019534
16 October 1987
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1020864
11 August 1987
Hull Examination
Physical examination · MSO PORTLAND, OREGON · USCG Northwest District (CGD-NW) · Activity 1007980
11 June 1987
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1340724
24 April 1987
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1007558
22 April 1987
Drydock Extension · Deficiency Check
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1006176
17 April 1987
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1000842
20 March 1987
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1326773
28 March 1986
Re-Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 999951
15 July 1985
Type not recorded
No type recorded · MSO SAN JUAN · USCG Southeast District (CGD-SE) · Activity 1288165
9 April 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 980555
15 February 1985
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1290250
Engineering
Issued 12 August 1991
Resolved
MAKE PERMANENT REPAIRS TO VENT FOR STBD DOUBLE BOTTOM FUEL OIL TANK #4 IN WAY OF BOTTOM OF S.W. BALLAST TANK #4 (FR153). STBD S.W. BALLAST TANK_x001C_ #4 TO BE KEPT SHUT AND DRY UNTIL PERMANT REPAIR EFFECTED.
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Fire Fighting
Issued 12 August 1991
Resolved
RENEW AND DEMONSTRATE PROPER OPERATION OF MANUAL FIRE DAMPER (01-127-0) FORENGINE ROOM SUPPLY VENTILATION.
Condition: Unknown
Due 27 September 1991
Resolved 27 September 1991
Engineering
Issued 12 June 1991
Resolved
REPAIR RELIEF VALVES ON SHIP SERVICE AIR RECEIVER AND AIR 800 KW GEN ROOM W/125# VALVES.
Condition: Unknown
Due 12 June 1991
Resolved 12 June 1991
Fire Fighting
Issued 12 June 1991
Resolved
PROVIDE AND INSTALL REPLACEMENT BANDS AND HORN CLIPS FOR PORTABLE FIRE EXTINGUISHERS.
Condition: Unknown
Due 12 June 1991
Resolved 12 June 1991
Lifesaving
Issued 12 June 1991
Resolved
INSTALL LIFE LINES OF PROPER SIZE ON #2 LIFEBOAT.
Condition: Unknown
Due 12 June 1991
Resolved 12 June 1991
Fire Fighting
Issued 12 June 1991
Resolved
RENEW AND DEMONSTRATE PROPER OPERATION OF MAUAL FIRE DAMPER (01-127-0) FORE/R SUPPLY VENTILATION.
Condition: Unknown
Due 12 June 1991
Resolved 12 June 1991
Engineering
Issued 12 June 1991
Resolved
INSTALL GLASS IN BREAK BOX FOR FORCED DRAFT REMOTE SHEET DOWNS. BLOWER REMOTE SHUTDOWN INOP.
Condition: Unknown
Due 8 August 1991
Resolved 4 September 1991
Lifesaving
Issued 12 June 1991
Resolved
PROVIDE AND INSTALL APPROVED CHAIN SUSPENSION EMBARKATION LADDER FOR #4 L/B.
Condition: Unknown
Due 12 June 1991
Resolved 12 June 1991
Engineering
Issued 12 June 1991
Resolved
PROVIDE CG APPROVED TEST PROCEDURES FOR BOILER BURNER MANAGEMENT AND PROVE PROPER OPERATION.
Condition: Unknown
Due 12 June 1991
Resolved 12 June 1991
Electrical
Issued 12 June 1991
Resolved
REPAIR #1 SSTG AND TEST TO SATISFACTION OF C/E PRIOR TO DEPARTING FAIRLIE SCOTLAND.
Condition: Unknown
Due 23 August 1991
Resolved 23 August 1991
Electrical
Issued 16 January 1991
Resolved
REPAIR 24 VOLT SYSTEM THAT CONTROLS GOVERNOR TO THE #1 SHIP SERVICE STEAM _x001C_TURBINE GENERATOR. _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 16 January 1991
Resolved 16 January 1991
Engineering
Issued 10 January 1991
Resolved
REPAIR OR REPLACE BLOWDOWN ADJUSTING SCREW FOR THE SUPERHEATER VALVES FOR _x001C_THE PORT & STARBOARD MAIN PROPULSION BOILERS._x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 January 1991
Resolved 10 January 1991
Engineering
Issued 10 January 1991
Resolved
REPAIR LEAKS ON THE PORT MAIN PROPULSION BOILER STEAM STOP VALVE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 10 January 1991
Resolved 10 January 1991
Electrical
Issued 29 August 1990
Resolved
REPAIR INOPERABLE EMBARKATION LIGHTS FOR THE LIFEBOAT #4. PROVE POWER FOR THE EMBARKATION LIGHTS SUPPLIED BY THE EMERGENCY DIESEL GENERATOR.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Navigation
Issued 29 August 1990
Resolved
CONDUCT SATISFACTORY OVERLOAD STEERING FAILURE ALARM TEST.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Electrical
Issued 29 August 1990
Resolved
REPAIR INOPERABLE OVERHEAD LIGHTS IN THE AFTER STEERING GEAR ROOM.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Navigation
Issued 29 August 1990
Resolved
CLEAN AFTER STEERING GEAR AREA FREE OF HYDRAULIC OIL AND OILY RAGS.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Navigation
Issued 29 August 1990
Resolved
REPAIR #2 STEERING GEAR PUMP MOTOR GROUND FAULT INDICATOR.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Fire Fighting
Issued 29 August 1990
Resolved
SERVICE 2 B-II CO2 PORTABLE FIRE EXTINGUISHERS LOCATED IN THE COMPARTMENT NEXT TO THE AFTER STEERING GEAR ROOM & FS 2-211-0.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Fire Fighting
Issued 29 August 1990
Resolved
SERVICE FIXED CO2 FIRE EXTINGUISHING SYSTEM IN AFTER PAINT LOCKER.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Fire Fighting
Issued 29 August 1990
Resolved
SERVICE 1 B-II CO2 PORTABLE FIRE EXTINGUISHER FE-3-205-0.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Unknown
Issued 29 August 1990
Resolved
SECURE METAL SPOOL AND FUEL OIL HOSE AT THE STARBOARD FUEL OIL STATION TO THE STORAGE COMPARTMENT.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Electrical
Issued 29 August 1990
Resolved
TEST OVERSPEED TRIP DEVICE FOR THE #1 & #2 SHIPS SERVICE TURBINE GENERATORSIN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Unknown
Issued 29 August 1990
Resolved
REPAIR OILY WATER SEPARATOR & MONITOR AND PROVE PROPER OPERATION OF THE SYSTEM IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Unknown
Issued 29 August 1990
Resolved
CLEAN ENGINEROOM BILGES FREE OF OILY-WATER MIXTURES.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Fire Fighting
Issued 29 August 1990
Resolved
REPAIR INOPERABLE REMOTE REACH ROD CONTROL FOR THE FIRE AND TANK CLEANING PUMP DISCHARGE VALVE.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Unknown
Issued 29 August 1990
Resolved
MAKE PERMANENT REPAIRS TO HOLE IN WAY OF THE TANK TOP OF THE PORT DOUBLE BOTTOM FUEL OIL TANK AMIDSHIP PORTSIDE AT FRAME 125 IN THE ENGINEROOM.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Unknown
Issued 29 August 1990
Resolved
MAKE PERMANENT REPAIRS TO HOLES IN WAY OF THE TANK TOP OF THE STARBOARD DOUBLE BOTTOM FUEL OIL TANK AT FRAME 126, JUST FORWARD OF THE BULKHEAD FROM THE SHAFT ALLEY AND AT FRAME 116 APPROXIMATELY 12 INCHES FROM THE STARBOARD SIDE SHELL IN THE ENGINEROOM.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Construction/Loadline
Issued 29 August 1990
Resolved
REPAIR INOPERABLE ALARMS FOR THE WATERTIGHT DOORS 2-103-1 AND 2-76-1.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Electrical
Issued 29 August 1990
Resolved
REPAIR INOPERABLE EMBARKATION LIGHTS FOR THE LIFEBOAT #2. PROVE POWER FOR THE EMBARKATION LIGHTS SUPPLIED BY THE EMERGENCY DIESEL GENERATOR.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Electrical
Issued 29 August 1990
Resolved
IDENTIFY AND LABEL EMERGENCY LIGHTS IN THE AFTER STEERING GEAR ROOM.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Unknown
Issued 29 August 1990
Resolved
REPAIR/REPLACE INOPERABLE SHIPS SERVICE AIR COMPRESSOR.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Unknown
Issued 29 August 1990
Resolved
REMOVE BARRELS AND METAL BOXES BLOCKING EMERGENCY ESCAPE LADDER NEXT TO THEBOS'N LOCKER.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Unknown
Issued 29 August 1990
Resolved
REPLACE CLOGGED AND LOOSE FLAME SCREEN FOR THE FUEL OIL VENT OF THE STAR- BOARD #4 DOUBLE BOTTOM TANK FUEL OIL TANK.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Electrical
Issued 29 August 1990
Resolved
REPAIR/REPLACE 800 KW STANDBY DIESEL GENERATOR.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Lifesaving
Issued 29 August 1990
Resolved
PROVIDE 3 ADDITIONAL EXPOSURE SUITS TO HAVE A TOTAL OF 117. UNTIL CORRECT-ED, THE VESSEL IS LIMITED TO 104 MAX.PERSONS ALLOWED ON BOARD WHEN THE VESSEL IS OPERATING ON ROUTES BEYOND 32 DEG. NORTH & SOUTH LATTITUDES IN THE ATLANTIC OCEAN & 35 DEG. NORTH & SOUTH LATITUDES IN ALL OTHER WATERS.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Lifesaving
Issued 29 August 1990
Resolved
REPAIR THE DISENGAGING GEAR PIPE LINKAGE ON NO. 2 LIFE BOAT AND PROVE THE PROPER OPERATION OF THE SAME AFTER REPAIR.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Lifesaving
Issued 29 August 1990
Resolved
PROVE THE PROPER OPERATION OF THE LIMIT SWITCH ON NO. 2 LIFE BOAT DAVIT.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Lifesaving
Issued 29 August 1990
Resolved
PROPERLY REPAIR THE HAND TILLER FOR THE RUDDER ON NO.2 LIFE BOAT.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Documentation
Issued 29 August 1990
Resolved
PROVIDE THE LOADLINE CERTIFICATE AND SAFETY CONSTRUCTION CERTIFICATE WITH THE ANNUAL SURVEY ENDORSEMENT CONDUCTED BY THE AMERICAN BUREAU OF SHIPPING (ABS).
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Fire Fighting
Issued 29 August 1990
Resolved
PROVIDE MSO SAN DIEGO THE COPY OF THE SERVICE REPORT OF FIXED CO2 SYS., SEMI-PORTABLE AND PORTABLE FIRE EXTINGUISHERS CONDUCTED BY THE SERVICING COMPANY.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Construction/Loadline
Issued 29 August 1990
Resolved
REPAIR THE PLATFORM STAND FOR THE SIGNAL LIGHT ON THE FLY BRIDGE.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Electrical
Issued 29 August 1990
Resolved
REPAIR INOPERABLE EMBARKATION LIGHTS FOR THE LIFEBOATS #1. PROVE POWER FOR THE EMBARKATION LIGHTS SUPPLIED BY THE EMERGENCY DIESEL GENERATOR.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Electrical
Issued 29 August 1990
Resolved
REPAIR INOPERABLE OVERSPEED TRIP DEVICE FOR THE EMERGENCY DIESEL GENERATOR AND PROVE PROPER OPERATION IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Unknown
Issued 29 August 1990
Resolved
REPAIR MALFUNCTIONING VENT LOUVER CONTROL FOR THE EMERGENCY DIESEL GENERATOR.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Electrical
Issued 29 August 1990
Resolved
REPAIR INOPERABLE EMERGENCY LIGHTS TO PORT & STARBOARD MAIN DECK.
Condition: Unknown
Due 29 August 1990
Resolved 29 August 1990
Engineering
Issued 5 February 1990
Resolved
SET AND SEAL PORT BOILER SUPERHEATER AND SUPERHEATER PILOT SAFETY VALVES WHICH SEALS WERE BROKEN ON 23 NOV 1989
Condition: Unknown
Due 5 February 1990
Resolved 5 February 1990
Construction/Loadline
Issued 22 May 1989
Resolved
INSTALL AND LABEL VENT DUCT CLOSURES (2) OUTSIDE PAINT LOCKER, SHAFT ALLEY STBD SIDE
Condition: Unknown
Due 22 May 1989
Resolved 22 May 1989
Construction/Loadline
Issued 22 May 1989
Resolved
MODIFY SHIP'S BILGE SUCTION SYSTEM SO THAT SUCTION CAN BE TAKEN FROM #1 HOLD
Condition: Unknown
Due 22 May 1989
Resolved 22 May 1989
Navigation
Issued 22 May 1989
Resolved
INSTALL VISUAL AND AUDIBLE ALARM ON THE BRIDGE FOR POWER FAILURE OF STEERING PUMPS
Condition: Unknown
Due 22 May 1989
Resolved 22 May 1989
Construction/Loadline
Issued 10 November 1988
Resolved
MAKE PERMANENT REPAIRS TO THE FIFTEEN INCH CRACK IN THE BOTTOM SHELL PLATE,STBD SIDE,NEAR THE CENTERLINE
Condition: Unknown
Due 10 November 1988
Resolved 10 November 1988
Engineering
Issued 4 May 1988
Resolved
DEMONSTRATE PROPER OPERATION OF PORT AND STBD BOILER LOW WATER TRIPS. THE [name withheld] THESE TESTS AND LOG THEM IN THE OFFICIAL LOG. A COPY OF THE LOG TO BE FORWARDED TO MSO HONOLULU.
Condition: Unknown
Due 4 May 1988
Resolved 4 May 1988
Engineering
Issued 4 May 1988
Resolved
OBTAIN SAFETY VALVE GAGS AND CARRY THEM ONBOARD AT ALL TIMES.
Condition: Unknown
Due 4 May 1988
Resolved 4 May 1988
Engineering
Issued 16 October 1987
Resolved
AT THE NEXT SCHEDULED DRY DOCK MAKE PERMANENT REPAIRS TO THE SEA WATER COOLING PIPELINE, LOWER LEVEL PORTSIDE ENGINEROOM, IN WAY OF THE TEMPORARY CONCRETE PATCH.
Condition: Unknown
Due 16 October 1987
Resolved 16 October 1987
Construction/Loadline
Issued 16 October 1987
Resolved
MAKE PERMANENT REPAIRS TO STARBOARD BULWARK STIFFENERS AT FRAMES 1 THRU 5 AT NEXT SCHEDULED DRYDOCK.
Condition: Unknown
Due 16 October 1987
Resolved 16 October 1987
Lifesaving
Issued 22 April 1987
Resolved
REPAIR/REPLACE PROTECTIVE COVERS TO ALL LIFEBOATS AS NECESSARY.
Condition: Unknown
Due 22 April 1987
Resolved 22 April 1987
Construction/Loadline
Issued 22 April 1987
Resolved
REMOVE OIL FROM #5 STBD ROSEBOX.
Condition: Unknown
Due 22 April 1987
Resolved 22 April 1987
Engineering
Issued 22 April 1987
Resolved
MAKE PERMANENT REPAIRS TO STBD BOILER ECONOMISER.
Condition: Unknown
Due 22 April 1987
Resolved 22 April 1987
Unknown
Issued 20 March 1987
Resolved
CONDUCT HYDROSTATIC TEST OF THE TWO AIR RECEIVERS LOCATED IN THE ENGINE ROOM.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
CONDUCT HYDROSTATIC TEST OR INTERNAL EXAMINATION OF THE DC HEATER.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
CONDUCT HYDROSTATIC TEST OR INTERNAL EXAMINATION OF THE EVAPORATORS.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
SERVICE THE TWO VIKING LIFERAFTS AT AN APPROVED SERVICING FACILITY.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
OVERHAUL ALL DAVITS, DAVIT WINCHES AND ASSOCIATED HARDWARE.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
STRIP AND CLEAN LIFEBOATS 1, 2, 3, AND 4.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
CLEAN/DERUST THE ROTTEMER RELEASING GEAR IN BOATS 1, 2, 3, AND 4. REPAIR AS NECESSARY AND PROVE OPERATION.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
FREE UP FLEMMING GEAR IN LIFEBOAT #2 AND PROVE OPERATION.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
PROCURE AND REPLACE 28 PARACHUTE FLARES, 7 EACH FOR LIFEBOATS 1, 2, 3, AND 4.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
PROVIDE 2 EACH SMOKE SIGNALS FOR LIFEBOATS NUMBER 1, 2, 3 AND 4.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
SET AND SEAL THE SAFETY VALVES ON THE STARBOARD BOILER.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
COMPLETE REPAIRS ON THE EMERGENCY GENERATOR (DIESEL) AND DEMONSTRATE UNDER OPERATING CONDITIONS.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
CONDUCT HYDROSTATIC TEST OF THE AIR RECEIVER LOCATED IN THE EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
DEMONSTRATE THE OVERSPEED LIMITING DEVICE ON #1 GENERATOR.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Unknown
Issued 20 March 1987
Resolved
SET AND SEAL THE SAFETY VALVES ON THE PORT BOILER.
Condition: Unknown
Due 20 March 1987
Resolved 20 March 1987
Lifesaving
Issued 15 February 1985
Resolved
PROVIDE ONE ROWING OAR AND ONE CG APPROVED FISHING KIT IN LIFEBOAT NR 2.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Lifesaving
Issued 15 February 1985
Resolved
PROVIDE CG APPROVED FISHING KIT FOR LIFEBOAT NR4.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Electrical
Issued 15 February 1985
Resolved
PROVE PROPER OPERATION OF AUX DIESEL GENERATOR REVERSE POWER RELAY.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Electrical
Issued 15 February 1985
Resolved
PROVE PROPER OPERATION OF AUX DIESEL GENERATOR WITH STEAM TURBO GENERATORS.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Construction/Loadline
Issued 15 February 1985
Resolved
SUBMIT PLANS FOR CG APPROVAL ON COMPLETED ALTERATIONS/REPAIRS IN NR1 CARGO HOLD BALLAST AND FUEL OIL TANK AND NR6 CARGO HOLD BALLAST AND FUEL OIL TANK.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Lifesaving
Issued 15 February 1985
Resolved
PROVIDE 7 ADDITIONAL CG APPROVED SURVIVAL SUITS.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Lifesaving
Issued 15 February 1985
Resolved
PROVIDE 2 CG APPROVED ROCKETS OF NON-BUOYANT TYPE FOR LINE THROWING APPARATUS.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Electrical
Issued 15 February 1985
Resolved
PROVIDE MANUAL MEANS OF TRAINING FLOODLIGHTS IN WAY OF LIFERAFTS NR1 & NR2,ON STBD BRIDGE WING, AND IN WAY OF LIFEBAOT NR3.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Electrical
Issued 15 February 1985
Resolved
PROVE PROPER OPERATION OF AUX DIESEL GENERATOR LOW LUBE OIL TRIP.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Accommodation/Occupational Safety
Issued 15 February 1985
Resolved
PROVIDE NON-PERMANENT CONNECTION FOR VESSEL'S SANITARY TANK AIR CUSHION SUPPLY LINE WHERE "QUICK-CONNECT" AIR HOSE FITTING EXISTS.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Accommodation/Occupational Safety
Issued 15 February 1985
Resolved
MAKE NON-PERMANENT CONNECTION FOR VESSEL'S POTABLE WATER TANK AIR CUSHION SUPPLY LINE WHERE PRESENTLY HARD PIPED.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Electrical
Issued 15 February 1985
Resolved
REPLACE BREAKER ON MAIN SWITCHBOARD ASSOCIATED WITH ENGINE ROOM VENTIL- ATION SHUTDOWN AS PER ORIGINAL INSTALLATION AND PROVE OPERATION OF ENGINE ROOM REMOTE VENTILATION SHUTDOWN FROM BUTTON @ 2-119-1 IN PASSAGEWAY AND VIA CO2 PRESSURE OPERATED SWITCH LOCATED IN CO2 ROOM.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Lifesaving
Issued 15 February 1985
Resolved
PROVIDE CG APPROVED DRINKING WATER FOR 12 PERSONS IN LIFERAFT NR2 AND FOR 11 PERSONS IN LIFERAFT NR1. THIS IS TO REPLACE SOLAS WATER CURRENTLY PROVIDED. A DESALTING KIT MAY BE SUBSTITUTED FOR UP TO 1/3 OF NECESSARY DRINKING WATER.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Lifesaving
Issued 15 February 1985
Resolved
PROVIDE ONE ROWING OAR AND MAKE PERMANENT REPAIRS TO BILGE PUMP HANDLE (OR REPLACE BILGE PUMP) IN LIFEBOAT NR1.
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985
Electrical
Issued 15 February 1985
Resolved
MAKE PERMANENT REPAIRS TO EMERGENCY DIESEL GENERATOR RADIATOR PRESENTLY FILLED WITH "STOP-LEAK".
Condition: Unknown
Due 15 February 1985
Resolved 15 February 1985