Records from 2016 to 2026. Most recent: inspection, 19 March 2026.
Everything above is free. The detail below — the inspection history, the deficiency record, the operational controls, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Documentation record
Registered dimensions (L × B × D)60.7 ft × 16.2 ft × 8.2 ft
Registered tonnagegross 58 / net 39
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderBREAUX'S BAY CRAFT INC · LOREAUVILLE, LA, UNITED STATES · built 1966
Hull materialAluminum
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portLONG BEACH, CA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 18 April 2026 · expires 30 April 2027
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it58 - Regulatory (Subpart C or D), Gross Ton
39 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 19
19 March 2026
Vessel Attendance · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8294950
27 August 2025
Vessel Attendance · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8202367
11 March 2025
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8063102
10 June 2024
Annual Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7856050
23 August 2023
Hull Examination · Administrative Inspection · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7666084
5 June 2023
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7643963
29 December 2022
Plan Review "T" Boat
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7622054
24 March 2022
COI Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7405232
25 August 2021
Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 7292508
1 June 2021
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7212557
31 August 2020
Deficiency Check · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7047041
31 August 2020
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7118250
11 June 2020
Annual Inspection · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6973499
19 August 2019
Hull Examination · Deficiency Check
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6783588
28 May 2019
Annual Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6638102
30 April 2018
Internal Structural Exam · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6385188
27 July 2017
Hull Examination
Physical examination · Marine Safety Detachment Santa Barbara · USCG Southwest District (CGD-SW) · Activity 6230143
13 March 2017
COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6065391
2 March 2016
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5809781
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 March 2026
Resolved
MI discovered a raw water pipe leak on the port side main engine near the alternator. O/O is to submit a repair plan and verfiy satisfactory repairs to the attending MI prior to continued operations.
Condition: Damaged By Earlier Event
Action required: 60 - Rectify deficiencies prior to movement
Resolved 24 March 2026
Resolution: MI observed temp repair for port side engine raw water leak.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 19 March 2026
No resolution recorded
Vessel has temporary repair on port MDE raw water cooling piping that needs to be permanently repaired.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 23 May 2026 — due date passed with no resolution recorded
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 27 August 2025
No resolution recorded
Each vessel certificated to operation on an oceans route in cold water must...be provided with life floats of an aggregate capacity that will accommodate at least 100% of the total persons permitted onboard. Vessel had 02, 12 person life floats that were not in serviceable condition. Vessel currently has 01, 15 person life float that is operational. Vessel is restricted to carrying a maximum of 15 total persons on board until 02 life floats are replaced with approved, operational life floats adequate for total number of persons allowed onboard.
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 June 2024
Resolved
Exhaust gas must not leak from the piping or any connections. Exhaust leak found between turbocharger and exhaust piping coming from port engine. Vessel is restricted from conducting operations until rectified.
46 CFR 182.430(b)
Condition: Invalid
Action required: 17 - Rectify deficiencies prior to departure
Resolved 10 June 2024
Resolution: Corrected to the satisfaction of the attending MI.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 10 June 2024
Resolved
A hatch exposed to the weather must be watertight, except that the following hatches may be weathertight: (1) A hatch on a watertight trunk that extends at least 305 millimeters (12 inches) above the weather deck; A hatch in a cabin top; and A hatch on a vessel that operates only on protected waters. Lazarette and engine room hatches found to not be watertight. Vessel is restricted to lakes, bays, and sounds route until rectified.
46 CFR 179.360(a)
Old S 46 CFR 171.124(a)
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 12 June 2024
Resolution: Attended vessel for DFU. See narrative for details.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 10 June 2024
Resolved
Piping, including valves, pipe fittings and flanges, conveying vapor, gas, or liquid, the temperature of which exceeds 65.5 °C (150 °F), must be suitably insulated where necessary to prevent injuries. Insulation around port engine turbocharger missing.
46 CFR 177.970
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2024
Resolved 12 June 2024
Resolution: Attended vessel for DFU. See narrative for details.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 10 June 2024
Resolved
A visual indicator must be provided at the operating station to indicate when any automatic bilge pump is operating. Electric bilge pumps in engine room and lazarette does not have a visual indicator at operating station.
46 CFR 182.530(c)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2024
Resolved 12 June 2024
Resolution: Attended vessel for DFU. See narrative for details.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 10 June 2024
Resolved
Overcurrent protection must be provided for each ungrounded conductor for the purpose of opening the
electric circuit if the current reaches a value that causes an excessive or dangerous temperature in the
conductor or conductor insulation. Bilge pump in lazarette found direct wired to battery without overcurrent protection.
46 CFR 183.380(a)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 24 June 2024
Resolved 12 June 2024
Resolution: Attended vessel for DFU. See narrative for details.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 24 March 2022
Resolved
Each ring life buoy on a vessel must be approved in accordance with 160.050 in subchapter Q of this chapter and one floating waterlight, with a lanyard of 3' but not more than 6', securing the waterlight around the body of the ring life buoy. Deteriorated grab line broke, and 60' rope and floating light were tied around the grab line.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 25 March 2022
Resolved 25 March 2022
Resolution: Operator replaced buoy on the spot and corrected rigging.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 24 March 2022
Resolved
A vessel of at least 26' in length must be provided with individual bilge lines and bilge suctions for each watertight compartment. Lounge bilge suction unable to empty test water.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 25 March 2022
Resolved 25 March 2022
Resolution: Operator provided video of lounge bilge suction; one way check valve was stuck closed (operator replaced).
01 - Certificates & Documentation › 011 - Ships Certificates › USCG Certificate of Documentation (COD)
Issued 24 March 2022
Resolved
A vessel may not be employed in any trade other than a trade endorsed upon the Certificate of Documentation (COD) issued for that vessel. During COI inspection, vessel COD noted to be "Coastwise endorsement valid solely for the purposes of Section 4205 of the Oil Pollution Act of 1990" but operator specifies vessel typically engages in crew boat work such as anchorage water taxi.
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 April 2022
Resolved 10 May 2022
Resolution: Operator provided updated COD via email.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 11 June 2020
Resolved
Shutoff valve at the tank must be manually operable from outside the compartment. Shutoff fuel valve found seized and inoperable. Make repairs to the satisfaction of the marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 11 June 2020
Resolved 11 June 2020
Resolution: Made repairs to the satisfaction of the marine inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 28 May 2019
Resolved
Vessels in ocean service shall carry sufficient life floats for all persons onboard.
Provide one 12 person lifloat, IBA or liferaft.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2019
Resolved 17 June 2019
Resolution: Provided new life float with proper marking and equipment.
09 - Working and Living Conditions › 092 - Working Conditions › Protection machines/parts
Issued 28 May 2019
Resolved
Repair worn exhaust lagging along both MDEs.
Condition: Damaged By Earlier Event
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2019
Resolved 17 June 2019
Resolution: replaced old insulation with new. Provides proper heat protection.
09 - Working and Living Conditions › 092 - Working Conditions › Structural features (ship)
Issued 28 May 2019
Resolved
Steering piping running through fwd bulkhead has gaps around it allowing vapors and water to progress into the adjacent space. Provide a water and vapor tight penetration.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2019
Resolved 17 June 2019
Resolution: Provided proper sealing around piping
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 28 May 2019
Resolved
Port MDE has a worn love joy coupling connecting the steering pump to the engine. Repair coupling.
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2019
Resolved 17 June 2019
Resolution: Replaced coupling with correct one. Proved proper operation.
09 - Working and Living Conditions › 092 - Working Conditions › Pipes, wires (insulation)
Issued 28 May 2019
Resolved
Repai exposed wires entering into lighting fixture on bridge.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 11 June 2019
Resolved 17 June 2019
Resolution: Removed exposed wires.
Lifesaving › Lifefloat › Paddle
Issued 13 March 2017
Resolved
Label all paddles for lifefloats with vessel name.
Due 27 March 2017
Resolved 13 March 2017
Resolution: Corrected during inspection.