Records from 2006 to 2025. Most recent: inspection, 13 November 2025.
Everything above is free. The detail below — the inspection history, the deficiency record, the casualty record and the documentation record — is Professional, $39 a month. Sign in.
Inspection history · 18
13 November 2025
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8037509
17 December 2024
Annual Inspection · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7734011
17 January 2024
Hull Examination · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7734024
11 December 2023
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7607020
7 November 2022
Plan Review "T" Boat · Examination of Repairs · COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7591073
2 May 2022
Examination of Repairs
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7442258
31 January 2022
Hull Examination · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7388185
6 December 2021
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7363185
22 September 2021
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7318531
1 June 2021
Administrative Inspection · In-Service Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7212438
28 October 2020
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7085793
5 September 2019
Annual Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6751042
21 January 2019
Deficiency Check · Hull Examination · Internal Structural Exam
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6879207
9 August 2018
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6505667
8 January 2018
Hull Examination · Examination of Repairs
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6338834
16 August 2017
Deficiency Check · COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6230591
11 August 2016
Annual Inspection · DAPI Audit
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5947207
27 January 2016
Internal Structural Exam · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5789077
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 13 November 2025
Resolved
All cable and wire must be installed with metal supports spaced not more than 610 milimeters (24 inches) apart, and in such a manner as to avoid chafing and other damage. The use of plastic tie wraps must be limited to building or retention of multiple cable installations, and not used as a means of support. MI observed metal supports were spaced more than 24 inches apart in the forward compartment. Install adequate amount of supports.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 November 2025
Resolved 21 November 2025
Resolution: Metal wire supports were installed 24 inches apart in the forward compartment.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 17 December 2024
Resolved
A flexible tube or hose may be used instead of fixed pipe for the discharge line of a submersible electric bilge pump. The discharge line of the submersible electric bilge pump in the forward bilge compartment, engine room, and lazarette was composed of plastic.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 December 2024
Resolved 31 December 2024
Resolution: Vessel representative submitted photos to the satisfaction of the MI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 December 2024
Resolved
All cables and wires must be installed with metal supports spaced not more than 24 inches apart, and in such a manner as to avoid chafing and other damage. The use of plastic tie wraps must be limited to bundling or retention of multiple cable installations, and not used as a means of support. In the forward bilge compartment, plastic tie wraps were used to support overhead cables.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 31 December 2024
Resolved 31 December 2024
Resolution: Vessel representative submitted photos to the satisfaction of the MI.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 11 December 2023
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock;MI identified dead end wires in aft engine room bulkhead.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 December 2023
Resolved 13 December 2023
Resolution: Dead end wires removed. All Sat.
09 - Working and Living Conditions › 092 - Working Conditions › Cleanliness of engine room
Issued 11 December 2023
Resolved
A vessel is inspected for compliance with the standards required by this subchapter. Machinery, equipment, materials, and arrangements not covered by standards in this subchapter may be inspected in accordance with standards acceptable to the cognizant OCMI as good marine practice. MI identified hydraulic fluid in fwd bilge compartment.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 25 December 2023
Resolved 13 December 2023
Resolution: Hydraulic fluid in bilge compartment removed. All Sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 17 November 2022
Resolved
Bilge system. Bilge in Laz, mid-cabin and fwd cabin inneffective and unable to pump.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Resolved 17 November 2022
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 17 November 2022
Resolved
Required design verification testing on SPVs. Vessel has not provided QFA/DVTP for newly installed throttles. CVC policy letter 17-07 (184.620.c.)
Condition: Improper Installation
Action required: 16 - Rectify deficiencies w/in 14 days
Due 21 November 2022
Resolved 13 December 2023
Resolution: Vessel provided QFA/DVPT. Attached in documents; All Sat.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 17 November 2022
Resolved
Ring life buoy light, while functional, has battery expired in 2019.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 17 November 2022
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 22 September 2021
Resolved
"Each ring life buoy on a vessel must be approved in accordance with § 160.050 in subchapter Q of this chapter." Ring life buoy found deteriorated past serviceable condition.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 22 October 2021
Resolved 28 September 2021
Resolution: Verified replacement of old ring life buoy.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 28 October 2020
Resolved
Receptacle outlets and attachment plugs for portable lamps, tools, and similar apparatus operating at 100 volts or more, must have a grounding pole and a grounding conductor in the portable cord. An outlet in the lower forward compartment near the collision bulkhead was found to have an open ground and an outlet at the steering console was found to have an open ground.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 November 2020
Resolved 29 October 2020
Resolution: Receptacles grounded by certified electrician.
02 - Structural Conditions › N/A - No Subsystem › Hull - corrosion
Issued 5 September 2019
Resolved
Construction must allow safe operation of the vessel giving consideration for a seaworthy hull. found hull wastage of 40% in the lazzeret. Provide a repair proposal.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 4 October 2019
Resolved 6 September 2019
Resolution: received an expectable repair proposal.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 9 August 2018
Resolved
During the inspection it was discovered that the vessel's emergency lighting was not operation when primary power was secured. This discrepancy was corrected, to the satisfaction of the attending Marine Inspector prior to departing the vessel.
Condition: Improper Installation
Action required: 10 - Deficiency Rectified
Due 9 August 2018
Resolved 9 August 2018
Resolution: An evaluation of the lighting system, by company maintenance staff, found a loose light bulb that when tightened allowed the entire system to energize.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 9 August 2018
Resolved
During the inspection it was discovered that 10 adult type 1 lifejackets (kapok) had exceeded there service life. This discrepancy was corrected, to the satisfaction of the attending Marine Inspector prior to departing the vessel.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Due 9 August 2018
Resolved 9 August 2018
Resolution: 10 new type 1 life jackets were placed in service with proper labeling.
Construction/Loadline › Hull › Hull Plating
Issued 17 January 2018
Resolved
Provide gauging report for lazarrette bilge as discussed, three belts athwartship.(12-16 shots)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 18 January 2018
Engineering › Fuel Oil Service System › Tank
Issued 17 January 2018
Resolved
Conduct hydrostatic testing on aft fuel tank.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 5 February 2018
Construction/Loadline › Structures › Transverse Bulkhead
Issued 17 January 2018
Resolved
Crop and renew STBD aft watertight bulkhead to good aluminum as discussed.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 25 January 2018
Construction/Loadline › Hull › Stiffener
Issued 8 January 2018
Resolved
Repair fractured starboard rudder frame.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 31 January 2018
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 8 January 2018
Resolved
Crop and renew clad welded section of forwarded fuel tank.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 31 January 2018
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 16 August 2017
Resolved
Replace retroreflective tape on 7 lifejackets as ID'd.
Action required: 705 - Other - as specified
Due 30 August 2017
Resolved 6 September 2017
Resolution: Lifejackets had retro renewed as directed.
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 16 August 2017
Resolved
Provide (10) additional lifejackets; pax count reduced to 56.
Action required: 705 - Other - as specified
Due 30 August 2017
Resolved 16 August 2017
Resolution: Vessel rep brought down additional lifejackets prior to departure.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 16 August 2017
Resolved
Replace first aid kit.
Action required: 705 - Other - as specified
Due 30 August 2017
Resolved 16 August 2017
Resolution: Vessel rep bought and brought new kit to boat prior to departure.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 16 August 2017
Resolved
Update Coast Pilot & Lightlist.
Action required: 705 - Other - as specified
Due 30 August 2017
Resolved 6 September 2017
Resolution: Updated 2017 Coast Pilot & Lightlist provided upon follow-up.
Engineering › Fuel Oil Storage/Transfer System › Tank
Issued 16 August 2017
Resolved
Make permanent repairs to forward fuel tank to satisfaction of attending Marine Inspector.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 5 February 2018
Resolution: Hydro tested fuel tank
Construction/Loadline › Hull › Bracket
Issued 16 August 2017
Resolved
Make permanent repairs to rudder support gusset to satisfaction of attending Marine Inspector.
Action required: 705 - Other - as specified
Due 31 January 2018
Resolved 5 February 2018
Resolution: Replaced both port and starboard rudder tubes and supports
Construction/Loadline › Hull › Weld
Issued 27 January 2016
Resolved
The port/starboard propeller shaft skegs were found cracked approximately 8-12" along the weld. Required backgouge/reweld.
Action required: 705 - Other - as specified
Resolved 27 January 2016
Resolution: Made welds as required.