RCM 245

RCM 245 is a 1997 tank barge. The Coast Guard has recorded 87 inspections since 1997, most recently in January 2025, along with 133 deficiencies, 2 operational controls and 4 casualty investigations between 2004 and 2023.

Records from 1997 to 2025. Most recent: inspection, 15 January 2025.

Built
1997
Last inspected
15 January 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Barge class in Maury's sources begin in 1972.

Inspection record

Last inspected 15 January 2025
…with no type recorded18
Operational controls None recorded without a removal date
Years with a record 27 calendar years (1997–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WDM9214
451525
Flag
UNITED STATES
Maury page id
psix-451525

Documentation record

Registered dimensions (L × B × D)554.8 ft × 93.2 ft × 45.8 ft
Registered tonnagegross 15,559 / net 15,559
ITC dimensions (L × B × D)554.8 ft × 93.2 ft × 45.8 ft
ITC tonnagegross 19,065 / net 12,073
BuilderGRETNA MACHINE & IRON WORKS · HARVEY, LA, UNITED STATES · built 1997
Hull materialSteel
PropulsionUNSPECIFIED
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW YORK, NY
Trade endorsementsCoastwise, unrestricted, Registry
DocumentationValid · issued 9 January 2026 · expires 31 January 2027
Service, as the file records itTank Barge
Hull formbarge (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it19065 - Convention (Subpart B), Gross Ton
15559 - Regulatory (Subpart C or D), Gross Ton
12073 - Convention (Subpart B), Net Ton
15559 - Regulatory (Subpart C or D), Net Ton
40221 - Dead Weight, Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 1972 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspected as a tow unit · 1

Inspection history · 87

15 January 2025 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8064225
13 November 2024 Deficiency Check
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 8034420
31 October 2024 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 8027779
29 August 2024 Administrative Inspection · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7992123
6 June 2024 In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7929564
2 December 2023 Administrative Inspection · In-Service Inspection · Damage Survey
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7832758
1 December 2023 Type not recorded
No type recorded · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 7847689
12 July 2023 COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7738760
30 January 2023 Deficiency Check
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7629128
19 December 2022 Deficiency Check · Administrative Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 7611119
16 February 2022 Internal Structural Exam · Administrative Inspection · Cargo Tank Internal · Deficiency Check · Examination of Repairs · In-Service Inspection · COI Inspection · Hull Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 7388871
27 January 2022 Administrative Inspection · Load Line/Change of Employment
Administrative · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7386487
9 November 2021 In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 7348272
21 January 2021 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7128493
19 December 2018 MTSA/ISPS Verification · Annual Inspection · MARPOL Annex I Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6600715
15 May 2018 Administrative Inspection · Deficiency Check · In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6415281
2 January 2018 Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 6329335
1 December 2017 In-Service Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 6316121
17 May 2017 Administrative Inspection
Administrative · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 6148704
16 May 2017 Internal Structural Exam · Drydock Exam · Examination of Repairs · Administrative Inspection · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 6138680
17 April 2016 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5880654
12 April 2016 MTSA/ISPS Verification · MARPOL Annex I Examination · COI Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 5849817
28 September 2015 Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5739191
3 September 2015 Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5234466
19 May 2015 In-Service Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 5137004
7 July 2014 Periodic Inspection · MTSA Verification · Administrative Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 4914465
27 June 2014 Administrative Inspection · Deficiency Check · Examination of Repairs
Physical examination · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 4902158
26 June 2014 Type not recorded
No type recorded · Sector Charleston · USCG Southeast District (CGD-SE) · Activity 4992429
27 December 2013 Damage Survey
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4774562
20 December 2013 Damage Survey
Physical examination · Sector Jacksonville · USCG Southeast District (CGD-SE) · Activity 4773260
19 December 2013 Damage Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4771867
3 December 2013 Type not recorded
No type recorded · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 4763469
23 August 2013 Administrative Inspection
Administrative · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4694251
24 June 2013 MARPOL Annex I Examination · Deficiency Check · Annual Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4624267
6 June 2012 Drydock Exam · Internal Structural Exam · Administrative Inspection · Cargo Tank Internal · Annual Inspection · MTSA Verification
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 4335488
21 September 2011 In-Service Inspection
Physical examination · Sector New Orleans · USCG Heartland District (CGD-H) · Activity 4151194
1 June 2011 Type not recorded
No type recorded · Sector Corpus Christi · USCG Heartland District (CGD-H) · Activity 4043789
7 June 2010 Deficiency Check · Administrative Inspection · MTSA Verification · Annual Inspection · DAPI Audit · Internal Structural Exam · Ballast Water Examination · MARPOL Annex I Examination
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3759875
4 June 2010 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 3760096
20 July 2009 Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 3453146
15 July 2009 Deficiency Check
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3535769
1 July 2009 Periodic Inspection · MARPOL Annex I Examination · MTSA Verification · MARPOL Annex V Examination
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3518243
22 October 2008 Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 3349464
15 August 2008 Administrative Inspection
Administrative · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3308850
18 July 2008 MTSA Verification · Annual Inspection
Physical examination · Sector Houston/Galveston · USCG Heartland District (CGD-H) · Activity 3272024
21 May 2007 Annual Inspection · Drydock Extension · Internal Structural Exam · Cargo Tank Internal
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2939365
11 August 2006 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2743881
18 April 2006 MARPOL Annex II Examination · Ballast Water Examination · MARPOL Annex I Examination · COI Inspection
Physical examination · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2627063
6 April 2006 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2618518
15 March 2006 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2603056
8 March 2006 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2599085
9 February 2006 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2582882
3 February 2006 Administrative Inspection
Administrative · Marine Safety Center (MSC) · Activity 2578899
15 December 2005 Type not recorded
No type recorded · Sector St Petersburg · USCG Southeast District (CGD-SE) · Activity 2551786
19 August 2005 Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 2470952
15 June 2005 MTSA/ISPS Verification
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2391380
10 May 2005 MARPOL Annex I Examination · Hull Examination · Internal Structural Exam · Annual Inspection · MARPOL Annex II Examination
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 2353865
14 March 2005 Security Plan Amendment Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2309859
22 July 2004 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2141385
21 July 2004 MTSA Verification
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2140238
7 July 2004 Annual Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2125057
30 June 2004 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2117146
28 May 2004 Security Plan Review - VSP
Administrative · Marine Safety Center (MSC) · Activity 2080689
9 April 2004 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2048240
9 December 2003 Security Plan Review - ASP
Administrative · Marine Safety Center (MSC) · Activity 1962419
23 October 2003 Type not recorded
No type recorded · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1953260
21 July 2003 Periodic Inspection · Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1849851
8 May 2003 Administrative Inspection
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1789358
20 September 2002 Administrative Inspection
Administrative · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1678289
28 May 2002 Annual Inspection · Internal Structural Exam
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1618037
6 August 2001 Deficiency Check
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1070136
3 May 2001 Type not recorded
No type recorded · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 715354
23 April 2001 COI Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1425113
9 June 2000 Re-Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1435069
7 August 1999 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 721578
22 June 1999 Deficiency Check
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1191170
17 June 1999 Deficiency Check
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1158522
6 May 1999 COI Inspection
Physical examination · MSO SAVANNAH · USCG Southeast District (CGD-SE) · Activity 1433495
14 January 1999 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 810044
28 August 1998 Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 797406
21 August 1998 Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1444043
30 April 1998 Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 790057
24 December 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 55954
24 December 1997 Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 213833
7 October 1997 Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1372003
19 June 1997 Deficiency Check
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1110688
20 May 1997 Initial Construction-Excluding Oversight · COI Inspection · Hull Examination
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1411476

Deficiency record · 133

06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 17 October 2024 Resolved
Each tankship that has a keel laying date on or after January 1, 1975, must have deckhouse and superstructure ventilation inlets and outlets and other openings to the exterior arranged to minimize the admission of flammable gas to enclosed spaces that contain a source of ignition. Found cargo pump shaft boot was ripped and unsecured on all 04 cargo pumps; did not provide vapor tight seal. Repair or replace vapor tight boots to the satisfaction of the Coast Guard.
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Due 31 October 2024
Resolved 18 October 2024
08 - Alarms › N/A - No Subsystem › Machinery controls alarm
Issued 17 October 2024 Resolved
Be identified with the legend “High-level Alarm” in black letters at least 50.8 millimeters (2 inches) high on a white background; The vessel overfill alarm was found to not be properly labeled. Mark as required.
Condition: Design Flaw
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 October 2024
Resolved 18 October 2024
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 17 October 2024 Resolved
Scantlings, materials, and workmanship of cargo spaces, fittings of cofferdams, and testing of tanks shall be at least equivalent to the requirements of the American Bureau of Shipping or other recognized classification society. Class surveyor found side shell damage of No. 8 WBTP and No. 9WBTP during internal exam and buckling of bilge strake, side shell brackets, transverse members, and longitudinal stiffeners. Make repairs to the satisfaction of Coast Guard and RO at next scheduled drydock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 3 November 2025
Resolved 5 May 2026
Resolution: Satisfactory repairs were made to side shell.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo operation
Issued 6 June 2024 Resolved
ach vessel vapor connection flange face must have a permanent stud projecting outward that has a 12.7 millimeter (0.5 inch) diameter and is at least 25.4 millimeters (1 inch) long. It must be located at the top of the flange face, midway between boltholes, and in line with the bolthole pattern. It was observed that the flange on the starboard aft vapor line is missing the permanent stud projection. To be addressed at next schedule drydock.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 September 2024
Resolved 14 November 2024
Resolution: Photo of flange stud recieved.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Loading instrument
Issued 6 June 2024 Resolved
On a tank barge, each cargo tank must be equipped with an overfill device that- (i) Meets the requirements of 46 CFR 39.2007(b)(2) through (b)(4), and (d)1 through (d)(4) and 46 CFR 39.2009 (a)(2) 46 CFR 39.2007 (d)(3): Activate a visible and audible alarm so that it can be seen and heard on the vessel where cargo transfer is controlled and in the cargo deck area. External audible and visible alarms were inoperable when tested.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 7 June 2024
Resolution: Vessel provide proof via email that the alarms were working corredctly.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 16 January 2024 Resolved
The aggregate capacity of the electric ship's service generating sources must be sufficient for the ship's service loads. In accordance with Bentley's report (Proj. ID: EP-2023-0046/Doc. ID: 000048); Nestco's Ballast Water Management Load Analysis (Dwg. No. T4600-S60-2-1/Rev. 0); and original Load Analysis and Short Circuit Analysis dated 8/9/96 (Dwg. No. E3/Rev.0) provided by the company, the vessel's electrical plant exhibits several overload conditions in its current configuration without the Ballast Water Management Treatment System installed. Relatively common operations of the barge may exacerbate these issues (i.e. operating the inert gas system, hydraulic power pack, and additional service loads and auxiliaries while only running the no. 1 or no. 2 generators). Prior to future electrical system modifications, the operator shall submit plans IAW 46 CFR 110.25-1 to Marine Safety Center (MSC) for review. All future modifications shall be approved and inspected to the satisfaction of the cognizant OCMI and Class.
Action required: 705 - Other - as specified
Due 1 August 2024
Resolved 15 January 2025
Resolution: Reviewed information issued by MSC in plan review letter E2-2400964.
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 7 December 2023 Resolved
Each pressure-vacuum relief valve must be tested for venting capacity in accordance with paragraph 1.5.1.3 of API 2000 (incorporated by reference, see 46 CFR 39.1005). The test must be carried out with a flame screen fitted at the vacuum relief opening and at the discharge opening if the pressure-vacuum relief valve is not designed to ensure a minimum vapor discharge velocity of 30 meters (98.4 feet) per second. Marine Inspector identified all P/V valves on board were past their required bench test inspection date. Provide proof of successful bench test or conduct required bench test for all p/v valves on board, to the satisfaction of a Coast Guard Marine Inspector prior to loading cargo. 46 CFR 39.2011(b)(2)
Action required: 705 - Other - as specified
Resolved 9 February 2024
Resolution: received tech reports of the replacement valves and attended the vessel to verify installation. All-Sat.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 7 December 2023 Resolved
The galleys, living quarters, navigation spaces, general cargo spaces, boiler rooms, and enclosed spaces where sources of vapor ignition are normally present, shall be segregated from cargo tanks by cofferdams or pump rooms or tanks, either empty or used to carry liquid having a flashpoint of 150 °F. or above, or deck spaces enclosed or open. Marine Inspector discovered multiple holes in the bulkhead of the cargo prime mover room and multiple holes the generator house bulkhead which are located in the hazardous zone. Repair/renew bulkheads to original vapor sealed condition, to the satisfaction of a Coast Guard Marine Inspector prior to loading cargo. 46 CFR 32.60-10(a)
Action required: 705 - Other - as specified
Resolved 21 December 2023
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 7 December 2023 Resolved
Vapor collection piping must be electrically bonded to the hull and must be electrically continuous. Marine Inspector discovered cargo/vapor piping on board missing grounding straps. Install appropriate grounding straps to cargo/vapor piping, to the satisfaction of a Coast Guard Marine Inspector prior to loading cargo. 46 CFR 39.2001(c)
Action required: 705 - Other - as specified
Resolved 21 December 2023
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Other (cargo)
Issued 7 December 2023 Resolved
A liquid filled pressure-vacuum breaker may be used for vapor overpressure and vacuum protection if the vessel owner or operator obtains the prior written approval of the Commandant. Marine Inspector discovered P/V breaker sight glass leaking voiding prior equipment approval. Repair sight glass to the satisfaction of a Coast Guard Marine Inspector prior to loading cargo. 46 CFR 39.2011(c)
Action required: 705 - Other - as specified
Resolved 21 December 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 December 2023 Resolved
When alteration or repair of boilers, pressure vessels, machinery, safety valves or piping systems becomes necessary, the work shall be done under the cognizance of the Officer in Charge Marine Inspection. Marine Inspectors identified cargo pump prime mover inoperable. No notification given to OCMI regarding failure or repair of prime mover. Repair prime mover to the satisfaction of a Coast Guard Marine Inspector prior to loading cargo. 46 CFR 50.05-10
Action required: 705 - Other - as specified
Resolved 21 December 2023
14 - Pollution Prevention › 141 - MARPOL Annex I › Other (MARPOL Annex I)
Issued 7 December 2023 Resolved
The master of a tank vessel shall ensure that the instruction manual under § 157.23 is used when the cargo or ballast systems are operated. Cargo Operations Manual, Section 4.1 – General Requirements, states “Stopping the transfer immediately if any discrepancies are discovered a during the transfer and contact RCM Operations!” Additionally, page 7 of the cargo operations manual states “ Communicate to tankerman that they have the ability, responsibility, and obligation to stop work when an unsafe condition, act or behavior may result in an unwanted event.” During cargo loading operations, the barge experienced several electrical casualties including an electrical fire on the no. 2 generator. All 3 generators are currently deemed inoperable. The initial notification to the RCM Operations Manager was around 0330 on Friday morning, 01DEC2023; however, the barge never stop cargo loading operations during the casualty and the nearest Coast Guard office was only notified of the event after the barge had completed loading which was around 1800 on Saturday, 02DEC2023. Company and vessel shall conduct an internal audit of the barge’s cargo operational procedures and submit a root cause of failure analysis report along with a correction action report to Sector Houston-Galveston prior to loading cargo. 46 CFR 157.49
Action required: 705 - Other - as specified
Resolved 9 February 2024
Resolution: resolved upon review of the submitted documentation and discussions with the company leadership.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 4 December 2023 Resolved
The installation of all electrical engineering or interior communications systems, together with the details of design, construction, and installation, must meet the requirements of subchapter J (Electrical Engineering Regulations) of this chapter. Electric installations on vessels must ensure: (1) Maintenance of services necessary for safety under normal and emergency conditions. (2) Protection of passengers, crew, other persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance with the applicable system requirements (IEEE, NEC, IEC, etc.) to which plan review has been approved. All shipboard generators experienced operational failure due to failed circuit protection and inadequate maintenance (i.e. - paint on generator windings). During generator failures, generator windings experienced arcing/sparking episodes. Provide permanent means to restore required power for shipboard and emergency systems as required by 46 CFR Subchapters D/F/J. Ensure all repairs are approved by flag/class, prior to movement. 46 CFR 32.45-1 46 CFR 111.01-1(a)
Action required: 30 - Ship detained
Resolved 16 January 2024
Resolution: Receieved multiple class reports and technical documents attesting to the repair and restoration of all generators and associated systems. SHG inspectors have verified the installation of all equipment and have cleared the vessel for departure.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 4 December 2023 Resolved
The installation of all electrical engineering or interior communications systems, together with the details of design, construction, and installation, must meet the requirements of subchapter J (Electrical Engineering Regulations) of this chapter. Each circuit that supplies a device on a switchboard, except a circuit under paragraph (b) of this section, must have overcurrent protection. Vessel’s generator circuit breakers and control overload protection fuses on the main switchboard failed to open upon overload condition. Power generation system components, such as generators’ excitation fields, windings, automatic voltage regulators (AVRs), and potential transformers (PTs), have failed based on evidence provided by the company. Provide technician's report attesting to the repair, testing, and satisfactory operation of the circuit breakers and overload protection fuses. 46 CFR 32.45-1 46 CFR 111.30-17(a)
Action required: 30 - Ship detained
Resolved 16 January 2024
Resolution: Receieved multiple class reports and technical documents attesting to the repair and restoration of all generators and associated systems. SHG inspectors have verified the installation of all equipment and have cleared the vessel for departure.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 December 2023 Resolved
The owner, agent, master, operator, or person in charge must, within 5 days, file a written report of any marine casualty required to be reported under § 4.05–1. This written report is in addition to the immediate notice required by § 4.05–1. This written report must be delivered to a Coast Guard Sector Office or Marine Inspection Office. It must be provided on Form CG–2692 (Report of Marine Casualty, Commercial Diving Casualty, or OCS-Related Casualty), and supplemented as necessary by appended Forms CG–2692A (Barge Addendum), CG–2692B (Report of Mandatory Chemical Testing Following a Serious Marine Incident Involving Vessels in Commercial Service), CG–2692C (Personnel Casualty Addendum), and/or CG–2692D (Involved Persons and Witnesses Addendum). The owner, agent, master, operator, or person in charge has failed to provide the written report in the provided time. USCG Sector Houston/Galveston has not received the report as of 41 days post casualty. A report containing all of the required information in this cite shall be submitted. 46CFR4.05-10(a)
Action required: 17 - Rectify deficiencies prior to departure
Resolved 16 January 2024
Resolution: Received an updated 2692 containing the required information.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 December 2023 Resolved
The owner, agent, master, operator, or person in charge must, within 5 days, file a written report of any marine casualty required to be reported under § 4.05–1. This written report is in addition to the immediate notice required by § 4.05–1. This written report must be delivered to a Coast Guard Sector Office or Marine Inspection Office. It must be provided on Form CG–2692 (Report of Marine Casualty, Commercial Diving Casualty, or OCS-Related Casualty), and supplemented as necessary by appended Forms CG–2692A (Barge Addendum), CG–2692B (Report of Mandatory Chemical Testing Following a Serious Marine Incident Involving Vessels in Commercial Service), CG–2692C (Personnel Casualty Addendum), and/or CG–2692D (Involved Persons and Witnesses Addendum). The owner, agent, master, operator, or person in charge has failed to provide the written report in the provided time. USCG Sector Houston/Galveston has not received the report as of 41 days post casualty. A report containing all of the required information in this cite shall be submitted. 46CFR4.05-10(a)
Action required: 10 - Deficiency Rectified
Due 2 December 2023
Resolved 16 January 2024
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 12 July 2023 Resolved
At each inspection for certification the marine inspector shall conduct such tests and inspections of the auxiliary machinery and its associated equipment as he feels necessary to check safe operation. The low lube oil alarms for two auxiliary generators were not appropriately set up for proper testing due to manufacturer specific preparations not being met. 46 CFR 61.20-3(a)
Condition: Design Flaw
Action required: 16 - Rectify deficiencies w/in 14 days
Due 26 July 2023
Resolved 17 July 2023
Resolution: Inspector returened to vessel to witness lube oil shut-down on the generators.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 18 November 2022 Resolved
Rule 24(b) of the 72 COLREGS states when a pushing vessel and a vessel being pushed ahead are rigidly connected in a composite unit, they are regarded as a power-driven vessel and must exhibit the lights under rule 23. 33 CFR 82.3
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2022
Resolved 19 December 2022
Resolution: Navigation light panel was labeled and all lights tested satisfactorily.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 18 November 2022 Resolved
Scantlings, material, and workmanship, subdivision of cargo spaces, fitting of cofferdams, and testing of tanks shall be at least equivalent to the requirements of ABS or other recognized classification society. 3 ventilation closure devices for port generator space found holed on knife edge, 1 missing locking device. 1 ventilation closure device for port cargo pump room found holed on knife edge. IGG ventilation closure device found with missing locking device. 46 CFR 32.60-1(a)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 December 2022
Resolved 30 January 2023
Resolution: TXC MIs visually inspected the above ventalation deficiencies. All sat.
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 15 May 2018 Resolved
Barge requires closed gauging. Sight glass on tank top for cargo tank #6P is shattered. Replace cargo sight glass on tank top #6P.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 15 June 2018
Resolved 4 June 2018
Resolution: New site glass for #6 Port tank trunk has been renewed.
Deck/Cargo › Ballast › Tank
Issued 15 May 2018 Resolved
Barge over-ballasted, submerging load line by approximately 1 meter. Corrected while CG inspectors were onboard during cargo discharge operations.
Action required: 10 - Deficiency Rectified
Due 15 May 2018
Resolved 15 May 2018
Resolution: Corrected while on board with cargo discharge operations.
Deck/Cargo › Holds/Tanks › Coaming
Issued 15 May 2018 Resolved
Trunk for Slop Tank #9S had evidence of product leaking down trunk wall onto the deck. Determine cause of leak and demonstrate tank is vapor tight.
Action required: 10 - Deficiency Rectified
Due 15 May 2018
Resolved 16 May 2018
Resolution: Completed vapor tightness test to 2 psi. Entire trunk was sprayed with soap/water mixture, no leaks identified.
Lifesaving › Inflatable Liferafts › Float Free
Issued 5 January 2018 Resolved
Life raft painter line not connected to the weak link, life raft was not in a float free configuration. Corrected on the spot.
Action required: 17 - Rectify deficiencies prior to departure
Resolved 5 January 2018
Resolution: Life raft reconfigured and connected to the weak link allowing float free configuration.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 16 December 2017 Resolved
All barges are required to have sufficient piping systems including pumps, valves, etc for the safe operation of the vessel. During discharge, the #2 cargo pump failed. The #4, #5, and #6 P & S cargo pumps lost suction and could not maintain suction due to suspected holes in the cargo piping below deck and improper packing. Vessel is to make permanent repairs to pumps and piping.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 January 2018
Resolved 5 January 2018
Resolution: Permanent repairs to pumps and piping have been made, all piping is now sufficient.
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 5 December 2017 Resolved
Vessel's gaging pipes, sight glasses, and cargo hatch covers are not vapor tight. At least eight sight glasses & six gauging pipes were leaking IG/cargo vapor mixture to atmosphere. Vessel is to be gas-freed and a vapor tightness test conducted. All components found to be leaking shall be repaired/renewed and a vapor tightness test repeated until the vessel is vapor tight.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 January 2018
Resolved 2 January 2018
Resolution: Repairs made and satisfactory vapor tightness test conducted 7Dec2017.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 5 December 2017 Resolved
The IGS system is not fucntioning as designed. The scrubber injectors clog up due to apparent excessive rust in the feed water line causing the system to shut down rendering the system inoperative until the injectors can be cleaned. Company must provide a stand-by means to maintain the inerted atmosphere in all tanks until all cargo tanks are empty and gas-freed.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 December 2017
Resolved 15 December 2017
Resolution: Company provided Stand by truck during discharge operations and was able to replace wasted piping.
Personnel › Training › Cargo Safety
Issued 2 December 2017 Resolved
After new inert gas system was installed; Entire approved procedures including testing/alarms and opreating of the system. Crew couldn't operate/start IG system, IG Tech. shall be onboard until the crew can show competency in the operation of the system to attending USCG Marine inspector and or ABS surveyer prior to cargo operations.
Action required: 705 - Other - as specified
Due 2 December 2017
Resolved 16 December 2017
Resolution: IG tech assisted company to create testing procedures. Crew was able to successfully operate IG system.
Engineering › Generator (propulsion/auxiliary-electric) › Overcurrent Devices Circuitry
Issued 2 December 2017 Resolved
The #2 Generator over-speed trip is inoperable. This generator operates the Inert Gas System.
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 January 2018
Resolved 5 January 2018
Resolution: Overspeed on #2 Generator is now fully operable.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 2 December 2017 Resolved
Sewage was discovered in the aft peak starboard side tank. Company had space pumped out and tagged out the MSD. Vesssel is required to have third party verify the sewage system is functioning properly prior to departure from New Orleans shipyard.
Action required: 705 - Other - as specified
Due 15 January 2018
Resolved 2 January 2018
Resolution: MSD pump replaced and new electrical panel installed.
Lifesaving › Rigid Liferafts › Hydrostatic Release Unit
Issued 2 December 2017 Resolved
The liferaft painter was connected to the bracket vice the weak link, making the liferaft not float free.
Action required: 705 - Other - as specified
Due 5 December 2017
Resolved 5 December 2017
Resolution: Crew re-installed the painter correctly on the spot.
Operations/Management › Drills/Instruction › Fire
Issued 1 December 2017 Resolved
Vessel has not conducted crew drills or training regarding fire fighting.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 December 2017
Resolved 16 December 2017
Resolution: Conducted sat fire drill in the generator room. Discussed duties for abandon ship. All sat.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 1 December 2017 Resolved
46CFR32.60-1 ...Scantlings, materials, and workmanship, subdivisions of cargo spaces, fittings of cofferdams, and testing of tanks shall be at least equivalent to the requirements of ABS. Cargo piping must be grounded as required by ABS Rules Part 4.9.21.
Condition: Improper Installation
Action required: 703 - Prior to bunkering operations
Resolved 12 December 2017
Resolution: Company had metal bars installed over expansion joints. ABS has authorized intallation, but required the proper flexible bonding straps due in 30 days.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 1 December 2017 Resolved
46 CFR 151.01-5. Must submit adequate proof that the safety relief valves have been bench tested or tested by other suitable means
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 January 2018
Resolved 5 January 2018
Resolution: Confirmed testing means by ABS Tech report.
Deck/Cargo › Holds/Tanks › Liquid Level Gaging
Issued 1 December 2017 Resolved
Liquid level gauging port covers were missing.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 January 2018
Resolved 5 January 2018
Resolution: Port covers had been installed over applicable gauging.
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 1 December 2017 Resolved
Fuel tank drain line gate valve is inoperable. Crew installed a threaded plastic cap to prevent further discharge of fuel on deck.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 January 2018
Resolved 2 January 2018
Resolution: New fuel valve installed to satisfaction of attending marine inspector.
Engineering › Sea-water System (primary cooling) › Valve
Issued 1 December 2017 Resolved
Sea Chest valve stem was wasted through causing the hand wheel to break off from the valve.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 January 2018
Resolved 12 December 2017
Resolution: Crew replaced the valve stem and wheel.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 1 December 2017 Resolved
Generators were missing guards over belt.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 15 January 2018
Resolved 5 January 2018
Resolution: Guards were installed over rotating belts.
Deck/Cargo › Ballast › Pumps
Issued 1 December 2017 Resolved
Port side ballast pump was leaking excessive amounts of water duing operation.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 15 January 2018
Resolved 5 January 2018
Resolution: Proper packing was installed to ensure leaking was resolved.
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 1 December 2017 Resolved
The crew of Bouchard 245 was unfamiliar with both fire and life saving drills and had not performed any drills since the vessel came from shipyard in Tampa, Florida on November 24, 2017
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 1 January 2018
Resolved 17 December 2017
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 1 December 2017 Resolved
The Bouchard 245 was found in operation with multiple marine engineering discrepancies.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 30 January 2018
Resolved 30 January 2018
07 - Fire Safety › N/A - No Subsystem › Inert gas system
Issued 1 December 2017 Resolved
The Bouchard 245 was found in operation with a flammable cargo (jet fuel) onboard with a non compliant Inert Gas System.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 30 January 2018
Resolved 30 January 2018
04 - Emergency Systems › N/A - No Subsystem › Functionality of Safety Systems
Issued 1 December 2017 Resolved
The crew of the Bouchard 245 were unable to use portable gas detection equipment onboard the vessel due to inoperable or missing calibration gas/equipment.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 30 January 2018
Resolved 30 January 2018
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 1 December 2017 Resolved
Multiple pieces of machinery equipment onboard the Bouchard 245 were found with missing or inadequate safety guards.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 30 January 2018
Resolved 30 January 2018
09 - Working and Living Conditions › 091 - Living Conditions › Sanitary Facilities
Issued 1 December 2017 Resolved
The Bouchard 245 was found with sewage being improperly stored in a void due to malfunctioning marine sanitation device & piping.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 30 January 2018
Resolved 30 January 2018
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 1 December 2017 Resolved
The crew of the Bouchard 245 was observed performing metalic grinding/filing in an atmosphere previously determined to be leaking flammable vapors.
Condition: Invalid
Action required: 10 - Deficiency Rectified
Due 30 January 2018
Resolved 30 January 2018
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 1 December 2017 Resolved
Numerous areas onboard the Bouchard 245 were observed with inadequate or missing electrical bonding, explosion proof covers, or intact insulated wiring.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 30 January 2018
Resolved 30 January 2018
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 December 2017 Resolved
The crew of the Bouchard 245 did not perform any security drills since leaving the shipyard in Tampa, FL on November 24, 2017.
Action required: 10 - Deficiency Rectified
Due 30 January 2018
Resolved 30 January 2018
06 - Cargo Operations Including Equipment › N/A - No Subsystem › Cargo transfer - Tankers
Issued 1 December 2017 Resolved
The Bouchard 245 was found with numerous non compliant cargo pumps, pipes, guages, valves, etc.
Condition: Improper/Lack of Maintenance
Action required: 10 - Deficiency Rectified
Due 30 January 2018
Resolved 30 January 2018
Construction/Loadline › Structures › Superstructure
Issued 3 November 2017 Resolved
PROVIDE UPDATED HAZARDOUS LOCATION PLANS. 46CFR31.10-25
Action required: 705 - Other - as specified
Due 30 November 2017
Resolved 20 November 2017
Resolution: PROVIDED UPDATED HAZARDOUS LOCATION PLANS TO THE SATISFACTION OF THE MARINE INSPECTOR.
Electrical › Lighting (service) › Lighting Fixture
Issued 2 November 2017 Resolved
ENSURE CLASS 1/ DIV 1 LIGHTS PRESENT ADJACENT TO P/V VALVES BETWEEN CARGO TANK 2&3. 46CFR111.105-31(l)(3)
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 30 November 2017
Resolved 20 November 2017
Resolution: ENSURED CLASS 1/ DIV 1 LIGHTS PRESENT ADJACENT TO P/V VALVES BETWEEN CARGO TANK 2&3 TO THE SATISFACTION OF THE MARINE INSPECTOR.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Pumproom
Issued 2 November 2017 Resolved
REPLACE 02 SHAFT COVERS ON PORT SIDE CARGO PUMP HOUSE. 46cfr111.105-31(F)
Action required: 705 - Other - as specified
Due 30 November 2017
Resolved 20 November 2017
Resolution: REPLACED 02 SHAFT COVERS ON PORT SIDE CARGO PUMP HOUSE TO THE SATISFACTION OF THE MARINE INSPECTOR.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 2 November 2017 Resolved
REPAIR PORT SIDE TANKS WASH PUMP ELECTRICAL CABLE. 46CFR111.105-17C
Action required: 705 - Other - as specified
Due 30 November 2017
Resolved 20 November 2017
Resolution: REPAIRED PORT SIDE TANKS WASH PUMP ELECTRICAL CABLE TO THE SATISFACTION OF THE MARINE INSPECTOR.
Deck/Cargo › Vapor Control Systems › Liquid Overfill Protection
Issued 2 November 2017 Resolved
ENSURE CARGO TANK OVERFILL GAUGES HAVE SEALS INSIDE BOXES AND REPLACE MISSING HARDWARE. 46CFR111.105-31(L)
Action required: 705 - Other - as specified
Due 30 November 2017
Resolved 20 November 2017
Resolution: ENSURED CARGO TANK OVERFILL GAUGES HAVE SEALS INSIDE BOXES AND REPLACE MISSING HARDWARE TO THE SATISFACTION OF THE MARINE INSPECTOR.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 2 November 2017 Resolved
ENSURE COMPLAINCE WITH CLASS 1/ DIV 1 ADJACENT TO P/V VALVES ON CARGO TANKS 1. 46CFR111.105-31(L)(3)
Action required: 705 - Other - as specified
Due 30 November 2017
Resolved 20 November 2017
Resolution: ENSURED COMPLAINCE WITH CLASS 1/ DIV 1 ADJACENT TO P/V VALVES ON CARGO TANKS 1 TO THE SATISFACTION OF THE MARINE INSPECTOR.
Construction/Loadline › Structures › Longitudinal Bulkhead
Issued 15 June 2017 Resolved
Provide repair proposal for wasted longitudinal stiffeners along the outer shell and along the cargo tank boundary in 1P ballast tank IAW 46 CFR 32.60-1
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 29 June 2017
Resolved 2 November 2017
Resolution: Repair proposal received and repairs made to longitudinal stiffners.
Deck/Cargo › Ballast › Piping
Issued 6 June 2017 Resolved
Replace broken expansion joint in ballast tank 2 starboard IAW 46 CFR 32.60-1
Action required: 705 - Other - as specified
Due 20 June 2017
Resolved 2 November 2017
Resolution: Broken expansion joint replaced in ballast tank 2 starboard to the satisfaction of the Marine Inspector.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 6 June 2017 Resolved
Replace ladders in 1P/1S ballast tank (uppers) IAW 46 CFR 32.60-1
Action required: 705 - Other - as specified
Due 20 June 2017
Resolved 2 November 2017
Resolution: Ladders replaced in 1P/1S ballast tank (uppers) to the satisfaction of the Marine Inspector.
Deck/Cargo › Ballast › Tank
Issued 6 June 2017 Resolved
Provide scaffolding in after end of all ballast anks from main deck to the first platform three bays forward to adequately inspect suspect areas IAW 46 CFR 32.60-1
Action required: 705 - Other - as specified
Due 20 June 2017
Resolved 2 November 2017
Resolution: Scaffolding provided on ballast tanks to adequately inspect suspect areas.
Construction/Loadline › Structures › Transverse Bulkhead
Issued 6 June 2017 Resolved
Provide repair proposal for wasted brackets in after peak IAW 46 CFR 32.60-1
Action required: 705 - Other - as specified
Due 20 June 2017
Resolved 2 November 2017
Resolution: Repair proposal received for wasted brackets in after peak.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 12 April 2016 Resolved
Cargo pump prime mover does not shut down when emergency pull is activated.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 18 May 2016
Resolved 17 April 2016
Resolution: Cargo pump engine air shutoff was removed and repaird at tech shop.
Engineering › Fuel Oil Service System › Filter
Issued 12 April 2016 Resolved
Fuel separators have drain valves that are not capped or plugged.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 May 2016
Resolved 17 April 2016
Resolution: Verified corrective action
Engineering › Engine Controls (Electric/Electronic) › Linkage
Issued 12 April 2016 Resolved
NR2 Generator speed control is held on with bailing wire.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 May 2016
Resolved 17 April 2016
Resolution: Verified corrective action
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 12 April 2016 Resolved
NR3 Cargo pump prime mover temp sensor is inop.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 May 2016
Resolved 17 April 2016
Resolution: Verified corrective action
Electrical › Electric Generation Source (service) › Generator
Issued 12 April 2016 Resolved
NR1 Generator temp gauge is broken
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 May 2016
Resolved 17 April 2016
Resolution: Verified corrective action
Engineering › Engine Controls (Electric/Electronic) › Circuit Board
Issued 12 April 2016 Resolved
Cargo and ballast pump prime movers all have dead end wires.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 10 May 2016
Resolved 17 April 2016
Resolution: Verified corrective action
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 27 June 2014 Resolved
Cease all transferring of cargo until satisfactory report from qualified service technician or [name withheld] attesting to the proper operation of the IGG.
Due 27 July 2014
Resolved 27 June 2014
Resolution: Satisfactory report and testing completed.
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 27 June 2014 Resolved
Renew PV Breaker water seal sight glass.
Due 27 July 2014
Resolved 27 June 2014
Resolution: Sight glass properly renewed.
Deck/Cargo › Inert Gas System › Scrubber Tower
Issued 27 June 2014 Resolved
Renew or provide gauging report for wasted and pitted cooling water feed piping (8ft) to IGG, no later than next scheduled dry dock.
Due 27 July 2014
Resolved 27 June 2014
Resolution: Request to repair wasted piping received. Company acknowledged proper repair will be complete at next dry dock.
Construction/Loadline › Hull › Double Hull
Issued 20 December 2013 Resolved
Make barge available to attending CG inspector at port of Tampa to determine cause of ingress of cargo into number 7 starboard ballast tank. There shall be no cargo in any adjacent tanks during transit from port of Jacksonville.
Action required: 705 - Other - as specified
Resolved 27 December 2013
Resolution: Pressed up #7 starboard ballast tank with water, found no leaks in #7 starboard cargo tank.
Construction/Loadline › Hull › Double Hull
Issued 19 December 2013 Resolved
At next US port of Jacksonville, Fl off load remaining cargo and make barge available for inspection by attending Class Surveyor and USCG Marine Inspector. Barge may not discharge any ballast water without prior Coast Guard approval.
Action required: 705 - Other - as specified
Due 20 December 2013
Resolved 20 December 2013
Resolution: Attended vessel to clear Sec Miami def and issue def for transit to Tampa.
Deck/Cargo › Inert Gas System › Main Valve
Issued 24 June 2013 Resolved
I.G. Pressure regulating valve is set at 45 degrees and not operating. Repair and provide a certified tech report within 30 days.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 30 July 2013
Resolution: Conducted satisfactory visual inspection IG system. Operated system within parameters and tested high O2 and low scrubber water press alarms and shutdown. Witnessed valves shift from "to deck" to "to atmosphere" for high O2 alarm.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 24 June 2013 Resolved
Audible alarm for the IG system is not operating on deck. Repair and provide a certified tech report prior to transferring cargoes required to be inerted.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 25 June 2013
Resolution: Received, reviewed and accepted tech report, from Rio Marine, stating the audible alarm for the IG system was replaced and properly tested.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 24 June 2013 Resolved
Repair the IG System Panel 5.30 lower locking mechanism to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 30 July 2013
Resolution: Crew has installed locking hasps on the IG System Panel.
Electrical › Electrical Distribution System (service) › Ground Detection
Issued 24 June 2013 Resolved
Provide cert tech report attesting to proper operation of ground detectors and stating that there are no grounds.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 31 July 2013
Resolution: Received, reviewed and accepted tech report from RIO Marine , Inc. stating that all ground detector systems are operating as designed.
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 24 June 2013 Resolved
Replace blown lights on the IG service panel to the satisfaction of the attending marine inspector.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 20 August 2013
Resolution: Received, reviewed and accepted tech report from RIO Marine Services stating the blown lamps have been replace and are now operating.
Engineering › Diesel Engine (auxiliary) › Piping (exhaust)
Issued 24 June 2013 Resolved
Mitigate oil leaks on #1 generator & replace oil soaked exhaust lagging.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 25 June 2013
Resolution: Verified oil soaked lagging on the #1 SSDG was replace with new lagging. Vessel rep stated cause of oil leak was due to the use of engine oil with light viscosity.
Engineering › Diesel Engine (auxiliary) › Governor
Issued 24 June 2013 Resolved
Repair the "STOP" solenoid on the #3 generator.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 26 June 2013
Resolution: Received certified tech''s report stating the solenoid valve was operating properly and overspeed test was satisfactory.
Deck/Cargo › Vapor Control Systems › Liquid Overfill Protection
Issued 24 June 2013 Resolved
Cargo prohibited in #3 P&S cargo tanks until proper operation of overfill is proven.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 June 2013
Resolution: Witnessed satisfactory test of #3 P&S cargo tanks.
Communications › Alarms/Indicators › General Alarm
Issued 24 June 2013 Resolved
Prove operation of general alarm, lights in generator space and stbd pump room machinery space.
Action required: 705 - Other - as specified
Due 9 July 2013
Resolved 25 June 2013
Resolution: Verified General Alarm Light in the generator room and STBD pump room operated properly activated.
Deck/Cargo › Vapor Control Systems › Piping/Hoses
Issued 24 June 2013 Resolved
Install 1" stud x 1/2" dia. on two aft vapor control connections.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 25 June 2013
Resolution: Verified 1" x 1/2" stud was installed on each vapor control line flange face.
Deck/Cargo › Cargo Stowage › General
Issued 24 June 2013 Resolved
Place cargo samples in a cargo sample locker.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 31 July 2013
Resolution: Cargo samples have been placed in an acceptable sample locker.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Mounting Bracket
Issued 24 June 2013 Resolved
Install brackets for B-II extinguishers in ballast pump rooms.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 30 July 2013
Resolution: Witnessed installed fire extinguisher brackets in ballast pump rooms.
Electrical › Electric Supply System (service) › Battery Charger
Issued 24 June 2013 Resolved
Install proper working gauge on the Lamarche battery charger located in the stbd cargo pump machinery space.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 26 June 2013
Resolution: Received tech report stating the battery charger was replaced and in proper working order.
Accommodation/Occupational Safety › Ventilation › General
Issued 24 June 2013 Resolved
Install closure device on gooseneck vent for stbd side accommodation space vent.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 25 June 2013
Resolution: Damaged Gooseneck vent pipe end on the STBD pump room was cropped and renewed to include installation of a new closure device.
Electrical › Electric Supply System (service) › Cable
Issued 24 June 2013 Resolved
Cover exposed wires and circuitry on the accommodation satellite dish.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 27 June 2013
Resolution: Received e-mail from tug captain and [name withheld] stating the satellite dish has been removed.
Lifesaving › Lifebuoys › Stowage
Issued 24 June 2013 Resolved
Stencil life rings and stow in brackets.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 24 June 2013
Resolution: Witnessed life rings stenciled and in brackets.
Accommodation/Occupational Safety › Refrigeration (stores) › General
Issued 24 June 2013 Resolved
Repair refrigerator wiring.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 25 June 2013
Resolution: Verified proper wire splice made within electrical junction box to the power cable of the refrigerator located in the Port cargo pump room.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 24 June 2013 Resolved
Replace expired medication.
Action required: 705 - Other - as specified
Due 24 July 2013
Resolved 30 July 2013
Resolution: Crew has replaced expired meds with new.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Lighting
Issued 9 July 2010 Resolved
Renew/replace orange overfill light. To satisfaction of local OCMI, prior to conducting cargo operations.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 9 July 2010
Resolution: Vessel crew and electrician''s were able to repair the orange overfill light prior to departure.
Electrical › Electrical Distribution System (service) › Non-conducting Deck Covering
Issued 9 July 2010 Resolved
Provide proof of nonconductive matting for electrical switch boards.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 23 July 2010
Resolved 9 July 2010
Resolution: Vessel provided new nonconductive matting for the electrical switch board.
Operations/Management › Drug and Alcohol Testing › MIS Submission
Issued 9 July 2010 Resolved
Provide copy of 2009 MIS Drug and Alcohol testing report.
Action required: 705 - Other - as specified
Due 9 July 2010
Resolved 9 July 2010
Resolution: Vessel provided copy of letter stating that the 2009 MIS report had been submitted.
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 1 July 2009 Resolved
Observed one soft patch and discovered another leak in the feed water supply line leading to the deck water seal of the IGS system. Make permanent repairs to the satisfaction of the attending marine inspector within 30 days (31July09). 46CFR32.53
Action required: 705 - Other - as specified
Due 31 July 2009
Resolved 15 July 2009
Resolution: Observed that the piping had been replaced.
Deck/Cargo › Inert Gas System › Deck Water Seal
Issued 18 July 2008 Resolved
Level indicator on deck water seal is frozen in place.
Condition: Unknown
Action required: 705 - Other - as specified
Due 8 September 2008
Resolved 23 October 2008
Deck/Cargo › Cargo Stowage › General
Issued 18 July 2008 Resolved
Vessels deck seal sight glass broken must be replaced.
Condition: Unknown
Action required: 705 - Other - as specified
Due 8 September 2008
Resolved 23 October 2008
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 18 July 2008 Resolved
Vessel is to replace paint lockers due to sea corrosion and lack of water and air tight fitting of doors.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 8 September 2008
Resolved 23 October 2008
Deck/Cargo › Inert Gas System › Inert Gas Generator (IGG)
Issued 21 June 2007 Resolved
Newly installed IGS was found inoperable.
Action required: 705 - Other - as specified
Resolved 18 July 2008
Resolution: Satisfactory test of IG system
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 18 April 2006 Resolved
Vessel had a CG/IMO approved MSD, but could not provide a new installation approval letter. Granted 30 day extension for submission of plans per POC request. 6.8.6.
Action required: 705 - Other - as specified
Due 18 July 2006
Resolved 29 December 2006
Resolution: MSC Ltr dated July 26, 2006 gave approval for installation w/ comments for OCMI to verify proper installation.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Piping
Issued 18 April 2006 Resolved
Cargo piping and hose to be hydro tested by 05MAY06.
Due 5 May 2006
Resolved 5 May 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Relief Valve
Issued 18 April 2006 Resolved
Test cargo pump relief valve.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 May 2006
Resolved 5 May 2006
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Cargo Pump
Issued 18 April 2006 Resolved
Calibrate cargo pump pressure gauges.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 18 May 2006
Resolved 5 May 2006
Accommodation/Occupational Safety › Washroom/Toilet › Toilet
Issued 18 April 2006 Resolved
Per MSC ltr dated July 26, 2006 the following must be verified to the satisfaction of the OCMI; the overboard discharge's penetration height must meet the requirements of 46 CFR 56.50-95(b)(4) & each bulkhead and deck piping penetration must meet the requirements of 46 CFR 56.50-1(a).
Action required: 705 - Other - as specified
Resolved 21 June 2007
Resolution: MSD equipment and penetrations were verified and found in compliance to the satisfaction of attending marine inspector.
Lifesaving › Lifebuoys › Serviceable
Issued 6 June 2005 Resolved
RENEW WORN RETROREFLECTIVE TAPE ON AFT RING BUOY.
Due 6 July 2005
Resolved 6 June 2005
Documentation › Markings/Placards › Warning Signs
Issued 6 June 2005 Resolved
REPLACE BENZENE HAZARD SIGNS ON IG HOUSE AND STBD BALLAST PUMP ROOM.
Due 6 July 2005
Resolved 15 July 2005
Documentation › Safety/Response Plans/Programs › Vessel Response Plan
Issued 6 June 2005 Resolved
PROVIDE PROOF OF ANNUAL AUDIT OF VESSEL REPSONSE PLAN.
Due 20 June 2005
Resolved 7 June 2005
Documentation › Safety Management System › Company Responsibility/Authority Documentation
Issued 6 June 2005 Resolved
PROVIDE PROOF OF BENZENE MONITORING PROGRAM TESTING RECORDS.
Due 20 June 2005
Resolved 31 October 2005
Resolution: Lab reports emailed to Sector St. Petersburg upon receipt by company rep.
Deck/Cargo › Cargo Transfer/Lightering (liquid) › Nuts
Issued 6 June 2005 Resolved
INITIATE AND PROVIDE PROOF OF FASTENER REPLACEMENT PROGRAM FOR CARGO PIPING VALVE BONNETS AND VALVE PACKING GLANDS.
Due 6 July 2005
Resolved 26 July 2005
Resolution: Emailed digital photos of on-going fastener replacement.
Deck/Cargo › Vapor Control Systems › Vessel Vapor Overpressure/Vacuum Protection
Issued 7 July 2004 Resolved
Prove proper operation of all P/V valves. Most valves were sticking and not free.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2004
Resolution: Cleared via digital Pictures and statement from barge rep [name withheld]
Operations/Management › Cargo Transfer/Lightering › Making a Connection
Issued 7 July 2004 Resolved
Remove emergency cargo hose or provide hose test for cargo hose located on deck portside storage.
Action required: 705 - Other - as specified
Due 13 August 2004
Resolved 19 July 2004
Resolution: Cleared via digital Pictures and statement from barge rep [name withheld]
Electrical › Lighting (emergency) › Lighting Fixture
Issued 7 July 2004 Resolved
Replace batteries as needed for emergency lighting.
Due 13 August 2004
Resolved 13 July 2004
Electrical › Electric Supply System (service) › Cable
Issued 7 July 2004 Resolved
Make permanent and proper repairs for shore tie.
Due 13 August 2004
Resolved 19 July 2004
Resolution: Cleared via digital Pictures and statement from barge rep [name withheld]
Deck/Cargo › Ballast › Piping
Issued 7 July 2004 Resolved
Port and starboard ballast piping was leaking at the first elbow above deck. Make temp repairs prior to loading. Make permanent repairs at drydock.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2004
Resolution: Cleared via digital Pictures and statement from barge rep [name withheld]
Deck/Cargo › Vapor Control Systems › Inerting System
Issued 7 July 2004 Resolved
Main IGS Riser P/V Valve is sticking. Prove proper operation after making permanent and proper repairs.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 19 July 2004
Resolution: Cleared via digital Pictures and statement from barge rep [name withheld]
Electrical › Lighting (service) › Lighting Fixture
Issued 7 July 2004 Resolved
Lights in Inert Gas space not functioning. Make permanent and proper repairs.
Due 13 August 2004
Resolved 19 July 2004
Resolution: Cleared via digital Pictures and statement from barge rep [name withheld]
Deck/Cargo › Cargo Transfer/Lightering (liquid)
Issued 21 July 2003 Resolved
Replace transfer hose between tug and barge to fuel diesel daytank. Prior to next transfer(between tug and barge). LEGACY COMPONENT DESC: Transfer Hose
Action required: 705 - Other - as specified
Resolved 24 July 2003
Electrical › Electric Generation Source (service)
Issued 18 July 2003 Resolved
Demonstrate proper operation of #1 SSG low lube oil sensor for generator as required by 46 CFR 112.50 (g). LEGACY COMPONENT DESC: Low Lube oil sensor
Due 7 August 2003
Resolved 24 July 2003
Documentation › Safety/Response Plans/Programs
Issued 17 May 2002 Resolved
PROVIDE DOCUMENTATION OF ANNUAL COMPANY REVIEW OF VESSEL RESPONSE PLAN. LEGACY COMPONENT DESC: Vessel Response Plan
Action required: 705 - Other - as specified
Due 28 May 2002
Resolved 20 June 2002
Resolution: Received fax letter from [name withheld], Bouchard Coastwise Management Corp, stating that company completed annual review of vessel response plan.
Electrical
Issued 23 April 2001 Resolved
PROVE PROPER OPERATION OF ALARMS & SHUTDOWNS FOR #1&2 GENERATORS. _x001C_
Condition: Unknown
Due 26 April 2001
Resolved 26 April 2001
Documentation
Issued 23 April 2001 Resolved
Operating a Tank Barge while not in compliance with the conditions of its Certificate of Inpsection (COI).
Condition: Unknown
Due 23 April 2001
Resolved 23 April 2001
Unknown
Issued 23 April 2001 Resolved
PROVE PROPER OPERATION OF THE RELIEF VALVE FOR THE AIR RECEIVER.
Condition: Unknown
Due 26 April 2001
Resolved 26 April 2001
Deck/Cargo
Issued 23 April 2001 Resolved
Prove proper operation of all alarms & shutdowns for the inert gas system in accordance with the manufacturer's recommendations.
Condition: Unknown
Due 1 June 2001
Resolved 4 June 2001
Electrical
Issued 6 May 1999 Resolved
PROVE PROPER OPERATION OF THE #1 GENERATOR OVERSPEED TRIP.
Condition: Unknown
Due 6 May 1999
Resolved 6 May 1999
Deck/Cargo
Issued 30 April 1998 Resolved
INSTALL 1/2" BY 1" ALIGNMENT PIN @ 1200 POSITION ON EACH FWD VAPOR RECOVERYFLANGE BOTH PORT AND STBD SIDES.
Condition: Unknown
Due 30 April 1998
Resolved 30 April 1998
Lifesaving
Issued 30 April 1998 Resolved
PROVIDE ADDITIONAL SPARE CHARGES FOR EACH EMERGENCY OUTFIT.
Condition: Unknown
Due 30 April 1998
Resolved 30 April 1998
Deck/Cargo
Issued 20 May 1997 Resolved
PROVIDE TWO SOURCES OF WATER TO IGS DECK SEAL UNIT AS PER ABS COMMENT LETTER ITEM #22 AND UPDATE OPERATING DIAGRAM ANDLINE DRAWINGS IN OPERATION MANUAL._x001C_
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Deck/Cargo
Issued 20 May 1997 Resolved
RESUBMIT TO MSC A HAZARDOUS LOCATION PLAN THAT IS CORRECTED TO REFLECT AS BUILT CONFIGURATION.
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Documentation
Issued 20 May 1997 Resolved
PROVIDE ABS AND MANUFACTURES P.E. DATA AND APPROVAL FOR AIR RECEIVER.
Condition: Unknown
Due 23 June 1997
Resolved 23 June 1997
Engineering
Issued 20 May 1997 Resolved
REPLACE ALL F/O AND L/O NON METALLIC FLEXIBLE HOSES ON ALL CARGO PUMP, BALLAST PUMP, AND GENERATOR PRIME MOVERS EXCEDING 30" IN LENGTH IAW _x001C_ 46 CFR 56.60-25(c).
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Deck/Cargo
Issued 20 May 1997 Resolved
PROVIDE ON BOARD, OPERATION MANUAL FOR METRITAPE CLOSED GUAGING SYSTEM TO CORRESPOND WITH NEW LOAD LINE CERTIFICATE TO BE ISSUED IN CORPUS CHRISTI, TX. AND PRIOR TO LOADING CARGO.
Condition: Unknown
Due 25 May 1997
Resolved 29 May 1997
Deck/Cargo
Issued 20 May 1997 Resolved
PROVIDE CALIBRATION REPORT FOR IGS ALARMS AND SHUTDOWNS PRIOR TO LOADING CARGO. DEMONSTRATE PROPER OPERATION TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 20 June 1997
Resolved 21 May 1997
Fire Fighting
Issued 20 May 1997 Resolved
PROVIDE APPROVED FIRE SAFETY PLAN ON BOARD VESSEL.
Condition: Unknown
Due 23 July 1997
Resolved 23 July 1997
Navigation
Issued 20 May 1997 Resolved
MARK EPIRB WITH NAME OF VESSEL AND PROVIDE PROOF OF REGISTRATION WITH FCC.
Condition: Unknown
Due 20 May 1997
Resolved 20 May 1997
Fire Fighting
Issued 20 May 1997 Resolved
PROVIDE APPROVED LETTERS FOR CONSTRUCTION MATERIALS USED IN ACCOMODATION SPACE.
Condition: Unknown
Due 20 June 1997
Resolved 29 May 1997
Deck/Cargo
Issued 20 May 1997 Resolved
PRIOR TO LOADING CARGO, PROVIDE AN ABS APPROVED LOADING MANUAL TO INCLUDE LOADING CONDITIONS ANS STABILITY DATA TO [name withheld].
Condition: Unknown
Due 20 June 1997
Resolved 29 May 1997

Casualty record · 4

9 April 2004Routine · role: Involved in a Marine Casualty · activity 2048240
4 June 2010Routine · role: Involved in a Marine Casualty · activity 3760096
16 March 2011Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · activity 3965789
1 December 2023Routine · role: Involved in a Marine Casualty · activity 7847689
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Recorded names · 1

B. NO. 245 (2004–2011). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.