MAURY USCG vessel records Sign in
← All vessels

SANTA JUANA *

SANTA JUANA * is a 1966 freight ship. The Coast Guard has recorded 31 inspections since 1984, most recently in April 1991, along with 66 deficiencies.

Records from 1984 to 1991. Most recent: inspection, 17 April 1991.

Built
1966
Last inspected
17 April 1991
Documentation
Not in the documentation file of 10 September 2026
Controls
None recorded without a removal date

Identity

6523028 View on MarineTraffic leaves Maury; a third-party site, nothing from it is stored here
Flag
GERMANY
366066000 (licence lapsed)
Maury page id
psix-45178

Inspections, by type

…with no type recorded8
Years with a record 8 calendar years (1984–1991)
The 31 inspections in the strip above, split by the kind of activity the US Coast Guard recorded. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

This record may be incomplete: the most recent inspection recorded for this vessel was 35 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the General Dry Cargo Ship class in Maury's sources begin in 1980.

Documentation record

Tonnage as PSIX records it11039 - Regulatory (Subpart C or D), Gross Ton
6588 - Regulatory (Subpart C or D), Net Ton
1369 - Dead Weight, Ton
21510 - Displacement, Ton
This hull's Official Number is not in the NVDC file dated 10 September 2026 as served by NOAA Fisheries, so no documentation record is shown. Absence from that file is a fact about the file, not about the hull.

Radio station licence

KFFJMMSI 366066000 · expired · compulsorily equipped · granted 6 July 1990, cancelled 6 July 1995
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown. A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.

A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.

Inspection history · 31

17 April 1991 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 911168
16 July 1990 Damage Survey
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1238981
20 June 1990 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1244775
3 May 1990 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 934885
10 April 1990 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1225533
8 April 1990 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 908777
20 March 1990 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 922554
20 March 1990 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1219091
16 March 1990 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 911839
9 March 1990 Permit to Proceed
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 917986
5 March 1990 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1233528
12 February 1990 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1230889
30 November 1989 Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 906728
1 September 1989 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1040543
31 May 1989 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1345334
6 March 1989 Re-Inspection · Drydock Extension
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1044149
19 April 1988 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1350871
4 March 1988 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1346873
10 November 1987 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1028312
13 July 1987 Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1324712
8 April 1987 Hull Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1324796
18 October 1986 MARPOL Annex I Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1013478
28 August 1986 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1316818
29 July 1986 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 988101
10 May 1986 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 995426
12 April 1986 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1307668
20 March 1986 Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1307604
24 February 1986 COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 991923
18 May 1985 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1298494
30 March 1985 Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 982691
14 March 1984 Credit Drydock
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 995807

Deficiency record · 66

Engineering
Issued 10 April 1990 Resolved
COMPLETE REPAIRS TO BOTH SOOT BLOWER LINES, CONDUCT HYDRO AT 1 1/2 MAWP, AND PROVIDE NDT AS REQUIRED.
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Construction/Loadline
Issued 8 April 1990 Resolved
RENEW GASKET FOR #2 HATCH AT 2ND JOINT FROM AFT SIDE, #6 HOLD, REPAIR HATCHAT 2 SPOTS TO ELIMINATE DAYLIGHT, #3 STBD & CENTER REPAIR CENTER JOINTS, #4STBD CROP & RENEW WASTED SECTION OF OF HATCH STIFFENER AND REPAIR CENTER GASKET.
Condition: Unknown
Due 8 April 1990
Resolved 8 April 1990
Fire Fighting
Issued 8 April 1990 Resolved
REPAIR LEAKY DECK WASH VALVE AT FS 17 AND FS VALVE AT FS20.
Condition: Unknown
Due 8 April 1990
Resolved 8 April 1990
Construction/Loadline
Issued 8 April 1990 Resolved
REPAIR #5 HATCH TO ELIMINATE DAYLIGHT PORT FWD AND STBD AFT SIDES, PROVIDE 8 NEW SECURING DOGS PRESENTLY MISSING FROM VARIOUS HATCHES. CONDUCT HOSE TEST ON HATCH #4 STBD AFTER COMPLETION OF REPAIRS.
Condition: Unknown
Due 8 April 1990
Resolved 8 April 1990
Construction/Loadline
Issued 20 March 1990 Resolved
MAKE PERMANENT REPAIRS TO THE HATCH COVERS FOR CARGO HOLDS 2, 3 & 4, UPON ARRIVAL IN SUBIC BAY AFTER UNLOADING CONTAINERS BUT PRIOR TO THE VESSEL'S DEPARTURE FROM SUBIC BAY. VESSEL IS TO STOP IN SINGAPORE TO ALLOW COAST GUARD INSPECTOR WITNESS TEST AND CONDUCT INSPECTIONS OF THE REPAIRS.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Engineering
Issued 20 March 1990 Resolved
MAKE PERMANENT REPAIRS TO THE SOUNDING PIPE TO THE #2 HOLD STBD SIDE ROSE BOX.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Construction/Loadline
Issued 20 March 1990 Resolved
MAKE PERMANENT REPAIRS TO THE LEAKY MAIN STEAM PIPING FLANGE GASKET LOCATEDIN THE LOWER ENGINE ROOM ABOVE FIRE STATION 28 NEXT TO THE LADDER.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Construction/Loadline
Issued 20 March 1990 Resolved
MAKE PERMANENT REPAIRS TO THE LEAKY STEAM PIPE FLANGE GASKET LOCATED AT THESTBD AFT BULKHEAD NEAR THE WATER TANK IN THE LOWER ENGINE ROOM.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Construction/Loadline
Issued 20 March 1990 Resolved
MAKE PERMANENT REPAIRS TO THE SOFT PATCHED MAIN DECK VENTS ON THE STBD SIDEFOR THE COFFERDAM FRAME 176-177 AND THE DOUBLE BOTTOM TANK #6.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Construction/Loadline
Issued 20 March 1990 Resolved
MAKE PERMANENT REPAIRS TO THE LEAKY WATERTIGHT DOOR HAND CRANK HYDRAULIC HOUSING ON THE SHAFT ALLEY SIDE.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Engineering
Issued 20 March 1990 Resolved
MAKE PERMANENT REPAIRS TO THE AUTOMATION SYSTEM WATCH CALL CIRCUIT AND TEST IN PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Accommodation/Occupational Safety
Issued 20 March 1990 Resolved
MAKE PERMANENT REPAIRS TO THE STBD ENGINE ROOM MAIN DECK CASING DOOR TO ALLOWING OPENING FROM EITHER SIDE.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Fire Fighting
Issued 20 March 1990 Resolved
MAKE PERMANENT REPAIRS TO THE SMOKE DETECTION SYSTEM AND PROVE OPERATION TOA COAST GUARD INSPECTOR. VESSEL MAY NOT CARRY VEHICLES OR EXPLOSIVES IN ANY HOLD UNTIL THE SYSTEM HAS BEEN REPAIRED.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Electrical
Issued 20 March 1990 Resolved
MAKE PERMANENT REPAIRS TO THE EMERGENCY GENERATOR SHUTDOWN TO CAUSE THE ENGINE TO SECURE RATHER THEN GO TO IDLE FOR OVERSPEED TRIP, LOW LUBE OIL PRESSURE TRIP AND HIGH JACKET WATER TEMPERATURE TRIP.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Engineering
Issued 30 November 1989 Resolved
CROP AND RENEW THE WASTED SECTION OF DOUBLE BOTTOM FUEL TANK VENTS FOR #2 PORT AFT, #3 CENTER FWD, #6 HOLD PORT SIDE FWD UPPER TWEEN DECK, AND REPAIRTHE CRUSHED SECTION OF VENT #4 HOLD STBD INBOARD AND RENEW SECTION WHICH HAS SOFT PATCH.
Condition: Unknown
Due 30 November 1989
Resolved 30 November 1989
Documentation
Issued 30 November 1989 Resolved
COMPLETE REPAIRS TO BOTH SOOT BLOWER LINES, CONDUCT HYDRO AT 1 1/2 MAWP, AND PROVIDE NDT AS REQUIRED.
Condition: Unknown
Due 30 November 1989
Resolved 30 November 1989
Engineering
Issued 30 November 1989 Resolved
PROVIDE NEW BILGE ROSE BOX STRAINERS IN #2 HOLD STBD SIDE TO REPLACE THE EXISTING STRAINERS, AND REPAIR SOUNDING TUBE FRACTURED APPROXIMATELY 2 FT. FROM TANK TOP STBD ROSE BOX.
Condition: Unknown
Due 30 November 1989
Resolved 30 November 1989
Construction/Loadline
Issued 30 November 1989 Resolved
CROP AND RENEW WASTED SECTIONS OF FRAMES IN #4 HOLD NEAR TANK TOP.
Condition: Unknown
Due 30 November 1989
Resolved 30 November 1989
Construction/Loadline
Issued 30 November 1989 Resolved
PROVIDE MATERIAL SPECIFICATIONS ON BOTH 28" BUTTERFLY VALVES TO DEMONSTRATEVALVE IS OF CATEGORY "A" DESIGNATION.
Condition: Unknown
Due 30 November 1989
Resolved 30 November 1989
Fire Fighting
Issued 30 November 1989 Resolved
MAKE PERMANENT REPAIRS TO THE SMOKE DETECTOR CABINET AND DEMONSTRATE OPERATION. FIRE WATCH IS TO MAKE A CHECK OF ALL SPACES AND CARGO HOLDS ANDLOG FINDINGS UNTIL SYSTEM IS REPAIRED.
Condition: Unknown
Due 30 November 1989
Resolved 30 November 1989
Engineering
Issued 1 September 1989 Resolved
REPLACE LUBE OIL PUMP SELECTION SWITCH TO THE MAIN ENGINE CONTROL CONSOLE.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989 Resolved
RENEW TUBING TO SALT WATER HEATERS ON #1 AND #2 EVAPORATORS.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989 Resolved
REPAIR FLANGE CUT TO 140 PSI STEAM LINE LOCATED BETWEEN MAIN FEEDPUMPS.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989 Resolved
REPAIR STEAM LEAK ON PORT BOILER CONTROL DESUPERHEATER BOTTOM GAP GASKET AND COMBUSTION CONTROL BONNET VALVE.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989 Resolved
REPLACE INSULATION TO STEAM PIPING IN MACHINERY SPACE WHERE WASTED AND TORN
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989 Resolved
RETURN COMBUSTION CONTROL AIR REGULATOR TO AUTOMATIC MODE FUNCTION.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989 Resolved
PRESENT PORT AND STARBOARD BOILERS FOR INTERNAL INSPECTION OF FIRE AND WATERSIDES.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Electrical
Issued 1 September 1989 Resolved
RENEW OR MAKE PERMANANT REPAIRS TO STANDBY GENERATOR CONDENSATE DRAIN PIPING.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Accommodation/Occupational Safety
Issued 1 September 1989 Resolved
RENEW THE HEATING ELEMENT TO THE DOMESTIC HOT WATER HEATER.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Fire Fighting
Issued 1 September 1989 Resolved
PERFORM 12 YEAR HYDROSTATIC TESTING OF ALL CO2 CYLINDERS IN FIXED FIRE EXTINGUISHING SYSTEM USING A 49 CFR 173.34 APPROVED FACILITY.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 6 March 1989 Resolved
MAKE DC (DIRECT CONTACT) HEATER AVAILABLE FOR INSPECTION AT NEXT HULL EXAM.
Condition: Unknown
Due 6 March 1989
Resolved 6 March 1989
Engineering
Issued 6 March 1989 Resolved
REPLACE EMERGENCY BATTERIES FOR EMERGENCY LUBE OIL PUMP TO REDUCTION GEAR.
Condition: Unknown
Due 6 March 1989
Resolved 6 March 1989
Engineering
Issued 6 March 1989 Resolved
RENEW ALL FUEL TANK VENT BELL MOUTHS.
Condition: Unknown
Due 6 March 1989
Resolved 6 March 1989
Unknown
Issued 6 March 1989 Resolved
REPAIR OR REPLACE THE 28 INCH MAIN CONDENSER AND LOW SEA SUCTION SEA VALVESAT TIME OF NEXT HULL EXAM.
Condition: Unknown
Due 6 March 1989
Resolved 6 March 1989
Electrical
Issued 6 March 1989 Resolved
INSTALL POWER DRIVEN HYDRAULIC PUMP TO EMERGENCY GENERATOR HYDRAULIC STARTING ACCUMULATOR.
Condition: Unknown
Due 6 March 1989
Resolved 6 March 1989
Unknown
Issued 4 March 1988 Resolved
INTERNALLY INSPECT THE D.C. HEATER.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988 Resolved
MAKE PERMANENT REPAIRS ON FUEL TANK VENTS AT: (1) NO.3 HOLD STBD FWD LOW DK; (2) NO.3 HOLD PORT AFT LWR DK; (3) NO.3 HOLD PORT 'TWEEN DK; (4) NO.3 HOLD STBD AFT UPPER 'TWEEN DK; (5) NO.3 HOLD PORT UPPER 'TWEEN DK; (6) NO.2HOLD PORT AFT 'TWEEN DK; & (7) NO.2 HOLD STBD UPPER 'TWEEN DECK.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988 Resolved
INSTALL EXPLOSION PROOF LIGHT FIXTURE IN ENGINEERS PAINT LOCKER.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988 Resolved
INSTALL PROTECTIVE COVERS IN CIRCUIT BREAKER BOXES WHERE CIRCUIT BREAKERS ARE MISSING.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988 Resolved
RENEW WIRING AND LIGHTING FIXTURES AT BOILER SIGHT GLASSES.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988 Resolved
REPLACE MISSING LIGHT COVERS AND/OR GUARDS THROUGHOUT THE SHIP.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988 Resolved
MAKE PERMANENT REPAIRS TO LAGGING ON STEAMLINES ON AFT SIDE OF PORT AND STBD BOILERS WHERE MISSING OR DAMAGED.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Engineering
Issued 4 March 1988 Resolved
SET AND SEAL SAFETY VALVES ON BOTH BOILERS IN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Engineering
Issued 8 April 1987 Resolved
PROVIDE THE INSTALLATION DATES FOR ALL MAIN CONDENSER EXPANSION JOINTS TO THE [name withheld]
Condition: Unknown
Due 8 April 1987
Resolved 8 April 1987
Engineering
Issued 8 April 1987 Resolved
PERMANENTLY REPLACE THE TEMPORARY EXPANSION JOINT(S) FOR THE MAIN CONDENSEROVERBOARD AND THE LOW/HIGH SUCTION CROSS OVER.
Condition: Unknown
Due 8 April 1987
Resolved 8 April 1987
Engineering
Issued 8 April 1987 Resolved
REPAIR OR REPLACE THE 28 INCH MAIN CONDENSER AND LOW SEA SUCTION SEA VALVES
Condition: Unknown
Due 8 April 1987
Resolved 8 April 1987
Engineering
Issued 8 April 1987 Resolved
REPAIR THE STARBOARD BOILER ECONOMIZER AND PERFORM A HYDROSTATIC TEST AT 1 1/4 MAWP.
Condition: Unknown
Due 8 April 1987
Resolved 8 April 1987
Electrical
Issued 8 April 1987 Resolved
MAKE PERMANENT REPAIRS TO THE STANDBY GENERATOR. TEST THE ASSOCIATED SAFETY DEVICES AND RECORD THE RESULTS IN THE VESSELS OFFICIAL LOG.
Condition: Unknown
Due 8 April 1987
Resolved 8 April 1987
Lifesaving
Issued 8 April 1987 Resolved
PROVIDE A SOLAS LIFESAVING TRAINING MANUAL IN ACCORDANCE WITH THE REQUIRE- MENTS OF SOLAS '83 AMENDMENTS.
Condition: Unknown
Due 8 April 1987
Resolved 8 April 1987
Unknown
Issued 12 April 1986 Resolved
STARBOARD BOILER MAIN STEAM STOP, AUX STEAM STOP, FEED STOP, GENERATOR BULKHEAD STOP SHALL BE OPENED PRIOR TO RECEIVING CREDIT FOR MOUNTINGS OPENED.
Condition: Unknown
Due 12 April 1986
Resolved 12 April 1986
Unknown
Issued 24 February 1986 Resolved
HAVE MOUNTING OPEN FOR INSPECTION ON PORT AND STARBOARD BOILERS.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986 Resolved
MAKE PERMANENT REPAIRS TO FRAME 175, STARBOARD SIDE OF NUMBER 5 HOLD.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986 Resolved
MAKE PERMANENT REPAIRS TO GASKET CHANNELS OF HATCH COVERS 3 AND 4.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986 Resolved
PROVE HIGH WATER ALARM ON PORT BOILER.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986 Resolved
HAVE 10, B-2 PORTABLE CO2 EXTINGUISHERS HYDROSTATICALLY TESTED.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986 Resolved
HAVE DC HEATER HYDROSTATICALLY TESTED OR INTERNALLY EXAMINED.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986 Resolved
CROP AND RENEW WASTED AREA IN FLUME TANK AS PER DRAWING.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986 Resolved
PROVE GALLEY VENTILATION GAYLORD SYSTEM.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986 Resolved
PROVE OVERSPEED TRIP ON EMERGENCY GENERATOR.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986 Resolved
HYDRO BOILERS PORT AND STARBOARD AT 1 1/2 TIMES MAXIMUM WORKING PRESSURE.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986 Resolved
CONDUCT WEIGHT TEST OF PORT LIFEBOAT.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986 Resolved
PROVIDE 19 USCG APPROVED LIGHTS FOR LIFE PRESERVERS.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986 Resolved
REMOVE ASBESTOS INSULATION IN NUMBER 5 HOLD FORWARD BULKHEAD.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Engineering
Issued 30 March 1985 Resolved
ACQUIRE 46 CFR SUCHAPTER I, CARGO AND MISCELLANEOUS VESSEL REGULATIONS.
Condition: Unknown
Due 30 March 1985
Resolved 30 March 1985
Engineering
Issued 30 March 1985 Resolved
PROVE OVERSPEED TRIP ON NUMBER TWO FEED PUMP.
Condition: Unknown
Due 30 March 1985
Resolved 30 March 1985
Unknown
Issued 30 March 1985 Resolved
DURING THE MIDPERIOD INSPECTION IT WAS NOTED THAT THERE WAS NO INTERNATIONAL OIL POLLUTION PREVENTION (IOPP) CERTIFICATE ONBOARD THE VESSEL. THIS IS IN VIOLATION OF U.S. LAWS AND INTERNATIONAL TREATIES. ADVISE ASAP OF THE STATUS OF THIS CERTIFICATE FOR THIS VESSEL.
Condition: Unknown
Due 30 March 1985
Resolved 30 March 1985

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.