Records from 1984 to 1991. Most recent: inspection, 17 April 1991.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 31
17 April 1991
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 911168
16 July 1990
Damage Survey
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1238981
20 June 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1244775
3 May 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 934885
10 April 1990
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1225533
8 April 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 908777
20 March 1990
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 922554
20 March 1990
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1219091
16 March 1990
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 911839
9 March 1990
Permit to Proceed
Administrative · MSO HAMPTON ROADS · USCG East District (CGD-E) · Activity 917986
5 March 1990
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1233528
12 February 1990
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1230889
30 November 1989
Hull Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 906728
1 September 1989
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1040543
31 May 1989
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1345334
6 March 1989
Re-Inspection · Drydock Extension
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1044149
19 April 1988
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1350871
4 March 1988
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1346873
10 November 1987
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1028312
13 July 1987
Administrative
Administrative · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1324712
8 April 1987
Hull Examination · Re-Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1324796
18 October 1986
MARPOL Annex I Examination
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1013478
28 August 1986
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1316818
29 July 1986
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 988101
10 May 1986
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 995426
12 April 1986
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1307668
20 March 1986
Deficiency Check
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1307604
24 February 1986
COI Inspection
Physical examination · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 991923
18 May 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 1298494
30 March 1985
Type not recorded
No type recorded · MSO HONOLULU · USCG Oceania District (CGD-O) · Activity 982691
14 March 1984
Credit Drydock
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 995807
Engineering
Issued 10 April 1990
Resolved
COMPLETE REPAIRS TO BOTH SOOT BLOWER LINES, CONDUCT HYDRO AT 1 1/2 MAWP, AND PROVIDE NDT AS REQUIRED.
Condition: Unknown
Due 10 April 1990
Resolved 10 April 1990
Construction/Loadline
Issued 8 April 1990
Resolved
RENEW GASKET FOR #2 HATCH AT 2ND JOINT FROM AFT SIDE, #6 HOLD, REPAIR HATCHAT 2 SPOTS TO ELIMINATE DAYLIGHT, #3 STBD & CENTER REPAIR CENTER JOINTS, #4STBD CROP & RENEW WASTED SECTION OF OF HATCH STIFFENER AND REPAIR CENTER GASKET.
Condition: Unknown
Due 8 April 1990
Resolved 8 April 1990
Fire Fighting
Issued 8 April 1990
Resolved
REPAIR LEAKY DECK WASH VALVE AT FS 17 AND FS VALVE AT FS20.
Condition: Unknown
Due 8 April 1990
Resolved 8 April 1990
Construction/Loadline
Issued 8 April 1990
Resolved
REPAIR #5 HATCH TO ELIMINATE DAYLIGHT PORT FWD AND STBD AFT SIDES, PROVIDE 8 NEW SECURING DOGS PRESENTLY MISSING FROM VARIOUS HATCHES. CONDUCT HOSE TEST ON HATCH #4 STBD AFTER COMPLETION OF REPAIRS.
Condition: Unknown
Due 8 April 1990
Resolved 8 April 1990
Construction/Loadline
Issued 20 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE HATCH COVERS FOR CARGO HOLDS 2, 3 & 4, UPON ARRIVAL IN SUBIC BAY AFTER UNLOADING CONTAINERS BUT PRIOR TO THE VESSEL'S DEPARTURE FROM SUBIC BAY. VESSEL IS TO STOP IN SINGAPORE TO ALLOW COAST GUARD INSPECTOR WITNESS TEST AND CONDUCT INSPECTIONS OF THE REPAIRS.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Engineering
Issued 20 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE SOUNDING PIPE TO THE #2 HOLD STBD SIDE ROSE BOX.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Construction/Loadline
Issued 20 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE LEAKY MAIN STEAM PIPING FLANGE GASKET LOCATEDIN THE LOWER ENGINE ROOM ABOVE FIRE STATION 28 NEXT TO THE LADDER.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Construction/Loadline
Issued 20 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE LEAKY STEAM PIPE FLANGE GASKET LOCATED AT THESTBD AFT BULKHEAD NEAR THE WATER TANK IN THE LOWER ENGINE ROOM.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Construction/Loadline
Issued 20 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE SOFT PATCHED MAIN DECK VENTS ON THE STBD SIDEFOR THE COFFERDAM FRAME 176-177 AND THE DOUBLE BOTTOM TANK #6.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Construction/Loadline
Issued 20 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE LEAKY WATERTIGHT DOOR HAND CRANK HYDRAULIC HOUSING ON THE SHAFT ALLEY SIDE.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Engineering
Issued 20 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE AUTOMATION SYSTEM WATCH CALL CIRCUIT AND TEST IN PRESENCE OF A COAST GUARD INSPECTOR.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Accommodation/Occupational Safety
Issued 20 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE STBD ENGINE ROOM MAIN DECK CASING DOOR TO ALLOWING OPENING FROM EITHER SIDE.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Fire Fighting
Issued 20 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE SMOKE DETECTION SYSTEM AND PROVE OPERATION TOA COAST GUARD INSPECTOR. VESSEL MAY NOT CARRY VEHICLES OR EXPLOSIVES IN ANY HOLD UNTIL THE SYSTEM HAS BEEN REPAIRED.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Electrical
Issued 20 March 1990
Resolved
MAKE PERMANENT REPAIRS TO THE EMERGENCY GENERATOR SHUTDOWN TO CAUSE THE ENGINE TO SECURE RATHER THEN GO TO IDLE FOR OVERSPEED TRIP, LOW LUBE OIL PRESSURE TRIP AND HIGH JACKET WATER TEMPERATURE TRIP.
Condition: Unknown
Due 20 March 1990
Resolved 20 March 1990
Engineering
Issued 30 November 1989
Resolved
CROP AND RENEW THE WASTED SECTION OF DOUBLE BOTTOM FUEL TANK VENTS FOR #2 PORT AFT, #3 CENTER FWD, #6 HOLD PORT SIDE FWD UPPER TWEEN DECK, AND REPAIRTHE CRUSHED SECTION OF VENT #4 HOLD STBD INBOARD AND RENEW SECTION WHICH HAS SOFT PATCH.
Condition: Unknown
Due 30 November 1989
Resolved 30 November 1989
Documentation
Issued 30 November 1989
Resolved
COMPLETE REPAIRS TO BOTH SOOT BLOWER LINES, CONDUCT HYDRO AT 1 1/2 MAWP, AND PROVIDE NDT AS REQUIRED.
Condition: Unknown
Due 30 November 1989
Resolved 30 November 1989
Engineering
Issued 30 November 1989
Resolved
PROVIDE NEW BILGE ROSE BOX STRAINERS IN #2 HOLD STBD SIDE TO REPLACE THE EXISTING STRAINERS, AND REPAIR SOUNDING TUBE FRACTURED APPROXIMATELY 2 FT. FROM TANK TOP STBD ROSE BOX.
Condition: Unknown
Due 30 November 1989
Resolved 30 November 1989
Construction/Loadline
Issued 30 November 1989
Resolved
CROP AND RENEW WASTED SECTIONS OF FRAMES IN #4 HOLD NEAR TANK TOP.
Condition: Unknown
Due 30 November 1989
Resolved 30 November 1989
Construction/Loadline
Issued 30 November 1989
Resolved
PROVIDE MATERIAL SPECIFICATIONS ON BOTH 28" BUTTERFLY VALVES TO DEMONSTRATEVALVE IS OF CATEGORY "A" DESIGNATION.
Condition: Unknown
Due 30 November 1989
Resolved 30 November 1989
Fire Fighting
Issued 30 November 1989
Resolved
MAKE PERMANENT REPAIRS TO THE SMOKE DETECTOR CABINET AND DEMONSTRATE OPERATION. FIRE WATCH IS TO MAKE A CHECK OF ALL SPACES AND CARGO HOLDS ANDLOG FINDINGS UNTIL SYSTEM IS REPAIRED.
Condition: Unknown
Due 30 November 1989
Resolved 30 November 1989
Engineering
Issued 1 September 1989
Resolved
REPLACE LUBE OIL PUMP SELECTION SWITCH TO THE MAIN ENGINE CONTROL CONSOLE.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989
Resolved
RENEW TUBING TO SALT WATER HEATERS ON #1 AND #2 EVAPORATORS.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989
Resolved
REPAIR FLANGE CUT TO 140 PSI STEAM LINE LOCATED BETWEEN MAIN FEEDPUMPS.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989
Resolved
REPAIR STEAM LEAK ON PORT BOILER CONTROL DESUPERHEATER BOTTOM GAP GASKET AND COMBUSTION CONTROL BONNET VALVE.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989
Resolved
REPLACE INSULATION TO STEAM PIPING IN MACHINERY SPACE WHERE WASTED AND TORN
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989
Resolved
RETURN COMBUSTION CONTROL AIR REGULATOR TO AUTOMATIC MODE FUNCTION.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 1 September 1989
Resolved
PRESENT PORT AND STARBOARD BOILERS FOR INTERNAL INSPECTION OF FIRE AND WATERSIDES.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Electrical
Issued 1 September 1989
Resolved
RENEW OR MAKE PERMANANT REPAIRS TO STANDBY GENERATOR CONDENSATE DRAIN PIPING.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Accommodation/Occupational Safety
Issued 1 September 1989
Resolved
RENEW THE HEATING ELEMENT TO THE DOMESTIC HOT WATER HEATER.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Fire Fighting
Issued 1 September 1989
Resolved
PERFORM 12 YEAR HYDROSTATIC TESTING OF ALL CO2 CYLINDERS IN FIXED FIRE EXTINGUISHING SYSTEM USING A 49 CFR 173.34 APPROVED FACILITY.
Condition: Unknown
Due 1 September 1989
Resolved 1 September 1989
Engineering
Issued 6 March 1989
Resolved
MAKE DC (DIRECT CONTACT) HEATER AVAILABLE FOR INSPECTION AT NEXT HULL EXAM.
Condition: Unknown
Due 6 March 1989
Resolved 6 March 1989
Engineering
Issued 6 March 1989
Resolved
REPLACE EMERGENCY BATTERIES FOR EMERGENCY LUBE OIL PUMP TO REDUCTION GEAR.
Condition: Unknown
Due 6 March 1989
Resolved 6 March 1989
Engineering
Issued 6 March 1989
Resolved
RENEW ALL FUEL TANK VENT BELL MOUTHS.
Condition: Unknown
Due 6 March 1989
Resolved 6 March 1989
Unknown
Issued 6 March 1989
Resolved
REPAIR OR REPLACE THE 28 INCH MAIN CONDENSER AND LOW SEA SUCTION SEA VALVESAT TIME OF NEXT HULL EXAM.
Condition: Unknown
Due 6 March 1989
Resolved 6 March 1989
Electrical
Issued 6 March 1989
Resolved
INSTALL POWER DRIVEN HYDRAULIC PUMP TO EMERGENCY GENERATOR HYDRAULIC STARTING ACCUMULATOR.
Condition: Unknown
Due 6 March 1989
Resolved 6 March 1989
Unknown
Issued 4 March 1988
Resolved
INTERNALLY INSPECT THE D.C. HEATER.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988
Resolved
MAKE PERMANENT REPAIRS ON FUEL TANK VENTS AT: (1) NO.3 HOLD STBD FWD LOW DK; (2) NO.3 HOLD PORT AFT LWR DK; (3) NO.3 HOLD PORT 'TWEEN DK; (4) NO.3 HOLD STBD AFT UPPER 'TWEEN DK; (5) NO.3 HOLD PORT UPPER 'TWEEN DK; (6) NO.2HOLD PORT AFT 'TWEEN DK; & (7) NO.2 HOLD STBD UPPER 'TWEEN DECK.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988
Resolved
INSTALL EXPLOSION PROOF LIGHT FIXTURE IN ENGINEERS PAINT LOCKER.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988
Resolved
INSTALL PROTECTIVE COVERS IN CIRCUIT BREAKER BOXES WHERE CIRCUIT BREAKERS ARE MISSING.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988
Resolved
RENEW WIRING AND LIGHTING FIXTURES AT BOILER SIGHT GLASSES.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988
Resolved
REPLACE MISSING LIGHT COVERS AND/OR GUARDS THROUGHOUT THE SHIP.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Unknown
Issued 4 March 1988
Resolved
MAKE PERMANENT REPAIRS TO LAGGING ON STEAMLINES ON AFT SIDE OF PORT AND STBD BOILERS WHERE MISSING OR DAMAGED.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Engineering
Issued 4 March 1988
Resolved
SET AND SEAL SAFETY VALVES ON BOTH BOILERS IN THE PRESENCE OF A MARINE INSPECTOR.
Condition: Unknown
Due 4 March 1988
Resolved 4 March 1988
Engineering
Issued 8 April 1987
Resolved
PROVIDE THE INSTALLATION DATES FOR ALL MAIN CONDENSER EXPANSION JOINTS TO THE [name withheld]
Condition: Unknown
Due 8 April 1987
Resolved 8 April 1987
Engineering
Issued 8 April 1987
Resolved
PERMANENTLY REPLACE THE TEMPORARY EXPANSION JOINT(S) FOR THE MAIN CONDENSEROVERBOARD AND THE LOW/HIGH SUCTION CROSS OVER.
Condition: Unknown
Due 8 April 1987
Resolved 8 April 1987
Engineering
Issued 8 April 1987
Resolved
REPAIR OR REPLACE THE 28 INCH MAIN CONDENSER AND LOW SEA SUCTION SEA VALVES
Condition: Unknown
Due 8 April 1987
Resolved 8 April 1987
Engineering
Issued 8 April 1987
Resolved
REPAIR THE STARBOARD BOILER ECONOMIZER AND PERFORM A HYDROSTATIC TEST AT 1 1/4 MAWP.
Condition: Unknown
Due 8 April 1987
Resolved 8 April 1987
Electrical
Issued 8 April 1987
Resolved
MAKE PERMANENT REPAIRS TO THE STANDBY GENERATOR. TEST THE ASSOCIATED SAFETY DEVICES AND RECORD THE RESULTS IN THE VESSELS OFFICIAL LOG.
Condition: Unknown
Due 8 April 1987
Resolved 8 April 1987
Lifesaving
Issued 8 April 1987
Resolved
PROVIDE A SOLAS LIFESAVING TRAINING MANUAL IN ACCORDANCE WITH THE REQUIRE- MENTS OF SOLAS '83 AMENDMENTS.
Condition: Unknown
Due 8 April 1987
Resolved 8 April 1987
Unknown
Issued 12 April 1986
Resolved
STARBOARD BOILER MAIN STEAM STOP, AUX STEAM STOP, FEED STOP, GENERATOR BULKHEAD STOP SHALL BE OPENED PRIOR TO RECEIVING CREDIT FOR MOUNTINGS OPENED.
Condition: Unknown
Due 12 April 1986
Resolved 12 April 1986
Unknown
Issued 24 February 1986
Resolved
HAVE MOUNTING OPEN FOR INSPECTION ON PORT AND STARBOARD BOILERS.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
MAKE PERMANENT REPAIRS TO FRAME 175, STARBOARD SIDE OF NUMBER 5 HOLD.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
MAKE PERMANENT REPAIRS TO GASKET CHANNELS OF HATCH COVERS 3 AND 4.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
PROVE HIGH WATER ALARM ON PORT BOILER.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
HAVE 10, B-2 PORTABLE CO2 EXTINGUISHERS HYDROSTATICALLY TESTED.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
HAVE DC HEATER HYDROSTATICALLY TESTED OR INTERNALLY EXAMINED.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
CROP AND RENEW WASTED AREA IN FLUME TANK AS PER DRAWING.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
PROVE GALLEY VENTILATION GAYLORD SYSTEM.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
PROVE OVERSPEED TRIP ON EMERGENCY GENERATOR.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
HYDRO BOILERS PORT AND STARBOARD AT 1 1/2 TIMES MAXIMUM WORKING PRESSURE.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
CONDUCT WEIGHT TEST OF PORT LIFEBOAT.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
PROVIDE 19 USCG APPROVED LIGHTS FOR LIFE PRESERVERS.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Unknown
Issued 24 February 1986
Resolved
REMOVE ASBESTOS INSULATION IN NUMBER 5 HOLD FORWARD BULKHEAD.
Condition: Unknown
Due 24 February 1986
Resolved 24 February 1986
Engineering
Issued 30 March 1985
Resolved
ACQUIRE 46 CFR SUCHAPTER I, CARGO AND MISCELLANEOUS VESSEL REGULATIONS.
Condition: Unknown
Due 30 March 1985
Resolved 30 March 1985
Engineering
Issued 30 March 1985
Resolved
PROVE OVERSPEED TRIP ON NUMBER TWO FEED PUMP.
Condition: Unknown
Due 30 March 1985
Resolved 30 March 1985
Unknown
Issued 30 March 1985
Resolved
DURING THE MIDPERIOD INSPECTION IT WAS NOTED THAT THERE WAS NO INTERNATIONAL OIL POLLUTION PREVENTION (IOPP) CERTIFICATE ONBOARD THE VESSEL. THIS IS IN VIOLATION OF U.S. LAWS AND INTERNATIONAL TREATIES. ADVISE ASAP OF THE STATUS OF THIS CERTIFICATE FOR THIS VESSEL.
Condition: Unknown
Due 30 March 1985
Resolved 30 March 1985