TRIBUTE is a 1966 passenger vessel (inspected). The Coast Guard has recorded 34 inspections since 2016, most recently in May 2026, along with 78 deficiencies, 1 operational control and 10 casualty investigations between 2004 and 2025.
Records from 2004 to 2026. Most recent: inspection, 27 May 2026.
- Built
- 1966
- Last inspected
- 27 May 2026
- Documentation
- Valid · documentation file of 10 August 2026
- Deficiencies
- 78 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 10 investigations · 2004–2025
Identity
503053
WDJ5323
45205
Flag
UNITED STATES
Maury page id
psix-45205
Inspections, by type
…with no type recorded4
Years with a record
11 calendar years (2016–2026)
The 34 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.
Documentation record
Registered dimensions (L × B × D)68.5 ft × 22.2 ft × 5.7 ft
Registered tonnagegross 75 / net 55
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDITTMAR AND DONALDSON · COSTA MESA, CA, UNITED STATES · built 1966
Hull materialWood
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portSAN DIEGO, CA
Trade endorsementsCoastwise, unrestricted, Fishery, Registry
DocumentationValid · issued 25 June 2026 · expires 31 May 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it75 - Regulatory (Subpart C or D), Gross Ton
55 - Regulatory (Subpart C or D), Net Ton
55 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
One vessel history report for this hull — every record on this page in one dated, citable document — $300, on request.
Inspection history · 34
27 May 2026
Deficiency Check · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8381219
9 February 2026
Damage Survey · Examination of Repairs
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8308371
23 September 2025
In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8240672
25 June 2025
Annual Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8161522
9 June 2025
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8156081
8 June 2025
In-Service Inspection · Damage Survey · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8156764
25 March 2025
COI Inspection · Administrative Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8083986
15 October 2024
In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 8020752
23 May 2024
Annual Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7921857
7 December 2023
Internal Structural Exam · Deficiency Check · Hull Examination · Examination of Repairs
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7828769
27 July 2023
In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7871872
5 July 2023
Administrative Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7734147
5 July 2023
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7741750
25 April 2023
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7675615
13 December 2022
In-Service Inspection · Plan Review "T" Boat
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7627591
11 September 2022
In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7560532
6 July 2022
Damage Survey · Administrative Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7501086
6 July 2022
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7596130
7 April 2022
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7450203
13 January 2022
Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7380118
15 December 2021
Examination of Repairs · Internal Structural Exam · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7368800
31 March 2021
Annual Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 7166176
9 April 2020
COI Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6934721
30 January 2020
In-Service Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6962091
10 December 2019
Deficiency Check · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6865657
28 October 2019
Damage Survey
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6844968
28 October 2019
Type not recorded
No type recorded · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6849766
26 September 2019
In-Service Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6821596
8 May 2019
Annual Inspection · Deficiency Check
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6679507
21 September 2018
Administrative Inspection
Administrative · Navigation Center · Activity 6545752
15 May 2018
Examination of Repairs · Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6415400
14 February 2018
Hull Examination · Internal Structural Exam
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6354987
19 June 2017
Annual Inspection
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 6173623
27 January 2016
Annual Inspection · Hull Examination · Plan Review "T" Boat
Physical examination · Sector San Diego · USCG Southwest District (CGD-SW) · Activity 5804302
Deficiency record · 78
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 27 May 2026
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines at the tank connection. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located. 03 of the vessel's shutoff valve were not operable.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 May 2026
Resolved
Electrical equipment on a vessel must be installed and maintained to minimize accidental personnel contact with energized parts. Both generators had open panel with exposed wires. Properly enclose boxes.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 27 May 2026
Resolved
The owner, charterer, master, or managing operator of a vessel carrying overnight passengers shall have a suitable number of watchmen patrol throughout the vessel during the nighttime, whether or not the vessel is underway, to guard against, and give alarm in case of, a fire, man overboard, or other dangerous situation. Vessel watchman system was inoperable, fix watchman system and notify local OCMI. Vessel will have logged rounds every hour until engine room watch system is corrected w/in 14 days.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 May 2026
Resolved
Electrical equipment must be installed to protect from electrical hazards. Electrical wiring underneath operating station has several exposed and dead-end wires. Properly remove or cover to prevent potential shock or fire hazards.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 27 May 2026
Resolved
All vessels must have operable navigation lights in accordance with the Navigation Rules. Stern light was inoperable. Provide navigation lights that are following the Navigation Rules. Vessel shall only operate in daylight hours.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 27 May 2026
Resolved
Vessel did not have non-conductive matting in front the switchboards. Vessel is to place non-conducting mats or grating shall be provided.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 9 February 2026
Resolved
Whenever a vessel is to carry out major repairs or alterations affecting the safety or seaworthiness of the vessel, it is the duty of the person in charge to report any contemplated repairs or alterations to the Officer in Charge, Marine Inspection (OCMI).
A report was received regarding repairs to the vessel’s planks. A Coast Guard Marine Inspector attended the vessel, observed questionable repairs, and identified concerns in the vicinity of the bow. No additional repairs or alterations shall be conducted without prior authorization from the OCMI.
02 - Structural Conditions › N/A - No Subsystem › Decks - cracking
Issued 9 February 2026
Resolved
Remove failed flooring support framing in forward storage room to assess damage to planking. Provide repair plan to replaced failed flooring support framing.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 9 February 2026
Resolved
Removed decking in way of forward frames in crew bunk room port and stbd sides to assess failed frame fasteners and cracked frame. Provide repair plan to re-strengthen deck clamp areas.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 9 February 2026
Resolved
Remove decking in way of forepeak compartment to assess frame-to-deck fastening. Provide repair plan to re-strengthen deck clamp areas.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 9 February 2026
Resolved
Provide repair plan to add additional longitudinal stringer from storage room and into forepeak.
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 9 February 2026
Resolved
Provide repair plan to stop water ingress at various plank seams.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - cracking
Issued 9 February 2026
Resolved
Provide repair plan to address movement of gunwale on bow of vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 25 June 2025
Resolved
Each ring life buoy on a vessel
must: (1) Be approved in accordance with
§160.050 in subchapter Q of this chapter,
or other standard specified by the Commandant. Each ring life buoy with a floating watertight must have a 3ft lanyard and be attached with a corrosion resistant clip. Port ring buoy is not of an approved type, waterlight lanyard is to short and does not have a clip. 46CFR180.70
05 - Radio Communications › N/A - No Subsystem › Other (radio communication)
Issued 25 June 2025
Resolved
Vessel must have a valid bridge-to-bridge certificate on board. Vessel did not have a bridge to bridge certificate. 47CFR80.1001
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 25 June 2025
Resolved
Life rafts require servicing. Provide annual servicing
report by 26Jun25. 46CFR185.730
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 20 June 2025
Resolved
Vessel conducted emergency haul out to address multiple areas of water intrusion from the hull. After re-entering the water on 18JUN25, 02 additional areas of water ingress were identified my MSD Santa Barbara marine inspector. New areas of water intrusion identified on 18JUN25 are: Butt-block above chine under bunk 24 / port side AND Butt-block under forward / stbd bunk in forward accommodation space. Vessel departed Ventura Boatyard without marine inspector verifying status of leaking areas identified.
Vessel's COI was removed from the vessel on 11JUN25 and is scheduled for a recertification inspection on 25JUN25 at Seaforth Landing.
Prior to the 25JUN25 recertification inspection, provide Sector San Diego with objective evidence attesting to any repairs made to address the 02 new areas of water ingress and the current leaking rated of each area.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
While at the dock, the vessel is actively making water from a butt-block, stbd side at chine, underneath the forward accommodation staircase. Two frame bays in-way-of butt-block have water trickling downward. Haul vessel out of the water for inspection and submit repair proposal.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
While underway, the vessel is making water in the forepeak compartment when the bow digs into swells. Areas of concern are the upper four strakes of planking, both port and stbd sides in the aft end of the compartment. Haul vessel out of the water for inspection and submit repair proposal.
02 - Structural Conditions › N/A - No Subsystem › Bulkheads - operational damage
Issued 9 June 2025
Resolved
The aft watertight bulkhead (collision bulkhead) is not watertight. Significant pass-through of water to the adjacent compartment was observed while filling the forepeak with water. Identify the cause and submit repair proposal.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
Plank seam at stbd garboard to strake B plank is making water in the aft end of the storage room adjacent to the forward accommodation space. Haul vessel out of the water for inspection and submit repair proposal.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 9 June 2025
Resolved
Partial butt-block in forward accommodation space, stbd side forward of staircase is seeping water. Haul vessel out of the water for inspection and submit repair proposal.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 25 March 2025
Resolved
While conducting steering tests, both rudders were found to be leaking excessively with water accumulation in the lazarette bilge pockets. Make packing gland adjustments to both rudders to reduce the water accumulation.46CFR 182.610
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 25 March 2025
Resolved
Both main engine sea strainers were found unmounted and were supported by the attached flexible hoses. Provide each main engine sea strainer with proper support to prevent movement in all sea conditions. 46CFR 182.420
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 25 March 2025
Resolved
Electrical submersible pump found partially disconnected with exposed wiring. Either remove or make permanent installation.
07 - Fire Safety › N/A - No Subsystem › Evaluation of crew performance (fire drills)
Issued 25 March 2025
Resolved
During the fire drill the two deckhands were not familiar with the location of the Halon pull station and thought it was activated with the galley pull station. The vessel was also found without a life-boatman but did not have training on how to launch a life raft. Conduct remedial training on both and once satisfactory, send a statement that you as Captain of the TRIBUTE found their knowledge of emergency drills satisfactory.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 25 March 2025
Resolved
Fire hose nozzle seized, replace with one IAW 46CFR181
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 23 May 2024
Resolved
Ring buoys must be maintained in accordance with 46CFR160.050. Retro reflective tape was missing from ring buoy on the starboard side of the vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 23 May 2024
Resolved
Vessel's must have a life jacket for every person on board. Vessel has 2 un - serviceable life jackets taken out of service and another 7 that needed new retro reflective tape. Vessel is restricted to 41 passengers.
05 - Radio Communications › N/A - No Subsystem › Operation/maintenance
Issued 23 May 2024
Resolved
Vessel must have a valid bridge to bridge certificate. Vessels bridge to bridge certificate was expired.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 23 May 2024
Resolved
Machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure and personnel injury. Exhaust has multiple pinholes on muffler and must be replaced.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 23 May 2024
Resolved
Machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure and personnel injury. Replace fire pump gauge or repair.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 23 May 2024
Resolved
A hatch cover must be attached to the hatch frame by hinges, chains or other devices of substantial strength to prevent its loss. Until replaced ensure hatch stays secured at all times.
07 - Fire Safety › N/A - No Subsystem › Fire patrol
Issued 23 May 2024
Resolved
Integrated smoke detectors were not integrated and did not all set each other off. Troubleshoot and ensure the smoke detectors were integrated. Roving watch was corrected at the time of the inspection but documented.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 5 July 2023
Resolved
Vessel was unable to start its MDEs or generators. Identify and repair the cause of the failure.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 25 April 2023
Resolved
Secondary means of escape from forward, lower bunk room was blocked by two rubber mats, impeding escape. Remove mats and keep escape hatch free of obstructions.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 8 July 2022
Resolved
Port side DC distribution panel behind accommodation bulkhead found to be missing cover. Install cover.
02 - Structural Conditions › N/A - No Subsystem › Decks - corrosion
Issued 7 July 2022
Resolved
Vessel decking IWO port side damaged area found to have significant rot and fastener wastage. Remove deck coating for further inspection.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 7 July 2022
Resolved
Vessel found to have damaged area and wood rot IWO port bow rub rail. Submit repair proposal.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 7 July 2022
Resolved
Vessel required to conduct fastener pull in vicinity of damaged area to the satisfaction of marine inspector.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 7 April 2022
Resolved
All vessels on an Oceans Route are required to carry twelve (12) distress flares. Vessel only had six (6) rocket parachute flares on board at time of inspection. Vessel route is reduced to a Lakes, Bays and Sounds until six (6) additional rocket parachute, red flame or smoke flares are provided.
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 7 April 2022
Resolved
Each overnight accommodation space on a vessel with overnight accommodations for passengers must be fitted with an independent modular smoke detection and alarm unit. Forward passenger berthing spaces on the port and starboard side did not have the smoke detection systems. Overnight passenger count is reduced by six (6) persons until deficiency is rectified.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 7 April 2022
Resolved
A fire hose with a suitable nozzle must be attached to each fire station on board the vessel. Fire hose and nozzle on the port side were damaged and need to be taken out of service. Must replace in kind to the satisfaction of the CG Marine Inspector. Starboard side hose is still operable and can reach all sections of vessel.
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Other (Conditions of employment)
Issued 7 April 2022
Resolved
[withheld — contains personal information; the deficiency system, dates, and resolution status are shown above]
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 7 April 2022
Resolved
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed. Crank case re-breather on the starboard main engine was not hooked into the air intake as required by engine manufacturers. Must correct to the satisfaction of the Marine Inspector.
04 - Emergency Systems › N/A - No Subsystem › Safe areas
Issued 7 April 2022
Resolved
All emergency exits must not be blocked and allow easy access for all personnel on board. Emergency egress from forward crew space was blocked by rubber floor grating in the galley. Must remove grating of cut around emergency egress spot prior to the next overnight trip.
09 - Working and Living Conditions › 092 - Working Conditions › Machinery
Issued 31 March 2021
Resolved
Install port fuel tank bonding wire. Due 30Apr2021.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 31 March 2021
Resolved
Install double hose clamps on fuel transfer pump hose. Due 30Apr2021.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 31 March 2021
Resolved
Secure port side A/C pump to foundation. Due 30Apr2021.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 31 March 2021
Resolved
Remove fuel from transfer pump containment. Due 30Apr2021.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 31 March 2021
Resolved
Install metallic plugs on fuel filter drains. Due 30Apr2021.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 31 March 2021
Resolved
Tighten bridge A/C panel cover to eliminate air-gap. Due 30Apr2021.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 18 December 2019
Resolved
At each initial & subsequent inspection for certification, reinspection and every other inspection, the MI shall require that all observed unsafe practices & hazardous situations be corrected. Vessel to make forepeak/stem of vessel available for inspection. Make proper repairs to ensure watertight integrity of the hull, vessel forepeak & Aft Watertight Bulkhead in Forepeak as indicated.
46 CFR 176.25-50
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 28 October 2019
Resolved
Provide operational approved fixed fire fighting for engine room. Make testing of system available to USCG.
09 - Working and Living Conditions › 092 - Working Conditions › Safe means of access
Issued 28 October 2019
Resolved
Provide certified marine chemist certificate showing engine room is safe for entry.
09 - Working and Living Conditions › 091 - Living Conditions › Sleeping room
Issued 26 September 2019
Resolved
Vessels emergency lighting did not actuate upon loss of power to the vessel. Provide passenger and crew accommodations with adequate emergency lighting.
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 26 September 2019
Resolved
Re-locate emergency escape labeling to actual hatch.
09 - Working and Living Conditions › 091 - Living Conditions › Electrical devices
Issued 26 September 2019
Resolved
Remove dead-ended cables from all bunks on vessel.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 September 2019
Resolved
Remove all hard-wired power strips from vessel. Restore to original outlet configuration.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 September 2019
Resolved
Properly mount and provide blank covers for all junction boxes under pilot house console.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 September 2019
Resolved
Label all breaker loads in all electrical panels.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 26 September 2019
Resolved
Vessel has been identified as having various A/C electrical modifications since initial certification. Sector San Diego does not have vessels electrical plans on file or current installations do not match what we have on file. Provide a one-line electrical drawing for all A/C switchboards and distribution panels. Include all circuit loads, conductor sizes, over current protection, and max panel ratings in amps. Include generator and shore power breaker ratings.
10 - Safety of Navigation › N/A - No Subsystem › Bridge operation
Issued 26 September 2019
Resolved
While underway or drifting at sea, every vessel shall at all times maintain a proper look-out by sight and hearing. The designated watchmen required by 46 CFR 185.410 cannot preform both roving patrolling and look-out watch simultaneously. Vessel has been instructed to operate with a look-out and watchman while conducting drift operations.
09 - Working and Living Conditions › 092 - Working Conditions › Fitness for duty - intoxication
Issued 8 May 2019
Resolved
Provide alcohol test strips to accommodate 100% of crew testing.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 8 May 2019
Resolved
Prove proper operation of anchor light.
05 - Radio Communications › N/A - No Subsystem › VHF EPIRB
Issued 8 May 2019
Resolved
Relocate EPIRB to open area to facilitate float free.
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 8 May 2019
Resolved
Relocate spanner wrench for fuel shutoff to outside of machinery space.
04 - Emergency Systems › N/A - No Subsystem › Man Overboard Drill (MOB)
Issued 8 May 2019
Resolved
Install captive rope/chain on MOB ladder to prevent loss of ladder.
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 8 May 2019
Resolved
Repair starboard side ventilation closure clasp.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 21 September 2018
Resolved
CLSN: Vsl is broadcasting Invalid Call Sign, ZERO DRAFT: no static draft information
Fire Fighting › Fire Pumps › Pressure
Issued 15 May 2018
Resolved
Provide a a gauge for the fire pump
Documentation › Certificates/Documents › Stability Letter
Issued 15 May 2018
Resolved
Provide upper deck max persons label
Construction/Loadline › Structures › Scuttle
Issued 15 May 2018
Resolved
Service water tight hatch to the lazerette.
Electrical › Electrical Distribution System (service) › Wiring
Issued 15 May 2018
Resolved
Provide proer support for teh wiring every 24"
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 15 May 2018
Resolved
Provide an anchor light
Stability › Weathertight Integrity › General
Issued 15 May 2018
Resolved
Replace broken bridge window.
Engineering › Fuel Oil Storage/Transfer System › Gauge
Issued 15 May 2018
Resolved
Provide proper install of F/O sight glass.
Pollution Prevention/Response › Prevention Equipment › Sewage System Valve
Issued 15 May 2018
Resolved
Provide a lock on the MSD OB valve.
Casualty record · 10
24 September 2004Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 injured · activity 2208798
4 February 2005Routine · role: Involved in a Marine Casualty · activity 2288012
4 June 2006Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · activity 2673017
22 September 2007Routine · role: Involved in a Marine Casualty · activity 3075978
13 November 2007Routine · role: Involved in a Marine Casualty · activity 3105812
17 September 2013Routine · role: Involved in a Marine Casualty · activity 4717494
28 October 2019Routine · role: Involved in a Marine Casualty · activity 6849766
6 July 2022Routine · role: Involved in a Marine Casualty · activity 7596130
5 July 2023Routine · role: Involved in a Marine Casualty · activity 7741750
9 June 2025Routine · role: Involved in a Marine Casualty · activity 8156081
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Recorded names · 1
HOLIDAY (2004–2007). Names as the Coast Guard recorded them in incident records, with the years they appear; some are renames and some are spelling variants.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.