Records from 1982 to 1997. Most recent: inspection, 25 August 1997.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 119
25 August 1997
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1120959
10 July 1997
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 778665
1 April 1997
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1100585
31 March 1997
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 401982
3 December 1996
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1184091
12 September 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 185409
9 September 1996
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1438492
5 June 1996
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 40128
5 June 1996
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 171493
13 October 1995
Deficiency Check
Physical examination · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 879380
23 July 1995
Re-Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1455276
17 July 1995
Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 876262
12 June 1995
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 182391
22 May 1995
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 378612
22 May 1995
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1183684
15 March 1995
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 828784
5 October 1994
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 75470
30 August 1994
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 864725
16 August 1994
Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1177943
4 August 1994
COI Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 864942
24 July 1994
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 466461
21 June 1994
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 35363
28 February 1994
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 475446
18 December 1993
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 531399
8 December 1993
Examination of Repairs · Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1382669
10 November 1993
Administrative
Administrative · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1142314
28 September 1993
Re-Inspection
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 844225
8 May 1993
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 172080
28 April 1993
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 86103
25 March 1993
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1148913
24 March 1993
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 505967
19 February 1993
Examination of Repairs · Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1449582
21 January 1993
Examination of Repairs
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1140822
6 December 1992
Type not recorded
No type recorded · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 97048
20 November 1992
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 826816
12 September 1992
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 953472
11 September 1992
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 649685
10 September 1992
Type not recorded
No type recorded · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 353054
9 September 1992
Deficiency Check
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1255765
4 September 1992
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 933876
3 September 1992
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 114541
24 August 1992
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 454773
21 July 1992
COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 950489
18 July 1992
Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1260069
17 March 1992
Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 46233
21 February 1992
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 649686
11 February 1992
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 9106
20 January 1992
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 348312
30 November 1991
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 131125
21 November 1991
Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 1246886
22 October 1991
Administrative
Administrative · MSO WILMINGTON · USCG East District (CGD-E) · Activity 942697
16 October 1991
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 528112
9 September 1991
Deficiency Check
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 942296
15 July 1991
Re-Inspection
Physical examination · MSO WILMINGTON · USCG East District (CGD-E) · Activity 938126
19 June 1991
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 540201
24 May 1991
Type not recorded
No type recorded · MSO WILMINGTON · USCG East District (CGD-E) · Activity 343984
16 January 1991
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 924716
2 January 1991
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 922412
7 December 1990
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 924349
5 December 1990
Administrative
Administrative · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 909156
2 December 1990
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 513067
16 November 1990
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 901303
15 October 1990
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 914111
13 September 1990
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 912214
20 July 1990
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1235328
18 July 1990
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 910892
17 July 1990
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1220561
22 May 1990
Type not recorded
No type recorded · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 905162
27 April 1990
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 918412
23 March 1990
Deficiency Check
Physical examination · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 904372
16 March 1990
Hull Examination
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 980996
15 March 1990
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1212127
26 February 1990
Deficiency Check
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 904038
7 February 1990
Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 901675
9 January 1990
Administrative
Administrative · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1231772
19 December 1989
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1217010
10 December 1989
Damage Survey
Physical examination · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1227685
27 October 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 894450
20 October 1989
Deficiency Check
Physical examination · MSO HOUSTON/GALVESTON · USCG Heartland District (CGD-H) · Activity 1209936
11 October 1989
Administrative
Administrative · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1339511
29 August 1989
Re-Inspection
Physical examination · MSO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1037461
17 May 1989
Type not recorded
No type recorded · MSO MILWAUKEE · USCG Great Lakes District (CGD-GL) · Activity 891610
25 February 1989
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 512093
24 February 1989
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 493647
6 December 1988
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1209201
30 September 1988
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1045202
23 July 1988
Type not recorded
No type recorded · MSO JACKSONVILLE · USCG Southeast District (CGD-SE) · Activity 1340129
20 July 1988
Deficiency Check
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1340177
18 July 1988
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 324572
12 July 1988
COI Inspection
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1031245
23 November 1987
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 1026770
16 November 1987
Type not recorded
No type recorded · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1027592
16 November 1987
Hull Examination
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1337487
13 September 1987
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 438218
21 July 1987
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1332123
16 July 1987
Re-Inspection
Physical examination · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1020327
14 July 1987
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 1030634
8 May 1987
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1329451
29 January 1987
Drydock Extension
Administrative · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1011304
20 January 1987
Administrative
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1013417
26 November 1986
Deficiency Check
Physical examination · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1028227
30 September 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 1312293
9 June 1986
Deficiency Check
Physical examination · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 992649
4 June 1986
Type not recorded
No type recorded · MSO PORT ARTHUR · USCG Heartland District (CGD-H) · Activity 491853
2 June 1986
COI Inspection
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1295880
22 October 1985
Type not recorded
No type recorded · COTP HOUSTON · USCG Heartland District (CGD-H) · Activity 490241
22 October 1985
Type not recorded
No type recorded · MIO HOUSTON · USCG Heartland District (CGD-H) · Activity 985836
21 October 1985
Credit Drydock
Administrative · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 985487
17 October 1985
Deficiency Check
Physical examination · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 993092
15 October 1985
Damage Survey
Physical examination · MSO Mobile · USCG Heartland District (CGD-H) · Activity 1296019
21 May 1985
Type not recorded
No type recorded · MSO Corpus Christi · USCG Heartland District (CGD-H) · Activity 501704
30 January 1985
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 978565
19 November 1984
Type not recorded
No type recorded · MSO CHARLESTON · USCG Southeast District (CGD-SE) · Activity 298999
15 November 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 977047
1 August 1984
Type not recorded
No type recorded · MSU GALVESTON · USCG Heartland District (CGD-H) · Activity 1282578
29 June 1984
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1282970
4 October 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 1271476
27 January 1983
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 972055
29 January 1982
Type not recorded
No type recorded · MIO NEW ORLEANS · USCG Heartland District (CGD-H) · Activity 968628
Unknown
Issued 9 September 1996
Resolved
PRIOR TO GETTING UNDERWAY, MASTER TO CONDUCT FIRE AND BOAT DRILL WITH FULLYCOMPLEMENTED CREW IN THE PRESENCE OF CG INSPECTOR.
Condition: Unknown
Due 18 April 1997
Resolved 28 March 1997
Lifesaving
Issued 9 September 1996
Resolved
PRIOR TO DEPARTURE, MASTER TO ENSURE ALL ONBOARD MEDICATIONS AND MEDICAL SUPPLIES ARE CURRENT AND WITHIN EXPRIATION DATES.
Condition: Unknown
Due 18 April 1997
Resolved 28 March 1997
Documentation
Issued 9 September 1996
Resolved
PRIOR TO DEPARTURE, PROVIDE ALL OFFICERS LICENSES/DOCUMENTS FOR REVIEW BY CG INSPECTOR.
Condition: Unknown
Due 18 April 1997
Resolved 28 March 1997
Lifesaving
Issued 9 September 1996
Resolved
PRIOR TO EMBARKATION OF PERSONNEL AND PRIOR TO DEPARTURE, CONDUCT SATISFACTORY WEIGHT TEST (110% CAPACITY) OF PORT LIFEBOAT AND DAVIT INSTALLATION.
Condition: Unknown
Due 9 September 1996
Resolved 9 September 1996
Engineering
Issued 23 July 1995
Resolved
REPLACE NO.2 MAIN ENGINE INJECTION SCOOP EXPANSION JOINT IN BOILER ROOM AT FIRST U.S. PORT CALL. NO FURTHER EXTENSIONS WILL BE GRANTED.
Condition: Unknown
Due 23 July 1995
Resolved 23 July 1995
Engineering
Issued 15 March 1995
Resolved
REPAIR BOTH BULKHEAD STEAM STOP BONNETS LOCATED IN E/R.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Construction/Loadline
Issued 15 March 1995
Resolved
REPLACE ALL MISSING GOOSENECK VENT SCREENS INCLUDING WASTED SCREENS.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Accommodation/Occupational Safety
Issued 15 March 1995
Resolved
REPLACE ALL WASTED VENTILATION SCREENS EXTERIOR OF VSL. INSURE ALL COVERS & GASKET/DOGS ARE IN ORDER.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Construction/Loadline
Issued 15 March 1995
Resolved
CROP & RENEW WASTED YARDARM AS ORIGINAL.
Condition: Unknown
Due 15 June 1995
Resolved 30 March 1995
Engineering
Issued 15 March 1995
Resolved
MAKE FLOOR BRICKS, SUPER HEATER VESTIBULE AND ECONOMIZER VESTIBULE FOR_x001C_ BOTH BOILERS READY FOR INSPECTION (CLEAN).
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Accommodation/Occupational Safety
Issued 15 March 1995
Resolved
REPAIR WASTED SUPPLY AND EXHAUST VENTILATION TRUNKS AND INSTALL INTAKE SCREENS. PORT/STBD DECK HOUSE 03 LEVEL.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Fire Fighting
Issued 15 March 1995
Resolved
REPLACE ALL WASTED/MISSING HOSE RACKS, FIRE STATION NO 17 & 19.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Construction/Loadline
Issued 15 March 1995
Resolved
REFIT WATERTIGHT DOOR STBD SIDE AFT DOG HOUSE.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Construction/Loadline
Issued 15 March 1995
Resolved
CROP & INSERT WASTED BULKHEAD, SECOND TO AFT DOG HOUSE PORT FWD BOTTOM.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Construction/Loadline
Issued 15 March 1995
Resolved
CROP & RENEW ALL WASTED CARGO HATCH COAMING STIFFENERS.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Accommodation/Occupational Safety
Issued 15 March 1995
Resolved
CROP & RENEW ALL WASTED/MISSING HANDRAILS TROUGHOUT VSL, INCLUDING COURSES.(CHAINS)
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Construction/Loadline
Issued 15 March 1995
Resolved
CROP & RENEW ALL WASTED GASKET CHANNELS ON ALL CARGO HOLD HATCHES.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Engineering
Issued 15 March 1995
Resolved
SUBMIT OIL ANALYSIS FOR STERN TUBE LUBE OIL. REPORT SHOULD HAVE BEEN WITHIN LAST 6 MONTHS & OIL SAMPLES SHOULD BE TAKEN EVERY 6 MONTH IN ACCORDANCE WITH 46CFR 61.20-17(D)(3).
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Engineering
Issued 15 March 1995
Resolved
SEAL PORT & STBD BOILER SAFETY VALVES AT FIRST U. S. PORT IN PRESENCE_x001C_ OF COAST GUARD INSPECTOR.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Engineering
Issued 15 March 1995
Resolved
RENEW BROKEN/WASTED BRICK STAYS BOTH PORT & STBD BOILERS IN CONJUCTION W/BRICK & REFACTORY REPLACEMENT WHERE NECESSARY INCLUDING AIR REGISTERS, AIR BOX & VESTIBULES.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Lifesaving
Issued 15 March 1995
Resolved
INSTALL COVERS FOR ALL CARGO HOLD MAN HOLES WHERE MISSING INCLUDING SECURING DEVICES.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Unknown
Issued 15 March 1995
Resolved
SUBMIT CG-2692 ACCIDENT REPORT CONCERNING THE SIDESHELL DAMAGE PORT & STBD SIDE OF VSL TO THE COGNIZANT OCMI.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Deck/Cargo
Issued 15 March 1995
Resolved
RENEW WASTED PORT ANCHOR CHAIN.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Unknown
Issued 15 March 1995
Resolved
PREPARE FOR INTERNAL EXAMINATION ONE DOUBLE BOTTOM FUEL OIL TANK PER CARGO HOLD & E/R.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Lifesaving
Issued 15 March 1995
Resolved
CROP & RENEW WASTED YARDARM AS ORIGINAL.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Unknown
Issued 15 March 1995
Resolved
PERMANENTLY MARK VSL'S NAME & HAILING PORT IN ACCORDANCE WITH 46 CFR_x001C_ 67.15-3(D).
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Engineering
Issued 15 March 1995
Resolved
CROP AND RENEW THE WASTED STEAM PIPING TO THE MAIN CONDENSER PUMP SEA CHEST.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Accommodation/Occupational Safety
Issued 15 March 1995
Resolved
MAKE PERMANENT REPAIRS TO HOLED SEWAGE TANK AND ASSOCIATED PIPING.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Construction/Loadline
Issued 15 March 1995
Resolved
WHEN REPAIRS COMPLETED, CONDUCT 30 PSI H20 TEST TO CARGO HATCHES AND ALL (3) THREE SIDE SHELL INSERTS TO THE SATISFACTION OF ABS. SUBMIT RESULTS AND ABS DRYDOCK REPORT TO [name withheld].
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Unknown
Issued 15 March 1995
Resolved
PERMANENTLY AND CORRECTLY MARK VSL'S LOAD LINE & REMOVE INCORRECT LOAD LINEMARKS.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Deck/Cargo
Issued 15 March 1995
Resolved
CROP AND RENEW ALL WASTED BOOM STANCHIONS.
Condition: Unknown
Due 15 March 1995
Resolved 15 March 1995
Engineering
Issued 4 August 1994
Resolved
PROVIDE TO MARINE SAFETY CENTER FOR APROVAL, AUTOMATION TEST PROCEDURES.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Engineering
Issued 4 August 1994
Resolved
MAKE AVAILABLE TO CG MARINE INSPECTORS FOR EXAMINATION FIRESIDE & WATERSIDEON BOTH BOILERS.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Construction/Loadline
Issued 4 August 1994
Resolved
MAKE PERMANENT REPAIRS TO HOLED VENT PIPE RISERS BELOW THE FLANGE AS FOLLOWS: PORT MAIN DECK, E/R COFFERDAM FRAME 138-140, 3" PORT DEEP TANK HOTWELL OVERFLOW, PORT & STBD E/R COFFERDAM FRAME 171-172, #4 STBD INBOARD DOUBLE BOTTOM FUEL OIL VENT.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Electrical
Issued 4 August 1994
Resolved
MAKE OPERABLE EMERGENCY GENERATOR RUNNING LIGHT ON ENGINE ROOM INDICATOR PANEL.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Construction/Loadline
Issued 4 August 1994
Resolved
MAKE PERMANENT REPAIRS TO BILGE PUMP AND STRAINER SUPPORT.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Construction/Loadline
Issued 4 August 1994
Resolved
MAKE PERMANENT REPAIRS TO AFT SUCTION/DISCHARGE LINE IN SHAFT ALLEY.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Lifesaving
Issued 4 August 1994
Resolved
PROVIDE ADDITIONAL PROVISIONS TO PROVIDE FOR 50 PERSONS FOR THE STARBOARD LIFEBOAT OR DE-RATE BOAT TO 35 PERSONS WITH NEW DATA PLATE PRIOR TO 04SEPT94.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Engineering
Issued 4 August 1994
Resolved
MAKE AVAILABLE TO CG MARINE INSPECTORS ALL BOILER MOUNTS ON BOTH BOILERS.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Fire Fighting
Issued 4 August 1994
Resolved
PROVIDE CORRECT NUMBER OF 50' LENGTHS OF 1.5" AS PER APPROVED FIRE PLAN WHICH WILL EQUAL AN ADDITIONAL 250' (5 LENGTHS).
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Construction/Loadline
Issued 4 August 1994
Resolved
PROVE PROPER OPERATION OF BILGE SYSTEM TO THE STARBOARD, #2 HOLD ROSE BOX.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Engineering
Issued 4 August 1994
Resolved
MAKE AVAILABLE TO CG MARINE INSPECTORS ALL BOILER PRESURE PIPING FOR HYDROSTATIC TEST.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Engineering
Issued 4 August 1994
Resolved
MAKE AVAILABLE TO CG MARINE INSPECTORS BOTH BOILERS FOR HYDROSTATIC TEST.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Engineering
Issued 4 August 1994
Resolved
REPAIR ENGINEERS ALARM BELL IN SHAFT ALLEY
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Engineering
Issued 4 August 1994
Resolved
MAKE AVAILABLE TO CG MARINE INSPECTORS ALL PRESURE VESSELS FOR INTERNAL INSPECTION OR HYDRO.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Accommodation/Occupational Safety
Issued 4 August 1994
Resolved
MAKE PERMANENT REPAIRS TO HOLED SEWAGE TANK AND ASSOCIATED PIPING.
Condition: Unknown
Due 4 August 1994
Resolved 4 August 1994
Accommodation/Occupational Safety
Issued 28 September 1993
Resolved
REPAIR OR REPLACE WASTED VENTILATION DUCTING SERVICING STEERING GEAR ROOM, PAINT LOCKER AND ROPE LOCKER. MAKE THE INTAKE OPENING FOR SAME ON MAIN DECK WEATHERTIGHT.
Condition: Unknown
Due 28 September 1993
Resolved 28 September 1993
Accommodation/Occupational Safety
Issued 28 September 1993
Resolved
REPAIR OR REPLACE THE VENTILATION SUPPLY INTAKE SCREENS ON AFT BULKHEAD OF MAIN HOUSE.
Condition: Unknown
Due 28 September 1993
Resolved 28 September 1993
Fire Fighting
Issued 28 September 1993
Resolved
REPAIR LEAKS TO ALL-PURPOSE NOZZLES (SEALS), WHERE REQUIRED.
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Fire Fighting
Issued 28 September 1993
Resolved
PROVIDE 250' OF ADDITIONAL APPROVED FIRE HOSE (1 1/2") AND PRESSURE TEST INPRESENCE OF USCG.
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Fire Fighting
Issued 28 September 1993
Resolved
REPAIR LEAKS TO ALL FIRE MAIN HYDRANTS (PACKING GLANDS) WHERE REQUIRED.
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Electrical
Issued 28 September 1993
Resolved
PROVIDE EXPLOSION-PROOF FIXTURES IN PAINT LOCKER (DECK).
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Lifesaving
Issued 28 September 1993
Resolved
PROVIDE FULLY CHARGED SCBA BOTTLE FOR ENGINEERS SPACES.
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Fire Fighting
Issued 28 September 1993
Resolved
REPAIR THE GENERAL ALARM BELLS IN WAY OF FIRESTATION #12 & #23.
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Lifesaving
Issued 28 September 1993
Resolved
REPAIR OR REPLACE THE LANTERN FOR #2 LIFEBOAT.
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Navigation
Issued 28 September 1993
Resolved
REPLACE THE TOP BULB IN STERN LIGHT FIXTURES.
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Electrical
Issued 28 September 1993
Resolved
REPAIR THE LIFEBOAT EMBARKATION LIGHTS AND DEMONSTRATE PROPER OPERATON OF.
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Accommodation/Occupational Safety
Issued 28 September 1993
Resolved
DEMONSTRATE PROPER OPERATION OF VENTILATION SYSTEM SERVICING STEERING GEAR ROOM, AFT (DECK) PAINT LOCKER AND ROPE LOCKER.
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Electrical
Issued 28 September 1993
Resolved
DEMONSTRATE PROPER AUTOSTART OF EMERGENCY GENERATOR AND PROPER TRANSFER OF LOAD TO EMERGENCY SWITCH BOARD.
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Lifesaving
Issued 28 September 1993
Resolved
PROPERLY STOW #2 LIFERAFT (REATTACH PAINTER).
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Electrical
Issued 28 September 1993
Resolved
REPAIR THE EMERGENCY LIGHTS IN THE WHEELHOUSE (STBD SIDE) AND DEMONSTRATE PROPER OPERATION.
Condition: Unknown
Due 28 October 1993
Resolved 5 October 1993
Navigation
Issued 28 September 1993
Resolved
PROPERLY ADJUST RUDDER ANGLE INDICATORS IN WHEELHOUSE AND ON BOTH BRIDGE WINGS (ADJUST AGAINST RUDDER STOCK INDICATOR).
Condition: Unknown
Due 28 September 1993
Resolved 28 September 1993
Navigation
Issued 28 September 1993
Resolved
REPAIR AND DEMONSTRATE PROPER OPERATION OF ENGINE ORDER TELEGRAPH (EOT) AUDIBLE AND VISIBLE ALARMS IN WHEELHOUSE.
Condition: Unknown
Due 28 September 1993
Resolved 28 September 1993
Engineering
Issued 28 September 1993
Resolved
RENEW FLAME SCREEN AND REPAIR CLOSURE ON FUEL OIL TANK VENT ON FAN TAIL, STBD SIDE.
Condition: Unknown
Due 28 September 1993
Resolved 28 September 1993
Electrical
Issued 28 September 1993
Resolved
REPAIR ELECTRICAL MALFUNCTION TO STBD ACCOMODATION LADDER WINCH CONTROLLER AND REPLACE INDICATOR LIGHT FOR SAME.
Condition: Unknown
Due 28 September 1993
Resolved 28 September 1993
Lifesaving
Issued 19 February 1993
Resolved
PROVE PROPER OPERATION OF RELEASING MECHANISM FOR VESSEL'S #2 LIFEBOAT (PORT SIDE) PRIOR TO DEPARTING THE PORT OF HOUSTON, TX.
Condition: Unknown
Due 23 February 1993
Resolved 12 March 1993
Lifesaving
Issued 19 February 1993
Resolved
MAKE PERMANENT REPAIRS TO VESSEL'S #2 LIFEBOAT (PORT SIDE) IN WAY OF LEAKING RIVETS AND DEMONSTRATE WATERTIGHT INTEGRITY OF THE LIFEBOAT'S HULL FOLLOWING REPAIRS.
Condition: Unknown
Due 19 February 1993
Resolved 19 February 1993
Lifesaving
Issued 21 January 1993
Resolved
CONDUCT A WEIGHT TEST OF THE NUMBER 2 LIFEBOAT AND TEST RELEASING MECHANISMIN THE PRESENCE OF A U.S. COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 21 January 1993
Resolved 21 January 1993
Lifesaving
Issued 21 July 1992
Resolved
SERVICE TEN PERSON INFLATABLE LIFERAFT AND HYDROSTATIC RELEASE._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 September 1992
Resolved 29 September 1992
Lifesaving
Issued 21 July 1992
Resolved
REPAIR HOLD #5 FAN CONTROLLER 1-171-1._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 September 1992
Resolved 29 September 1992
Accommodation/Occupational Safety
Issued 21 July 1992
Resolved
LABEL CO2 REMOTE PULL OUTSIDE OF AFT BOS'N STORE LOCKER.
Condition: Unknown
Due 29 September 1992
Resolved 29 September 1992
Electrical
Issued 21 July 1992
Resolved
REPAIR HOLD #3 FAN CONTROLLER 1-91-1._x001C_ _x001C_ _x001C_ _x001C_
Condition: Unknown
Due 29 September 1992
Resolved 29 September 1992
Electrical
Issued 21 July 1992
Resolved
INSTALL BLANKS IN ELECTRIC DISTRIBUTION PANELS 1-65-4, 1-65-2, 1-66-1.
Condition: Unknown
Due 29 September 1992
Resolved 29 September 1992
Electrical
Issued 21 July 1992
Resolved
SECURE/PROVIDE GUARD FOR LIGHT FIXTURE IN FORWARD, STBD BOSUN'S SPACE.
Condition: Unknown
Due 29 September 1992
Resolved 29 September 1992
Lifesaving
Issued 21 July 1992
Resolved
INSTALL RETRO-REFLECTIVE TAPE ON PERIMETER OF BOTH LIFEBOATS.
Condition: Unknown
Due 29 September 1992
Resolved 29 September 1992
Construction/Loadline
Issued 21 July 1992
Resolved
REPAIR AND PROVE PROPER OPERATION OF OILY WATER SEPARATOR, TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR, PRIOR TO SAILING FOREIGN FROM U.S. WATERS.
Condition: Unknown
Due 21 July 1992
Resolved 21 July 1992
Documentation
Issued 21 July 1992
Resolved
VESSEL PROHIBITED TO DEPART GRAND CANARY ISLAND UNTIL VALID LOADLINE AND SAFETY CONSTRUCTION CERTIFICATES ISSUED BY ABS AND RECEIVED BY [name withheld].
Condition: Unknown
Due 29 September 1992
Resolved 29 September 1992
Construction/Loadline
Issued 21 July 1992
Resolved
EFFECT PERMANENT REPAIRS TO HATCH COVERS TO MAKE WATERTIGHT. VESSEL TO MAKETEMPORARY REPAIRS TO SATISFACTION OF ABS PRIOR TO DEPARTURE GRAND CANARY ISLAND, AND [name withheld] ABS SURVEYOR.
Condition: Unknown
Due 29 September 1992
Resolved 29 September 1992
Construction/Loadline
Issued 15 July 1991
Resolved
MAKE PERMANENT REPAIR TO THE WASTED SEA SUCTION LINE FOR THE GENERAL SERVICE PUMP, PORT SEA CHEST, IN WAY OF TEMPORARY CEMENT BOX REPAIR.
Condition: Unknown
Due 15 July 1991
Resolved 15 July 1991
Lifesaving
Issued 15 July 1991
Resolved
PROVIDE SOLAS BOAT COVER FOR PORT BOAT PRIOR TO VESSEL'S DEPARTURE FROM THECAPE FEAR RIVER AREA ANCHORAGE.
Condition: Unknown
Due 15 July 1991
Resolved 15 July 1991
Lifesaving
Issued 15 July 1991
Resolved
PROVIDE 6 ADDITIONAL REPLACEMENT LIFEBOAT RATIONS FOR THE STARBOARD LIFE BOAT PRIOR TO DEPARTURE FROM THE CAPE FEAR RIVER AREA ANCHORAGE.
Condition: Unknown
Due 15 July 1991
Resolved 15 July 1991
Accommodation/Occupational Safety
Issued 15 July 1991
Resolved
INSTALL PRESSURE RELIEF VALVE WITH HAND RELIEVING GEAR RATED AT OR BELOW MAWP ON THE POTABLE WATER TANK.
Condition: Unknown
Due 15 July 1991
Resolved 15 July 1991
Electrical
Issued 15 July 1991
Resolved
RENEW SOLINOID SWITCH ON HYDRAULIC STARTING SYSTEM IN WAY OF ACCUMULATORS_x001C_ FOR EMERGENCY GENERATOR PRIOR TO VESSEL'S DEPARTURE FRON THE CAPE FEAR AREAANCHORAGE.
Condition: Unknown
Due 15 July 1991
Resolved 15 July 1991
Engineering
Issued 15 July 1991
Resolved
MAKE PERMANENT REPAIRS TO HOLED PIPE ELBOW FOR #2 DISTILLER BRINE PUMP.
Condition: Unknown
Due 15 July 1991
Resolved 15 July 1991
Navigation
Issued 15 July 1991
Resolved
RENEW WIRING AND PROVE PROPER OPERATION OF SPP ON THE MAIN DECK, STARBOARD SIDE OF FANTAIL.
Condition: Unknown
Due 15 July 1991
Resolved 15 July 1991
Construction/Loadline
Issued 15 July 1991
Resolved
MAKE PERMANENT REPAIRS TO THE HOLED AFT, STARBOARD TRANSVERSE BULKHEAD OF_x001C_ #1 HOLD, IN WAY OF THE FIRE STATION.
Condition: Unknown
Due 15 July 1991
Resolved 15 July 1991
Accommodation/Occupational Safety
Issued 15 July 1991
Resolved
MAKE PERMANENT REPAIRS TO HOLED SEWAGE PIPE IN WAY OF SEWAGE TANK.
Condition: Unknown
Due 15 July 1991
Resolved 15 July 1991
Construction/Loadline
Issued 15 July 1991
Resolved
PROVE WATERTIGHTNESS OF #5 CENTER HATCH COVER WITH 30 PSI HOSE TEST PRIOR TO VESSEL DEPARTING CAPE FEAR RIVER AREA ANCHORAGE.
Condition: Unknown
Due 15 July 1991
Resolved 15 July 1991
Accommodation/Occupational Safety
Issued 15 July 1991
Resolved
INSTALL A PRESSURE/TEMPERATURE VALVE RATED AT MAWP OR BELOW WITH A MAXIMUM TEMPERATURE RATING OF 210 DEGREES WITH HAND RELIEVING GEAR, OR INDIVIDUAL PRESSURE AND TEMPERATURE VALVES RATED AS ABOVE ON THE STEAM HEATED HOT WATER TANK.
Condition: Unknown
Due 15 July 1991
Resolved 15 July 1991
Engineering
Issued 15 July 1991
Resolved
INSTALL RELIEF VALVES WITH A SET PRESSURE OF LESS THAN MAWP OF AIR RECIEVERS AND WITH FLANGED OR THREADED CONNECTIONS TO BOTH S/S AIR RECIEVERS, PROVE PROPER OPERATION OF SAME.
Condition: Unknown
Due 15 July 1991
Resolved 15 July 1991
Unknown
Issued 16 January 1991
Resolved
RESUBMIT FOR APPROVAL TO [name withheld], TX ENGINEROOM AUTOMATION TEST PROCEDURES ( RETURNED FOR REVISION WITH MSO PORT ARTHUR, TX 16711/GALVESTONBAY LETTER DATED 9 JANUARY 1991 ).
Condition: Unknown
Due 16 January 1991
Resolved 16 January 1991
Electrical
Issued 15 October 1990
Resolved
CONNECT NEW AIR COMPRESSOR INSTALLATION TO THE ELECTRICAL POWER SOURCE AS PER ITS ORIGINAL APPROVED INSTALLATION.
Condition: Unknown
Due 15 October 1990
Resolved 15 October 1990
Engineering
Issued 13 September 1990
Resolved
CHANGE 14 EXPANSION JOINTS IN ENGINE ROOM OVERBOARD PIPING
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Electrical
Issued 13 September 1990
Resolved
SUBMIT FOR APPROVAL TO USCG MARINE SAFETY CENTER THE REVISED ENGINEROOM AUTOMATION TEST PROCEDURES.
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990
Resolved
REPAIR CARGO WINCHES P/S FORWARD FOR #2 CARGO HOLD.
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990
Resolved
PROVIDE PROOF OF ABS OR CARGO BUREAU INSPECTION OF FORWARD CARGO BOOMS FOR #2 CARGO HOLD, PRIOR TO USE.
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990
Resolved
REPAIR BOTH LADDERS IN UPPER TWEEN DECKS IN #4 CARGO HOLD
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990
Resolved
REPAIR ENGINE ROOM AND BOILER AUTOMATION AND TEST COMPLETELY IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990
Resolved
PROVIDE COAST GUARD WITH DOCUMENTATION TO PROVE BOILER MANUFACTURER'S SATISFACTION AND APPROVAL FOR USING PLASTIC REFRACTORY IN FURNACE AND SUPERHEATER VSTIBLE WALLS AND FOR ABSENCE OF SUPPORTS FOR SUPERHEATERS.
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990
Resolved
PROVIDE REVISED FIRE CONTROL PLAN TO MSO PORT ARTHUR FOR REVIEW.
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990
Resolved
CROP AND RENEW DECK BELOW BOTH EVAPORATORS
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Unknown
Issued 13 September 1990
Resolved
ADD A FIREMAN/WATERTENDER TO EACH ENGINE ROOM WATCH ROTATION
Condition: Unknown
Due 13 September 1990
Resolved 13 September 1990
Engineering
Issued 17 July 1990
Resolved
ADD A FIREMAN/WATERTENDER TO EACH ENGINE ROOM WATCH ROTATION UNTIL REQUIREMENT E1 IS COMPLETED.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Engineering
Issued 17 July 1990
Resolved
REPAIR BRIDGE THROTTLE CONTROL SYSTEM OR REMOVE. IF SYSTEM IS REMOVED, RESUBMIT AUTOMATION TEST PROCEDURES FOR COAST GUARD APPROVAL.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Engineering
Issued 17 July 1990
Resolved
REPAIR TRUE SCALE STEAM DRUM WATER LEVEL INDICATOR FOR PORT BOILER.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Accommodation/Occupational Safety
Issued 17 July 1990
Resolved
REPAIR STBD VENTILATION FAN.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Engineering
Issued 17 July 1990
Resolved
REPAIR OILY WATER SEPARATOR AND TEST.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Engineering
Issued 17 July 1990
Resolved
MAKE PERMENANT REPAIRS TO AND PROVE PROPER OPERATION OF THE ELECTRICAL GENERAL SERVICE PUMP TO THE SATISFACTION OF AN ATTENDING COAST GUARD MARINEINSPECTOR PRIOR TO DEPARTURE FROM THE NEXT U.S. PORT. UNTIL COMPLETED MAKEAVAILABLE TWO PORTABLE ON BOARD.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Lifesaving
Issued 17 July 1990
Resolved
SERVICE VESSELS SINGLE 25 MAN LIFERAFT AT CG APPROVED SERVICING FACILITY
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Deck/Cargo
Issued 17 July 1990
Resolved
REPAIR FORWARD PORT AND STBD CARGO WINCHES FOR #2 CARGO HOLD.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Fire Fighting
Issued 17 July 1990
Resolved
PROVIDE 4 2.5 INCH X 50 FT APPROVED FIRE HOSE TO REPLACE UNAPPROVED HOSE DISCOVERED DURING INSPECTION.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Deck/Cargo
Issued 17 July 1990
Resolved
REPAIR AND CONDUCT OPERATIONAL TEST OF ALL CARGO HATCH OPENING AND CLOSING DEVICES INCLUDING TWEEN DECK HATCHES
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Unknown
Issued 17 July 1990
Resolved
RECROP AND RENEW PIPEGUARDS AROUND ANCHOR WINDLASS.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Deck/Cargo
Issued 17 July 1990
Resolved
PROVIDE PROOF OF ABS OR CARGO BUREAU INSPECTION OF FORWARD CARGO BOOMS FOR #2 CARGO HOLD
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Unknown
Issued 17 July 1990
Resolved
REPLACE HINGE PINS AS ORIGINAL IN WATERTIGHT DOORS ON STBD SIDE OF #2 AND#3RESISTOR HOUSES
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Deck/Cargo
Issued 17 July 1990
Resolved
RENEW/REPAIR AS ORIGINAL ALL DOGS AND HINGE PINS IN/ON MANHOLE COVERS FOR FOR ALL CARGO HOLDS
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Unknown
Issued 17 July 1990
Resolved
REPLACE BOTH MISSING LADDERS IN UPPER TWEEN DECK OF #4 CARGO HOLD.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Lifesaving
Issued 17 July 1990
Resolved
CONDUCT OPERATIONAL AND WEIGHT TEST OF STBD LIFEBOAT
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Fire Fighting
Issued 17 July 1990
Resolved
SUBMIT REVISED FIRE CONTROL PLAN TO MSO PORT ARTHUR FOR REVIEW.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Engineering
Issued 17 July 1990
Resolved
REPAIR ENGINE ROOM AND BOILER AUTOMATION AND TEST COMPLETELY IN THE PRESENCE OF A COAST GUARD MARINE INSPECTOR.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Engineering
Issued 17 July 1990
Resolved
TEST SHUTDOWN FOR STEAM DRIVEN FUEL OIL TRANSFER PUMP.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Engineering
Issued 17 July 1990
Resolved
PROVIDE ON BOARD AUTOMATION TEST PROCEDURES FOR ENGINE ROOM.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Construction/Loadline
Issued 17 July 1990
Resolved
CROP AND RENEW DECK BELOW BOTH EVAPORATORS.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Electrical
Issued 17 July 1990
Resolved
FIND AND REPAIR GROUND INDICATED ON GROUND DETECTION SYSTEM FOR EMERGENCY BUS ON SWITCHBOARD IN EMERGENCY GENERATOR ROOM.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Engineering
Issued 17 July 1990
Resolved
PROVIDE COAST GUARD WITH DOCUMENTATION TO PROVE BOILER MANUFACTURER'S SATISFACTION AND APPROVAL FOR USING PLASTIC REFRACTORY IN FURNACE AND SUPERHEATER VESTIBLE WALLS AND FOR ABSENCE OF SUPPORTS FOR SUPERHEATERS.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Construction/Loadline
Issued 17 July 1990
Resolved
CHANGE 14 EXPANSION JOINTS IN OVERBOARD PIPING.
Condition: Unknown
Due 17 July 1990
Resolved 17 July 1990
Deck/Cargo
Issued 22 May 1990
Resolved
REPLACE MISSING ANCHOR AND APPROXIMATELY TWO SHOTS OF ANCHOR CHAIN (46 CFR 96.07-5).
Condition: Unknown
Due 22 May 1990
Resolved 22 May 1990
Fire Fighting
Issued 23 March 1990
Resolved
SET AND MAINTAIN A SMOKE AND FIRE WATCH ON NO.5 PORT LOWER TWEEN HOLD. ROUNDS TO BE CONDUCTED AT 30 MINUTE INTERVALS UNTIL #5 MODULE IN SMOKE DETECTOR SYSTEM IS REPAIRED TO SATISFACTION OF USCG MARINE INSPECTOR. REPAIRS TO BE MADE UPON NEXT U.S. PORT CALL.
Condition: Unknown
Due 23 March 1990
Resolved 23 March 1990
Construction/Loadline
Issued 16 March 1990
Resolved
REPLACE ALL MISSING AND DAMAGED DOGS IN SCUTTLE HATCHES IN CARGO HOLDS.
Condition: Unknown
Due 16 March 1990
Resolved 16 March 1990
Construction/Loadline
Issued 16 March 1990
Resolved
MAKE FORE PEAK TANK, NO. ONE LOWER CARGO HOLD AND THE VOID FORWARD OF THE AFTER PEAK TANK AVAILABLE FOR INTERNAL EXAMINATION.
Condition: Unknown
Due 16 March 1990
Resolved 16 March 1990
Construction/Loadline
Issued 16 March 1990
Resolved
CLEAN, GAS FREE AND MAKE AVAILABLE FOR INTERNAL EXAMINATION BY A USCG MARINE INSPECTOR, AT LEAST ONE FORWARD, ONE AMIDSHIPS AND ONE AFT DOUBLE BOTTOM FUEL OIL TANKS. PROVIDE A WRITTEN PROPOSAL FOR APPROVAL BY THE COGNIZANT OCMI OF THE DOUBLE BOTTOM TANKS WHICH ARE TO BE MADE AVAILABLE.
Condition: Unknown
Due 16 March 1990
Resolved 16 March 1990
Fire Fighting
Issued 16 March 1990
Resolved
SET AND MAINTAIN A SUITABLE CONTINUOUS SMOKE AND FIRE WATCH TO COVER ALL SPACES PROTECTED BY THE MISSING SMOKE DETECTION SYSTEM. THE ROUNDS SHALL BECONDUCTED ON 30 MIN INTERVALS MINIMUM UNTIL SUCH TIME AS THE SMOKE DETECTION CABINET IS INSTALLED AND TESTED BY A USCG INSPECTOR.
Condition: Unknown
Due 16 March 1990
Resolved 16 March 1990
Engineering
Issued 16 March 1990
Resolved
PROVIDE THE LATEST OIL ANALYSIS REPORT OF THE TAILSHAFT LUBE OIL SYSTEM TO THE COAST GUARD MARINE SAFETY OFFICE AT PORT ARTHUR, TEXAS.
Condition: Unknown
Due 16 March 1990
Resolved 16 March 1990
Deck/Cargo
Issued 26 February 1990
Resolved
PRIOR TO DEPARTURE FROM THE PORT OF HOUSTON, TEXAS, CONDUCT AN OPERATIONAL TEST OF THE PORT ANCHOR WINCH.
Condition: Unknown
Due 26 February 1990
Resolved 26 February 1990
Construction/Loadline
Issued 7 February 1990
Resolved
MAKE PERMANENT HULL PLATE AND STRUCTURAL REPAIRS TO DAMAGED PORTS SIDE BE- TWEEN FRAMES #70 AND #75, APPROX 18 FEET BELOW MAIN DECK. REPAIRS TO BE COMPLETED TO SATISFACTION OF USCG MARINE INSPECTOR PRIOR TO VSL CONTINUING OPERATIONS AFTER ARRIVAL AT HOUSTON, TEXAS, FROM ANTWERP, BELGIUM.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Deck/Cargo
Issued 7 February 1990
Resolved
REPAIR AFT MOORING WINCH
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Deck/Cargo
Issued 7 February 1990
Resolved
PROVIDE ADEQUATE MOORING LINES TO ENABLE VSL TO MOOR SAFELY AND SECURELY INSEVERE WEATHER CONDITIONS.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Construction/Loadline
Issued 7 February 1990
Resolved
MAKE PERMANENT REPAIRS TO NUMEROUS CARGO HATCH COVERS TO MAINTAIN WATER- TIGHT INTEGRITY
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Fire Fighting
Issued 7 February 1990
Resolved
PROVIDE UPDATED AND USCG-APPROVED FIRE CONTROL PLAN; POST ON VESSEL AND PLACE IN WATERTIGHT CONTAINER AT GANGWAY.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Construction/Loadline
Issued 7 February 1990
Resolved
MAKE PERMANENT REPAIRS TO ALL WASTED BALLAST LINES THROUGHOUT VESSEL.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Lifesaving
Issued 7 February 1990
Resolved
PROVIDE SOLAS 83 LIFESAVING TRAINING MANUALS IN EACH CREW MESSROOM AND RECREATION ROOM (REGULATION 18).
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Lifesaving
Issued 7 February 1990
Resolved
PROVIDE ADEQUATE LAUNCHING AND OPERATING INSTRUCTIONS AT EACH LIFEBOAT AND LIFERAFT STATION.
Condition: Unknown
Due 7 February 1990
Resolved 7 February 1990
Engineering
Issued 29 August 1989
Resolved
PROVE PROPER OPERATION OF REMOTE SHUTDOWN FOR STEAM FUEL OIL SERVICE PUMP,
Condition: Unknown
Due 29 August 1989
Resolved 29 August 1989
Engineering
Issued 29 August 1989
Resolved
REPLACE BROKEN PLEXIGLAS INDICATOR COVER FOR (JERGUSON) STEAM DRUM WATER LEVEL INDICATOR / ALARM ON PORT BOILER.
Condition: Unknown
Due 29 August 1989
Resolved 29 August 1989
Lifesaving
Issued 12 July 1988
Resolved
MAKE PERMANENT REPAIRS TO PORT LIFEBOAT IN WAY OF PINHOLE LEAKS ON STARBOARD SIDE AFT SECTION OF HULL.
Condition: Unknown
Due 12 July 1988
Resolved 12 July 1988
Engineering
Issued 12 July 1988
Resolved
PROVE PROPER OPERATION OF LOW-LOW WATER CUT-OUTS ON BOTH BOILERS IN ACCORDANCE WITH APPROVED TEST PROCEDURES.
Condition: Unknown
Due 12 July 1988
Resolved 12 July 1988
Electrical
Issued 12 July 1988
Resolved
PROVE PROPER OPERATION OF BOTH S/S GENERATORS REVERSE POWER RELAYS.
Condition: Unknown
Due 12 July 1988
Resolved 12 July 1988
Electrical
Issued 12 July 1988
Resolved
PROVIDE AN OPERATIONAL KW-METER FOR #1 S/S GENERATOR.
Condition: Unknown
Due 12 July 1988
Resolved 12 July 1988
Lifesaving
Issued 16 November 1987
Resolved
PROVIDE REQUIRED CONTAINERS OF DRINKING WATER FOR 50 PERSONS IN BOTH NO.1 AND NO.2 LIFEBOATS.
Condition: Unknown
Due 16 November 1987
Resolved 16 November 1987
Lifesaving
Issued 16 November 1987
Resolved
STENCIL VESSEL'S CORRECT NAME ON ALL OARS IN BOTH NO.1 AND NO.2 LIFEBOATS.
Condition: Unknown
Due 16 November 1987
Resolved 16 November 1987
Lifesaving
Issued 16 November 1987
Resolved
MAKE PERMANENT REPAIRS TO NO.1 LIFEBOAT DRAIN PLUG.
Condition: Unknown
Due 16 November 1987
Resolved 16 November 1987
Lifesaving
Issued 16 November 1987
Resolved
MAKE PERMANENT REPAIRS TO FLOOR OF NO.2 LIFEBOAT WHERE FRP HAS DELAMINATED FORWARD OF THE PROP GEAR BOX.
Condition: Unknown
Due 16 November 1987
Resolved 16 November 1987
Lifesaving
Issued 16 July 1987
Resolved
WEIGHT TEST STBD LIFEBOAT INPRESENTS OF CG MARINE INSPECTOR. TEST TO BE COMPLETED PRIOR DEPARTING LAKE CHARLES, LA.
Condition: Unknown
Due 16 July 1987
Resolved 16 July 1987
Electrical
Issued 17 October 1985
Resolved
PROVE PROPER OPERATION OF THE HIGH JACKET WATER TEMPERATURE ALARM FOR THE EMERGENCY GENERATOR TO THE SATISFACTION OF THE COGNIZANT [name withheld]23OCT85.
Condition: Unknown
Due 17 October 1985
Resolved 17 October 1985
Electrical
Issued 15 October 1985
Resolved
PERMANENTLY REPAIR EMERGENCY GENERATOR DIESEL ENGINE PRIOR TO LEAVING NEXT PORT OF CALL. DEMONSTRATE OPERATION TO A USCG INSPECTOR.
Condition: Unknown
Due 15 October 1985
Resolved 15 October 1985
Unknown
Issued 15 November 1984
Resolved
THE FOLLOWING DEFICIENCY PERTAIN TO THE VESSEL, MALLORY LYKES, DN504077
Condition: Unknown
Due 15 November 1984
Resolved 15 November 1984
Unknown
Issued 15 November 1984
Resolved
OPEN DC HEATER FOR COAST GUARD INSPECTION OR HYDROSTATICALLY TEST DC HEATERTO THE SATISFACTION OF THE ATTENDING COAST GUARD INSPECTOR AT VESSEL'S NEXTDRYDOCKING, BUT IN NO CASE LATER THAN 31 APRIL 85.
Condition: Unknown
Due 15 November 1984
Resolved 15 November 1984
Unknown
Issued 29 June 1984
Resolved
THE FOLLOWING DEFICIENCY PERTAIN TO THE VESSEL, MALLORY LYKES, DN504077 ANDIS TO BE COMPLIED WITH BY 29JUL84.
Condition: Unknown
Due 29 June 1984
Resolved 29 June 1984
Construction/Loadline
Issued 29 June 1984
Resolved
CROP AND RENEW SET IN AREA OF STARBOARD SIDESHELL PLATES G8 AND F8 AND ASSOCIATED INTERNALS FROM APPROXIMATELY FRAME 73 1/2 TO 80 1/2.
Condition: Unknown
Due 29 June 1984
Resolved 29 June 1984