MAURY USCG vessel records
← All vessels

LUNA

LUNA is a 1996 passenger vessel (inspected). The Coast Guard has recorded 23 inspections since 2016, most recently in September 2025, along with 49 deficiencies.

Records from 2016 to 2025. Most recent: inspection, 24 September 2025.

Built
1996
Last inspected
24 September 2025
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 24 September 2025
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2025)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WCX3758
453006
Flag
UNITED STATES
Maury page id
psix-453006

Documentation record

Registered dimensions (L × B × D)64.2 ft × 20.0 ft × 7.7 ft
Registered tonnagegross 49 / net 44
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTREWORGY YACHTS INC · PALM COAST, FL, UNITED STATES · built 1996
Hull materialSteel
PropulsionAuxiliary Sail
Hull shapeSail (Distinct Keel)
Hull configurationMonohull
Hailing portNEWPORT, RI
Trade endorsementsCoastwise, unrestricted, Fishery, Recreational, Registry
DocumentationValid · issued 29 April 2026 · expires 31 March 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it49 - Simplified, Gross Ton
44 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 23

24 September 2025 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8239669
8 May 2025 Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8145123
20 December 2024 Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8049656
26 June 2024 Administrative Inspection · COI Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7942386
31 May 2024 Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7924114
26 September 2023 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7789386
22 November 2022 Drydock Exam · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7599031
27 September 2022 Deficiency Check · DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7566434
23 May 2022 Deficiency Check
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7457532
15 October 2021 In-Service Inspection · Administrative Inspection
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7329133
22 September 2021 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7308350
26 May 2021 Administrative Inspection · In-Service Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7207440
12 March 2021 Drydock Exam · Internal Structural Exam · Examination of Repairs · Plan Review "T" Boat
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7148107
24 September 2020 Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7053251
28 June 2019 DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6717869
30 May 2019 Administrative Inspection · COI Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6683976
13 March 2019 Internal Structural Exam · Administrative Inspection · Deficiency Check · Drydock Exam
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6627804
6 June 2018 Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6641921
23 January 2018 Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6342014
8 May 2017 Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6141998
15 November 2016 Deficiency Check · Internal Structural Exam · Administrative Inspection · DAPI Audit · Drydock Exam · Annual Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 6041229
22 February 2016 DAPI Audit · Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Sector Key West · USCG Southeast District (CGD-SE) · Activity 5829139
26 January 2016 Administrative Inspection
Administrative · Sector Key West · USCG Southeast District (CGD-SE) · Activity 5803437

Deficiency record · 49

10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 24 September 2025 Resolved
Secure shackles on main mast as discussed with vessel owner.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2025
Resolved 29 September 2025
Resolution: Corrected
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 20 December 2024 Resolved
Vessel is overdue for the dry dock and internal structural exam
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 20 January 2025
Resolved 8 August 2025
Resolution: Recieved Credit DDX and ISE
07 - Fire Safety › N/A - No Subsystem › Fire detection and alarm system
Issued 27 September 2022 Resolved
Prove proper operation of Fireboy shutdown feature prior to carrying passengers.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 27 September 2022
Resolved 29 September 2022
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 15 October 2021 Resolved
At each subsequent inspection for certification masts, spars, standing and running rigging, blocks, fittings, and sails shall be inspected. Aft mast starboard lower toggle jaw for the shrouds was cracked at the eye, replace toggle jaw.
Action required: 705 - Other - as specified
Due 15 November 2021
Resolved 23 May 2022
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 26 May 2021 Resolved
Prior to carrying more than 38 passenger 41 total persons receive approval for weight change from the Marine Safety Center.
Condition: Invalid
Action required: 705 - Other - as specified
Due 26 June 2021
Resolved 16 June 2021
Resolution: Received approved weight change from MSC
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 26 May 2021 Resolved
Complete genset install to approved plans with Marine Inspector oversight and attendance prior to operating new installation.
Condition: Invalid
Action required: 705 - Other - as specified
Due 26 June 2021
Resolved 27 September 2022
Resolution: Completed generator install to approved plans.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 21 May 2021 Resolved
Submit weight change calculations for new generator installation to MSC and cognizant OCMI prior to carrying any passengers.
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 May 2021
Resolved 26 May 2021
Resolution: Calcs submitted issued additional req to reduce passengers until calcs have been reviewed and approved by MSC.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 21 May 2021 Resolved
New generator installation will require continued CG oversight and tested prior to operating generator.
Condition: Invalid
Action required: 705 - Other - as specified
Resolved 26 May 2021
Resolution: Opened new act and added req to complete install to approved plans with CG oversight.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 24 September 2020 Resolved
Repair inoperative override feature on fireboy shut down.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 24 September 2020
Resolved 25 September 2020
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 30 May 2019 Resolved
All life floats must meet the specifications in 46 CFR 160.027. 02 of the life floats are compressed around the float by the line used to reattach the painter lines, permanently deforming the life floats. The other life float must be repaired or replaced to meet the above specification. All the life float free links must be replaced due to missing tags. All the contents required must be marked and stowed accordingly. Vessel is limited to 03NM from shore as long as the EPIRB remains operational.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 June 2019
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 30 May 2019 Resolved
Each battery used in life saving equipment must be replaced during the annual inspection if the expiration date is not known.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 30 May 2019 Resolved
Vessel must be registered in the state of principle operation
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 June 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 30 May 2019 Resolved
Vessel must obtain a FCC safety certificate.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
11 - Life Saving Appliances › N/A - No Subsystem › Operational readiness of lifesaving appliances
Issued 30 May 2019 Resolved
Child life jackets must be stowed separately from adult life jackets.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 May 2019 Resolved
Vessel must have a emergency instruction list and the master and crew must all be familiar with its contents.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
14 - Pollution Prevention › 145 - MARPOL Annex V › Garbage management plan
Issued 30 May 2019 Resolved
Vessel must have a waste management plan.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 30 May 2019 Resolved
First aid kit must contain the required contents listed in 46 CFR 160.041
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 30 May 2019 Resolved
Vessel must have up to date charts and publications for all areas of operation.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 June 2019
07 - Fire Safety › N/A - No Subsystem › Ventilation
Issued 30 May 2019 Resolved
There must be a means secure ventilation from the engine room for proper operation of the pre-engineered fire system.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 30 May 2019 Resolved
Fireboy cylinder must be tested and marked in accordance with 46 CFR 147.60.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 30 May 2019 Resolved
forward emergency escape hatch must be weather tight. There is a crack through the forward section between the deck and the housing.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 June 2019
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 30 May 2019 Resolved
Port light on the aft starboard side must create a weather tight seal. Gasket is coming out and rotted.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 June 2019
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 30 May 2019 Resolved
essel must have a public address system or a battery powered bullhorn (the batteries are to be continually maintained at a fully charged level by use of a battery charger. PRIOR TO THE CARRIAGE OF OVERNIGHT PASSENGERS.
Action required: 705 - Other - as specified
Resolved 28 June 2019
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 30 May 2019 Resolved
Compartments used to store flammable liquids must be either constructed of metal or lined with metal.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 June 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 May 2019 Resolved
All connections on battery terminals must be permanent. No wing nuts.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 30 May 2019 Resolved
adequate emergency lighting must automatically actuate upon failure of the main lighting system and shall be fitted along the line of escape. Prior to overnight passengers
Action required: 705 - Other - as specified
Resolved 28 June 2019
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 30 May 2019 Resolved
Engine room hatch must provide a vapor tight seal for proper operation of the pre-engineered fire system.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 May 2019 Resolved
All wiring must meet the the specifications outlined in 46 CFR 183.340 (UL Boat Wire or Marine Wire).
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 June 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 May 2019 Resolved
Fuel tank fill hose must be grounded due to use of non metallic flexible hose.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
04 - Emergency Systems › N/A - No Subsystem › Location of emergency installations
Issued 30 May 2019 Resolved
Emergency escape locations must be clearly marked (2).
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 May 2019 Resolved
Raw water hose wasted, must be replaced
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 May 2019 Resolved
Provide hose clamp for flexible fuel vent hose at "T" connection.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 30 May 2019 Resolved
Provide means to ensure spaces containing diesel fuel tank and engine room are vapor tight, multiple penetrations in bulkhead separating lazarette and accommodation spaces. Engine room hatch cover is not vapor tight, provide gasket material on edges of box. *Vessel is restricted from carrying overnight passengers until completed*
Action required: 16 - Rectify deficiencies w/in 14 days
Due 28 June 2019
Resolved 28 June 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 30 May 2019 Resolved
Provide fixed powered bilge pump in lazarette space, currently lazarette bilge drains into engine room. Engine room must be vapor tight for pre-engineered fixed fire extinguishing system.
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 28 June 2019
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 30 May 2019 Resolved
Connections to STBD battery terminals shall be limited to 4 connections per terminal.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 28 June 2019
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 13 March 2019 Resolved
Provide securing device for hatch cover forward of collision bulkhead. *Prior to credit drydock
Action required: 705 - Other - as specified
Resolved 28 March 2019
Resolution: Completed.
09 - Working and Living Conditions › 092 - Working Conditions › Other (accident prevention)
Issued 13 March 2019 Resolved
Provide 4 inch rail courses at forward bow area and block access to bowsprit gangway. *Prior to credit drydock
Action required: 705 - Other - as specified
Resolved 28 March 2019
Resolution: Courses installed
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 13 March 2019 Resolved
Make connection point (bobstay to the bowsprit) available for re-inspection, unable to inspect due to the height of the connection and paint covering connection point. *Prior to credit drydock
Action required: 705 - Other - as specified
Resolved 28 March 2019
Resolution: Area made available for inspection, all SAT.
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 14 February 2017 Resolved
Provide documentation proving enrollment in drug and alcohol testing program
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 22 February 2017
Fire Fighting › Fixed Gas Fire Extinguishing System › Operating Controls
Issued 14 February 2017 Resolved
Prove operation of fire boy engine shutdown, alarm and override functions
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 February 2017
Lifesaving › Lifebuoys › Quantity
Issued 14 February 2017 Resolved
Renew missing life ring. Vessel required 02 life rings
Action required: 705 - Other - as specified
Due 28 February 2017
Resolved 22 February 2017
Resolution: Purchased and labeled life ring
Operations/Management › Equipment Service/Testing › EPIRB
Issued 14 February 2017 Resolved
Renew expired hydrostatic release for EPIRB.
Action required: 705 - Other - as specified
Due 4 March 2017
Resolved 22 February 2017
Resolution: Purchased and intalled new hydrostatic release
Communications › Radio Communications › VHF Radiotelephone
Issued 14 February 2017 Resolved
Provide VHF radio with GPS input
Action required: 705 - Other - as specified
Due 14 March 2017
Resolved 22 February 2017
Resolution: Installed new radio with integrated GPS
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 21 December 2016 Resolved
Remove bunk from aft compartment containing vessel's fuel tank
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 February 2017
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 21 December 2016 Resolved
Make aft bulkhead separating galley/mess deck and aft compartment vapor tight
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 February 2017
Fire Fighting › Structural Fire Protection - General › Cooking Area
Issued 15 November 2016 Resolved
Provide documentation that surfaces within 3 feet of cook top meet ASTM-84.
Action required: 705 - Other - as specified
Due 21 January 2017
Resolved 14 February 2017
Resolution: Installed aluminum around cook top area
Lifesaving › Lifejacket/PFD (Type I) › Retroreflective Material
Issued 22 February 2016 Resolved
SOLAS Retroreflective Material on 21 indetified Type I Life Jackets needs to be replaced to the satisfaction of the attending CG Marine Inspector by 29FEB16.
Action required: 705 - Other - as specified
Due 29 February 2016
Resolved 24 February 2016
Resolution: Vessel replaced SOLAS Retroreflective Material on all identified Type I Life Jackets.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 22 February 2016 Resolved
Vessel must provide new/reconfigured gangway for safe access to the vessel.
Action required: 705 - Other - as specified
Due 29 February 2016
Resolved 24 February 2016
Resolution: Vessel constructed new gangway with stanchions and a rail.
Sail Rigging › Stays/Shrouds › Clevis Pins and Cotter Pins
Issued 22 February 2016 Resolved
Provide most recent rigging survey report.
Action required: 705 - Other - as specified
Due 29 February 2016
Resolved 24 February 2016
Resolution: Vessel provided survey report dated 12FEB15.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.