Records from 2012 to 2023. Most recent: inspection, 5 May 2023.
Documentation record
Registered dimensions (L × B × D)52.0 ft × 20.0 ft × 8.0 ft
Registered tonnagegross 55 / net 44
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderTRI-STAR MARINE INC · DUVAL, WA, UNITED STATES · built 1997
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portSKAGWAY, AK
Trade endorsementsRecreational
DocumentationCase Pending · issued 30 June 2004
Service, as the file records itTowing Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it55 - Simplified, Gross Ton
44 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 11
5 May 2023
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7682001
4 May 2022
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7444208
3 August 2021
Administrative Inspection
Administrative · Commandant (CG-CVC) · Activity 7275848
13 November 2020
Initial Certification · Administrative Inspection
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 7094969
6 November 2019
Administrative Inspection · Deficiency Check · Damage Survey
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6851058
1 November 2019
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 6902880
1 August 2019
Deficiency Check · Internal Structural Exam · Drydock Exam
Physical examination · Detached Duty Office Seward · USCG Arctic District (CGD-A) · Activity 6770085
12 February 2015
Administrative Inspection
Administrative · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 5068430
30 April 2014
Industry Initiated Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4965157
2 August 2013
Industry Initiated Exam
Physical examination · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4742840
29 September 2012
Type not recorded
No type recorded · Sector Western Alaska and U.S. Arctic · USCG Arctic District (CGD-A) · Activity 4457020
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 4 May 2022
No resolution recorded
A towing vessel must undergo an annual inspection within 3 months before or after the COI anniversary date. The BULLY DOG was not made available for inspection within 3 months of 14DEC2021 and must undergo an annual inspection prior to operating.
Action required: 17 - Rectify deficiencies prior to departure
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 3 August 2021
Resolved
All owners and operators of an existing towing vessel must have a valid COI prior to the specified phase-in period. This vessel is one of the associated fleet that has not obtained a valid COI. The vessel shall be made available for a Coast Guard COI inspection within 90 days. If an inspection is not completed prior to this date, the action for this deficiency shall be changed to a 60 (Rectify deficiencies prior to movement) and the vessel may no long be permitted to operate.
Condition: Invalid
Action required: 705 - Other - as specified
Due 1 November 2021
Resolved 8 September 2021
Resolution: COI Issued.
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 November 2020
No resolution recorded
Fire pump must be able to be started from a location outside the engine room
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 14 November 2020
No resolution recorded
Provide a way to prove fire pump can deliver water at a pressure of 50 psi
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021 — due date passed with no resolution recorded
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 November 2020
No resolution recorded
Battery charger and lights in engine room shall be hard wired if permanent
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021 — due date passed with no resolution recorded
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 14 November 2020
No resolution recorded
Junction boxes and electrical outlets and openings in distribution panels must be covered
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021 — due date passed with no resolution recorded
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 14 November 2020
No resolution recorded
Towing lights and anchor light are inoperable
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021 — due date passed with no resolution recorded
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 14 November 2020
Resolved
Vessel must carry dayshapes as required by COLREGS
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021
Resolved 19 January 2021
Resolution: Cert on board
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 14 November 2020
No resolution recorded
Vessel must carry a FCC Bridge-to-Bridge Certificate
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021 — due date passed with no resolution recorded
10 - Safety of Navigation › N/A - No Subsystem › Navigation bridge visibility
Issued 14 November 2020
Resolved
Bridge center window cracked
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021
Resolved 19 January 2021
Resolution: Window renewed
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 14 November 2020
No resolution recorded
Fire detection system must be CG approved or listed by a NRTL and certified and inspected by a registered PE or NICET Level IV technician or class society
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021 — due date passed with no resolution recorded
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 November 2020
No resolution recorded
Starboard rudder post leaks excessively
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021 — due date passed with no resolution recorded
07 - Fire Safety › N/A - No Subsystem › Means of escape
Issued 14 November 2020
Resolved
Inside handle of engine room door needs to allow quick and easy egress
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 January 2021
Resolved 19 January 2021
Resolution: handle repaired
01 - Certificates & Documentation › 011 - Ships Certificates › Other (certificates)
Issued 13 November 2020
Resolved
All owners and operators of an existing towing vessel must have a valid COI prior to the specified phase-in period. This vessel is one of the 50% of the vessels that has not obtained a valid COI. The vessel shall be made available for a Coast Guard COI inspection within 30 days. If an inspection is not completed prior to this date, the action for this deficiency shall be changed to a 60 (rectify deficiencies prior to movement) and the vessel may no longer be permitted to operate.
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 13 December 2020
Resolved 14 December 2020
Resolution: Vsl received COI Inspection
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 6 November 2019
Resolved
Make interior of vessel available for inspection.
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 24 September 2020
Resolution: Inspected engine room.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 6 November 2019
Resolved
Conduct satisfactory sea trials.
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 27 September 2020
Resolution: Received statement for master of vessel that satisfactory sea trials were conducted.