← All vessels
ANTICIPATION V
Passenger (Inspected) · Passenger Ship class · Built 1990s · USCG East District (CGD-E) · Other hulls named ANTICIPATION V
ANTICIPATION V is a 1997 passenger vessel (inspected). The Coast Guard has recorded 57 inspections since 1997, most recently in April 2026, along with 244 deficiencies, 3 operational controls and 5 casualty investigations between 2005 and 2024.
Records from 1997 to 2026. Most recent: inspection, 20 April 2026.
- Built
- 1997
- Last inspected
- 20 April 2026
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 244 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 5 investigations · 2005–2024
Identity
1051527
WDL4302
453617
Flag
UNITED STATES
367132910
Maury page id
psix-453617
Inspections, by type
…with no type recorded4
Years with a record
26 calendar years (1997–2026)
The 57 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)70.7 ft × 20.0 ft × 5.4 ft
Registered tonnagegross 51 / net 34
ITC dimensions (L × B × D)70.7 ft × 20.0 ft × 5.4 ft
ITC tonnagegross 133 / net 52
BuilderTSS FABR-H SKIPPERLINR-C · LA CROSSE WI · built 1997
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portFT MYERS, FL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 14 March 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it51 - Regulatory (Subpart C or D), Gross Ton
133 - Convention (Subpart B), Gross Ton
34 - Regulatory (Subpart C or D), Net Ton
52 - Convention (Subpart B), Net Ton
133 - Convention (Subpart B), Gross Ton
34 - Regulatory (Subpart C or D), Net Ton
52 - Convention (Subpart B), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDL4302MMSI 367132910 · active · compulsorily equipped · granted 31 January 2020, expires 31 January 2030
WDD3544MMSI 367132910 · expired · compulsorily equipped · granted 3 August 2006, cancelled 8 October 2016
WCX6353MMSI not assigned · expired · compulsorily equipped · granted 25 July 1997, cancelled 29 September 2007 · licensed under a name not among this hull’s recorded names (not shown)
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 57
20 April 2026
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8353490
5 March 2026
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8320256
11 February 2026
Internal Structural Exam · Deficiency Check · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8309160
22 December 2025
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8286269
22 July 2025
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8191901
28 October 2024
Deficiency Check · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8026035
20 October 2024
Damage Survey
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8021602
19 October 2024
Type not recorded
No type recorded · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 8022157
16 May 2024
Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7913956
7 February 2024
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7862123
27 February 2023
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7642764
3 February 2023
Administrative Inspection
Administrative · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7631607
11 March 2022
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7463872
1 September 2021
Drydock Exam · Internal Structural Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7302496
14 April 2021
In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7175668
10 March 2021
Deficiency Check · Administrative Inspection · Annual Inspection
Physical examination · Detached Duty Office Fort Myers · USCG Southeast District (CGD-SE) · Activity 7152596
23 December 2019
COI Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6876654
2 October 2019
Spot Check · Drydock Exam · Internal Structural Exam · Administrative Inspection · Examination of Repairs
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6826123
18 September 2018
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6542890
16 January 2018
Annual Inspection · Administrative Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6338209
20 October 2016
Annual Inspection · DAPI Audit
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6025612
20 October 2016
DAPI Audit
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6030491
15 September 2016
Drydock Exam · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 6001243
10 November 2015
Deficiency Check · Administrative Inspection · In-Service Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5760740
29 October 2014
Drydock Exam · Examination of Repairs · Deficiency Check · Internal Structural Exam
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5014097
6 October 2014
DAPI Audit · Annual Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 5011701
2 October 2014
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4997452
28 June 2012
Internal Structural Exam · Drydock Exam · Examination of Repairs
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4357483
15 February 2012
Deficiency Check · In-Service Inspection · Examination of Repairs
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4245431
14 February 2012
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4250531
14 September 2011
DAPI Audit · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 4144795
21 January 2009
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3397880
21 January 2009
Damage Survey
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3398081
25 August 2008
Annual Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3306053
29 April 2008
Deficiency Check · Hull Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 3194357
19 July 2007
Deficiency Check · Annual Inspection
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2999593
17 August 2006
Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2751823
11 August 2006
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2744014
26 July 2006
Annual Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2727333
29 March 2006
Hull Examination
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2611943
24 January 2006
Administrative Inspection
Administrative · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2572424
3 November 2005
Type not recorded
No type recorded · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2560234
10 June 2005
COI Inspection · Deficiency Check
Physical examination · Sector Miami · USCG Southeast District (CGD-SE) · Activity 2386306
15 July 2004
Administrative Inspection
Administrative · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 2134028
17 June 2003
In-Service Inspection · Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1822303
5 August 2002
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1655781
10 June 2002
Annual Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1628606
13 September 2001
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1073560
26 July 2001
Annual Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1418946
20 June 2001
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1426624
31 August 2000
Deficiency Check
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1053852
15 June 2000
COI Inspection · MARPOL Annex V Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1469310
22 July 1999
MARPOL Annex V Examination · Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1420173
15 June 1999
Hull Examination
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1388827
23 July 1998
Re-Inspection
Physical examination · MSO MIAMI · USCG Southeast District (CGD-SE) · Activity 1465980
9 July 1997
Initial Certification
Physical examination · MSO TAMPA · USCG Southeast District (CGD-SE) · Activity 1467015
6 June 1997
Hull Examination · Initial Construction-Excluding Oversight
Physical examination · MSO ST LOUIS · USCG Heartland District (CGD-H) · Activity 1457468
Deficiency record · 244
09 - Working and Living Conditions › 092 - Working Conditions › Holds and tanks safety
Issued 20 April 2026
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant [name withheld] discovered that the sewage holding tank was in need of repair. Vsl owner is to submit plans to the local OCMI for approval prior to work.
46 CFR 176.700
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 April 2026
Resolved
Where a flexible fill pipe section is necessary, suitable flexible tubing or hose having high resistance to salt water, petroleum oils, heat and vibration, may be used. Such hose must overlap metallic pipe ends at the least 11/2 times the pipe diameter and must be secured at each end by clamps. The flexible section must be accessible and as near the upper end of the fill pipe as practicable. When the flexible section is a nonconductor of electricity, the metallic sections of the fill pipe separated thereby must be joined by a conductor for protection against generation of a static charge when filling with fuel. There is no conductor to
protect against the generation of static charge.
46CFR182.445(g)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 April 2026
Resolved
All fuel tanks must be electrically bonded to a common ground. Diesel fuel tank was not bonded to a common ground.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 20 April 2026
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations must be corrected and all required guards and protective devices must be in satisfactory condition. MI discovered the port main did not have a guard over rotating machinery. Make repairs to the satisfaction of the attending MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 April 2026
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of electrical equipment and systems, including the following, Inspection of batteries for condition and security of stowage. MI discovered the stbd battery wire connection to be deteriorating. Make repairs to the satisfaction of the attending MI. 46 CFR 176.806
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 20 April 2026
Resolved
At each initial and subsequent inspection for certification of a vessel, the owner or managing operator shall be prepared to conduct tests and have the vessel ready for inspection of electrical equipment and systems, including the following, Inspection of all cable as far as practicable without undue disturbance of the cable or electrical apparatus. MI discovered cables in the Engine room on the SSDG to be zip tied at an angle of which is damaging the wires. Make repairs to the satisfaction of the attending MI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 20 April 2026
Resolved
At each inspection for certification and at every other vessel inspection all observed unsafe practices, fire hazards, and other hazardous situations. MI discovered that the windings on the SSDG to be oil covered. Make repairs to the satisfaction of the attending MI.
46 CFR 176.830
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 4 December 2024
Resolved
07124 - The owner, managing operator, or a qualified servicing facility as applicable must conduct the following inspections and tests:portable extinguishers must be inspected and maintained in accordance with NFPA 10 and for fixed-gas fire extinguishing systems the owner or managing operator must provide satisfactory evidence of the required servicing to the marine inspector. All portable fire extinguishers and the fixed fire extinguishing system missed annual servicing.
46 CFR 176.810(b)
12 - Dangerous Goods › N/A - No Subsystem › Other (tankers)
Issued 4 December 2024
Resolved
12199 - Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. When the fuel shutoffs were activated the valves did not fully close.
46 CFR 182.455(b)(4)
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 4 December 2024
Resolved
11117 - Each ring life buoy must be marked in clearly legible block capital letters with the vessel's name. The ring buoy on the forward part of the vessel was not marked with the name.
46 CFR 185.604(b)
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 4 December 2024
Resolved
03106 - Each window must be capable of withstanding the maximum load from wave and wind conditions expected due to its location on the vessel and the authorized route of the vessel. The window on the main deck starboard side, amidships, was cracked.
46 CFR 177.1020
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 20 October 2024
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. Repairs or alterations that affect the safety of the vessel include, but are not limited to: replacement, repair, or refastening of deck or hull planking, plating, and structural members; repair of plate or frame cracks.
Vessel Operator reported damages to the bow and deck plating of the vessel after a collision with another vessel.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 7 February 2024
Resolved
A vessel on a lakes, bays, and sounds, or rivers route must carry:
(1) Three hand red flare distress signals approved in accordance with § 160.021 in subchapter Q of this chapter, or other standard specified by the Commandant. Vessel missing 02 of the 06 required distress signals.
46CFR180.68(b)
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 7 February 2024
Resolved
Each rescue boat and ring life buoy must be marked with Type II retroreflective material approved in accordance with 46 CFR 164.018 or other standard specified by the Commandant. The arrangement of the retroreflective material applied after March 11, 1996, must be as specified by IMO Resolution A.658(16). New retro tape was needed on 01 life ring.
46CFR185.604(i)
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 7 February 2024
Resolved
A carbon dioxide cylinder may not be inclined more than 30° from the vertical unless fitted with flexible or bent siphon tubes, in which case it may be inclined not more than 80° from the vertical.
CO2 bottle siphon tube line should be installed at the 12 o'clock position as indicated on the bottle to ensure proper discharge of agent. Bottles were reinstalled oriented in different directions than what is required for horizontal installation. Provide documentation from fire suppression company that siphon tube is oriented in appropriate position.
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage discharge connection
Issued 7 February 2024
Resolved
The operator must secure each Type III device in a manner which prevents discharge of sewage.
Sewage ovbd discharge valve was found in the open position with no means of securing. Close valve and remove handle or padlock valve in closed position on ovbd discharge valve.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 7 February 2024
Resolved
The number and identification of items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets.
Re-label the number of life jackets stowed in each storage compartment.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 27 February 2023
Resolved
A carbon dioxide cylinder may not be inclined more than 30° from the vertical unless fitted with flexible or bent siphon tubes, in which case it may be inclined not more than 80° from the vertical. CO2 bottles found to be installed incorrectly.
46 CFR 180.410(c)(7)
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 27 February 2023
Resolved
Each distribution panel or switchboard must be totally enclosed and of the dead front type. Marine inspector found multiple open slots on vessel's switchboard panel.
46 CFR 183.330(b)
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 27 February 2023
Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure. Junction box in aft compartment found with missing cover.
46 CFR 183.340(g)
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 27 February 2023
Resolved
Each connection to a conductor or terminal part of a conductor must be made within an enclosure. Electrical outlet in the galley was found with a missing cover.
46 CFR 183.340(g)
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 February 2023
Resolved
A dry exhaust pipe must be kept clear of, and suitably insulated or shielded from, combustible material. Generator turbo exhaust was missing lagging.
46 CFR 182.430(g)(1)
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 February 2023
Resolved
A vessel must carry one floating waterlight, unless it is limited to daytime operation, in which case no floating waterlight is required. Each floating waterlight must be approved in accordance with § 161.010 in subchapter Q of this chapter. Waterlight found to be installed with incorrect battery type.
46 CFR 180.70(d)(1)
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 February 2023
Resolved
Each ring life buoy on a vessel must be approved in accordance with § 160.050 in subchapter Q of this chapter and be readily accessible for use. Ring buoy plug was missing.
46 CFR 180.70(b)(1)(2)
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Repairs or alterations to hull, machinery, or equipment that effects sasfety of the vessel must not be made without the approval of the cognizant Officer in Charge Marine Inspection (OCMI) except in emergency.
At the commencement of vessel hull and internal structure exam the following worklist items were outlined for repair or replacement as original. Provide repair plan proposal to OCMI for approval prior to commencing.
1. Both port and starboard side of vessel from top of cleat sockets to one foot below the waterline marking (white stripe on hull below chine) from stem to stern including stern corners wrapping around to the stern are to be cleaned down to bare metal including all ‘bondo’ and then gauged for thickness. Due to hull scantlings the allowable percentage of waste not to exceed 15%
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Clean to bare metal and gauge where bottom is marked in grid pattern starting in center of marked area expanding out ward in 6” intervals up to 12 inches.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Clean off ‘bondo’ from both port and starboard embarkation decks and the entrance bulkhead IWO main accommodation area doors and framing to access damage.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Repair as original hole in bulkhead IWO bilge suction at keel on aft bulkhead of storage hold aft of forepeak.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Repair deck and bulkhead IWO embarkation areas to inclide hull plate and deck plate replacement as original.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Repair as original holed areas in 02 deck and 02 deck starboard base of bulkhead entering into 02 accommodation space.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Remove paneling interior IWO atrium area to access steel bulkhead condition.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Repair/replace as original the bases for the exhaust “buckets’
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Repair / replace as original aft engine room longitudinal and tabs where longitudinal connect to aft bulkhead outboard of port engine.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Replace as original missing Structural Fire Protection in engine room areas where missing.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Remove interior paneling and interferences in way of main deck windows to access wastage to the superstructure around window trim.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Repair as original rotted exterior superstructure trim and drain areas above main deck windows.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Gauge under potable water tank.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Replace fore peak hatch gasket.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Replace Starboard engine R/W suction valve
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Replace rubber section of over board drainage line for bar sink overboard drain and add an overboard skin valve.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Remove concrete patch around AC thru hull valve in Storage Void port side. Gauge hull plating IWO of thru hull for thickness.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Repair hole on side shell plate in Storage void starboard forward corner.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Repair / replace as original port aft corner longitudinal and tabs where longitudinal connect to aft bulkhead in steering compartment.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 1 September 2021
Resolved
Replace as original lower six longitudinal stringers in fore peak.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 1 September 2021
Resolved
Prior to carriage of passengers all repairs shall be completed to satisfaction of Officer In Charge Marine Inspection (OCMI)and a satisfactory seal trial completed.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 14 April 2021
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Excess oil was found to be accumulated under the Generator. 46 CFR 182.100
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 14 April 2021
Resolved
All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury. Blow by hose on Generator was found to have excess oil and residue and improperly contained. 46 CFR 182.100
03 - Water/Weathertight Conditions › N/A - No Subsystem › Windows, sidescuttles and deadlights
Issued 14 April 2021
Resolved
Glass and other glazing material used in windows accessible to passengers and crew must be of material that will not break into dangerous fragments if fractured. Window in main accomodation area on port side aft was cracked and shattering. Replace broken window. 46CFR177.1010
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 10 March 2021
Resolved
Repair secondary fire/bilge PTO pump on starboard main engine.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 10 March 2021
Resolved
Replace missing cover for starboard main engine computer control box.
01 - Certificates & Documentation › 013 - Documents › Survey report file
Issued 10 March 2021
Resolved
Provide CO2 testing report from March 2021.
10 - Safety of Navigation › N/A - No Subsystem › Nautical publications
Issued 10 March 2021
Resolved
Provide appropriate tide tables, charts, and coast pilot for intended area of operation (Baltimore, MD).
10 - Safety of Navigation › N/A - No Subsystem › Radar
Issued 10 March 2021
Resolved
Repair or replace inoperable marine radar.
10 - Safety of Navigation › N/A - No Subsystem › Lights, shapes, sound-signals
Issued 10 March 2021
Resolved
Repair inoperable spot light.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 10 March 2021
Resolved
Only 04 red hand flares were onboard. Provide a minimum of 06 flares (03 red and 03 orange, or 06 red).
09 - Working and Living Conditions › 091 - Living Conditions › Medical Equipment
Issued 10 March 2021
Resolved
Update first aid kit with ammonia inhalants.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 10 March 2021
Resolved
Remove dead end wires in lazarette.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 December 2019
Resolved
FCC Safety Radio Authorization Certificate is expired. Provide renewed certificate.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 23 December 2019
Resolved
FCC Bridge to Bridge Certificate is expired. Provide renewed certificate.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 23 December 2019
Resolved
Servicing report for fire systems was not on board during the inspection. Operator was able to provide an email of the report prior to the conclusion of the inspection.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 23 December 2019
Resolved
Flares must be stored in a water tight container marked "DISTRESS SIGNALS". Current storage is not water tight.
11 - Life Saving Appliances › N/A - No Subsystem › Distress flares
Issued 23 December 2019
Resolved
Vessel is required to have 6 day and 6 night flares. 3 day and 2 night flares are missing.
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 25 January 2018
Resolved
Add missing blanks electrical panel on main deck.
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 January 2018
Resolved
Electrical wiring not properly secured or maintained in galley, main dining area and engine room.
Construction/Loadline › Structures › Superstructure
Issued 25 January 2018
Resolved
Replace broken windows on main deck; 04 total.
Engineering › Diesel Engine (auxiliary) › Turbocharger
Issued 25 January 2018
Resolved
Provide technician report or satisfactory testing of generator with fire pump running to simulate engine under load. Engine was emitting excessive smoke while under load.Potential turbocharger issue.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 16 January 2018
Resolved
Vessel must undergo annual inspection prior to carrying passengers.
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 20 October 2016
Resolved
stenciling is worn. re-stencile all 3 ring buoys.
Lifesaving › Lifejacket/PFD (General) › Storage
Issued 20 October 2016
Resolved
Life jacket location marking is out of date. Update the actual amount of life jackets at the storage locations to reflect amount on board.
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 20 October 2016
Resolved
Permanently mark the vessels name.
Engineering › Shafting/Propeller Arrangements › Bearing
Issued 15 September 2016
Resolved
Renew P/S strut and P/S shaft tube cutlass bearings.
Construction/Loadline › Hull › Stiffener
Issued 15 September 2016
Resolved
Renew 03 gussets, one in lazerette on stern starboard side and two in sewage tank space (marked).
Construction/Loadline › Hull › Bottom Plating
Issued 15 September 2016
Resolved
Clean prep for inspection identified area of scaling in engine room, port side bottom plating. **Repair proposal submitted to insert an 18 X 18 plate to renew area of wasted hull**
Construction/Loadline › Hull › Longitudinal Frame
Issued 15 September 2016
Resolved
Renew fram in forepeak, starboard side second frame.
Construction/Loadline › Structures › Deck Plating
Issued 15 September 2016
Resolved
Crop and renew to good metal idendified wasted areas in galley deck (marked in lazerette).
Operations/Management › Drug and Alcohol Testing › Proof of Enrollment
Issued 10 November 2015
Resolved
Provide documentation of enrollment of all crew members in drug and alcohol program.
Operations/Management › Drug and Alcohol Testing › Testing, Pre-employment
Issued 10 November 2015
Resolved
Provide documentation of pre-employment screening or consortium enrollment with test data.
Lifesaving › Hand Flares › Expired
Issued 10 November 2015
Resolved
Provide 6 red hand flares.
Operations/Management › Navigation Safety › Carriage of Charts and Publications
Issued 10 November 2015
Resolved
Provide up to date charts and publications.
Navigation › Piloting/Steering › Magnetic Compass
Issued 10 November 2015
Resolved
Prove illumination of magnetic compass.
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 10 November 2015
Resolved
Prove operation of port navigation light and mast head light.
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 10 November 2015
Resolved
Prove operation of waterlight.
Communications › Public Address System › Loudspeaker
Issued 10 November 2015
Resolved
Prove operation of all PA speakers.
Engineering › Steering Gear System › Trick Wheel
Issued 10 November 2015
Resolved
Repair/ renew cracked helm hub.
Stability › Unintentional Flooding › General
Issued 10 November 2015
Resolved
Repair/ renew cracked potable water atnk.
Communications › Alarms/Indicators › Engine RPM Gauge/Indicator
Issued 10 November 2015
Resolved
Stbd engine tachometer is reading erratically at idle. Voltmeter and oil pressure indicator are fluctuating as well. Operator to prove proper operation.
Construction/Loadline › Hull › Bottom Plating
Issued 29 October 2014
Resolved
Submit repair proposals for approval for holed/wasted areas of the hull identified by USCG Marine Inspector (port quarter, transom center line, port side of underwater body outboard of keel 1/3 length fwd of stern, port side underwater body outboard of the keel 1/3 length aft of the stern)
Construction/Loadline › Hull › Bottom Plating
Issued 29 October 2014
Resolved
Grind all paint and coating from areas of the hull identified by USCG Marine Inspector and make availible for inspection
Construction/Loadline › Hull › Hull Plating
Issued 29 October 2014
Resolved
Provide repair proposals for approval for missing/deteriorated longitudinal connection brackets in the steering space stbd side aft bulkhead, #2 void stbd side aft bulkhead, and #3 void stbd side aft bulkhead
Construction/Loadline › Hull › Bottom Plating
Issued 29 October 2014
Resolved
Descale and gauge the bilges in the #2 and #3 void spaces 12" outboard of the CVK on port and stbd sides. These areas have fresh paint over the top of scale rust
Construction/Loadline › Hull › Hull Plating
Issued 29 October 2014
Resolved
Provide gauging report from a qualified NDT tech for the areas identified by the USCG Marine Inspector (stbd quarter, stbd mid ship between the chine and W/L, stbd fwd, stbd fwd quarter, port fwd quarter, port forward between the chine and W/L)
Lifesaving › Lifebuoys › Self-igniting Lights
Issued 6 October 2014
Resolved
Properly renew topside ring buoy and battery. Battery must be IAW correct battery type as labeled on light casing.
Construction/Loadline › Hull › Bottom Plating
Issued 3 July 2012
Resolved
Provide gauging of hull bottom from approx. 2' inboard of chin and 6' aft of bow stem where. pitted.
Construction/Loadline › Hull › Side Shell
Issued 3 July 2012
Resolved
Crop to good metal and repair as original wasted metal under rub rails
Construction/Loadline › Hull › Bottom Plating
Issued 28 June 2012
Resolved
Make hull from boot stripe down available for USCG Inspection.
Construction/Loadline › Hull › Side Shell
Issued 28 June 2012
Resolved
Remove port and STBS rub rails and make available for USCG Inspection.
Construction/Loadline › Structures › Superstructure
Issued 28 June 2012
Resolved
Scale around all window frames port and STBD side upper and lower windows (pay close attention to window lip).
Construction/Loadline › Structures › Superstructure
Issued 28 June 2012
Resolved
Make available for inspection port side superstructure interior IWO fwd windows where wasted.
Construction/Loadline › Hull › Bottom Plating
Issued 28 June 2012
Resolved
Crop to good metal and make repairs to #3 fwd port compartment hull where holed, port transom aprrox. 2" from hull plate where holed and port side shell just fwd of loading door below main deck where holed.
Construction/Loadline › Structures › Superstructure
Issued 28 June 2012
Resolved
Crop to good metal and make repairs to galley aft wall (super structure on transom).
Stability › Watertight Integrity › General
Issued 28 June 2012
Resolved
Install gasket for forepeak scuttle (hatch).
Construction/Loadline › Hull › Longitudinal Frame
Issued 28 June 2012
Resolved
Crop and renew holed aft port stringer under water heater #3 compartment.
Construction/Loadline › Hull › Bottom Plating
Issued 28 June 2012
Resolved
#3 compartment, remove scale center aft port bilge and remove all scale for inspection.
Electrical › Lighting (service) › Lighting Fixture
Issued 28 June 2012
Resolved
Mount light fixture in #3 compartment STBD aft.
Accommodation/Occupational Safety › Potable Water System › General
Issued 28 June 2012
Resolved
Make repairs to fresh water tank PVC and fiberglass patch in #4 compartment.
Construction/Loadline › Hull › Transverse Frame
Issued 28 June 2012
Resolved
Crop and renew holed center transverse frame between fuel and water tank #4 compartment.
Construction/Loadline › Hull › Longitudinal Frame
Issued 28 June 2012
Resolved
Crop and renew wasted longitudinal frame bracket port center aft bulkhead in #4 compartment.
Stability › Weathertight Integrity › General
Issued 28 June 2012
Resolved
Crop and renew wasted main deck port and stbd door frames fwd.
Construction/Loadline › Hull › Transverse Frame
Issued 28 June 2012
Resolved
Crop and renew transverse frame under starboard shaft in engine room.
Construction/Loadline › Structures › Superstructure
Issued 28 June 2012
Resolved
Crop to good metal all areas of superstructure (above main deck) identified with holes and make proper repairs.
Construction/Loadline › Hull › Bottom Plating
Issued 28 June 2012
Resolved
Provide repair proposal for all hull, frame and superstructure repairs.
Construction/Loadline › Hull › Bottom Plating
Issued 28 June 2012
Resolved
Complete anode calculations to determine if enough zinc is installed.
Engineering › Steering Gear System › Actuator
Issued 15 February 2012
Resolved
Provide tech report from Mathers certified technician on the cause of the port engine going full astern while in neutral. Provide in report corrective actions and any input from Mathers parent company.
Engineering › Steering Gear System › Actuator
Issued 15 February 2012
Resolved
In the presents of a USCG Marine Inspector complete tests of Mathers MicroCommander once repairs are made and tests are completed by tech.
Stability › Weathertight Integrity › General
Issued 14 September 2011
Resolved
Replace the two cracked windows, port side fwd.
Accommodation/Occupational Safety › Ventilation › General
Issued 14 September 2011
Resolved
Engine room ventilation dampners are not fully closing. Prove proper operation of closure.
Electrical › Electrical Distribution System (service) › Conductor
Issued 14 September 2011
Resolved
Remove or properly terminate dead-ended wires under bridge console.
Engineering › Bilge Water Management System › Hose
Issued 14 September 2011
Resolved
Flex bilge discharge hose overboard from manifold does not met new "T" 46 CFR 182.510. Replace with hard pipe at next dry-dock.
Communications › Public Address System › Announcing Station
Issued 14 September 2011
Resolved
Make public address speakers audible in all accommodation spaces.
Engineering › Diesel Engine (propulsion-direct drive) › Block
Issued 21 January 2009
Resolved
Make permanent repairs and prove proper operation of Stbd main diesel engine prior to carrying passengers.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 25 August 2008
Resolved
Provide onboard current edition of the tidal currents, US Coast Pilot, US Coast Guard light list and current/updated/corrected charts.
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 25 August 2008
Resolved
Update first aid kit IAW 46 CFR 160.041(b) and replace expired items.
Deck/Cargo › Mooring/Anchoring › Anchor Shackle
Issued 25 August 2008
Resolved
Mouse shackle connecting anchor to anchor line.
Navigation › Piloting/Steering › Deviation Table/Graph
Issued 25 August 2008
Resolved
Provide deviation table for magnetic compass.
Deck/Cargo › Mooring/Anchoring › Mooring Line/Hawser
Issued 25 August 2008
Resolved
Replace chaffed mooring line FWD #1 and #2.
Electrical › Electrical Distribution System (service) › Switch
Issued 25 August 2008
Resolved
Mount temperature controller for A/C in galley STBD side.
Stability › Weathertight Integrity › General
Issued 25 August 2008
Resolved
Provide repair proposal for main deck greenhouse window, both P/S side upper window frame on main deck, water intrusion IWO windows port side staircase FWD leading to 2nd deck, bar 2nd deck IWO overhead and wheelhouse window framing.
Electrical › Electrical Distribution System (service) › Wiring
Issued 25 August 2008
Resolved
Remove saturated wood consol and ensure space under consol is dry.
Construction/Loadline › Hull › Transverse Frame
Issued 25 August 2008
Resolved
Provide proposal for wasted frame #2 in forepeak and wasted framing at bottom of door leading to soda locker.
Electrical › Lighting (service) › Lighting Fixture
Issued 25 August 2008
Resolved
Replace/provide covers for eight light fixtures in soda locker.
Fire Fighting › Fire Pumps › Capacity
Issued 25 August 2008
Resolved
Repair/replace gauge on fire pump to show 60 psi at the pump outlet.
Stability › Weathertight Integrity › General
Issued 25 August 2008
Resolved
Repair/replace STBD window in greenhouse.
Documentation › Certificates/Documents › Certificate of Documentation (CG-1270)
Issued 29 April 2008
Resolved
Provide onboard a current Certificate of Documentation with correct owner address. COD expired on 31 Mar08.
Engineering › Sea-water System (primary cooling) › Piping
Issued 29 April 2008
Resolved
make repairs to leaking pipe on salt water pump in f/o tank void port side.
Operations/Management › Bilge/Bilge System Management › Control of Oil Mixtures
Issued 29 April 2008
Resolved
Remove all oil from bilge in engin room and oil on hoses, generator and MDE's
Construction/Loadline › Structures › Superstructure
Issued 29 April 2008
Resolved
Make proper repairs to wasted metal on fwd window frames, main deck top.
Construction/Loadline › Hull › Weld
Issued 29 April 2008
Resolved
Remove coating from fwd weld stbd side hull (exterior) w/ wire wheel or brush and make ready for USCG inspection.
Engineering › Bilge Water Management System › Strainer
Issued 29 April 2008
Resolved
Replace wasted strainer on bilge piping in 2nd compartment.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Tanks
Issued 18 July 2007
Resolved
Prior to the carriage of passengers provide report stating proper repairs to fix fire fighting system were completed and system is fully operational.
Navigation › Piloting/Steering › Coast Guard Light List
Issued 26 July 2006
Resolved
Provide current charts, light list and coast pilot.
Navigation › Piloting/Steering › Compass Deviation Table
Issued 26 July 2006
Resolved
Provide compass deviation table.
Electrical › Electrical Distribution System (service) › Wiring
Issued 26 July 2006
Resolved
Remove dead ended wires from beneath operating station and breaker cabinet main deck.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 26 July 2006
Resolved
Properly mount Moffat oven in galley.
Communications › Radio Communications › VHF Radiotelephone
Issued 26 July 2006
Resolved
Properly fill out radio distress placard.
Documentation › Certificates/Documents › FCC SSL
Issued 26 July 2006
Resolved
Provide valid FCC station license.
Communications › Radio Communications › EPIRB
Issued 26 July 2006
Resolved
Properly mount EPIRB in float free mount away from overhead obstructions prior to vessel operating outside rivers route. Vessel restricted to ICW until corrected.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 26 July 2006
Resolved
Prove proper operation of rescue platform ensuring platform can not fall of vessel. prior to vessel operating outside rivers route. Vessel restricted to ICW until corrected.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Operating Controls
Issued 26 July 2006
Resolved
Prove proper operation of engine room vent closures.
Engineering › Bilge Water Management System › Valve
Issued 26 July 2006
Resolved
Provide positive control valve for electrical sub pump in starboard shaft bilge.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 29 March 2006
Resolved
Crop and Renew forward bow railing
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 29 March 2006
Resolved
Crop and Renew railing on boarding ramp.
Construction/Loadline › Structures › Superstructure
Issued 29 March 2006
Resolved
Properly mount/install navigational mast and radar as proposed in company's repair proposal.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 March 2006
Resolved
Replace 5 wasted gussetts on port side located near collision bulkhead in #1 void space.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 March 2006
Resolved
Replace 2 sections of frame members and 1 full frame member located forward of collision bulkhead in #1 void space.
Accommodation/Occupational Safety › Occupational Safety › Portable Electric Equipment/Appliances
Issued 29 March 2006
Resolved
Remove/properly install overhead lights located throughout all voids on vessel.
Accommodation/Occupational Safety › Potable Water System › General
Issued 29 March 2006
Resolved
Properly mount PVC piping in #3 void space
Construction/Loadline › Hull › Weld
Issued 29 March 2006
Resolved
Properly weld cracked weld located forward stbd side in #3 void.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 March 2006
Resolved
Crop and Renew strength members located in void space #2 as original.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 March 2006
Resolved
Crop and renew as original frame members in void space #4 on starboard side.
Construction/Loadline › Hull › Weld
Issued 29 March 2006
Resolved
Weld top of support members on welded patch in #2 void space.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 March 2006
Resolved
Crop and renew as original frame member located by ladder on top in #4 void space.
Engineering › Diesel Engine (propulsion-direct drive) › Turbocharger
Issued 29 March 2006
Resolved
Excessive engine oil blow by starboard turbo seal.
Engineering › Diesel Engine (propulsion-reduction gear) › Piping (exhaust)
Issued 29 March 2006
Resolved
Replace port exhaust baffle and properly mount
Electrical › Electrical Distribution System (service) › Wiring
Issued 29 March 2006
Resolved
Replace frayed electrical wire located near port exhaust
Engineering › Bilge Water Management System › Pump
Issued 29 March 2006
Resolved
Replace positive control valve on electric bilge pump located in engineroom.
Fire Fighting › Miscellaneous Items › Insulation (Penetration of Oil/Oil Vapors)
Issued 29 March 2006
Resolved
Replace missing insulation to overhead in engine room.
Engineering › Sea-water System (primary cooling) › Valve
Issued 29 March 2006
Resolved
Replace starboard main valve to main sea suction.
Fire Fighting › Fire Main › Material
Issued 29 March 2006
Resolved
Replace overboard hose on firemain with proper hose.
Pollution Prevention/Response › Prevention Equipment › Sewage System Tank
Issued 29 March 2006
Resolved
Provide means to indicate sewage tank is 3/4 full.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 29 March 2006
Resolved
Properly mount PVC piping in #5 void space.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 29 March 2006
Resolved
Provide proper cap on hose and remove highlighter in hose located in #5 void space.
Electrical › Electrical Distribution System (service) › Wiring
Issued 29 March 2006
Resolved
Remove dead-ended wires aft of steering ram.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 March 2006
Resolved
Crop and renew as original indentation located in #5 void space.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 29 March 2006
Resolved
Properly mount sewage discharge piping.
Accommodation/Occupational Safety › Potable Water System › General
Issued 29 March 2006
Resolved
Make proper repairs to water heater located in void space #5
Electrical › Electrical Distribution System (service) › Wiring
Issued 29 March 2006
Resolved
Remove all extension cords located in galley.
Accommodation/Occupational Safety › Refrigeration (air conditioning) › General
Issued 29 March 2006
Resolved
Properly mount AC compressor located in galley.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 March 2006
Resolved
Crop and Renew longitudinal frame member as original located above port exhasut in engineroom.
Construction/Loadline › Structures › Superstructure
Issued 29 March 2006
Resolved
Crop and renew as original to good metal all port and aft starboard bulworth near all cleats.
Construction/Loadline › Structures › Superstructure
Issued 29 March 2006
Resolved
Weld multiple holes on starboard side before replacing the rubrail.
Construction/Loadline › Hull › Longitudinal Frame
Issued 29 March 2006
Resolved
Crop and Renew as original inset aft starboard and frame member supporting inset in enginroom located in the corner of the space.
Construction/Loadline › Structures › Superstructure
Issued 29 March 2006
Resolved
Properly repair 4 window posts on starboard side.
Construction/Loadline › Structures › Superstructure
Issued 29 March 2006
Resolved
Properly repair 1 window post on port side.
Construction/Loadline › Hull › Bottom Plating
Issued 29 March 2006
Resolved
Make bottom available for inspection.
Engineering › Shafting/Propeller Arrangements › Propeller Shaft
Issued 29 March 2006
Resolved
Provide report on propellers and shafts.
Construction/Loadline › Hull › Bottom Plating
Issued 29 March 2006
Resolved
Provide gauging report for 24 areas on starboard side of the hull and 22 areas on the port.
Construction/Loadline › Hull › Weld
Issued 29 March 2006
Resolved
Repair washed out weld on outerbody of the hull
Communications › Radio Communications › EPIRB
Issued 10 June 2005
Resolved
Provide an EPIRB in accordance with 46CFR180.205 Prior to carrying Passengers.
Documentation › Certificates/Documents › FCC SSL
Issued 10 June 2005
Resolved
Provide Safety Radiotelepohny Certificate
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 10 June 2005
Resolved
Porivde p to dat 1st Kit
Engineering › Sea-water System (primary cooling) › Piping
Issued 10 June 2005
Resolved
Double Calmp and properly support Exhuast cooling hose.
Construction/Loadline › Structures › Superstructure
Issued 10 June 2005
Resolved
Replace broken Bridge window.
Lifesaving › Lifebuoys › Buoyant Lifeline
Issued 9 March 2004
Resolved
Renew lifering line and line to float light.
Engineering › Bilge Water Management System › Hose
Issued 9 March 2004
Resolved
Renew flexible hose at fire pump/ bilge discharge at side shell.
Fire Fighting › Fixed CO2 Fire Extinguishing System › Servicing
Issued 9 March 2004
Resolved
Prove CO2 fire suppression system is intact and ready for operation (service report)
Engineering › Bilge Water Management System › Pump
Issued 9 March 2004
Resolved
Provide hand bilge pump with min. of 5 gals per minute
Accommodation/Occupational Safety › Medical/First Aid › Medicine Chest
Issued 9 March 2004
Resolved
Provide tourniqutte for first aid kit.
Electrical › Electric Generation Source (service) › Panelboard
Issued 9 March 2004
Resolved
Repair/replace voltage guage for genset.
Communications › Alarms/Indicators › Propeller Revolutions Rate Indicator
Issued 8 March 2004
Resolved
Repair/replace starboard main engine tachmeter.
Electrical › Electric Supply System (service) › Cable
Issued 8 March 2004
Resolved
Make safe dead ended cable or remove. (lazerette).
Construction/Loadline › Penetrations › Valve Flange
Issued 8 December 2003
Resolved
Present thru hull valves for examination.
Documentation › Certificates/Documents › Certificate of Inspection
Issued 8 December 2003
Resolved
Present vessel for in-service inspection to verifiy compliance with COI.
Construction/Loadline › Hull › Hull Plating
Issued 25 August 2003
Resolved
Crop and renew bottom plate as marked.
Construction/Loadline › Hull › Hull Plating
Issued 25 August 2003
Resolved
Make repairs to staboard aft transom corner where damaged.
Engineering › Bilge Water Management System › Piping
Issued 25 August 2003
Resolved
Prove all bilge suctions.
Communications › Alarms/Indicators › Bilge Alarm
Issued 25 August 2003
Resolved
Prove all bilge alarms.
Construction/Loadline › Markings › Draft Marks/Indicating System
Issued 25 August 2003
Resolved
Provide draft marks or loading marks.
Construction/Loadline › Structures › Superstructure
Issued 25 August 2003
Resolved
Repair broken window at strarboard bow.
Construction/Loadline › Hull › Bottom Plating
Issued 27 June 2003
Resolved
Conduct Hull guaging of entire hull from chine to chine, bow to stern
Construction/Loadline › Structures › Door
Issued 27 June 2003
Resolved
Properly repair embarkation doors on port and starboard side.
Construction/Loadline › Hull › Bottom Plating
Issued 27 June 2003
Resolved
Submit repair proposal for repair of wasted areas of hull.
Construction/Loadline › Hull › Hull Plating
Issued 17 June 2003
Resolved
Remove all paint from exterior hull from stem to tern and from port chine to stbd chine to facilitate inspection.
Construction/Loadline › Hull › Bottom Plating
Issued 17 June 2003
Resolved
Submit original scantlings plans for review.
Accommodation/Occupational Safety › Potable Water System › General
Issued 17 June 2003
Resolved
Properly repair both water heaters to cover heating elements.
Accommodation/Occupational Safety › Occupational Safety
Issued 10 June 2002
Resolved
Re-install MDE protection guards over pulley system. LEGACY COMPONENT DESC: Guards for Exposed Hazards
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 10 June 2002
Resolved
Provide documentation of use of flexible hose or bent siphon tube on fixed CO2 system (80 degree inclined installation).
LEGACY COMPONENT DESC: Piping
Fire Fighting › Ventilation Systems
Issued 10 June 2002
Resolved
Label fixed fire-fighting ventilation closure. LEGACY COMPONENT DESC: Operating Controls
Construction/Loadline › Structures
Issued 10 June 2002
Resolved
Renew gasket on fwd. chainlocker. LEGACY COMPONENT DESC: Manhole
Construction/Loadline › Markings
Issued 10 June 2002
Resolved
Provide permanent draft marks. LEGACY COMPONENT DESC: Draft Marks/Indicating System
Fire Fighting › Fixed CO2 Fire Extinguishing System
Issued 10 June 2002
Resolved
Install correct piping on fixed CO2 system. LEGACY COMPONENT DESC: Piping
Lifesaving › Embarkation Appliances/Stations
Issued 10 June 2002
Resolved
Provide MOB retrival ladder with drop down platform. LEGACY COMPONENT DESC: Steps
Navigation › Collision/Grounding Avoidance
Issued 10 June 2002
Resolved
Provide 12 inch bell.
Navigation › Collision/Grounding Avoidance
Issued 10 June 2002
Resolved
Relocate Port and Stbd. floodlights to enable correct arc of visibility on side lights. LEGACY COMPONENT DESC: Navigation Lights
Communications › Audible Communications
Issued 10 June 2002
Resolved
Provide additional PA speaker in galley.
Construction/Loadline › Structures
Issued 10 June 2002
Resolved
Provide securing device for forward hatch. LEGACY COMPONENT DESC: Manhole
Fire Fighting › Fire Main
Issued 10 June 2002
Resolved
Install plumbing for additional fire pump.
Accommodation/Occupational Safety
Issued 26 July 2001
Resolved
Sea rails missing on hotplates
Electrical
Issued 26 July 2001
Resolved
Emergency lighting on upper deck lounge is defective
Engineering
Issued 26 July 2001
Resolved
Vital system piping is not IAW Current regulations.
Electrical
Issued 26 July 2001
Resolved
Lighting system in liquor hold requires permenant electrical wiring.
Fire Fighting
Issued 26 July 2001
Resolved
No ventilation closures in engine room for fixed fire fighting system
Accommodation/Occupational Safety
Issued 26 July 2001
Resolved
No garbage disposal log maintained.
Lifesaving
Issued 26 July 2001
Resolved
Vessel requires hoisting davit for life sling
Construction/Loadline
Issued 26 July 2001
Resolved
Vessel has a water intrusion on the port side of the engine room when it rains.
Lifesaving
Issued 26 July 2001
Resolved
Galley appliances are not secured for sea.
Fire Fighting
Issued 15 June 2000
Resolved
Prior to the carriage of passengers, move portable fire extinguisher behindbar on second deck.
Lifesaving
Issued 15 June 2000
Resolved
Prior to 30Jun00, replace retroreflective tape, as discussed, on all ring life buoy's.
Lifesaving
Issued 15 June 2000
Resolved
Prior to 30Jun00, post maximum number of passengers for upper deck on the FWD ladder.
Lifesaving
Issued 15 June 2000
Resolved
Prior to 15Jul00, provide First Aid/Red Cross "CPR" cards fot 50% of the marine crew.
Documentation
Issued 23 July 1998
Resolved
PROVIDE FCC SAFETY CERTIFICATE._x001C_ _x001C_
Documentation
Issued 23 July 1998
Resolved
PROVIDE FCC OPERATOR'S PERMIT._x001C_ _x001C_ _x001C_ _x001C_
Engineering
Issued 23 July 1998
Resolved
PROVIDE PROOF OF PROPER VENTILATION IN FUEL TANK SPACE._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 9 July 1997
Resolved
INSTALL AND DEMONSTRATE PROPER OPERATION OF RESCUE BOAT.
Documentation
Issued 9 July 1997
Resolved
PROVIDE VALID SAFETY RADIO TELEPHONY CERTIFICATE. VESSEL'S ROUTE IS RESTRICTED TO NOT MORE THAN 1000 FEET FROM SHORE UNTIL CERTIFICATE IS PROVIDED.
Casualty record · 5
3 November 2005Routine · role: Involved in a Marine Casualty · at 3RD AVENUE BRIDGE · activity 2560234
21 January 2009Routine · role: Involved in a Marine Casualty · activity 3397880
14 February 2012Routine · role: Involved in a Marine Casualty · activity 4250531
7 February 2013Routine · role: Involved in a Marine Casualty · activity 4533918
19 October 2024Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 2 injured · activity 8022157
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.