Records from 2016 to 2018. Most recent: inspection, 6 June 2018.
Inspection history · 5
6 June 2018
Annual Inspection
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 6436300
16 February 2018
Drydock Exam
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 6356335
9 June 2017
Annual Inspection
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 6170482
9 March 2016
COI Inspection
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 5823879
14 January 2016
Drydock Exam
Physical examination · Marine Safety Unit Brownsville · USCG Heartland District (CGD-H) · Activity 5798008
Construction/Loadline › Markings › Vessel Name/Home Port
Issued 6 June 2018
Resolved
State numbers are not present on the bow of vessel, neither is the vessel name on the stern; place state numbers and name of veseel on vessel as indicated.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2018
Resolved 9 July 2018
Resolution: numbers placed on vsl hull
Documentation › Logs/Records › Drug Test Records
Issued 6 June 2018
Resolved
Provide proof of enrollment for Captain and Deckhand for company's drug and alchohol program.
Action required: 701 - Prior to carriage of passengers/cargo
Due 6 June 2018
Resolved 6 June 2018
Resolution: enrolled in dapi
Construction/Loadline › Hull › Hull Plating
Issued 6 June 2018
Resolved
Slight cracking/separation where hull meets forward storage space. Repair deck separation in front passenger area.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 20 June 2018
Resolved 22 June 2018
Resolution: FRP work performed to satisafaction
Engineering › Fuel Oil Storage/Transfer System › Valve
Issued 6 June 2018
Resolved
Emergency shut offs for fuel are operated inside tank space. Reposition method of operating emergency shut off valve for fuel outside tank space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 6 July 2018
Resolved 9 July 2018
Resolution: remote shut offs moved outside the space
Lifesaving › Lifebuoys › Markings (ship name/port)
Issued 9 June 2017
Resolved
replace retro tape and vessel name
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 June 2017
Resolved 9 June 2017
Navigation › Piloting/Steering › Gyro Compass
Issued 9 June 2017
Resolved
repair light
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 23 June 2017
Resolved 23 June 2017
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 9 June 2017
Resolved
vsl is restricted to carrying 15 persons o/b until new life jackets are there
Condition: Design Flaw
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 June 2017
Resolved 9 June 2017
Fire Fighting › Fire Bucket › Availability
Issued 9 June 2017
Resolved
replace fire buckets and have proper line and markings
Condition: Damaged By Earlier Event
Action required: 701 - Prior to carriage of passengers/cargo
Due 9 June 2017
Resolved 9 June 2017
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 9 March 2016
Resolved
Emergency Instructions not displayed.
Action required: 705 - Other - as specified
Due 16 March 2016
Resolved 14 March 2016
Resolution: Emergency Instructions displayed.
Operations/Management › Lifesaving › Op Readiness/Maintenance/Inspection
Issued 9 March 2016
Resolved
Lifejacket instruction placard not displayed.
Action required: 705 - Other - as specified
Due 16 March 2016
Resolved 14 March 2016
Resolution: Lifejacket instructional placard displayed.
Electrical › Electric Generation Source (service) › Generator Cable
Issued 9 March 2016
Resolved
Battery cable needs chaffing gear around engine mount.
Action required: 705 - Other - as specified
Due 9 April 2016
Resolved 9 June 2017
Navigation › Piloting/Steering › Gyro Compass
Issued 9 March 2016
Resolved
Compass light does not function. Repalce/Repair light. Restricted to day time ops only.
Due 9 April 2016
Resolved 9 June 2017