GAIL FORCE is a 1966 passenger vessel (inspected). The Coast Guard has recorded 81 inspections since 1984, most recently in November 2025, along with 120 deficiencies, 2 operational controls and 2 casualty investigations between 2009 and 2018.
Records from 1984 to 2025. Most recent: inspection, 4 November 2025.
- Built
- 1966
- Last inspected
- 4 November 2025
- Documentation
- Valid · documentation file of 10 September 2026
- Deficiencies
- 120 recorded · 0 without a recorded resolution
- Controls
- None recorded without a removal date
- Casualties
- 2 investigations · 2009–2018
Identity
506705
WDG9927
45433
Flag
UNITED STATES
367592620
Maury page id
psix-45433
Inspections, by type
…with no type recorded8
Years with a record
39 calendar years (1984–2025)
The 81 inspections in the strip above, split by the kind of activity the US
Coast Guard recorded. Years with a record are calendar years in which a record exists, not
years in service. What Maury does not do.
Coast Guard record current through 13 September 2026, retrieved 18 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 1977.
Documentation record
Registered dimensions (L × B × D)50.6 ft × 16.7 ft × 7.6 ft
Registered tonnagegross 44 / net 30
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderDRAKE CRAFT CO · OXNARD, CA, UNITED STATES · built 1966
Hull materialWood
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portLOS ANGELES, CA
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 21 April 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it44 - Regulatory (Subpart C or D), Gross Ton
30 - Regulatory (Subpart C or D), Net Ton
30 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Radio station licence
WDP5218MMSI 367592620 · active · compulsorily equipped · granted 10 April 2024, expires 10 April 2034
WDG9927MMSI 367592620 · expired · compulsorily equipped · granted 22 October 2013, cancelled 23 December 2023
WDE6566MMSI 366747320 · expired · compulsorily equipped · granted 23 October 2008, cancelled 29 December 2018
WCY2878MMSI 366747320 · expired · compulsorily equipped · granted 8 April 1998, cancelled 14 June 2008
FCC Universal Licensing System ship-station file of 6 September 2026, matched to this hull on its
US Official Number. Status and dates are the file’s own. The licensee is not read from the file and is not shown.
A lapsed licence’s MMSI is still the number the vessel transmitted under while it was valid.
Inspection history · 81
4 November 2025
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8231299
15 July 2025
COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 8117600
8 October 2024
Administrative Inspection · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7850704
14 November 2023
Internal Structural Exam · Deficiency Check · Examination of Repairs · Hull Examination · Administrative Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7637937
23 May 2023
Annual Inspection · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7637940
24 October 2022
Administrative Inspection · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7568876
16 November 2021
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7352436
20 October 2021
Deficiency Check · Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7336238
28 July 2020
COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 7008989
5 November 2019
Administrative Inspection · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6665682
6 September 2019
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6805743
31 October 2018
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6557526
13 September 2018
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6539958
9 September 2018
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6538380
31 October 2017
Hull Examination · Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6274891
25 October 2017
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6274888
30 November 2016
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6050258
25 October 2016
Annual Inspection · DAPI Audit
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 6021380
8 October 2015
Internal Structural Exam · Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5738584
5 August 2015
DAPI Audit · COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5198044
29 October 2014
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 5009468
6 December 2011
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4186668
20 July 2011
Administrative Inspection
Administrative · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 4088532
24 March 2010
In-Service Inspection · Construction Oversight · Plan Review "T" Boat
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3703408
10 December 2009
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3626480
27 March 2009
Type not recorded
No type recorded · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3441622
3 November 2008
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3340770
28 November 2007
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3105392
2 October 2007
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 3054474
18 October 2006
Annual Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2769679
29 November 2005
Hull Examination
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2542474
25 August 2005
Deficiency Check
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2474742
2 August 2005
COI Inspection
Physical examination · Sector Los Angeles/Long Beach · USCG Southwest District (CGD-SW) · Activity 2449386
22 October 2004
Annual Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 2224632
9 December 2003
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1958361
23 October 2003
Annual Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1932230
13 May 2003
Construction Oversight · Plan Review "T" Boat
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1792954
23 April 2002
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1608723
4 December 2001
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1482291
10 October 2001
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1382405
27 March 2001
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1401450
25 July 2000
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1403198
28 January 2000
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1424865
9 September 1999
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1420189
18 August 1999
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1114250
18 March 1999
Plan Review "T" Boat
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 808359
29 July 1998
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1468458
8 December 1997
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1381075
24 July 1997
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1428811
8 August 1996
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1355896
7 December 1995
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1377570
8 September 1995
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1189985
9 August 1995
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1443613
28 July 1994
Deficiency Check · Hull Examination · COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1174058
26 July 1994
Plan Review "T" Boat
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1363064
22 July 1994
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1174624
26 May 1994
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1170746
10 September 1993
Administrative
Administrative · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1142618
29 June 1993
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 845550
8 March 1993
COI Inspection
Physical examination · MSO SAN FRANCISCO BAY · USCG Southwest District (CGD-SW) · Activity 1146599
30 October 1992
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 932365
2 April 1992
Re-Inspection
Physical examination · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 951517
2 April 1992
Administrative
Administrative · MSO SAN DIEGO · USCG Southwest District (CGD-SW) · Activity 961930
20 August 1991
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1252732
19 June 1991
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 892688
2 May 1991
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1236683
25 February 1991
Drydock Extension
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1231921
26 April 1990
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1229132
20 April 1990
Administrative
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1214391
19 March 1990
Plan Review "T" Boat · COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 927673
2 October 1989
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1330521
31 August 1989
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1042302
23 March 1989
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 972009
13 April 1988
Re-Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1210482
6 November 1987
Hull Examination
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1335953
18 October 1987
Deficiency Check
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1016506
23 March 1987
COI Inspection
Physical examination · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1019435
12 March 1987
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1021663
6 March 1987
Administrative
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1008713
21 May 1986
Credit Drydock
Administrative · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1003089
5 December 1984
Type not recorded
No type recorded · MSO LOS ANGELES/LONG BEACH · USCG Southwest District (CGD-SW) · Activity 1288466
Deficiency record · 120
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 8 October 2024
Resolved
Combustibles insulated from heated surfaces. Internal combustion engine exhausts, boiler and galley uptakes, and similar sources of ignition must be kept clear of and suitably insulated from combustible material. Cardboard boxes and open jerry can of diesel fuel were found in the lazarette space with an internal combustion engine (generator). Remove items from space/vessel.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 October 2024
Resolved
Flexible nonmetallic hose may be used in lube oil, fuel oil and fluid power systems, subject to the following requirements: Flexible hose runs must be visible, easily accessible, protected from mechanical damage, and must not penetrate watertight decks or bulkheads. Flexible fuel hose for generator is transiting through the bulkhead.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 October 2024
Resolved
When the flexible section of a diesel fuel fill pipe is a nonconductor of electricity, the metallic sections of the filling pipe separated thereby shall be joined by a conductor for protection against static spark when filling. Fuel fills had bonding wires but were not installed properly to make electrically continuous.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 8 October 2024
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end of the fuel line to stop fuel flow when servicing accessories. The shutoff valve at the tank must be manually operable from outside the compartment in which the valve is located, preferably from an accessible position on the weather deck. If the handle to the shutoff valve at the tank is located inside the machinery space, it must be located so that the operator does not have to reach more than 300 millimeters (12 inches) into the machinery space and the valve handle must be shielded from flames by the same material the hull is constructed of, or some noncombustible material. Shutoff valves were not properly shielded as the piece of steel does not fully protect the vicinity of the valve handle.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 8 October 2024
Resolved
Electrical equipment on a vessel must be installed and maintained to: Protect passengers, crew, other persons, and the vessel from electrical hazards, including fire, caused by or originating in electrical equipment, and electrical shock. Multiple shock hazards identified; E/R light switch missing cover plate, E/R distribution panel missing breaker filler plate, E/R light pulled from junction box and hanging from wires.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 8 October 2024
Resolved
Each hatch cover exposed to the weather must be attached to the hatch frame or coamings by hinges, captive chains, or other device to prevent its loss. Lazarette hatch cover had no means to retain on board, provide means to secure hatch to vessel.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 8 October 2024
Resolved
Cables entering boxes or fittings shall be protected from abrasion, and shall conform with the following requirements: The cable armor shall be secured to the box or fitting. Bait pump electrical A/C cable entering motor box was found with chaffed armor and missing stuffing tube.
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 8 October 2024
Resolved
All electrical equipment and circuits must be clearly marked and identified. Properly identify all switches on distribution panel labeled "120/230 VAC 10", multiple breakers not identified for what equipment they supply power to.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Auxiliary engine
Issued 8 October 2024
Resolved
Suitable covers, guards, or rails shall be installed in way of all exposed and hazardous places such as gears,
machinery, etc. Rotating machinery in E/R is not guarded to prevent accidental contact. Port and STBD engines have expose pulleys and belts
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 23 May 2023
Resolved
The number and identification of the items stowed inside, and their sizes, must be marked in clearly legible letters and numbers on each container for life jackets. The containers for life jackets on the upper deck were not labeled with the life jacket storage capacity and size.
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 23 May 2023
Resolved
On a vessel on which the number of passengers on upper decks is limited by stability criteria, as indicated by the vessel's stability letter, the maximum number of passengers allowed on an upper deck must be indicated by a durable marking of at least 1 inch numbers and letters at the entranceway to that deck. The upper deck maximum passenger allowance marking was missing.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 20 October 2021
Resolved
Shutoff valves, installed so as to close against the fuel flow, must be fitted in the fuel supply lines, one at the tank connection and one at the engine end to stop fuel flow. Port side fuel valve did not close all the way, the valve hit the fuel tank. Vessel owner fixed the valve handle in order for it to close.
14 - Pollution Prevention › 141 - MARPOL Annex I › Oil fuel tank protection
Issued 5 November 2019
Resolved
Where liquid level indicating gages are installed, they must be of heat resistant materials, adequately protected from mechanical damage & provided at the tank connections w/devices which automatically close in the event of rupture of the gage or gage lines. Vessel to replace/renew fuel tank sight glass w/one that is of heat resistant material and which is adequately protected, as indicated.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 6 September 2019
Resolved
A lifejacket must be provided for each person carried on board a vessel. Vessel's COI calls for 53 lifejackets, but vessel only provided 51. Provide 02 lifejackets.
46 CFR 180.71(a) 10c
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 6 September 2019
Resolved
Each item of lifesaving equipment determined by the marine inspector to not be in serviceable condition must be repaired or replaced. Ring life buoy was found to be unserviceable. Replace ring life buoy.
46 CFR 176.808(b) 10c
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 31 October 2018
Resolved
As appropriate for the intended voyage, a vessel must carry adequate and up-to-date charts of large enough scale to make safe navigation possible. Charts onboard vessel did not have chart corrections annotated and Broadcast Notice to Mariners were not onboard the vessel or maintained by the Master.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 September 2018
Resolved
Prove proper operation of primary propulsion machniery to the satisfaction of the attending marine inspector.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 13 November 2017
Resolved
Repair stair base as identified during hull exam, prior to allowing passengers on upper deck.
Accommodation/Occupational Safety › Occupational Safety › Guards for Exposed Hazards
Issued 25 October 2017
Resolved
Install covers over exposed shafts on both MDE's in the engine room.
Fire Fighting › Ventilation Systems › Ventilation Fire Dampers
Issued 25 October 2017
Resolved
Replace damaged ventillation cover on port side engine room exhaust.
Engineering › Fuel Oil Service System › Valve, Control
Issued 25 October 2016
Resolved
Install flame shields for fuel shutoff valves in engine room.
Construction/Loadline › Hull › Side Shell
Issued 3 November 2015
Resolved
Submit repair proposal for damaged area identified on starboard bow (external & internal) including longitudinal chine frame
Engineering › Diesel Engine (propulsion-direct drive) › Valve
Issued 3 November 2015
Resolved
Replace two (02) thru hull valves in lazarette servicing generator (1½” ball) and bait tank ( 2” ball)
Engineering › Steering Gear System › Rudder
Issued 3 November 2015
Resolved
Renew support block under rudder board port side
Construction/Loadline › Hull › Side Shell
Issued 3 November 2015
Resolved
Prepare and reseal chip in fiberglass port quarter
Construction/Loadline › Hull › Longitudinal Frame
Issued 3 November 2015
Resolved
Prepare and reseal areas identified in lazarette
Electrical › Electric Generation Source (service) › Metallic Enclosure/Frame
Issued 3 November 2015
Resolved
Secure inboard mount for generator (tighten bolts)
Stability › Watertight Integrity › Watertight Subdivision Standard
Issued 3 November 2015
Resolved
Make engine room bulkheads watertight and fore/aft penetrations where identified
Pollution Prevention/Response › Prevention Equipment › Sewage System Tank
Issued 3 November 2015
Resolved
Replace sewage holding tank access cover lid in kind
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 3 November 2015
Resolved
Replace hatch gasket on forward bow hatch
Deck/Cargo › Holds/Tanks › Hatch Cover
Issued 3 November 2015
Resolved
Ensure gasket is watertight on stern hatch.
Construction/Loadline › Hull › Side Shell
Issued 3 November 2015
Resolved
Prepare and seal damaged area identified on port side amidships, surface damage only
Lifesaving › Lifejacket/PFD (General) › Quantity
Issued 5 August 2015
Resolved
Vessel missing 05 adult lifejackets.
Lifesaving › Lifejacket/PFD (General) › Retroreflective Material
Issued 5 August 2015
Resolved
07 adult and 01 child lifejackets required new retroreflective material.
Lifesaving › Hand Flares › Quantity
Issued 5 August 2015
Resolved
Vessel missing 02 red hand flares.
Fire Fighting › Portable Dry Chemical Fire Extinguisher › Pressure
Issued 5 August 2015
Resolved
Portable fire extinguishers (02) in the engine room read over pressurized on the gauges. Have extinguishers serviced or replaced.
Accommodation/Occupational Safety › Occupational Safety › Deck Rail
Issued 2 December 2009
Resolved
Provide properly fastened deck rails IAW 46CFR177.900. "No-Sail".
Electrical › Electrical Distribution System (service) › Circuit Breaker
Issued 3 November 2008
Resolved
Provide a dead end front covering for bridge electrical panel IAW 46 CFR 183.330.
Electrical › Electrical Distribution System (service) › Wiring
Issued 2 October 2007
Resolved
dead end wires, removed or capped before completion of inspection
Fire Fighting › Fire Bucket › Availability
Issued 2 October 2007
Resolved
2.5 gallon fire buckets not present.
Electrical › Lighting (service) › Lighting Fixture
Issued 5 August 2005
Resolved
Service lighting in forward compartment adjacent to head and lifejacket stowage locker inoperable.
Electrical › Electric Generation Source (service) › Generator
Issued 5 August 2005
Resolved
Service generator shutdown linkage operable but loose and in need of maintenance.
Electrical › Electric Generation Source (service) › Generator
Issued 5 August 2005
Resolved
Service generator exhaust hose not properly supported in area of transom.
Electrical › Electrical Distribution System (service) › Wiring
Issued 5 August 2005
Resolved
Electrical receptacle for galley grill top was loose due to improper wiring.
Electrical › Electrical Distribution System (service) › Distribution Panel Bus
Issued 5 August 2005
Resolved
Provide drip shields on all breaker panels in engine room space.
Fire Fighting › Combustible Materials › Paints/Varnishes/Other Finishes
Issued 5 August 2005
Resolved
Hazardous/ combustible materials stored in forward passenger space, on the starboard side.
Fire Fighting › Means of Escape › Blocked
Issued 5 August 2005
Resolved
Emergency escape hatch stuck in place and inoperable.
Operations/Management › Pollution › Control of Discharge of Sewage
Issued 5 August 2005
Resolved
Toilet discharge line to holding tank not properly secured/supported IAW 46CFR182.40-10 and 46CFR182.40-1(a)(2).
Engineering › Diesel Engine (propulsion-direct drive) › Valve
Issued 5 August 2005
Resolved
Starboard engine shut off valve inoperable.
Engineering › Steering Gear System › Linkage
Issued 5 August 2005
Resolved
Steering gear linkage at aft u-joint and forward of gear box operable but loose.
Pollution Prevention/Response › Prevention Equipment › Sewage System Piping
Issued 5 August 2005
Resolved
Thru-hull fitting for MSD tank overboard drain and exhaust piping in steering gear space not double clamped IAW 46CFR 182.01-5(a).
Stability › Watertight Integrity › Weathertight Enclosure
Issued 5 August 2005
Resolved
Steering gear space deck hatch not adjusted to ensure watertight integrity of compartment IAW 46CFR171.124.
Stability › Watertight Integrity › General
Issued 5 August 2005
Resolved
Port side engine room aft bulkhead had multiple unused unsealed penetration holes.
Lifesaving › Buoyant Apparatus › Serviceable
Issued 5 August 2005
Resolved
Wooden deck and seams of older life float fractured and in need of repair. Float test of life float was conducted with satisfactory results. No reduction in passengers required.
Construction/Loadline › Hull › Stringer
Issued 5 August 2005
Resolved
Stringer located on port and starboard side of engine room, behind diesel fuel tanks rotted. Sections of rot to be cropped back to new and replaced.
Construction/Loadline › Hull › Longitudinal Frame
Issued 5 August 2005
Resolved
Longitudinal frame on inboard side of starboard engine motor mount rotted.
Engineering › Fuel Oil Service System
Issued 4 December 2001
Resolved
Install flame impingement bowl on Raycor fuel filter in E/R. LEGACY COMPONENT DESC: Filter
Construction/Loadline
Issued 10 October 2001
Resolved
Seal holes in forward engine room bulkhead where penetrated by hoses..
Engineering
Issued 10 October 2001
Resolved
Provide handle on starboard main engine cooling water sea valve.
Engineering
Issued 10 October 2001
Resolved
Replace fuel line to electrical generator. New fuel line must be as per 46C.F.R. 182.455.
Electrical
Issued 10 October 2001
Resolved
Provide operable frequency (Hz) gauge for generator.
Engineering
Issued 10 October 2001
Resolved
Provide metallic pipes for main engine cooling system as per 46 C.F.R. 182.710.
Lifesaving
Issued 10 October 2001
Resolved
Provide 4 additional adult lifejackets to replace those no longer suitable for service.
Fire Fighting
Issued 18 August 1999
Resolved
CONDUCT INSPECTION ON FIXED FIREFIGHTING INSTALLATION IN THE PRESENCE OF A MARINE INSPECTOR.
Electrical
Issued 9 August 1995
Resolved
Provide electrical junction box covers on A-C generator.
Electrical
Issued 9 August 1995
Resolved
Provide 15 amp circuit breakers for all common plug receptacles on board.
Electrical
Issued 9 August 1995
Resolved
Hard wire engine room battery charger and large refrigerator to correctly sized circuits as per 46 CFR Part 183.
Lifesaving
Issued 9 August 1995
Resolved
Provide a 2" band of retroreflective tape around each side of lifefloat.
Accommodation/Occupational Safety
Issued 8 March 1993
Resolved
PROVIDE BUG SCREEN FOR POTABLE WATER VENT LINE.
Documentation
Issued 8 March 1993
Resolved
PROVIDE CURRENT RADIO OPERATOR'S PERMIT AND RADIO TELEPHONY CERT.
Construction/Loadline
Issued 8 March 1993
Resolved
RE-ATTACH KEEPER CHAIN ON AFT COMPARTMENT HATCH COVER.
Documentation
Issued 8 March 1993
Resolved
PROVIDE PROOF OF APPROVED DRUG TESTING PROGRAM.
Lifesaving
Issued 2 April 1992
Resolved
PRIOR TO CARRYING PASSENGERS, GET UNDERWAY FOR DRILLS TO INCLUDE FIRE, MAN OVERBOARD, COLLISION/ALLISION AND FLOODING. ALL DRILLS TO BE CONDUCTED IN THE PRESENCE OF A COAST GUARD INSPECTOR.
Electrical
Issued 2 May 1991
Resolved
REINSTALL ALTERNATORS ON BOTH ENGINES AND RECONNECT WIRING.
Navigation
Issued 2 May 1991
Resolved
PROVIDE TIDE AND CURRENT TABLES.
Accommodation/Occupational Safety
Issued 2 May 1991
Resolved
REPLACE CRACKED WINDOWS IN PILOTHOUSE.
Engineering
Issued 2 May 1991
Resolved
LABEL BILGE MANIFOLD
Accommodation/Occupational Safety
Issued 2 May 1991
Resolved
LABEL ESCAPE HATCH IN PILOTHOUSE 'ESCAPE HATCH - KEEP CLEAR'._x001C_ _x001C_ _x001C_ _x001C_
Documentation
Issued 2 May 1991
Resolved
POST STABILITY LETTER IN PILOTHOUSE._x001C_ _x001C_ _x001C_ _x001C_
Lifesaving
Issued 2 May 1991
Resolved
PROVIDE 9 ADDITIONAL LIFE PRESERVERS. VESSEL LIMITED TO 46 PERSONS ONBOARD UNTIL THIS IS COMPLETED.
Lifesaving
Issued 2 May 1991
Resolved
REPLACE OUTDATED 6 FLARES WITH CURRENT FLARES.
Lifesaving
Issued 2 May 1991
Resolved
REPLACE GRAB LINE ON RING BUOY. VESSEL NOT TO OPERATE WITH PASSENGERS UNTILTHIS IS COMPLETED. NEW RING BUOY IS ON BOARD BUT VESSEL NAME NEEDS TO BE PUT ON RING BUOY.
Fire Fighting
Issued 2 May 1991
Resolved
HYDRO 3 B-II EXTINGUISHERS AND SERVICE ALL EXTINGUISHERS ONBOARD.
Documentation
Issued 2 May 1991
Resolved
PROVIDE CURRENT RADIO TELEPHONY CERTIFICATE.
Construction/Loadline
Issued 19 March 1990
Resolved
PERMANENTLY LABEL NEW VESSEL'S NAME ON THE TRANSOM AND BOTH SIDES OF THE BOW.
Documentation
Issued 19 March 1990
Resolved
PROVIDE UPDATED FCC RADIO CERTIFICATE TO REFLECT VESSEL NAME CHANGE AND CORRECT CALL SIGN.
Navigation
Issued 19 March 1990
Resolved
PROVIDE CURRENT NAVIGATIONAL PUBLICATIONS AS PER 46 CFR 185.20-35.
Lifesaving
Issued 19 March 1990
Resolved
PROPERLY LABEL NUMBER OF PFD'S AT EACH STORAGE LOCATION.
Fire Fighting
Issued 19 March 1990
Resolved
SERVICE ALL FIRE EXTINGUISHERS AND PROVIDE SUITABLE MOUNTING BRACKET FOR THE B-1 EXTINGUISHER.
Lifesaving
Issued 19 March 1990
Resolved
RELABEL LIFEFLOAT OARS WITH CURRENT VESSEL'S NAME.
Lifesaving
Issued 19 March 1990
Resolved
REPLACE THE FLOAT FREE WEAK LINK WITH THE PROPER ONE FOR THE LIFEFLOAT.
Fire Fighting
Issued 19 March 1990
Resolved
INSTALL HOSE CLAMPS ON DISCHARGE SIDE OF HAND FIRE PUMP, AT GALLEY SINK DRAIN OVERBOARD AND STARBOARD ENGINE COOLING DISCHARGE FOR EXHAUST.
Accommodation/Occupational Safety
Issued 19 March 1990
Resolved
SECURE THE FOLLOWING GALLEY APPLIANCES: MICROWAVE, REFRIGERATOR AND COMBINATION SINK/RANGE.
Engineering
Issued 19 March 1990
Resolved
REMOVE OR PROPERLY CAP COOLING LINES FROM STARBOARD ENGINE TO OLD HEATER UNIT.
Electrical
Issued 19 March 1990
Resolved
PROPERLY LABEL CIRCUIT BREAKER PANELS IN THE WHEELHOUSE (DC), ENGINE ROOM (AC) AND THE ELECTRICAL SUPPLY ROTARY SWITCH.
Electrical
Issued 19 March 1990
Resolved
PROPERLY SUPPORT ELECTRICAL WIRING WITH METALLIC SUPPORTS AT PORT SIDE STORAGE SPACE, LAZARETTE AND ENGINE ROOM STARBOARD SIDE.
Electrical
Issued 19 March 1990
Resolved
REMOVE NON-PERMANENT BATTERY CHARGER FOR GENERATOR STARTING BATTERY.
Electrical
Issued 19 March 1990
Resolved
INSTALL TWO COVER PLATES FOR GENERATOR ELECTRICAL CONNECTION AND RESISTOR ON SIDE OF GENERATOR.
Electrical
Issued 19 March 1990
Resolved
REMOVE DEAD ENDED WIRING ON DC TERMINAL STRIP ON STARBOARD AFT ENGINE ROOM BULKHEAD.
Electrical
Issued 19 March 1990
Resolved
INSTALL THREE PRONG PLUG FOR BEVERAGE REEFER.
Electrical
Issued 31 August 1989
Resolved
REMOVE ALL WIRE NUTS AND MAKE UP THE CONNECTIONS USING SOLDERLESS BUTT CONNECTIONS OR OTHER APPROVED METHODS.
Electrical
Issued 31 August 1989
Resolved
REMOVE AND/OR INSTALL THE PROPER MARINE GRADE LIGHTING FIXTURE NEAR THE LIFEFLOAT.
Electrical
Issued 31 August 1989
Resolved
REMOVE ALL IMPROPER WIRE CABLE AND INSTALL WITH THE PROPER SIZE/TYPE CONDUCTOR (VARIOUS LOCATIONS THROUGHOUT THE VESSEL).
Construction/Loadline
Issued 31 August 1989
Resolved
PROPERLY PREPARE AND TREAT THE WOOD ON THE HULL IN THE FOLLOWING AREAS: INWAY OF THE TRANSOM ALONG THE BASE AROUND THE GROUND STRAP; IN WAY OF THE PORT BILGE IN THE FOREPEAK.
Engineering
Issued 31 August 1989
Resolved
PROPERLY SUPPORT THE EXHAUST MUFFLERS FROM MOVEMENT.
Engineering
Issued 31 August 1989
Resolved
REMOVE AND PLUG THE LINE THAT SUPPLIES THE CLEAR PLASTIC TUBING USED FOR A TEMPORARY SIGHTGLASS ON THE DIESEL FUEL SUPPLY LINES.
Electrical
Issued 31 August 1989
Resolved
INSTALL COVERS ON ALL ELECTRICAL JUNCTION BOXES AND SWITCHBOXES WHERE MISSING.
Lifesaving
Issued 31 August 1989
Resolved
STENCIL THE VESSEL'S NAME AND PASSENGER CAPACITY ON THE LIFEFLOAT.
Lifesaving
Issued 23 March 1989
Resolved
REPLACE NET AND ATTACH IT TO PLATFORM ON LIFEFLOAT.
Construction/Loadline
Issued 23 March 1989
Resolved
REPAIR HOLE IN STARBOARD SIDE SHELL APPROXIMATELY 12" ABOVE THE WATERLINE IN SPACE BELOW PASSENGER ACCOMMODATION AREA, APPROXIMATELY 4 FEET AFT OF FORWARD BULKHEAD; HOLE IS APPROXIMATELY 1" IN DIAMETER.
Engineering
Issued 23 March 1989
Resolved
REPLACE FLEXIBLE HOSE SECTION TO BILGE PIPING LOCATED FORWARD OF THE PORT ENGINE.
Navigation
Issued 23 March 1989
Resolved
REPLACE SUPPORT TO STEERING ROD IN LAZARETTE.
Electrical
Issued 23 March 1989
Resolved
PROVIDE BLANK COVER FOR BRIDGE ELECTRICAL PANEL.
Lifesaving
Issued 13 April 1988
Resolved
STENCIL VSL NAME ON RING BUOYS ATTACHED TO LIFE FLOATS.
Navigation
Issued 13 April 1988
Resolved
VERIFY PROPER OPERATION OF EPIRB.
Lifesaving
Issued 13 April 1988
Resolved
PROVIDE 6 ORANGE SMOKE SIGNALS.
Lifesaving
Issued 13 April 1988
Resolved
PROVIDE 11 APPROVED LIFE PRESERVERS.
Documentation
Issued 23 March 1987
Resolved
POST THE VSL'S STABILITY LETTER.
Construction/Loadline
Issued 23 March 1987
Resolved
MAKE PERMANENT REPAIRS TO DAMAGED SECTION OF HULL IN THE FOREPEAK COMPART- MENT.
Construction/Loadline
Issued 23 March 1987
Resolved
MAKE PERMANENT REPAIRS TO THE CRACKED STIFFENER TRANSOM, #2 ON PORT SIDE.
Casualty record · 2
27 March 2009Routine · role: Involved in a Marine Casualty · serious marine incident, as classified · 1 dead · activity 3441622
9 September 2018Routine · role: Involved in a Marine Casualty · activity 6538380
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it, and the bridge, lock or dam the investigation names where it names one. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.
Ownership record
The Coast Guard's documentation record for this hull -- the Abstract of Title,
with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National
Vessel Documentation Center, files it here with its date, and every reader of this page gets it.