Documentation record
Registered dimensions (L × B × D)42.0 ft × 12.5 ft × 5.1 ft
Registered tonnagegross 17 / net 14
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderEVANS BOAT CONSTRUCTION & REPAIR INC · CRISFIELD, MD, UNITED STATES · built 1997
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeShip
Hull configurationMonohull
Hailing portHAMPTON, VA
Endorsements, as the file codes themcw_un, fi, rec
DocumentationValid · issued 2 July 2026 · expires 31 July 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it17 - Simplified, Gross Ton
14 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel
Behind this panel: 17 inspections, each with its date, unit and type; 15 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; 1 other recorded name; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast
Guard wrote; the counts above are the same counts as in the summary, and they are free.
Professional is $39 a month or $299 a year,
or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks
every detail section on every vessel page, fleet watch tied to your account, and ownership records
on request. Already a subscriber? Sign in.
Maury does not score, rate or grade vessels, at any price.
Inspection history · 17
22 May 2025
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 8139006
4 April 2024
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7889498
20 March 2024
Drydock Exam · Examination of Repairs · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7882487
24 May 2023
Annual Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7685427
16 November 2022
Administrative Inspection · In-Service Inspection
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7595347
5 October 2022
Drydock Exam · Internal Structural Exam
Physical examination · Sector Virginia · USCG East District (CGD-E) · Activity 7563542
7 February 2022
Administrative Inspection · COI Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7391893
15 September 2021
Damage Survey · Examination of Repairs · In-Service Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7313171
30 March 2021
Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7166174
19 January 2021
Internal Structural Exam · Drydock Exam · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 7127099
14 April 2020
Annual Inspection · Deficiency Check
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6936088
10 April 2019
Annual Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6662995
28 January 2019
Internal Structural Exam · Drydock Exam
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6616542
11 April 2018
DAPI Audit · Annual Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6389784
14 February 2017
COI Inspection · DAPI Audit · Administrative Inspection
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6088169
5 January 2017
Internal Structural Exam · Hull Examination
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 6072616
31 March 2016
Annual Inspection · DAPI Audit
Physical examination · Sector Maryland-National Capital Region · USCG East District (CGD-E) · Activity 5844788
11 - Life Saving Appliances › N/A - No Subsystem › Rigid liferafts
Issued 4 April 2024
Resolved
46CFR180.137(b)(1)
46CFR160.073-1(a):
The float-free link required by 180.130(a)(1) in subchapter Q of this chapter. This subchapter contains requirements for a float-free link used for connecting a
life float painter to a vessel. The float-free link is designed to be broken by the buoyant force of the life float so that the float breaks free of a vessel that sinks in water deeper than the length of the painter. Vessels float-free link is arranged where the life float would be unable to float freely.
Action required: 701 - Prior to carriage of passengers/cargo
Due 5 April 2024
Resolved 5 April 2024
Resolution: Sent photographic proof of correct set up.
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 4 April 2024
Resolved
46 CFR 181.400(b)(5): Where the amount of carbon dioxide gas required in a fixed fire extinguishing system can be supplied by one portable extinguisher or a semi-portable extinguisher. Space containing propulsion machinery is currently supplied by two 15 lb portable extinguishers; whereas the regulations require one portable extinguisher to cover the enter space. Provide a plan proposal for fire extinguishing system for main propulsion space.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 May 2024
Resolved 23 July 2024
Resolution: Replaced two 15lb portable extinguishers with one 35lb portable extinguisher.
07 - Fire Safety › N/A - No Subsystem › Division - decks, bulkheads and penetrations
Issued 4 April 2024
Resolved
46CFR184.420(a)(3): The quantity of carbon dioxide in kilograms (pounds) that the system must be capable of providing to a space must not be less than the gross volume of the space divided by the appropriate factor given in Table 181.410(f)(4)(i). If fuel can drain from a space being protected to an adjacent space or if the spaces are not entirely separate, the volume of both spaces must be use
to determine the quantity of carbon dioxide to be provided. MI observed 02 wire run penetrations on the
fwd engineering compartment bulkhead and 01 wire drop on
on the stbd side penetrating the main deck increasing
increasing gross volume of space needing CO2 protection.
MI completed gross volume calculations for all
compartments connected to the E/R determining the total volume for CO2 protection requires more CO2 lbs based on table 181.410(f)(4)(i). Provide plan proposal for fire protection to be in compliance with 46CFR 181.400.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 May 2024
Resolved 23 July 2024
Resolution: Replaced two 15lb portable extinguishers with one 35lb portable extinguisher.
11 - Life Saving Appliances › N/A - No Subsystem › Lifejackets incl. provision and disposition
Issued 4 April 2024
Resolved
46 CFR 185.516(a): Placards containing instructions for the donning and use of the life jackets aboard the vessel must be posted in conspicuous places that are regularly accessible and visible to the crew and passengers. Vessel did not have
donning instructions for all types of life jackets on
board.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 3 May 2024
Resolved 5 April 2024
Resolution: Purchased new 01 life jacket in kind with all of the rest of the life jackets on board that already have donning produres posted. Therefore no need to affix new donning procedures. Owner provided photographic proof of new life jacket and reciept.
08 - Alarms › N/A - No Subsystem › Other (alarms)
Issued 4 April 2024
Resolved
46CFR182.530(a)(1): On a vessel of at least 26" in length, a visual and audible alarm must be provided at the operating station to indicate a high water level in each of the following normally unmanned spaces: a space with a through-hull fitting below the deepest load waterline, such as a lazarette. Vessel's lazarette high water alarm was
inoperable.
Action required: 10 - Deficiency Rectified
Due 4 April 2024
Resolved 4 April 2024
Resolution: Fixed wire connection, which made the audible and visual alarm work. Corrected on the spot.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 4 April 2024
Resolved
46CFR181.610: A vessel not required to have a power driven fire pump by 181.300 must have at least three 2.5 gallon buckets, with an attached lanyard satisfactory to the cognizant OCMI, placed so as to be easily available during an emergency. The words "FIRE BUCKET" must be stenciled in a contrasting color on each bucket. Vessel's fire buckets were not labeled.
Action required: 10 - Deficiency Rectified
Resolved 4 April 2024
Resolution: The words FIRE BUCKET written on all 3 fire buckets. Corrected on the spot.
10 - Safety of Navigation › N/A - No Subsystem › Other (navigation)
Issued 4 April 2024
Resolved
46 CFR 184.420(a)(3): As appropriate for the intended voyage, a vessel must carry adequate and up-to-date: Coast Guard Light Lists. Vessel had light lists from 2021.
Action required: 10 - Deficiency Rectified
Due 4 April 2024
Resolved 4 April 2024
Resolution: Updated light list downloaded. Corrected on the spot.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 4 April 2024
Resolved
46 CFR 185.524(d): Fire drill entries shall include date, training, and general description of the scenario/training topics.
Action required: 10 - Deficiency Rectified
Resolved 4 April 2024
Resolution: During Fire Drill performed during annual, all required documention was completed IAW regs. Training was performed to ensure the correct documention is done in the future.
01 - Certificates & Documentation › 013 - Documents › Log-books/compulsory entries
Issued 4 April 2024
Resolved
46 CFR 185.520(f): Man overboard drill entries shall include date, training, and general description of the scenario/training topics. Training log lacked information.
Action required: 10 - Deficiency Rectified
Resolved 4 April 2024
Resolution: During Man Overboard Drill performed during annual, all required documentation was completed IAW regs. Training was performed to ensure the correct documentation is done in the future.
02 - Structural Conditions › N/A - No Subsystem › Hull damage impairing seaworthiness
Issued 15 September 2021
Resolved
Repairs or alterations to the hull, machinery, or equipment that affect the safety of the vessel must not be made without the approval of the cognizant OCMI, except during an emergency. Vessel operator informed Coast Guard of damages to vessel after hitting an object in the water while underway.
Vessel is not allowed to carry passengers prior to a damage assessment conducted by an attending Coast Guard Marine Inspector. 46 CFR 176.700(a)
Action required: 701 - Prior to carriage of passengers/cargo
Due 15 September 2021
Resolved 28 September 2021
Resolution: Satisfactorily inspected fiberglass repair to crack in STBD stern tube. Once vessel was placed in water, conducted satisfactory power trials of ahead and astern propulsion.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 April 2020
Resolved
Strong and effective rudder stops must be provided to prevent jamming and damage to the rudder and its fittings. These stops may be structural or internal to the main steering gear. During inspection, the Marine Inspectors noticed the lack of rudder stops for main steering gear.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 13 May 2020
Resolved 8 May 2020
Resolution: Rudder stops installed.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 14 April 2020
Resolved
A vessel must be fitted with ground tackle and mooring lines necessary for the vessel to be safely anchored or moored. Vessel's ground tackle switch was inoperable and prevented the proper operation of the anchor in case of emergency.
46 CFR 184.300
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2020
Resolved 8 May 2020
Resolution: Ground tackle control switch replaced and is now working.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Covers (hatchway-, portable-, tarpaulins, etc.)
Issued 14 April 2020
Resolved
A hatch cover must: (1) Have securing devices; and (2) Be attached to the hatch frame or coaming by hinges, captive chains, or other devices of substantial strength to prevent its loss. All three deck hatches exposed to weather did not have any securing devices.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2020
Resolved 8 May 2020
Resolution: Lashings installed to prevent loss of hatch covers.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 April 2020
Resolved
The official number of the vessel, preceded by the abbreviation “NO.” must be marked in not less than 3 in in height on some clearly visible interior structural part of the hull. The number must be permanently affixed to the vessel so that alteration, removal, or replacement would be obvious. Vessel did not have its ON permanently affixed to the interior of the hull.
46 CFR 67.121
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2020
Resolved 8 May 2020
Resolution: Official number affixed to framing member in the bilge.
11 - Life Saving Appliances › N/A - No Subsystem › Stowage and provision of liferafts
Issued 14 April 2020
Resolved
The float-free link required by § 180.130(a)(1) must be
of proper strength for the size of the life float or buoyant apparatus as indicated on its identification tag. During inspection, the tag for the float-free link specific for the vessel's required life float capacity was not on-board.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 May 2020
Resolved 8 May 2020
Resolution: New float free link installed.