Records from 2016 to 2024. Most recent: inspection, 1 November 2024.
Documentation record
Registered dimensions (L × B × D)40.0 ft × 14.1 ft × 6.0 ft
Registered tonnagegross 24 / net 16
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderRON RAWSON INC · REDMOND WA, UNITED STATES · built 1967
Hull materialFRP (Fiberglass)
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEWPORT, OR
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 29 November 2025 · expires 30 November 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it24 - Regulatory (Subpart C or D), Gross Ton
16 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Inspection history · 20
1 November 2024
Hull Examination · Administrative Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 8032649
17 October 2023
COI Inspection
Physical examination · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7810206
11 October 2023
Administrative Inspection
Administrative · Sector Columbia River · USCG Northwest District (CGD-NW) · Activity 7806734
16 November 2022
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7595026
31 October 2022
Hull Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7586319
29 March 2022
In-Service Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7421156
29 March 2022
Type not recorded
No type recorded · Station Yaquina Bay · USCG Northwest District (CGD-NW) · Activity 7421449
29 March 2022
Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7425785
10 December 2021
DAPI Audit · Annual Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7367303
27 June 2021
Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7262172
20 October 2020
DAPI Audit · Annual Inspection · Hull Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7100543
16 August 2020
Type not recorded
No type recorded · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7060828
15 August 2020
Examination of Repairs · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 7034109
3 October 2019
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6826300
27 February 2019
Hull Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6634983
16 August 2018
DAPI Audit · COI Inspection
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6525177
1 November 2017
Deficiency Check · Examination of Repairs
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6308675
4 May 2017
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6308667
7 February 2017
Deficiency Check · Hull Examination
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 6092632
24 May 2016
Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Portland OR · USCG Northwest District (CGD-NW) · Activity 5886425
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 13 January 2025
No resolution recorded
Propulsion machinery must be suitable in type and design for propulsion requirements of the hull in which it is installed and capable of operating at constant marine load under such requirements without exceeding its designed limitations. Engine is inoperable due to water entering all cylinders.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 1 November 2024
Resolved
A drydock examination conducted in compliance with § 176.600 must be conducted while the vessel is hauled out of the water or placed in a drydock or slipway. Vessel is not operating and missed DDX
Condition: Invalid
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 13 January 2025
Resolution: Completed Drydock exam.
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 11 October 2023
Resolved
You must submit your written application for renewal of a Certificate of Inspection to the OCMI at least 30 days prior to the expiration of the Certificate of Inspection. Vessel failed to submit application for renewal and operated beyond expiration of COI. Vessel is restricted from commercial service authorized by the COI until new COI is issued to vessel.
Action required: 701 - Prior to carriage of passengers/cargo
Due 8 November 2023
Resolved 17 October 2023
Resolution: Conducted COI inspection and issued COI.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 29 March 2022
Resolved
VSL EXPERENCED LOSS OF POWER DUE TO FAILED OIL COOLER FOR THE DUAL DISC TRANSMISSION RESULTING IN AN OVERHEAT OF THE TRANSMISSION.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 26 April 2022
Resolved 10 May 2022
Resolution: Installed new transmission and oil cooler. Conducted satisfactory sea trial.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 3 October 2019
Resolved
A vessel must be provided w/ bilge pumps IAW table 182.520(a). The bilge pump in the steering compartmentwas found to be pumping inadequately and less than the minimum capacity required per pumpin table 182.520(a).
Action required: 17 - Rectify deficiencies prior to departure
Resolved 8 October 2019
Resolution: Pump replaced.
10 - Safety of Navigation › N/A - No Subsystem › Record of drills and steering gear tests
Issued 3 October 2019
Resolved
Abandon Ship and MOB drills and training must be logged IAW 185.520. Log all drills & training.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 October 2019
Resolution: Reviewed drill procedures, and verified properly logged.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 3 October 2019
Resolved
Fire fighting drills & training must be logged IAW 185.520. Log all drills and training.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 October 2019
Resolution: Verified logging of drills etc.
05 - Radio Communications › N/A - No Subsystem › Satellite EPIRB 406MHz/1.6GHz
Issued 3 October 2019
Resolved
EPIRB shall be tested monthly and logged.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 October 2019
Resolution: Verified proper logging.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 3 October 2019
Resolved
Vessel must carry adequate & up-to-date charts.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 October 2019
Resolution: New charts on board.
07 - Fire Safety › N/A - No Subsystem › Fire fighting equipment and appliances
Issued 3 October 2019
Resolved
Vessel must have three 2.5 gallon buckets w/ an attached lanyard.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 October 2019
Resolution: Fire buckets provided.
02 - Structural Conditions › N/A - No Subsystem › Other (Structural condition)
Issued 3 October 2019
Resolved
Provide proof that bilge ovbd discharge has a valve or non-return valve installed.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 8 October 2019
Resolution: Overboard valve available.
Engineering › Bilge Water Management System › Pump
Issued 4 May 2017
Resolved
Demonstrate proper operation of fixed bilge system. IAW 46 CFR 182.520
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2017
Resolved 11 May 2017
Resolution: Engine driven pump repaired and operated normally.
Engineering › Bilge Water Management System › Pump
Issued 4 May 2017
Resolved
Mount bilge submersible pump in lazarette, IAW 46 CFR 182.520
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2017
Resolved 11 May 2017
Resolution: Pump mounted.
Fire Fighting › Fire Bucket › Quantity
Issued 4 May 2017
Resolved
Provide three fire buckets, IAW 46 CFR 181.610
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2017
Resolved 11 May 2017
Resolution: Buckets provided.
Engineering › Sea-water System (primary cooling) › Valve
Issued 4 May 2017
Resolved
Provide proper bonding of metalic sea valves on FRP vessel.
Due 4 June 2017
Resolved 11 May 2017
Navigation › Piloting/Steering › Marine Charts
Issued 4 May 2017
Resolved
Provide nautical charts for operating area, IAW 46 CFR 184.420
Action required: 701 - Prior to carriage of passengers/cargo
Due 4 June 2017
Resolved 11 May 2017
Resolution: Charts provided.
Construction/Loadline › Structures › Deck Plating
Issued 7 February 2017
Resolved
Make permanent repairs to wasting and delaminating deck covering and structural members above engine room, and lazzarette areas. Repairs are to address any affected deck members and coverings. Proposal and repairs to be made to the satisfaction of the attending Coast Guard marine inspector.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 1 November 2017
Resolved 15 May 2018
Resolution: Repairs completed.
Construction/Loadline › Structures › Deck Plating
Issued 7 February 2017
Resolved
Identify and make permanent repairs to leaking areas iwo engine room vents, and along railings around salon.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 7 April 2017
Resolved 15 May 2018
Resolution: Repairs complete.
Engineering › Sea-water System (primary cooling) › Valve
Issued 7 February 2017
Resolved
Replace head sea suction gate valve.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 March 2017
Resolved 9 February 2017
Resolution: Witnessed replacement valve installation.
Engineering › Sea-water System (primary cooling) › Valve
Issued 7 February 2017
Resolved
Replace wash down pump sea suction valve.
Action required: 701 - Prior to carriage of passengers/cargo
Due 7 March 2017
Resolved 9 February 2017
Resolution: Witnessed installation of new sea valve.
Engineering › Shafting/Propeller Arrangements › Stern Tube Bearing
Issued 7 February 2017
Resolved
Replace stern tube bearing.
Action required: 705 - Other - as specified
Due 7 March 2017
Resolved 9 February 2017
Resolution: Witnessed replacement of bearing.
Engineering › Steering Gear System › Hand Pump
Issued 24 May 2016
Resolved
Hand tiller showed signs of corrosion and wastage during operational testing.
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
Due 24 June 2016
Resolved 25 May 2016
Resolution: Rec'd picture of hand tiller.