MAURY USCG vessel records
← All vessels

HIYU

HIYU is a 1967 passenger vessel (inspected). The Coast Guard has recorded 28 inspections since 2016, most recently in June 2026, along with 49 deficiencies — 1 with no resolution recorded — and 7 casualty investigations between 2008 and 2014.

Records from 2008 to 2026. Most recent: inspection, 20 June 2026.

Built
1967
Last inspected
20 June 2026
Documentation
Valid · documentation file of 10 August 2026
Controls
None recorded without a removal date

Everything above is free. The detail below — the inspection history, the deficiency record, the casualty record and the documentation record — is Professional, $39 a month. Sign in.

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 20 June 2026
Operational controls None recorded without a removal date
Years with a record 10 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

8645301
WX9133
Flag
UNITED STATES
Maury page id
psix-45515

Documentation record

Registered dimensions (L × B × D)150.4 ft × 63.0 ft × 15.6 ft
Registered tonnagegross 498 / net 338
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderGUNDERSON BROS ENGINEER CORP · PORTLAND, OR, UNITED STATES · built 1967
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portSEATTLE, WA
Trade endorsementsCoastwise, unrestricted, Recreational, Registry
DocumentationValid · issued 24 July 2025 · expires 31 July 2026
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it498 - Regulatory (Subpart C or D), Gross Ton
338 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
Detail on this page

28 inspections, each with its date, unit and type; 49 deficiencies with the resolution recorded against each; 7 casualty investigations, with date and classification; the documentation record: dimensions, tonnage, builder, hailing port, endorsements, dates. The counts in the summary above are the same counts, and they are free.

$39 a month or $299 a year, every vessel page, cancel any time. Founding rate $19.99 a month for life, for the first 200 subscribers. Plans Sign in

Maury does not score, rate or grade vessels, at any price.

Vessel history report
Every record for this hull, in one document — $299

Every recorded inspection, 2016 to 2026 for this class, in one chronology · every deficiency, with system, dates and resolution · operational controls imposed and removed · every name this hull has been recorded under · the vessels it was inspected alongside, and when · how its record compares with hulls of similar age and size, as a fact about the population and never a judgement about this vessel.

Read one first, in full: a forty-year chronology · a hull that changed operators four times · the sparse case, shown as an example, not for sale.

This report is in development and is not for sale yet. There is no date, and nothing is charged. Leave an email and we will tell you when it exists, once.

Inspection history · 28

20 June 2026 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8412565
30 January 2026 Re-Inspection · Deficiency Check
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8304262
25 September 2025 Re-Inspection · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8255839
30 April 2025 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8112333
14 November 2024 Re-Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 8035029
31 July 2024 Re-Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7972584
5 April 2024 COI Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7876166
18 January 2024 Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7848937
17 February 2022 Administrative Inspection · Hull Examination · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7398194
20 August 2021 Administrative Inspection · Re-Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7302247
16 April 2021 COI Inspection · MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7169015
9 September 2020 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 7055110
9 June 2020 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6972057
20 March 2020 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6930760
13 February 2020 Examination of Repairs
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6908903
4 November 2019 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6849193
24 September 2019 Periodic Inspection · MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6820236
14 June 2019 Re-Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6713811
8 March 2019 COI Inspection · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6615288
7 March 2019 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6638324
27 November 2018 Re-Inspection · Administrative Inspection · MTSA Verification
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6571126
12 October 2018 Deadweight Survey
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6564141
27 June 2018 Periodic Inspection · Administrative Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6457886
16 May 2018 In-Service Inspection · Administrative Inspection · Deficiency Check · Excursion Permit
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6416036
23 February 2018 Administrative Inspection
Administrative · Navigation Center · Activity 6360551
26 January 2018 COI Inspection · Administrative Inspection · In-Service Inspection
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6343549
17 March 2017 Drydock Exam · Internal Structural Exam
Physical examination · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 6106544
13 January 2016 Administrative Inspection
Administrative · Sector Puget Sound · USCG Northwest District (CGD-NW) · Activity 5797056

Deficiency record · 49

07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 5 March 2026 Resolved
Fixed fire-extinguishing systems shall be checked as noted in table 71.25-20(a)(2). Carbon dioxide: cylinders must be tested and marked, and all flexible connections on fixed carbon dioxide systems must be tested or renewed, as required by 147.60 and 147.65 of this chapter. Carbon dioxide cylinders forming part of fixed fire extinguishing system must be retested at least every 12 years. Flexible connections between cylinders and distribution piping of fixed carbon dioxide fire extinguishing systems must be renewed or retested at a pressure of 1000 psi. The test must be performed when the cylinders are retested. Fixed CO2 cylinders last hydro date is 12/2013 and are overdue for the 12 year hydro. Flex hoses marked as installed or tested on 12/2013 and are also overdue. All bottles and hoses due for hydro must be satisfactorily retested prior to to commercial operations.
Action required: 60 - Rectify deficiencies prior to movement
Due 5 March 2026
Resolved 15 April 2026
Resolution: Confirmed that all bottles were hydroed and all hoses pressure tested as part of annual servicing by AGow.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 5 March 2026 Resolved
An abandon ship and a fire drill, as described in 199.180, must be conducted on each passenger vessel at least weekly. The entire crew does not have to be involved in every drill, but each crewmember must participate in an abandon-ship and a fire drill each month.
Action required: 10 - Deficiency Rectified
Due 5 March 2026
Resolved 5 March 2026
01 - Certificates & Documentation › 011 - Ships Certificates › Certificate of Inspection (COI)
Issued 25 September 2025 Resolved
At least three reinspections shall be made on each vessel within one year. These reinspections will be made at approximately equal intervals between annual inspections. In the case of vessels with a seasonal schedule, reinspections will be made during the operating season if practicable.
Condition: Invalid
Action required: 60 - Rectify deficiencies prior to movement
Due 14 November 2025
Resolved 7 November 2025
Resolution: Reinsepction was completed this day.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 30 April 2025 No resolution recorded
Hot water heating boiler control system does not provide a pre-purge period. Small oil fired heating unit control systems are required to provide a pre-purge of sufficient length to provide four changes of air in the combustion chamber and stack but in no case less than 15 seconds. MFG date on boiler is 10/87. 46 CFR 63.10-20(c) (1970).
Condition: Improper/Lack of Maintenance
Action required: 705 - Other - as specified
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 30 April 2025 Resolved
Fuel oil pump on the #1 generator is leaking fuel. Repair or renew leaking pump, make oil tight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 May 2025
Resolved 26 June 2025
Resolution: Gasket replaced.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 30 April 2025 Resolved
Fuel soaked absorbent pads present under #1 generator and oil soaked pads under reduction gears. These absorbent pads must be removed. Pads shall be renewed regularly to prevent the unacceptable accumulation of combustible liquids (fuel/oil).
Action required: 10 - Deficiency Rectified
Due 30 April 2025
Resolved 30 April 2025
Resolution: Pads renewed.
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 30 April 2025 Resolved
Fuel filter housing (front of engine) on #2 main engine is leaking fuel in way of drain plug. Make fuel filter housing oil tight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 May 2025
Resolved 26 June 2025
Resolution: gasket replaced
07 - Fire Safety › N/A - No Subsystem › Oil accumulation in engine room
Issued 30 April 2025 Resolved
Emergency generator fuel injector pump leaking fuel. Make pump housing oil tight.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 31 May 2025
Resolved 26 June 2025
Resolution: gasket replaced
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 30 April 2025 Resolved
05 emergency lights on car deck are extinguished. Both E-lights on port side, 01 on starboard side, and 02 on center car deck. 46 CFR 78.17-45
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2025
Resolved 26 June 2025
Resolution: light bulbs replaced.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 30 April 2025 Resolved
Alcohol test swabs onboard are all expired. 46 CFR 4.06-15(a)(1)
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2025
Resolved 26 June 2025
Resolution: New alcohol swaps purchased and onboard.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 30 April 2025 Resolved
Plastic on ring buoy located on the bridge wing above rescue boat is cracked and needs to be replaced. 46 CFR 71.25-15
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 1 June 2025
Resolved 26 June 2025
Resolution: New ring buoy on vessel.
07 - Fire Safety › N/A - No Subsystem › Other (fire safety)
Issued 31 July 2024 Resolved
46 CFR 111.79-1(c) Each receptacle outlet must be compatible with the voltage and current of the circuit in which it is installed. Identified 15-amp receptacle on a 40 amp circuit (panel 207) in the engine room. Complete review/update to one-line drawing and submit to Marine Safety Center for review within 30-days.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 30 August 2024
Resolved 2 July 2025
Resolution: One line drawing was submitted to MSC per owner.
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 18 April 2024 Resolved
General. Each survival craft must be stowed — As close to the accommodation and service spaces as possible; IBAs not installed on vessel. 46CFR199.130(a)(1)
Condition: Improper Installation
Action required: 701 - Prior to carriage of passengers/cargo
Due 3 May 2024
Resolved 26 April 2024
Resolution: IBAs installed on vessel
10 - Safety of Navigation › N/A - No Subsystem › Rudder angle indicator
Issued 18 April 2024 Resolved
The position of the rudder, if power operated, must be shown at the principal steering station. #2 rudder angle indicator on the #2 end not installed correctly. 46CFR113.40-5
Condition: Invalid
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 May 2024
Resolved 30 May 2024
Resolution: Rudder angle indicator replaced and working properly.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 18 April 2024 Resolved
For propulsion machinery spaces intended for centralized operations, alarms for abnormal conditions (pressure and temperature) of the cooling media and automatic safety system functions are to be provided. Unable to test High Temp Alarm on Main Diesel Engines during inspection. 46 CFR 58.01-5 ABS Rules 4-6-5/7.7.5
Action required: 16 - Rectify deficiencies w/in 14 days
Due 2 May 2024
Resolved 26 April 2024
Resolution: MI conducted sat test of Engine high temp alarms
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 16 April 2021 Resolved
Repair and demonstrate proper operation of currently inoperable heat activated detector for emergency generator space CO2 fixed extinguishing system.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2021
Resolved 26 April 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 April 2021 Resolved
Demonstrate proper operation of both main propulsion engine overspeed trips or provide an authorized third party report indicating successful testing was performed.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2021
Resolved 29 April 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 April 2021 Resolved
Demonstrate proper operation of or provide an authorized third party report attesting to the proper operation of the auxiliary boiler pressure relief valve. 46 CFR 61.05-10
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2021
Resolved 20 April 2021
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 16 April 2021 Resolved
Repair and demonstrate proper operation of main steering sump low hydraulic oil low level alarms on both #1 and #2 end steering systems. No alarm was actuated upon attempted test. 46 CFR 58.25-25 (d)(3)
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2021
Resolved 20 April 2021
08 - Alarms › N/A - No Subsystem › General alarm
Issued 16 April 2021 Resolved
Repair and demonstrate proper operation of general alarm light in emergency generator space.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2021
Resolved 29 April 2021
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 16 April 2021 Resolved
Provide updated Fuel Oil Transfer procedures with revised procedures for reporting discharges. Current procedures contain outdated reporting contact information as Washington State Ferry offices. 33 CFR 155.750
Action required: 16 - Rectify deficiencies w/in 14 days
Due 30 April 2021
Resolved 29 April 2021
11 - Life Saving Appliances › N/A - No Subsystem › Inflatable liferafts
Issued 16 April 2021 Resolved
Each survival craft must be serviced at an approved facility within 12 months of each subsequent servicing. One of the IBAs was due to be serviced in February. Required to get the IBA serviced prior to the carriage of passengers. 46 CFR 199.190 (g)
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 June 2021
Resolved 25 May 2021
Resolution: Received confirmation that the IBA has been serviced.
04 - Emergency Systems › N/A - No Subsystem › Fire drills
Issued 16 April 2021 Resolved
Every crewmember must participate in at least one abandon-ship drill and one fire drill every month. Vessel has not been operating due to COVID. Required to conduct drills prior to the carriage of passengers. 46 CFR 199.180 (c)
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 June 2021
Resolved 8 June 2021
Resolution: Received pictures of the logbook confirming that a fire and an abandonship drill were conducted.
11 - Life Saving Appliances › N/A - No Subsystem › Rescue boats
Issued 16 April 2021 Resolved
As far as is reasonable and practicable, rescue boats, other than lifeboats which are also rescue boats, must be launched with their assigned crew aboard and maneuvered in the water each month. Such launching and maneuvering must occur at least once every 3 months. Required to lower and maneuver rescue boat in the water prior to the carriage of passengers. 46 CFR 199.180 (d) (7)
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 June 2021
Resolved 8 June 2021
Resolution: Rescue boat was lowered into the water.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 16 April 2021 Resolved
Noticed several emergency lights burned out. Required to ensure proper operation of all emergency lights prior to the carriage of passengers. 46 CFR 112.43
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 June 2021
Resolved 10 May 2021
Resolution: Verified light change out.
08 - Alarms › N/A - No Subsystem › General alarm
Issued 16 April 2021 Resolved
The minimum sound-pressure levels for the emergency-alarm tone in interior and exterior spaces must be a sound level of not less than 80 dB(A). The GA in the Salish Room did not produce an adequate sound level. Required to fix prior to the carriage of passengers. 46 CFR 113.25-12
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 June 2021
Resolved 10 May 2021
Resolution: Verified alarm.
04 - Emergency Systems › N/A - No Subsystem › Public address system
Issued 16 April 2021 Resolved
The public address system was not audible in the Salish room. Required to fixed prior to the carriage of passengers. 46 CFR 113.50-5
Action required: 701 - Prior to carriage of passengers/cargo
Due 30 June 2021
Resolved 10 May 2021
Resolution: Verified speaker operation.
10 - Safety of Navigation › N/A - No Subsystem › Automatic Identification System (AIS)
Issued 16 April 2021 Resolved
A vessel that is certified to carry more than 150 passengers is required to have a properly installed USCG approved AIS Class A. The display is damaged and not legible. Required to repair or replace. 33 CFR 164.46 (b)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2021
Resolved 10 May 2021
Resolution: Verified operation.
07 - Fire Safety › N/A - No Subsystem › Operation of Fire protection systems
Issued 16 April 2021 Resolved
Complete but simple instructions for the operation of the systems must be located in a conspicuous place at or near all pull boxes, stop valve controls and in the CO2 cylinder storage room. The time on the instructions does not match the time delay bottle. Redo instructions for the installed 30 second time delay. 46 CFR 76.15-10 (h)
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2021
Resolved 10 May 2021
Resolution: Instructions updated to reflect 30 second time delay.
07 - Fire Safety › N/A - No Subsystem › Maintenance of Fire protection systems
Issued 16 April 2021 Resolved
One of the fire hose nozzles' quick release was malfunctioning. Required to repair or replace. 46 CFR 76.10-10
Action required: 50 - Rectify deficiencies w/in 30 days
Due 16 May 2021
Resolved 10 May 2021
Resolution: Nozzle replaced.
02 - Structural Conditions › N/A - No Subsystem › Stability/strength/loading information and instruments
Issued 2 July 2019 Resolved
Submit plans to the USCG's Marine Safety Center to prove the structural adequacy of the tent installations is suitable for its intended service. The vessel's operation is limited such that the tent arrangement shall not be subject to apparent wind in excess of 30 MPH.
Action required: 705 - Other - as specified
Due 2 August 2019
Resolved 6 April 2021
Resolution: MSC review completed APR20.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 2 July 2019 Resolved
Remedy and/or address all items denoted on the HIYU's regulatory review (attached). Dated July 2, 2019.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 2 August 2019
Resolved 6 April 2021
Resolution: Completed JUN20.
10 - Safety of Navigation › N/A - No Subsystem › Charts
Issued 14 June 2019 Resolved
46 CFR 78.05-5 - Provide up-to-date charts.
Due 15 July 2019
Resolved 1 July 2019
05 - Radio Communications › N/A - No Subsystem › VHF radio installation
Issued 14 June 2019 Resolved
47 CFR 80.905(a)(1) - Provide a VHF radio with DSC.
Due 15 July 2019
Resolved 1 July 2019
01 - Certificates & Documentation › 012 - Crew Certificates › Medical certificate
Issued 14 June 2019 Resolved
46 CFR 16.210 - Provide drug pre-employment testing for all employees with designated safety sensitive positions.
Due 14 July 2019
Resolved 1 July 2019
14 - Pollution Prevention › 144 - MARPOL Annex IV (Not Applicable to PSC Exams conducted in the U.S.) › Sewage treatment plant
Issued 14 June 2019 Resolved
33 CFR 159.7 - Prove that the portable toilets installed on boards the vessel are USCG approved.
Due 15 July 2019
Resolved 9 September 2019
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 14 June 2019 Resolved
46 CFR 76.27-10 - Prove proper operation of the AMS panel on the bridge.
Due 15 July 2019
Resolved 1 July 2019
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance of Life Saving Appliances
Issued 14 June 2019 Resolved
46 CFR 199.190(g)(ii) - Provide proof of 12 month servicing for the 100 person IBA.
Due 15 July 2019
Resolved 1 July 2019
04 - Emergency Systems › N/A - No Subsystem › Location of emergency installations
Issued 14 June 2019 Resolved
46 CFR 71.65-5(d) - Updated fire control plan to reflect changes in fire extinguisher placement.
Due 15 July 2019
Resolved 10 May 2021
07 - Fire Safety › N/A - No Subsystem › Fire prevention structural integrity
Issued 14 June 2019 Resolved
46 CFR 72.05-25(a)(1) - Prove proper operation of both fire screen doors to ensure they fully close and latch.
Due 15 July 2019
Resolved 1 July 2019
01 - Certificates & Documentation › 013 - Documents › Certificate or documentary evidence of financial security relating to shipowners liability
Issued 27 March 2019 Resolved
The vessel owner or operator must ensure that they maintain one English language copy of the VRP, at a minimum the contents listed in paragraphs...of this section and a copy of the Coast Guard approval letter, onboard the vessel. In lieu of paper format, the vessel owner or operator may keep an electric copy of the VRP and approval letter onboard the vessel. Approval letter was onboard the vessel and avaible for inspection. Obtain approval letter within 30 days.
Action required: 705 - Other - as specified
Due 15 May 2019
Resolved 16 January 2020
03 - Water/Weathertight Conditions › N/A - No Subsystem › Other (load lines)
Issued 27 November 2018 Resolved
All subdivision bulkheads must be watertight. Provide temporary repair in way of caulking at the cable penetration located frame 18 prior to carrying passengers. Thereafter make permanent repairs with manufactures approved blocking system.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 December 2018
Resolved 18 December 2018
Resolution: Replaced transit and installed IAW manufactors instructions.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 27 November 2018 Resolved
All stowage locations for lifesaving equipment must be labeled with the number of devices in that location. Label the amount of lifejackets in each stowage location.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 December 2018
Resolved 20 December 2018
Resolution: Labels with the number of lifesaving equipment was labeled in each location.
11 - Life Saving Appliances › N/A - No Subsystem › Other (life saving)
Issued 27 November 2018 Resolved
Modify lifesaving plan to reflect changes in equipment. Resubmit to OCMI for approval.
Condition: Improper/Lack of Maintenance
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 December 2018
Resolved 24 January 2019
Resolution: Updates to FCP were reviewed and approved.
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 November 2018 Resolved
Prove the electrical modifications in way of the receptacles were part of approved electrical plans. Submit the original drawing with list of materials to the OCMI for renewal.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 December 2018
Resolved 20 March 2020
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 27 November 2018 Resolved
Cables must be installed in accordance with IEEE 45-2002. Install metallic bonds for cable installations.
Condition: Improper Installation
Action required: 50 - Rectify deficiencies w/in 30 days
Due 27 December 2018
Resolved 18 December 2018
Resolution: Installed new metallic bonding ties encompassing the entire vertical cable bundle.
11 - Life Saving Appliances › N/A - No Subsystem › Lifebuoys incl. provision and disposition
Issued 27 June 2018 Resolved
At least one lifebuoy on each side of the vessel be fitted with a life line. Secure life lines to the body of the lifebuoys IAW 46 CFR 199.70.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 14 July 2018
Resolution: Installed life-line around body of life ring.
11 - Life Saving Appliances › N/A - No Subsystem › Maintenance and inspections
Issued 27 June 2018 Resolved
Replace all batteries in the floating water-lights onboard as they are expired IAW 46 CFR 199.190(f)(4)(5).
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Resolved 28 June 2018
Resolution: Batteries were replaced, all sat.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 27 June 2018 Resolved
Liquid Propane Gas (LPG) installation for the food truck onboard the vessel must be approved, installed and tested in accordance with approved engineering requirements in sub-chapter "F" Marine Engineering IAW 46 CFR 58-16.
Condition: Improper Installation
Action required: 705 - Other - as specified
Due 27 July 2018
Resolved 28 June 2018
Resolution: Master provided L&I inspection report which exceed the requirements in Sub F.

Casualty record · 7

15 October 2008Routine · role: Involved in a Marine Casualty · activity 3350174
25 October 2008Routine · role: Involved in a Marine Casualty · activity 3352863
9 February 2009Routine · role: Involved in a Marine Casualty · activity 3415440
19 March 2011Routine · role: Involved in a Marine Casualty · activity 3969062
10 October 2011Routine · role: Involved in a Marine Casualty · activity 4165974
31 May 2012Routine · role: Involved in a Marine Casualty · activity 4331069
19 February 2014Routine · role: Involved in a Marine Casualty · activity 4802801
Each line is an incident investigation the Coast Guard recorded with this hull among the vessels involved, with the date and the classification the Coast Guard gave it. Involvement is not fault. The investigation narrative is not published. Source: IIR, through 2026.

Ownership record

The Coast Guard's documentation record for this hull -- the Abstract of Title, with its owners and liens as filed -- is not in PSIX. Ask, and Maury buys it from the National Vessel Documentation Center, files it here with its date, and every reader of this page gets it.