Records from 2016 to 2025. Most recent: inspection, 9 April 2025.
Inspection history · 24
9 April 2025
COI Inspection · Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 8097096
1 August 2024
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 7972463
3 April 2024
Deficiency Check · Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7888651
27 February 2024
Internal Structural Exam · Deficiency Check · Cargo Tank Internal · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7870427
13 September 2023
Deficiency Check · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7792094
14 August 2023
Periodic Inspection · Deficiency Check · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7767799
31 July 2023
Deficiency Check
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7757118
22 July 2023
Damage Survey
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7748964
22 July 2023
Type not recorded
No type recorded · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 7801821
9 August 2022
Annual Inspection · MTSA Verification
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 7512809
8 March 2022
Internal Structural Exam · Drydock Exam
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7407779
20 July 2021
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7262187
12 March 2021
MARPOL Annex I Examination · Annual Inspection · MTSA Verification · MARPOL Annex VI Survey
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 7155242
13 May 2020
MTSA Verification · COI Inspection
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 6952527
10 April 2020
MTSA Verification · COI Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6937817
30 August 2019
Deficiency Check · Annual Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6798979
25 March 2019
Drydock Exam · Internal Structural Exam
Physical examination · Sector Delaware Bay · USCG East District (CGD-E) · Activity 6648701
25 September 2018
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6548481
17 August 2018
Annual Inspection · MTSA Verification
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6514713
15 February 2018
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6355832
26 June 2017
Annual Inspection · Administrative Inspection
Physical examination · Sector New York · USCG Northeast District (CGD-NE) · Activity 6187053
6 April 2017
Administrative Inspection
Administrative · Sector New York · USCG Northeast District (CGD-NE) · Activity 6119228
1 March 2017
Drydock Exam · Examination of Repairs · Internal Structural Exam · Administrative Inspection
Physical examination · Marine Safety Unit Houma · USCG Heartland District (CGD-H) · Activity 6097330
19 May 2016
MARPOL Annex I Examination · MTSA Verification · Annual Inspection · MARPOL Annex VI Survey
Physical examination · Marine Safety Unit Texas City · USCG Heartland District (CGD-H) · Activity 5882252
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Operation of machinery
Issued 9 April 2025
Resolved
Vesselwas unable to demonstrate function of the Aux steering system. Futhermore, the vessel was unfamiliar with emergency opertaing procedures. Conduct a emergency steering drill in the presence of attending MI prior to commercial ops.
46 CFR 58.25-10
Action required: 705 - Other - as specified
Resolved 11 April 2025
Resolution: Vessel conducted emergency steering drill in the presence of attending MI.
03 - Water/Weathertight Conditions › N/A - No Subsystem › Doors
Issued 9 April 2025
Resolved
Engine room emergency escape door which leaded to a hacth on deck. The door at the engine room portside was not watertight. Make repairs/adjustments.
46 CFR 42.15-35
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 April 2025
Resolution: vessel adjusted the QAWTD and now fully seals.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 9 April 2025
Resolved
Breaker on main switch board for Anchor Windless was found broken. Replace breaker with approved type.
46 CFR 111.01-1
Action required: 16 - Rectify deficiencies w/in 14 days
Resolved 11 April 2025
Resolution: Vessel replaced broken breaker.
09 - Working and Living Conditions › 092 - Working Conditions › Anchoring devices
Issued 1 August 2024
Resolved
Vessels certificated under Subchapter I that are in ocean, coastwise, or Great Lakes service must be fitted with anchors, chains, and hawsers in general agreement with the Standards established by the American Bureau of Shipping (ABS). The ABS rules relating to anchor equipment are mandatory.
The vessel's current anchoring arrangement is not in compliance with Subchapter I (Cargo and Miscellaneous Vessels) requirements.
Rectify vessel's anchoring arrangement prior to engaging in Subchapter I operations.
Action required: 705 - Other - as specified
Resolved 11 April 2025
Resolution: Special note added to ensure anchor system is inspected prior to Sub CH I operations.
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 14 August 2023
Resolved
A means of draining or removing discharged oil or hazardous material from each container or enclosed deck area without discharging the oil or hazardous material into the water, many of the deck containment were being used as a storage location for wood and chains, in addition the some of the drain plugs were missing.
Containments were cleaned out and drain plugs installed while on-board.
Action required: 10 - Deficiency Rectified
Due 14 August 2023
Resolved 14 August 2023
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 14 August 2023
Resolved
Provide proof that all immersion suits have been air pressure tested in accordance with the manufacturer's recommendations.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2023
Resolved 13 September 2023
99 - Other › N/A - No Subsystem › Other (Safety in general)
Issued 14 August 2023
Resolved
All vessels shall have efficient guard rails or bulwarks on decks and bridges. There is no railing or chain for the stern of the vessel. Chain installed while on board.
Action required: 10 - Deficiency Rectified
Due 14 August 2023
Resolved 14 August 2023
07 - Fire Safety › N/A - No Subsystem › Fixed fire extinguishing installation
Issued 14 August 2023
Resolved
Complete but simple instructions for the operation of the fixed fire systems must posted. Label the parts/valves in the storage room in order for easy to follow instructions.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2023
Resolved 13 September 2023
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 14 August 2023
Resolved
Fire control plans are to be verified by the OCMI and must go through final approval as per letter C1-202864
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2023
Resolved 18 October 2023
Resolution: Fire control plan verified.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2023
Resolved
Marine diesel engine shall be suitable for intended service; port engine lube oil line from the filter to engine is leaking oil and must be replaced. Cleared on the spot by replacement in kind.
Action required: 10 - Deficiency Rectified
Due 14 August 2023
Resolved 14 August 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 14 August 2023
Resolved
Marine diesel engine shall be suitable for intended service; keel cooler water line from fwd filter housing to the inboard engine side is being chaffed by a bracket, this line must be replaced.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2023
Resolved 13 September 2023
03 - Water/Weathertight Conditions › N/A - No Subsystem › Manholes/flush scuttles
Issued 14 August 2023
Resolved
Manholes and flush scuttles shall be closed by substantial covers capable of being water tight; gasket on aft emergency escape from engine room was falling out preventing proper closure and watertightness.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2023
Resolved 13 September 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 14 August 2023
Resolved
Scope of inspection shall be as to show equipment is in satisfactory condition and fit for service for which it is intended; vessels fwd PTO driven fire pump run off the bow thruster shaft packing was leaking excessively and must be fixed to new condition.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 14 September 2023
Resolved 13 September 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 22 July 2023
Resolved
Propulsion systems and their necessary auxiliaries are vital to the vessel's survivability and safety. STBD MDE sustained catastrophic failure STBD MDE to be replaced and tested to the satisfaction of attending MI prior to commercial operations.
Action required: 15 - Rectify deficiencies by next port
Resolved 26 July 2023
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Other (machinery)
Issued 10 August 2022
Resolved
46 CFR 105.05-27
A provision must be included to compare indications under fault conditions with those under normal conditions.
One of the ground detection light receptacles was not receiving power from it's designated phase. Vessel shall enact permanent repairs to the satisfaction of attending USCG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 January 2023
Resolution: Received pictures confirming that recptacle was repaired.
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 9 August 2022
Resolved
46 CFR 112.15-1 (d)
There must be sufficient signs so that the direction of escape is obvious.
Direction to emergency escape hatch is not visible from the forward end of engine room. Vessel shall install signs so that direction to escape hatch is visible to the satisfaction of attending USCG Marine Inspector.
Action required: 50 - Rectify deficiencies w/in 30 days
Resolved 27 January 2023
07 - Fire Safety › N/A - No Subsystem › Ready availability of fire fighting equipment
Issued 9 August 2022
Resolved
46 CFR 95.10-10 (i)
Firehose nozzles previously approved under subpart 162.027 of this chapter may be retained so long as they are maintained in good condition to the satisfaction of the Officer in Charge, Marine Inspection.
Nozzle on hose station #1 was leaking out of the side of the bail.
Action required: 10 - Deficiency Rectified
Resolved 10 August 2022
Resolution: Nozzle was replaced on the spot.
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 20 July 2021
Resolved
The vessel Fire Plan shows that it is revision "E" however the revision block shows that the last revision was "F". Provide the correct plan. In addition the plan shall be submitted to USCG MSC for review as per MSC Guidelines for Review of Fire Control Plans, Procedure Number: H2-15
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2021
Resolved 24 August 2021
11 - Life Saving Appliances › N/A - No Subsystem › Immersion suits
Issued 20 July 2021
Resolved
The personal life saving items are not stowed as indicated on lockers Personal life saving equipment to be located as indicated on the safety plan in addition the locations shall be marked with the IMO Symbols and if more than one item is stowed in the location the number of devices must be indicated
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2021
Resolved 24 August 2021
99 - Other › N/A - No Subsystem › Other (MARPOL operational)
Issued 20 July 2021
Resolved
There is no evidence that the operator has completes a Permit Authorization and Record of Inspection (PARI) form and retains it on-board the vessel. Owner/operators of vessels that meet the requirements of The Vessel General Permit for Discharge Incidental to the Normal Operation of Vessels (VGP) under Part 1.5.1.2 are not required to submit NOIs. Instead these owner/operators must sign and maintain a copy of the PARI form.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2021
Resolved 24 August 2021
14 - Pollution Prevention › 141 - MARPOL Annex I › Control of discharge
Issued 20 July 2021
Resolved
The vessel has a fixed container/containment around each fuel oil or bulk lubricating oil tank vent, overflow, and fill pipe, however the drainage plug is not able to be threaded into the female socket due to excessive paint. Tap out each socket and demonstrate the plugs can be threaded in.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2021
Resolved 24 August 2021
18 - Maritime Labour Convention (Not Applicable to PSC Exams conducted in the U.S.) › N/A - No Subsystem › Lighting (Working spaces)
Issued 20 July 2021
Resolved
The light diffusers of the overhead lights in the engine room are held in with wire ties. Each fixture globe, lens, or diffuser must have a guard and must be properly installed as designed.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2021
Resolved 24 August 2021
02 - Structural Conditions › N/A - No Subsystem › Electrical installations in general
Issued 20 July 2021
Resolved
There is a ground in the 120 volt distribution panel. An electric apparatus must be designed, constructed, and installed to prevent any person from accidentally contacting energized parts. Remove the ground.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2021
Resolved 24 August 2021
14 - Pollution Prevention › 141 - MARPOL Annex I › 15 PPM Alarm arrangements
Issued 20 July 2021
Resolved
Oil filtering equipment referred to in paragraph 1 of this regulation shall be in of a design approved by the Administration and shall be such as will ensure that any oily mixture discharged into the sea after passing through the system has an oil content of 15 ppm. Vessel operator could not demonstrate satisfactory operation of the Oil Content Meter. Vessel is restricted from operating in a discharge zone or operating oily water separator until satisfactory demonstration of oil content meter.
Action required: 705 - Other - as specified
Resolved 24 August 2021
Resolution: Vessel is restricted from operating in a discharge zone or operating oily water separator until satisfactory demonstration of oil content meter
04 - Emergency Systems › N/A - No Subsystem › Emergency, lighting, batteries and switches
Issued 20 July 2021
Resolved
Emergency lighting in engine room does not sufficiently illuminate the area to effect damage control procedures and to provide for safe egress from each space, the batteries appear to be drained. Demonstrate that the area is sufficiently illuminated.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2021
Resolved 24 August 2021
01 - Certificates & Documentation › 013 - Documents › Signs, indications
Issued 20 July 2021
Resolved
Using the guidance of the MSM II F. Misc Deck Equipment There's no objection to the use of reflective signs to mark emergency equipment, instructions, and escape routes. However, such signs must meet the intent of the applicable regs governing required markings. These signs are just photo copies.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 20 August 2021
Resolved 24 August 2021
08 - Alarms › N/A - No Subsystem › General alarm
Issued 30 August 2019
Resolved
All general alarm bells shall be identified by red lettering at least 1/2 inches "GENERAL ALARM - WHEN BELL RINGS GO TO YOUR STATION." Mark general alarm on 01 deck accordingly.
Action required: 50 - Rectify deficiencies w/in 30 days
Due 28 September 2019
Resolved 5 September 2019
01 - Certificates & Documentation › 011 - Ships Certificates › Cargo Ship Safety Radio (including exemption)
Issued 25 September 2018
Resolved
In the event of alterations involving the safety of the vessel, the applicable plans shall be submitted for approval covering the proposed work except as modified by 46 CFR 91.45-1. The general scope of the plans shall be as noted in 46 CFR 91.55-5. The vessel has installed a 15 TON A-Frame crane. The crane is approved by its Class Society (ABS), but not by USCG. Submit plans for approval to USCG Marine Safety Center.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 25 October 2018
Resolved 18 October 2018
02 - Structural Conditions › N/A - No Subsystem › Closing devices/watertight doors
Issued 17 August 2018
Resolved
It shall be the responsibility of the master to assure himself that all exposed cargo hatches and other openings in the hull of his vessel are closed, made properly watertight by the use of tarpaulins, gaskets or other similar devices. The vessel installed incorrect gaskets in watertight hatches. Remove and properly install approved gasket material.
Condition: Damaged By Earlier Event
Action required: 10 - Deficiency Rectified
Resolved 17 August 2018
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 17 August 2018
Resolved
Electrical installations on vessels must ensure protection of passengers, crew, other persons, and the vessel from electrical hazards. ID'd stateroom on O-1 deck has a loose wire coming from the wall. Properly cap or remove wire.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 September 2018
Resolved 17 August 2018
07 - Fire Safety › N/A - No Subsystem › Fire pumps and its pipes
Issued 17 August 2018
Resolved
Fire pumps shall be fitted with a pressure gage on the discharge side of the pump. The gage for the top deck fire monitor was unresponsive when in use. Prove proper operation of gage.
Condition: Damaged By Earlier Event
Action required: 50 - Rectify deficiencies w/in 30 days
Due 17 September 2018
Resolved 17 August 2018
Engineering › Diesel Engine (propulsion-electric) › Emergency shutdown
Issued 13 July 2017
Resolved
PROVIDE TECH REPORT FOR GENERATOR OVERSPEED AND LOW OIL PRESSURE SHUTDOWN IAW 46CFR111.12-1
Action required: 705 - Other - as specified
Due 13 August 2017
Resolved 8 August 2017
Resolution: recieved Cummins tech test report from vessel rep, all sat. Please see activity narrative for further info.