Records from 1998 to 2014. Most recent: inspection, 7 March 2014.
Documentation record
Registered dimensions (L × B × D)98.1 ft × 27.0 ft × 13.7 ft
Registered tonnagegross 146 / net 85
ITC dimensions (L × B × D)98.1 ft × 27.0 ft × 13.7 ft
ITC tonnagegross 288 / net 86
BuilderTHOMA-SEA BOAT BUILDERS · HOUMA, LA, UNITED STATES · built 1997
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeNot recorded
Hull configurationNot recorded
Hailing portPORT CANAVERAL, FL
Trade endorsementsCoastwise, unrestricted
DocumentationValid · issued 12 June 2026 · expires 30 June 2027
Service, as the file records itOffshore Supply Vessel
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it288 - Convention (Subpart B), Gross Ton
146 - Regulatory (Subpart C or D), Gross Ton
86 - Convention (Subpart B), Net Ton
85 - Regulatory (Subpart C or D), Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 September 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
A report is not offered for this hull: Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. Reports.
Inspection history · 9
7 March 2014
Administrative Inspection
Administrative · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4811986
29 May 2012
Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Morgan City · USCG Heartland District (CGD-H) · Activity 4327471
4 August 2011
MTSA Verification · Deficiency Check · Annual Inspection
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 4020559
13 December 2010
Deficiency Check · Construction Oversight
Physical examination · Marine Safety Unit Port Arthur · USCG Heartland District (CGD-H) · Activity 3907785
16 March 2009
Type not recorded
No type recorded · Marine Safety Unit New Bedford · USCG Northeast District (CGD-NE) · Activity 3434322
15 January 2009
Initial Certification
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3394545
20 November 2007
MTSA Verification · Initial Certification · Internal Structural Exam · Hull Examination
Physical examination · Sector Southeastern New England · USCG Northeast District (CGD-NE) · Activity 3101559
22 July 1999
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 213416
3 March 1998
Type not recorded
No type recorded · MSO MORGAN CITY · USCG Heartland District (CGD-H) · Activity 1118062
Accommodation/Occupational Safety › Sleeping Accommodations › Berth
Issued 29 May 2012
Resolved
Identified engineer accommodation space that didn't meet proper berthing size requirements IAW 46 CFR Subchapter L 1270280
Condition: Improper/Lack of Maintenance
Action required: 17 - Rectify deficiencies prior to departure
Resolved 7 September 2012
Resolution: Vessel owner removed engineer from accommodation space and converted it to a passenger berthing space.
Electrical › Electrical Distribution System (service) › Wiring
Issued 4 August 2011
Resolved
Provide proof of MSC approval for updated ship's wiring diagram.
Action required: 705 - Other - as specified
Due 4 October 2011
Resolved 27 September 2011
Resolution: Diagrams submitted to MSC and subsequently approved.
Deck/Cargo › Cargo Transfer (solid) › General
Issued 22 February 2011
Resolved
Crane has yet to be certified by the ICGB that it was designed & installed per API specs & that it was inspected & tested per API & USCG standards.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 22 April 2011
Resolved 4 August 2011
Resolution: Observed ICGB documentation
Stability › Intact Stability (when using lifting gear) › General
Issued 22 February 2011
Resolved
Vessel needs MSC conformation on whether a new stability letter needs to be issued or additional deadweight/inclining surveys needs to be conducted.
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 22 April 2011
Resolved 4 August 2011
Resolution: Observed satisfactory stability letter.
Electrical › Electrical Distribution System (service) › Wiring
Issued 22 February 2011
Resolved
MSC needs to approve the wiring plans after the new generators were installed
Action required: 705 - Other - as specified
Due 22 April 2011
Resolved 4 August 2011
Resolution: CG 835 requirement reissued.
Electrical › Electric Generation Source (service) › Generator
Issued 22 February 2011
Resolved
MSC needs to approve the general arrangement plans after the new generators were installed.
Action required: 705 - Other - as specified
Due 22 April 2011
Resolved 4 August 2011
Resolution: Observed satisfactory general arrangement plans.
Engineering › Fuel Oil Storage/Transfer System › Manifold
Issued 24 April 2009
Resolved
Prior to sailing and departing Fairhaven, receive approval from MSC for the upgrades to the fuel oil transfer system.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 May 2009
Resolved 11 June 2009
Resolution: Received approved plan.
Operations/Management › Vessel Safety Management › Plans for Shipboard Operations
Issued 24 April 2009
Resolved
Prior to sailing and departing Fairhaven, receive final approval from MSC for the "A" frame hydraulic system.
Action required: 17 - Rectify deficiencies prior to departure
Due 29 May 2009
Resolved 11 June 2009
Resolution: Received approved plan
Engineering › Fuel Oil Storage/Transfer System › Hose
Issued 15 January 2009
Resolved
Provide manufactures specs for non-metallic flex hose fitted on A-Frame hydraulics. Hose must meet SAE J-1942 in accordance with 46 CFR 56.60-25 & MSC Ltr dated 27 Apr 09 / Ser# E1-0901312. Prove to the satisfaction of OCMI prior to commercial operations.
Action required: 705 - Other - as specified
Due 17 July 2009
Resolved 3 August 2009
Personnel › Training › Familiarization Training
Issued 15 January 2009
Resolved
Prior to commercial operations conduct new to zone inspection
Action required: 705 - Other - as specified
Due 17 July 2009
Resolved 3 August 2009
Engineering › Steering Gear System › Power Unit
Issued 15 January 2009
Resolved
Prior to commercial operations; receive approval from the Marine Safety Center on the electrical schematic of the control and alarm system for the steering system per MSC Ltr dated 31 Mar 09 / Ser# E1-0900995
Action required: 705 - Other - as specified
Due 17 July 2009
Resolved 3 August 2009