QUAIAPEN

Built
1967
Last inspected
16 April 2026
Documentation
Valid · NVDC file of 10 August 2026
Controls
None recorded without a removal date

Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard. Records for the Passenger Ship class in Maury's sources begin in 2016.

Inspection record

Last inspected 16 April 2026
Operational controls None recorded without a removal date
Years with a record 11 calendar years (2016–2026)
Every line above is a count of records the US Coast Guard wrote, or a date it recorded. A blank resolution means none was recorded in this data; it does not establish that a deficiency is outstanding. Years with a record are calendar years in which a record exists, not years in service. What Maury does not do.

Identity

WCB6470
Flag
UNITED STATES
Maury page id
psix-45591

Documentation record

Registered dimensions (L × B × D)63.7 ft × 20.3 ft × 7.5 ft
Registered tonnagegross 87 / net 64
ITC dimensions (L × B × D)Not recorded
ITC tonnageNot recorded
BuilderWARREN, RI, UNITED STATES · built 1967
Hull materialSteel
PropulsionDiesel Reduction
Hull shapeUNSPECIFIED
Hull configurationUNSPECIFIED
Hailing portNEW YORK, NY
Endorsements, as the file codes themcw_un
DocumentationValid · issued 29 April 2026 · expires 30 April 2027
Service, as the file records itPassenger (Inspected)
Hull formpowered (Maury's inference from propulsion, hull shape, material and length, rule hf-1; not a recorded fact)
Tonnage as PSIX records it87 - Simplified, Gross Ton
64 - Simplified, Net Ton
Every line above is a field of the National Vessel Documentation Center's file as served by NOAA Fisheries, dated 10 August 2026, matched to this hull on its Official Number. Registered and ITC measurements are two systems and are never combined. One snapshot is held so far; documentation history begins with the next.
Professional
The full record for this vessel

Behind this panel: 20 inspections, each with its date, unit and type; 19 deficiencies with the resolution recorded against each; operational controls, none recorded without a removal date; no tow-unit appearances recorded; no other recorded names; the documentation record: dimensions, tonnage, builder, hailing port and endorsements. Every line is a record the Coast Guard wrote; the counts above are the same counts as in the summary, and they are free.

Professional is $39 a month or $299 a year, or $19.99 a month locked for life at the founding rate, for the first 200 subscribers. It unlocks every detail section on every vessel page, fleet watch tied to your account, and ownership records on request. Already a subscriber? Sign in.

Maury does not score, rate or grade vessels, at any price.

Vessel history report

A report is not offered for this hull. Its record holds only 2 of the seven kinds of material a report is built from: inspections, deficiencies, operational controls, tow-unit appearances, casualty records, dimensions and documentation. That is a statement about the record, not about the vessel. What a sparse-record report looks like.

Inspection history · 20

16 April 2026 Internal Structural Exam · Drydock Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8356834
18 September 2025 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8237374
16 September 2024 Deficiency Check · Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 8002000
9 April 2024 Examination of Repairs · Drydock Exam · Administrative Inspection · Internal Structural Exam
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7892236
19 September 2023 Annual Inspection · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7793620
24 April 2023 Examination of Repairs · Administrative Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7683940
16 June 2022 Re-Inspection · DAPI Audit
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7458960
8 April 2022 Drydock Exam · Internal Structural Exam · Examination of Repairs
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7426639
22 September 2021 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7313129
29 September 2020 Drydock Exam · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7067731
18 September 2020 Annual Inspection · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 7060727
9 June 2020 Internal Structural Exam · Drydock Extension
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6972211
18 September 2019 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6809215
12 September 2018 Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6496652
24 May 2018 Hull Examination
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6403526
27 June 2017 COI Inspection · Administrative Inspection · DAPI Audit · Deficiency Check · MTSA Verification
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6177849
12 June 2017 Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 6173865
23 August 2016 MTSA Verification · Annual Inspection
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5980532
29 April 2016 Hull Examination · Internal Structural Exam · Deficiency Check
Physical examination · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5865300
3 March 2016 Administrative Inspection
Administrative · Marine Safety Unit Coram · USCG Northeast District (CGD-NE) · Activity 5826035

Deficiency record · 19

13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Propulsion main engine
Issued 16 September 2024 Resolved
During annual inspection it was discovered the vessels MDE had blown a piston and had been out of service approx two weeks. Issued requirement to repair/replace STBD MDE.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 October 2024
Resolved 15 May 2025
Resolution: New MDE installed. Sea trials conducted.
09 - Working and Living Conditions › 092 - Working Conditions › Stowage of cargo
Issued 16 September 2024 Resolved
Two windows that are being used to facilitate cargo are written on the emergency safety plan as emergency exits, but labeled as such on board. Issued requirement to label emergency egress.
Condition: Improper/Lack of Maintenance
Action required: 701 - Prior to carriage of passengers/cargo
Due 16 October 2024
Resolved 15 May 2025
Resolution: Labelled emergency exits.
11 - Life Saving Appliances › N/A - No Subsystem › Buoyant apparatus
Issued 22 September 2021 Resolved
Painter line to BA no longer servicable, issued CG-835 to recitify deficiency within 14 days.
Condition: Invalid
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2021
Resolved 24 September 2021
Resolution: Received attestment from O/O that painter line to BA's had been replaced.
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Gauges, thermometers, etc
Issued 22 September 2021 Resolved
A wire from the battery box to navigation station was frayed in the pilothouse. Issued CG-835 to rectify deficiency. The wire was found to go to a gauge that was removed and the wire was deadened. Vsl rep removed frayed wire.
Condition: Improper/Lack of Maintenance
Action required: 16 - Rectify deficiencies w/in 14 days
Due 6 October 2021
Resolved 22 September 2021
Resolution: Vsl rep removed frayed wire.
01 - Certificates & Documentation › 013 - Documents › Fire control plan - all
Issued 24 September 2020 Resolved
Update the vessel's fire control plan to accurately reflect equipment on board.
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 25 September 2020
Resolution: MI attended vessel and witnessed correction.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 September 2020 Resolved
Remove non-permanent type connections (wing-nuts) on batteries below the pilot house/ in the forward portion of the passenger compartment.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 25 September 2020
Resolution: MI attended vessel and witnessed correction.
09 - Working and Living Conditions › 092 - Working Conditions › Electrical
Issued 18 September 2020 Resolved
Configure battery compartment cover in the forward passenger compartment with a securing latch to deter passengers from access.
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 25 September 2020
Resolution: MI attended vessel and cleared requirement
13 - Propulsion and Auxiliary Machinery › N/A - No Subsystem › Bilge pumping arrangements
Issued 18 September 2020 Resolved
Prove proper operation of the bilge suction prior to carrying passengers.
Condition: Placed in Improper Service
Action required: 17 - Rectify deficiencies prior to departure
Due 24 September 2020
Resolved 25 September 2020
Resolution: MI attended vessel and witnessed correction
01 - Certificates & Documentation › 012 - Crew Certificates › Certificates for master and officers
Issued 18 September 2020 Resolved
Provide copy of consortium MIS report for 2020 random testing
Condition: Placed in Improper Service
Action required: 16 - Rectify deficiencies w/in 14 days
Due 8 October 2020
Resolved 25 September 2020
Resolution: MI recieved a copy of the MIS form
02 - Structural Conditions › N/A - No Subsystem › Beams, frames, floors-op. damage
Issued 18 September 2019 Resolved
Cracked welds found on framing in Lazzerette, make repairs at upcoming dry dock.
Condition: Damaged By Earlier Event
Action required: 705 - Other - as specified
Due 1 January 2020
Resolved 29 September 2020
01 - Certificates & Documentation › 013 - Documents › Ship specific plans for the recovery of persons from the water
Issued 18 September 2019 Resolved
Found that the posted Emergency Procedures was incorrect
Condition: Placed in Improper Service
Action required: 50 - Rectify deficiencies w/in 30 days
Due 18 October 2019
Resolved 4 November 2019
Resolution: O/O provide proof of correction to emergency proceedures.
Operations/Management › Drills/Instruction › Man Overboard Recovery
Issued 27 June 2017 Resolved
Complete MOB and Fire Drills with USCG MI in attendance, prior to carrying passengers. 46CFR185.520
Action required: 705 - Other - as specified
Due 27 June 2017
Resolved 28 June 2017
Resolution: Completed at Davis Park Ferry Terminal with USCG MI in attendance.
Engineering › Bilge Water Management System › Not Operational
Issued 27 June 2017 Resolved
Prove proper operation of bilge system prior to carrying passengers. 46CFR182.25-10(a)&(b) [Old T]
Action required: 705 - Other - as specified
Due 27 June 2017
Resolved 27 June 2017
Resolution: Completed on the spot after checking line. (too much air in the system initially)
Electrical › Electrical Distribution System (service) › Panelboard
Issued 27 June 2017 Resolved
Label electrical panel @ operating station. 46CFR183.220(d)
Action required: 705 - Other - as specified
Due 5 July 2017
Resolved 17 August 2017
Resolution: labeled
Engineering › Sea-water System (primary cooling) › Piping
Issued 27 June 2017 Resolved
Provide double hose clamps where possible on flex hose in engine room. 46CFR182.410(d)
Action required: 705 - Other - as specified
Due 5 July 2017
Resolved 17 August 2017
Resolution: provided
Navigation › Collision/Grounding Avoidance › Navigation Lights
Issued 23 August 2016 Resolved
Stern light inoperable, repair stern light
Condition: Placed in Improper Service
Action required: 705 - Other - as specified
Due 23 August 2016
Resolved 23 September 2016
Resolution: Corrected on the spot.
Construction/Loadline › Hull › Keel
Issued 29 April 2016 Resolved
Submit repair proposal for hole in keel (2nd compt from aft) and repair prior to credit dry dock.
Action required: 705 - Other - as specified
Due 29 April 2016
Resolved 6 May 2016
Resolution: MI attended vessel and witnessed satisfactory repair.
Construction/Loadline › Hull › Hull Plating
Issued 29 April 2016 Resolved
Submit repair proposal for hole in midships stern, and repair prior to credit drydock.
Action required: 705 - Other - as specified
Due 29 April 2016
Resolved 6 May 2016
Resolution: MI attended vessel and witnessed satisfactory repair.
Accommodation/Occupational Safety › Occupational Safety › Tripping/Falling Hazard
Issued 29 April 2016 Resolved
Repair cracked weld in ladder rung in 2nd compt from fwd.
Action required: 705 - Other - as specified
Due 29 April 2016
Resolved 6 May 2016
Resolution: MI attended vessel and witnessed satisfactory repair.

Ownership record