This record may be incomplete: the most recent inspection recorded for this vessel was 30 years ago. Maury shows what the Coast Guard recorded, not whether the vessel has been inspected since, is still in service, or what condition it is in. Coast Guard record current through 23 August 2026, retrieved 5 September 2026 from PSIX. Every field on this page was recorded by the Coast Guard.
Every line above is a count of records the US Coast Guard wrote, or a date it recorded.
A blank resolution means none was recorded in this data; it does not establish that a
deficiency is outstanding. Years with a record are calendar years in which a record
exists, not years in service. What Maury does
not do.
2776 - Regulatory (Subpart C or D), Gross Ton
2776 - Regulatory (Subpart C or D), Net Ton
Maury page id
psix-45624
Vessel history report
Every record for this hull, in one document — $299
Every recorded inspection, 1972 to
2026, in one chronology · every deficiency, with system, dates
and resolution · operational controls imposed and removed · every name this
hull has been recorded under · the vessels it was inspected alongside, and when
· how its record compares with hulls of similar age and size, as a fact about the
population and never a judgement about this vessel.
This report is in development and is not for sale yet. There is
no date, and nothing is charged. Leave an email and we will tell you when it exists, once.
Used only to tell you when the report exists.
Not shared, not sold, and not added to a mailing list.
Inspection history · 26
6 November 1996Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1430305
29 August 1995Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 871061
19 May 1995Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 929280
18 May 1995Type not recorded
No type recorded · COTP NEW YORK · USCG Northeast District (CGD-NE) · Activity 179942
24 February 1995Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 67907
13 January 1995Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1132521
8 July 1994COI Inspection · MARPOL Annex I Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 866285
6 July 1994Hull Examination
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1174677
24 March 1992Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 946287
15 March 1991Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 916847
26 February 1991Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1240146
17 July 1990Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 900674
10 April 1990Examination of Repairs
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1212965
22 March 1990Damage Survey
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 918365
13 March 1990COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1216275
9 February 1990Hull Examination · Re-Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 904881
1 November 1989Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1341746
21 March 1989COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1340516
11 May 1988Deficiency Check
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1039323
3 February 1988Administrative
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1323437
8 January 1988Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1317877
5 November 1987Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1024351
23 March 1987COI Inspection
Physical examination · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1327852
22 March 1986Credit Drydock
Administrative · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1307258
20 March 1985Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 979762
4 February 1985Type not recorded
No type recorded · ACTIVITIES NEW YORK · USCG Northeast District (CGD-NE) · Activity 1283200
GAS FREE AND MAKE AVAILABLE FOR INSPECTION CARGO TANKS 1 - P,S, 3P, AND VOIDS 1-P,S, 3P AND FOREPEAK. VESSEL NOT TO CARRY CARGO UNTIL INSPECTION AND ANY REQUIRED REPAIRS ARE COMPLETED TO THE SATISFACTION OF THE ATTENDINGMARINE INSPECTOR.
Condition: Unknown
Due 19 May 1995
Resolved 19 May 1995
Fire Fighting
Issued 8 July 1994Resolved
PROVIDE TWO (2) B-II PORTABLE FIRE EXTINQUISHERS. NOTE: VSL IS RESTRICTEDFROM LOADING CARGO PRIOR TO MEETING THESE REQUIREMENTS.
Condition: Unknown
Due 8 July 1994
Resolved 8 July 1994
Deck/Cargo
Issued 8 July 1994Resolved
PROVE PROPER OPERATION OF THE TANK LEVEL ALARM SYSTEM TO THE SATISFACTION OF THE ATTENDING CG MARINE INSPECTOR.
Condition: Unknown
Due 8 July 1994
Resolved 8 July 1994
Documentation
Issued 22 March 1990Resolved
VESSEL MAY BE USED AS A RETENTION FACILITY PIER SIDE ONLY.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Construction/Loadline
Issued 22 March 1990Resolved
#3 VOID SPACE STBD SIDE MUST BE VISUALLY INSPECTED FOR LEAKAGE TWICE DAILY AND CONDITION LOGGED.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Construction/Loadline
Issued 22 March 1990Resolved
REQ 1, 2 & 3 ISSUED BY NYCMI ON 21MAR90 ARE PREDICATED UPON SATISFACTORY COMPLETION OF TEMPORARY REPAIR DESCRIBED IN NYCMI REQ #1 THIS DATE.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Construction/Loadline
Issued 22 March 1990Resolved
VESSEL IS ALLOWED TO PROCEED BETWEEN YONKERS TREATMENT FACILITY AND REPAIR FACILITY AS NEEDED TO COMPLETE PERMANENT IN WAY OF BILGE WRAPPER #3 STBD VOID SPACE.
Condition: Unknown
Due 22 March 1990
Resolved 22 March 1990
Construction/Loadline
Issued 21 March 1989Resolved
IN CONJUNCTION WITH REQ #5 THE PERSON IN CHARGE OF BARGE MUST VISUALLY INSPTHE CONDITION OF THE TEMP REPAIR PRIOR TO LOADING & IMMEDIATELY AFTER DISCHARGING CARGO. THE CONDITION OF THE REPAIR MUST BE LOGGED. ANY BREACH OF CRACKING OF THE REPAIR MUST BE REPORTED IMMEDIATELY TO OCMI, NEW YORK.
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Construction/Loadline
Issued 21 March 1989Resolved
PRIOR TO LOADING CARGO PUMP OUT WATER IN FORWARD RAKE AND CONDUCT EXAMINATION OF THE SAME, TO THE SATISFACTION OF THE ATTENDING MARINE INSPECTOR.
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Construction/Loadline
Issued 21 March 1989Resolved
CROP TO GOOD METAL AND INSERT WASTED AREA IN WAY OF TEMPORARY WELD REPAIR IN FORWARD BULKHEAD OF NO. 1 CARGO TANK. TEMPORARY REPAIR IS A WELDED 9" CRACK APPROXIMATELY 5FT DOWN FROM DECK (IMMEDIATELY BELOW ENTRANCE TO FORWARD RAKE).
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Documentation
Issued 21 March 1989Resolved
PROVIDE UPDATED LOAD LINE CERTIFICATE.
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Accommodation/Occupational Safety
Issued 21 March 1989Resolved
PROVIDE APPROVED MSD ON BOARD AND REMOVE ALL EXISTING PIPING UNDER DECK.
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Construction/Loadline
Issued 21 March 1989Resolved
REPAIR AS NEEDED GOOSE NECK VENTS: STARBOARD SIDE NUMBERS 1 AND 3 (FORE TO AFT), PORT SIDE NUMBERS 1,3, AND 4; ALSO MAKE REPAIRS TO AFT PEAK VENT STARBOARD SIDE.
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Navigation
Issued 21 March 1989Resolved
PROPERLY MOUNT STERN LIGHT.
Condition: Unknown
Due 21 March 1989
Resolved 21 March 1989
Accommodation/Occupational Safety
Issued 8 January 1988Resolved
REMOVE DRAIN LINE FROM HEAD SHOWER , AND SINK INSTALLATION. THIS OPENING TO THE CARGO TANK IS NOT PERMITTED IN ACCORDANCE WITH 46 CFR 32.60-10(C)(2)INSERT NEW PLATE IN WAY OF DRAIN LINE TO RESTORE CARGO TANK WALL INTEGRITY.
Condition: Unknown
Due 8 January 1988
Resolved 8 January 1988
Accommodation/Occupational Safety
Issued 5 November 1987Resolved
PROVIDE APPROVED PLANS FOR SEWAGE HOLDING SYSTEM OR REMOVE TOILET FROM VESSEL. UNTIL THIS REQUIREMENT IS COMPLIED WITH TOILET PIPING MUST BE SECURED.
Condition: Unknown
Due 5 November 1987
Resolved 5 November 1987